Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distributed Computing Resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Interface tracking simulations of bubbly flows in PWR relevant geometries

[en] Highlights: • Simulations were performed for turbulent bubbly flows in PWR subchannel geometry. • Liquid turbulence is fully resolved by direct numerical simulation approach. • Bubble behavior is captured using level-set interface tracking method. • Time-averaged single- and two-phase turbulent flow statistical quantities are obtained. - Abstract: The advances in high performance computing (HPC) have allowed direct numerical simulation (DNS) approach coupled with interface tracking methods (ITM) to perform high fidelity simulations of turbulent bubbly flows in various complex geometries. In this work, we have chosen the geometry of the pressurized water reactor (PWR) core subchannel to perform a set of interface tracking simulations (ITS) with fully resolved liquid turbulence. The presented research utilizes a massively parallel finite-element based code, PHASTA, for the subchannel geometry simulations of bubbly flow turbulence. The main objective for this research is to demonstrate the ITS capabilities in gaining new insight into bubble/turbulence interactions and assisting the development of improved closure laws for multiphase computational fluid dynamics (M-CFD). Both single- and two-phase turbulent flows were studied within a single PWR subchannel. The analysis of numerical results includes the mean gas and liquid velocity profiles, void fraction distribution and turbulent kinetic energy profiles. Two sets of flow rates and bubble sizes were used in the simulations. The chosen flow rates corresponded to the Reynolds numbers of 29,079 and 80,775 based on channel hydraulic diameter (D_h) and mean velocity. The finite element unstructured grids utilized for these simulations include 53.8 million and 1.11 billion elements, respectively. This has allowed to fully resolve all the turbulence scales and the deformable interfaces of individual bubbles. For the two-phase flow simulations, a 1% bubble volume fraction was used which resulted in 17 bubbles in the smaller case and 262 bubbles in the larger case. In the larger simulation case the size of the resolved bubbles is 0.65 mm in diameter, and the bulk mesh cell size is about 30 microns. Those large-scale simulations provide new level of details previously unavailable and were enabled by the excellent scaling performance of our two-phase flow solver and access to the state-of-the-art supercomputing resources. The presented simulations used up to 256 thousand processing threads on the IBM BG/Q supercomputer “Mira” (Argonne National Laboratory).

Nuclear Science & Technology↗

Traveler: Navigating Task Parallel Traces for Performance Analysis

Understanding the behavior of software in execution is a key step in identifying and fixing performance issues. This is especially important in high performance computing contexts where even minor performance tweaks can translate into large savings in terms of computational resource use. To aid performance analysis, developers may collect an execution trace —a chronological log of program activity during execution. As traces represent the full history, developers can discover a wide array of possibly previously unknown performance issues, making them an important artifact for exploratory performance analysis. However, interactive trace visualization is difficult due to issues of data size and complexity of meaning. Traces represent nanosecond-level events across many parallel processes, meaning the collected data is often large and difficult to explore. The rise of asynchronous task parallel programming paradigms complicates the relation between events and their probable cause. Here, to address these challenges, we conduct a continuing design study in collaboration with high performance computing researchers. We develop diverse and hierarchical ways to navigate and represent execution trace data in support of their trace analysis tasks. Through an iterative design process, we developed Traveler , an integrated visualization platform for task parallel traces. Traveler provides multiple linked interfaces to help navigate trace data from multiple contexts. We evaluate the utility of Traveler through feedback from users and a case study, finding that integrating multiple modes of navigation in our design supported performance analysis tasks and led to the discovery of previously unknown behavior in a distributed array library.

97 MATHEMATICS AND COMPUTING↗

Load Balancing for Multiphysics. In: AIAA 2013-2856,

Coupled Multi-Physics simulations, such as hybrid CFD-MD simulations, represent an increasingly important class of scientific applications. Often the physical problems of interest demand the use of high-end computers, such as TeraGrid resources, which are often accessible only via batch-queues. Batch-queue systems are not developed to natively support the coordinated scheduling of jobs – which in turn is required to support the concurrent execution required by coupled multi-physics simulations. In this paper we develop and demonstrate a novel approach to overcome the lack of native support for coordinated job submission requirement associated with coupled runs. We establish the performance advantages arising from our solution, which is a generalization of the Pilot-Job concept – which in of itself is not new, but is being applied to coupled simulations for the first time. Our solution not only overcomes the initial co-scheduling problem, but also provides a dynamic resource allocation mechanism. Support for such dynamic resources is critical for a load balancing mechanism, which we develop and demonstrate to be effective at reducing the total time-to-solution of the problem. We establish that the performance advantage of using Big Jobs is invariant with the size of the machine as well as the size of the physical model under investigation. The Pilot-Job abstraction is developed using SAGA, which provides an infrastructure agnostic implementation, and which can seamlessly execute and utilize distributed resources.

Lohner, Rainald↗

Persistent DynAMICS

Persistent DynAMICS is a lightweight software platform that enables distributed sensing systems to operate as a unified, responsive network. It integrates with existing sensors, data systems, and processing tools as an overlay, without requiring hardware replacement or increasing user burden. As data is collected, the system identifies situations that require additional attention and directs selected sensors to gather more information. For example, if a sensor detects an unusual condition along a pipeline, the system can task nearby sensors or different sensing modalities to confirm the event and focus data collection where it is needed. To support this, the platform forms temporary groups of sensors that work together to address specific objectives. Once complete, these groups are dissolved and resources are reassigned as needed. Communication is handled through an integrated messaging framework with client and server components, enabling reliable operation and data continuity even in low-bandwidth or intermittent connectivity environments.

97 MATHEMATICS AND COMPUTING↗

Decentralised Reinforcement Learning for Dynamic Cyberattack Response in Microgrid Networks

Microgrids rely on communication networks for reliable operation, which makes them inherently vulnerable to cyberattacks. Such attacks can destabilise system dynamics and drive states away from their nominal operating trajectories. Although several physics-informed and machine learning-based strategies have been developed to counter these threats, the rapidly evolving cyber landscape enables adversaries to bypass static defences or rules-based mitigation approaches. This paper proposes a dynamic, online-trained and fully decentralised reinforcement learning (RL)-based cyberattack response framework to protect microgrids from evolving cyberattacks. The proposed framework deploys multiple deep Q-networks (DQNs), each associated with a distributed energy resource (DER), to enable localised and adaptive attack mitigation. In this framework, each DQN processes local voltage and frequency measurements—combined with intrusion detection system (IDS) alerts—as observations and rewards to guide decision-making. Extensive simulation studies demonstrate the robustness of the proposed framework under diverse attack scenarios and varying IDS-induced detection delays. Comparative analysis highlights its superiority over existing static or preexisting rules-based mitigation approaches. Finally, we present an analysis that shows the framework's scalability to real-life microgrids with more interacting agents.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Minimizing Uncertainties Impact in Decision Making with an Applicability Study for Economic Power Dispatch

This report summaries the work performed under the LDRD project on the preliminary study on knowledge automation, where specific focus has been made on the investigation of the impact of uncertainties of human decision making onto the optimization of the process operation. At first the statistics on signals from the Brain-Computing Interface (BCI) is analyzed so as to obtain the uncertainties characterization of human operators during the decision making phase using the electroencephalogram (EEG) signals. This is then followed by the discussions of an architecture that reveals the equivalence between optimization and closed loop feedback control design, where it has been shown that all the optimization problems can be transferred into the control design problem for closed loop systems. This has led to a “closed loop” framework, where the structure of the decision making is shown to be subjected to both process disturbances and controller’s uncertainties. The latter can well represent the uncertainties or randomness occurred during human decision making phase. As a result, a stochastic optimization problem has been formulated and a novel solution has been proposed using probability density function (PDF) shaping for both the cost function and the constraints using stochastic distribution control concept. A sufficient condition has been derived that guarantees the convergence of the optimal solution and discussions have been made for both the total probabilistic solution and chanced constrained optimization which have been well-studied in optimal power flows (OPF) area. A simple case study has been carried out for the economic dispatch of powers for a grid system when there are distributed energy resources (DERs) in the system, and encouraging results have been obtained showing that a significant savings on the generation cost can be expected.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Supply Chain Management in Cyber Grid Guard Framework

Grid modernization has impeded innovative power grid applications and energy resources that are increasingly distributed. Blockchain/distributed ledger technology (DLT) has the potential to enhance the resilience of the electric infrastructure, particularly in a decentralized and distributed environment. The benefits of blockchain are to ensure asset information and lifecycle events are secure and traceable and identify potential malicious modification of data. Oak Ridge National Laboratory (ORNL) has developed a framework, Cyber Grid Guard (CGG), incorporating blockchain. The system implements a low-energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems, including substations, control centers, and metering infrastructures. Currently, one of the major concerns is supply chain attacks. There have been several recent attacks that have significantly impacted critical infrastructures and organizations around the world. This document focuses on how CGG can be used to address the supply chain issue.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Device Access Abstractions for Resilient Information Architecture Platform for Smart Grid

An open application platform distributes the intelligence and control capability to local endpoints (or nodes) reducing total network traffic, improving speed of local actions by avoiding latency, and improving reliability by reducing dependencies on numerous devices and communication interfaces. The platform must be multi-tasking and able to host multiple applications running simultaneously. Given such a system, the core functions of power grid control systems include grid state determination, low level control, fault intelligence and reconfiguration, outage intelligence, power quality measurement, remote asset monitoring, configuration management, power and energy management (including local distributed energy resources, such as wind, solar and energy storage) can be eventually distributed. However, making this move requires extensive regression testing of systems to prove out new technologies, such as phasor measurement units (PMU). Additionally, as the complexity of the systems increase with the inclusion of new functionality (especially at the distribution and consumer levels), hidden coupling issues becomes a challenge with possible N-way interactions known and not known by device and application developers. Therefore, it is very important to provide core abstractions that ensure uniform operational semantics across such interactions. Here in this paper, we describe the pattern for abstracting device interactions we have developed for the RIAPS platform in the context of a microgrid control application we have developed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Blockchain for Fault-Tolerant Grid Operations

Distribution system fault/failure has a direct impact on customers. Distribution systems are not designed with the contingency of one or more elements failing as the transmission system, however, distribution systems are more likely to have faults in comparison to transmission and generation systems. Most of the distribution systems have a radial design with the protection system assumption of unidirectional power flow. The radial design results in the disconnection of customers for any given component failure. The rapid deployment of distributed energy resources conflicts with the assumption of unidirectional power flow. To maintain/improve the distribution system fault tolerance for a grid with high penetration of distributed energy resources requires improvement. Blockchain can add value to improve fault-tolerant grid operations. That can be achieved using blockchain’s core features of distributed consensus-based decision-making process and immutability. In the process of preparing for an event or system restoration, there is a need for reliable data and system situational awareness. The system situational awareness enables accurate planning for possible scenarios and system restoration after an event, an area where blockchain’s distributed architecture can help. The value of blockchain for a fault-tolerant grid operation is elaborated with three use cases: 1) fault location, isolation, and service restoration; 2) topology identification; and 3) data configuration. These use cases demonstrate how blockchain-based architecture can facilitate bridging the vulnerabilities of the existing implementation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Application of Point Precipitation Frequency Estimates to Watersheds

This report documents work sponsored by the U.S. Nuclear Regulatory Commission (NRC) at the Oak Ridge National Laboratory (ORNL) as part of the RES project, “Application of Point Precipitation Frequency Estimates to Watersheds.” This project was implemented as part of the Probabilistic Flood Hazard Assessment (PFHA) Research Program. The objective of the PFHA Research Program is to develop tools and guidance on the use of PFHA methods to risk-inform NRC’s licensing of new facilities as well as licensing and oversight of currently operating facilities as they relate to flooding hazards. Many nuclear power plants (NPPs) are located on or near rivers so riverine flooding hazards need to be considered in their design and operation. Probabilistic riverine flood models are important tools for realistic assessment of flooding risks. However, these models require areal estimates of the depth, duration, and frequency of rainfall distributed over the watershed, which are not often available. Point precipitation frequency estimates are more widely available. For example, the National Oceanic and Atmospheric Administration (NOAA) has published NOAA Atlas 14, which provides point precipitation frequency estimates for 5-minute through 60-day durations at average recurrence intervals of 1-year through 1,000-year. The research documented in this report addresses areal reduction factors (ARFs), which can be used to convert the widely available point precipitation frequency estimates, to estimates of areal precipitation frequency over a watershed. The most widely used ARF source is Technical Paper 29 (TP-29) published by the then U.S. Weather Bureau in 1958. However, both the methods and the underlying precipitation data used to produce TP-29 are seriously out of date. For example, due to the small gauge network available at the time of TP-29’s compilation, ARF estimates developed are only for watersheds smaller than about 400 square miles. Due to the relatively short record lengths of precipitation data available, frequency considerations could not be accurately determined. Other factors such as regional climate and seasonality were not addressed. Several newer methods have been published since TP-29 was developed and both the type and quantity of precipitation data have increased significantly, along with computational resources and analytical tools such as geographic information systems. This report reviewed and assessed the available precipitation products and methods for conducting ARF analysis. The work applied up-to-date precipitation data products and analysis methods with a novel watershed-based approach to investigate how ARF estimates vary across different methods, data sources, geographical locations, return periods, and seasons. The overall findings reported here regarding basic ARF trends are in line with other recent studies showing that ARFs decrease with increasing area, increase with increasing duration, and decrease with increasing return period. This study found significant differences among the available ARF methods. This work also found a strong geographical variability across different US hydrologic regions, suggesting that the ARF are specific to regional climate patterns and geographical characteristics and should not be applied arbitrarily to other locations. The results also reveal the importance of data record length, especially for high return level ARFs. The work reported in NUREG/CR-7271 will assist NRC staff in assessing different classes of ARF methods in conjunction with available rainfall data sets. It will also support the development of guidance for application of point precipitation data in PFHAs. It should be noted that the ARF values presented in this report for any location or region were developed for the purposes of comparing methods and investigating the factors that influence ARFs. They should not be considered official and should not be used in leu of a site-specific analysis.

54 ENVIRONMENTAL SCIENCES↗

Quality assurance for the query and distribution systems of the RCSB Protein Data Bank

The RCSB Protein Data Bank (RCSB PDB, www.pdb.org) is a key online resource for structural biology and related scientific disciplines. The website is used on average by 165 000 unique visitors per month, and more than 2000 other websites link to it. The amount and complexity of PDB data as well as the expectations on its usage are growing rapidly. Therefore, ensuring the reliability and robustness of the RCSB PDB query and distribution systems are crucially important and increasingly challenging. This article describes quality assurance for the RCSB PDB website at several distinct levels, including: (i) hardware redundancy and failover, (ii) testing protocols for weekly database updates, (iii) testing and release procedures for major software updates and (iv) miscellaneous monitoring and troubleshooting tools and practices. As such it provides suggestions for how other websites might be operated.

59 BASIC BIOLOGICAL SCIENCES↗

A shared-mobility-based framework for evacuation planning and operations under forecast uncertainty

To meet evacuation needs from carless populations who need personalized assistance to evacuate safely, in this article we propose a ridesharing-based evacuation program that recruits volunteer drivers before a disaster strikes, and then matches volunteer drivers with evacuees once demand is realized. Here we optimize resource planning and evacuation operations under uncertain spatiotemporal demand, and construct a two-stage stochastic mixed-integer program to ensure high demand fulfillment rates. We consider three formulations to improve the number of evacuees served, by minimizing an expected penalty cost, imposing a probabilistic constraint, and enforcing a constraint on the conditional value at risk of the total number of unserved evacuees, respectively. We discuss the benefits and disadvantages of the different risk measures used in the three formulations, given certain carless population sizes and the variety of evacuation modes available. We also develop a heuristic approach to provide quick, dynamic and conservative solutions. We demonstrate the performance of our approaches using five different networks of varying sizes based on regions of Charleston County, South Carolina, an area that experienced a mandatory evacuation order during Hurricane Florence, and utilize real demographic data and hourly traffic count data to estimate the demand distribution.

97 MATHEMATICS AND COMPUTING↗

Large scale and low latency analysis facilities for the CMS experiment: Development and operational aspects

While a majority of CMS data analysis activities rely on the distributed computing infrastructure on the WLCG Grid, dedicated local computing facilities have been deployed to address particular requirements in terms of latency and scale. The CMS CERN Analysis Facility (CAF) was primarily designed to host a large variety of latency-critical workflows. These break down into alignment and calibration, detector commissioning and diagnosis, and high-interest physics analysis requiring fast turnaround. In order to reach the goal for fast turnaround tasks, the Workload Management group has designed a CRABServer based system to fit with two main needs: to provide a simple, familiar interface to the user (as used in the CRAB Analysis Tool[7]) and to allow an easy transition to the Tier-0 system. While the CRABServer component had been initially designed for Grid analysis by CMS end-users, with a few modifications it turned out to be also a very powerful service to manage and monitor local submissions on the CAF. Transition to Tier-0 has been guaranteed by the usage of the WMCore, a library developed by CMS to be the common core of workload management tools, for handing data driven workflow dependencies. This system is now being used with the first use cases, and important experience is being acquired. In addition to the CERN CAF facility, FNAL has CMS dedicated analysis resources at the FNAL LHC Physics Center (LPC). In the first few years of data collection FNAL has been able to accept a large fraction of CMS data. The remote centre is not well suited for the extremely low latency work expected of the CAF, but the presence of substantial analysis resources, a large resident community, and a large fraction of the data make the LPC a strong facility for resource intensive analysis. We present the building, commissioning and operation of these dedicated analysis facilities in the first year of LHC collisions, we also present the specific development to our software needed to allow for the use of these computing facilities in the special use cases of fast turnaround analyses.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources: Preprint

Integration of a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problem requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (controllable DERs) including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperformed other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources

Integrating a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problems requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (controllable DERs), including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperforms other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Control Parameter Sensitivity Study for Inverter-Based-Resource Dominated Grids: A Small Signal Stability Approach and Framework

The growing adoption of renewable energy is driving the prevalence of inverter-based resources (IBRs) within power grids. Future power grids will integrate both grid-following IBRs (GFM-IBRs) and grid-forming IBRs (GFL-IBRs) alongside synchronous generators. Therefore, it is crucial to perform stability studies that account for all components and especially control interactions related to IBRs. Extensive research has performed to study the IBR-related stability, however, the sensitivity study of IBRs' control parameters on system stability has not been adequately studied yet, especially from a systematic way. Therefore, this paper conducts a small signal stability analysis for a generic grid with multiple types of resources and develops an analytical framework for assessing the sensitivity of control parameters affecting stability margins. To achieve that, the non-autonomous reduced-order non-linear dynamic model is developed for a generic power system with multiple synchronous generator-based resources (SGBRs), GFM-IBRs, and GFL-IBRs. Based on the analytic model, a systematic framework for parametric sensitivity on systems' asymptotic stability is developed. A parameter sensitivity analysis based on eigenvalue methods is proposed. The impact of the droop controllers of GFM-IBRs, PQ-dispatch and the PLL controller of GFL-IBR on the system asymptotic stability is discussed. This sensitivity study is aiming to provide deep insights on control parameters' impact on system stability, and gives direction for parameter tuning in case of instability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power system effects and mitigation recommendations for DER cyberattacks

Extensive deployment of interoperable distributed energy resources (DER) is increasing the power system cyber security attack surface. National and jurisdictional interconnection standards require DER to include a range of autonomous and commanded grid‐support functions, which can drastically influence power quality, voltage, and bulk system frequency. Here, the authors investigate the impact to the cyber‐physical power system in scenarios where communications and operations of DER are controlled by an adversary. The findings show that each grid‐support function exposes the power system to distinct types and magnitudes of risk. The physical impact from cyber actions was analysed in cases of DER providing distribution system voltage regulation and transmission system support. Finally, recommendations are presented for minimising the risk using engineered parameter limits and segmenting the control network to minimise common‐mode vulnerabilities.

24 POWER TRANSMISSION AND DISTRIBUTION↗