Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Fast Modular Reactor (FMR): Overview and Conceptual Design Work

The conceptual design of the FMR including the experimental and numerical verifications will lead to: Cost estimation of the FMR based on the conceptual design results and guidelines of advanced reactor construction. Submittal of the pre-application licensing plan to the NRC for review and feedback.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Ceramic Membranes/Modules for Ultra Efficient Hydrogen (H2) Production/Carbon Dioxide (CO2) Capture for Coal-Based Polygeneration Plants: Fabrication, Testing, and CFD Modeling

Inorganic membrane-based systems are a promising technology for precombustion CO2 capture with simultaneous H2 production. State-of-the-art packages for high temperature and pressure service consist of multiple tube membrane bundles prepared in a "candle filter" configuration, in which the membrane tubes are open at one end and sealed at the other. This configuration is used for practical reasons, specifically the need to minimize problems due to thermal expansion mismatch between the ceramic tube bundle and the steel housing. However, the primary technical problem with the candle filter format for commercial-scale installations is the inability to purge the tube side (typically the permeate side), a feature that is crucial for high H2 recovery. In this study, the focus is to design and fabricate the first dual-end open full ceramic multiple tube membrane bundle that enables tube side (permeate) purge for gas separation applications. An additional key feature of this design is the simplified module layout, as the membrane bundles can be installed end-to-end with tube side (permeate) flow directly from one bundle to the next. This layout simplifies the membrane to housing seals and yields significant improvement in membrane packing density. Detailed focus areas in our studies include: (i) Materials development and preparation of the tube-to-tube sheet potting for the dual-ended bundle; (ii) the sealing and optimal module configuration design to minimize membrane stress upon module mounting; (iii) the demonstration, via the fabrication of CMS and Pd-alloy membranes supported on full-size, dual-ended ceramic support bundles, of the first example of a purgeable ceramic membrane and module; and (iv) development of a CFD model of the membrane module for calculation of feed flow distribution, and for use in scale-up, and capital cost estimating. The CFD model was validated using experimental data with the multi-tubular membrane system, employing He/N2 as a model gas mixture (surrogate for H2/CO2), and has been shown to be quite accurate. Employing the model, we are able to study the effects of operating pressure and temperature, feed and sweep gas flow rates, and the choice of membrane tube configuration on system performance.

20 FOSSIL-FUELED POWER PLANTS↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

Volume 10: Flow Test Facilities

Adding additional flow testing facilities has been considered as part of the High Flux Isotope Reactor (HFIR) Sustaining and Enhancing Neutron Science (SENSe) Initiative at Oak Ridge National Laboratory (ORNL) to support HFIR operations and experiments. This prospect has prompted many ideas and discussions regarding potential features, configurations, locations, and applications for the facilities. A working group of ORNL staff members was formed in fiscal year 2022 to recommend one or more configurations to best support future HFIR operations and scientific capacities and to develop order-of magnitude cost estimates and timing. The ideas discussed in this report include options ranging from upgrading existing small-scale testing facilities to building a full-scale HFIR mockup for detailed thermohydraulic testing and fuel assessment.

07 ISOTOPE AND RADIATION SOURCES↗

Volume 4: Detection Systems and Ultra-Cold Neutrons

As part of the Sustaining and Enhancing Nuclear Science (SENSe) initiative at Oak Ridge National Laboratory (ORNL), the prospect of adding new detection systems to support High Flux Isotope Reactor (HFIR) operations and to advance scientific research has prompted many ideas and discussions regarding potential features, configurations, locations, and applications. A working group of ORNL staff members was organized to further develop the concepts and recommending one or more configurations to best support future HFIR operations and scientific capacities and to provide order-of-magnitude cost estimates and timing. The areas of investigation included fast access detection systems, non-scattering beamline instruments, shielded detection instruments, and an ultracold neutron source. In each case, the focus was to develop world leading capabilities that would be unmatched by any other facility.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Analytics Supporting Stockpile and Enterprise Planning [Slides]

A robust and growing modeling effort supports Los Alamos weapons leadership as well as NNSA (NA18, NA12, NA19) and DoD (DASD-NM, USSTRATCOM). Current work are valuable to several key NNSA working groups supporting strategic planning: Stockpile Stewardship Management Plan (SSMP); Requirements & Planning Document (RPD) analysis; Requirements and Capacity Working Group (RCWG); Production Integration Collaboration Working Group (PICWG); Enterprise Modeling and Analysis Consortium (EMAC); Cost Estimating Analysis Group (CEAG).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Volume 6: Experiment Facility Spectrum Tailoring (HFIR Futures – Enhanced Capabilities Series)

In-core irradiation experiment research, such as materials and fuels irradiation research and radioisotope production, is one of the primary missions of Oak Ridge National Laboratory’s (ORNL) versatile High Flux Isotope Reactor (HFIR). In support of the HFIR-Sustaining and Enhancing Neutron Science (SENSe) Initiative, a technically diverse group of ORNL irradiation research subject matter experts formed the Spectrum Tailoring Working Group, with the goal of developing a compendium of experiment facility concepts to enhance irradiation experiment conditions via neutron spectrum tailoring capabilities. The purpose of this report is to document the concepts developed in FY22 and the associated scientific justifications, identify potential facility sponsors, and estimate costs and schedules for each concept. This report documents the efforts performed in FY22, which may continue in FY23 or later pending the direction of the HFIR-SENSe Initiative and the interested sponsors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Prefabricated Standard Modular Hydropower Installations for Low-cost Small Hydropower

The goal of the present project was to investigate the potential savings in greenfield hydropower project costs across sites having vastly different characteristics. Littoral Power Systems, Inc. (LPS) undertook the project described herein to explore the promise of Standard Modular Hydropower (SMH) to transform the processes of site identification, conceptual design, detailed design, and construction planning to support low- cost, environmentally attractive development of small hydropower facilities at new stream- reaches. This report includes descriptions of the work to develop these processes, the resulting facility designs achieved using these processes and the projected economics. Installation cost estimates for the resulting conceptual greenfield facility design at two different locations come in at $\$3,419$/kW for Balcony Falls and $\$2,124$/kW for LPS 566. The installation time from site preparation to commissioning-ready is estimated to be 58 weeks for the conceptual facility at Balcony Falls and 42 weeks for the conceptual facility at LPS 566. A real challenge to any hydropower facility – not only the two cases studied here – is that environmental and social conditions can change, and as such, the facility may be required to change. The h-Modulor modules connect uniquely and are structurally independent, enabling site configurations to be changed on the fly, as needed. These results show that LPS's h-Modulor SMH approach delivers an attractive balance between efficiency, economics, and environmental sustainability for small hydro greenfield sites.

13 HYDRO ENERGY↗

Final Report for Water Electrodialysis Reversal Pilot

This final report presents all the work and tests performed during ION Clean Energy’s Water Electrodialysis Reversal Pilot referred to as the “WERP” Project (DE-FE-0032066). ION Clean Energy Engineering (ION) and Nebraska Public Power District (NPPD) executed the Electrodialysis Reversal (EDR) Pilot Study and developed a commercial cost estimate needed to evaluate the retrofit of an EDR system to NPPD’s Gerald Gentleman Station (GGS). The proven project team was comprised of NPPD, Sargent & Lundy (S&L) and ElectroSep, who is a leading developer, fabricator and operator of electrodialysis units. ION, working in conjunction with NPPD and ElectoSep, developed a test program for evaluating the performance of the EDR technology proposed to be employed and evaluated for this pilot. The Department of Energy’s National Energy and Technology Laboratory (DOE/NETL) awarded ION Clean Energy, Inc. a single budget period (BP) of $816,759 with $207,942 of in-kind contribution from NPPD to investigate ElectroSep’s Electrodialysis technology to clean grey water from NPPD’s GGS.

01 COAL, LIGNITE, AND PEAT↗

Alternate Retrieval A-105 Application Assessment Report

This report summarizes the historical development of the Confined Sluicing End Effector (CSEE) technology as well scarification technology. We also summarize the systems integration and deployment of that technology in the Gunite and Associated Tanks (GAAT) at the Oak Ridge Reservation where the retrieval system successfully removed the remaining sludge and heel in the eight tanks for tank closure and disposition. We also summarize the lessons learned from the deployment at Oak Ridge. Simulant development and testing have been key activities for any waste retrieval effort as many of the physical properties of the waste are unknown; therefore, this report discusses a bounding series of simulants that helps to reduce uncertainty for operations. These simulants have been developed for potential Hanford waste retrieval deployment. The potential key attributes for retrieval, based upon information provided by Washington River Protection Services (WRPS), of single-shell tank A-105 are discussed along with the potential application of CSEE technology to the challenges presented by the unique nature of A-105. These unique features include a major tear in the bottom of the tank, which necessitates technologies other than past practice sluicing to be deployed to prevent further intrusion of waste into the vadose zone. In addition, significant in-tank hardware makes A-105 particular challenging. However, there appear to be a number of parameters that should be investigated through additional testing or review of prior testing that may demonstrate the applicability of the CSEE technology to A-105. Testing of the Waste Retrieval End Effector (WREE), which was based on the original CSEE design, to demonstrate the ability to remove sludge and hardpan from Tank 241-C-106 will be reviewed to determine relevance to the Tank A-105 retrieval. There may be new requirements for the deployment system that accesses the tank with the CSEE because the tank bottom may not be flat, requiring the ability to maneuver the CSEE to maintain the appropriate stand-off distance from the CSEE and the tank bottom. Finally, we provide a set of recommendations, a set of task descriptions, and a range of estimated costs for a demonstration of the technology by the end of FY17. These tasks are summarized as: Complete system-level functional requirements; Procure or access the capacity to perform; Generate simulant development and simulant testing; Develop CSEE functionality; Develop demonstration plan; Perform demonstration; Analyze and document testing results; Perform project management and engineering.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MARVEL 90% Final Design Report

This document provides documentation of the Microreactor Applications Research Validation and Evaluation Project’s (MARVEL) 90% Final Design, as required by U.S. Department of Energy (DOE) Standard-1189, “Integration of Safety into the Design Process." Per DOE-STD-1189-2016, the 90% Final Design documentation focuses on design completion, at a level capable of supporting procurement, construction, testing, and operation. At this phase, the design organization finalizes the hazards and accident analyses, Fire Hazard Analysis (FHA), security vulnerability assessments, and other supporting analyses for design completion. The objective of this report is to provide a high-level summary of the design thus far and provide references including, but not limited to, the following design deliverables: • Complete final drawings, specifications and commercial grade dedications that may be released for bid and/or construction. • Clearly defined testing plans for the safety and functionality of all subsystems. • Quality Assurance Program for Design, Testing and Procurement. • Software Quality Assurance Plan. • Code of Record (COR), applicable design requirements including codes and standards. • Final design that meets all the requirements stipulated in the COR. • Final design review, consisting of final validation of comment resolution from previous reviews, and a review of any additional developments since the last review. • Updated Safety Design Strategy. • Hazard Analysis. • Fire Hazard Analysis. • Accident analysis. • Security vulnerability assessment. • Current and detailed cost estimate. • Current construction schedule, and • Risk & Opportunities Assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

HIGHLY-EFFICIENT 20-MW L-BAND MULTI-BEAM KLYSTRON

The overall goal of this project was to develop and demonstrate a novel two-stage multi-beam klystron (TS-MBK) for use in accelerator, medical, national security, medical, and environmental cleanup applications. The novelties embodied in the TS-MBK design include use of hollow beams to obtain strong coupling to cavities, and post acceleration after bunching to reduce the beam’s energy spread to allow an exceptional electronic efficiency that we predict can reach 90%. During Phase I of this project, Omega-P R&D refined its conceptual design of the 1.0 GHz TS-MBK, and collector design and cooling requirements for several levels of average power output. If, as was the case, it turned out that estimated costs for fabrication and testing of a full 12-beam TS-MBK prototype would exceed available Phase II funding, our Plan-B would have be adopted. In it, a single-beam version would have been designed and built, with all specifications identical to the 12-beam version, except that the average power level would be reduced by a factor of about 12. This one-beam version would still allow evaluation of the efficacy of our design concept for implementing two stages, including prevention of radiation loss at the HV gap, and for demonstrating the predicted 90% electronic efficiency and the absence of reflected electrons from the collector reaching the cathodes. But the absence of the expected industrial partner in further development of this novel RF source made it impractical for advancing the project into Phase II.

43 PARTICLE ACCELERATORS↗

Direct Air Capture-Based Carbon Dioxide Removal with United States Low-Carbon Energy and Sinks

The overall objective of this project was to complete an initial design of a commercial-scale, Carbon Capture and Storage system for Direct Air Capture (CCS-DAC) that separates and stores a minimum of 100,000 tonnes/year (t/yr.) net CO 2 from air. Three geographically diverse host sites will be used to determine the impact of different climates on the design and cost of the CCS-DAC systems; California (dry-hot), Louisiana (humid-hot), and Wyoming (mid-continental). In addition, the impact of using different low-carbon energy sources was also examined. The focus of this project was to geologically store the CO 2 , rather than the utilization of CO 2 . This Final Scientific/Technical Report is a collection of the deliverables for the project. The project team was able to successfully complete all the necessary tasks needed to determine the feasibility of the designs and operational needs of the DAC systems for each location. The data created by this allowed the project team to conduct the required evaluations to meet the requirements of the deliverables. The following deliverables were drafted and submitted to DOE prior to the conclusion of the project: (1) Initial Engineering Design; (2) Costing Estimate; (3) Techno-Economic Analysis (TEA); (4) Life Cycle Analysis (LCA); (5) Business Case Assessment; and (6) Technology EH&S Risk Assessment.

42 ENGINEERING↗

Carbon Capture Technologies: Status and Challenges

Presentation at the Society of Petroleum Engineers Workshop: Oil and Gas Technology for a Net-Zero World – Defining Our Grand Challenges for the Next Decade. Provides a high-level overview of point source carbon capture and direct air capture technologies, challenges and cost estimation.

Fout, Timothy↗

Considerations for Improving the Technoeconomic Viability of Heat Pipe Microreactors by Employing a Functional Containment Approach

The economic cost of a microreactor is being investigated by leveraging MARVEL cost information in conjunction with some simplified design and analysis activities to present a hypothetical, yet feasible, option for investigation. This bottom-up cost estimate for a hypothetical commercial microreactor will be used to provide guidance to the industry and research communities regarding where priorities should be set to improve the viability of broad microreactor deployment. To support the design and analysis activities required to present a feasible option, some understanding of maximum accidental radionuclide releases and consequences is needed to provide bounding estimates on containment or confinement systems for radionuclide retention. To estimate fission product barrier and retention performance, a gaussian plume dose and dispersion model is employed, with isotopic inventories being propagated between barriers assuming conservative fractional release rates. Demonstrably conservative meteorological assumptions are also assumed. Standard reference release rates are assumed where safety requirements could be easily and economically employed. Results are provided in units of total effective dose equivalent as a function of distance from the release (i.e., the reactor). Initial results indicate that the hypothetical microreactor will likely need to credit the fuel cladding and at least one other barrier, or combination of barriers, to ensure public health and safety as required during a postulated accident. This approach is referred to as “functional containment,” since no single barrier will be relied upon for satisfying regulatory requirements and fundamental safety functions for radionuclide retention. Finally, a set of barrier options are provided so that future economic analyses can select the most viable design path.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Continued Development and Advanced Testing of DPC Filler Cements (on FY22 R&D and Demonstration Activities) (Progress Report)

Commercial generation of energy by nuclear power plants in the United States (U.S.) has produced thousands of metric tons of spent nuclear fuel (SNF), the disposal of which is the responsibility of the U.S. Department of Energy (DOE). Utilities typically utilize the practice of storing this SNF in dual-purpose canisters (DPCs). DPCs were designed, licensed, and loaded to meet Nuclear Regulatory Commission (NRC) requirements that preclude the possibility of a criticality event during SNF storage and transport, but were not designed or loaded to preclude the possibility of a criticality event during the regulated post-closure period following disposal, which could be up to 1,000,000 years (Price, 2019). There are several options being investigated that could facilitate the disposal of SNF stored in DPCs in a geologic repository (Hardin et al., 2015; SNL 2020b; SNL 2021b). These include: (1) repackage the SNF into canisters that are designed to prevent criticality during the regulated post-closure period following disposal, but with an increased disposal cost estimated at approximately $\$$20B in United States dollars (USD) (Freeze et al., 2019); (2) analysis of the probability and consequences of criticality from the direct disposal of DPCs during a 1,000,000-year post-closure period in several geologic disposal media (Price, 2019); and (3) filling the void space of a DPC with a material before its disposal that significantly limits the potential for criticality over the post-closure regulatory period. This report further investigates the third option, filling DPC already containing SNF with a material to limit the potential for criticality over the post-closure regulatory period.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hydrogen Sustainable Infrastructure Guidelines (H2SIG)

Infrastructure interacts with major global challenges inclusive of climate change, resilience, equity and social justice, environmental protection and biodiversity, public health, and economic recovery. This effort directly addresses how to apply sustainability assessments to the unique aspects of hydrogen (H2) infrastructure projects using the Envision® sustainability framework developed by the Institute for Sustainable Infrastructure (ISI). Envision is a flexible system of criteria and performance objectives to aid decision makers and help project teams identify sustainable approaches during planning, design and construction of infrastructure projects that will continue throughout the project’s operations, maintenance, and end-of-life phases. The goal of this work is to support those interested in conducting sustainability assessments for hydrogen infrastructure projects. Through this work the team has developed hydrogen-specific guidelines and best practices to assist project developers, investors and regulators in straightforward application of the Envision framework to systematically enhance clarity and increase objectivity across hydrogen projects. Subject matter experts from 20 different organizations (industry, non-profits, municipalities, emissions regulators, national labs) were engaged through 7 focus groups to discuss the H2-prioritized Envision requirements and elements to be included in the guidelines. In addition to these guidelines, the team conducted case studies as a way of demonstrating and informing the guidelines and providing examples or ideas for implementing sustainability in future projects. Through this study, the authors found that hydrogen infrastructure projects can incorporate many sustainable practices including reducing GHG emissions affecting climate change, reducing air pollutant emissions affecting the health of communities, synergistically handling waste byproducts, integrating into existing infrastructure, incorporating renewable energy, and addressing equity and environmental justice. Additionally, hydrogen infrastructure projects could benefit from 2-way communication engagement and collaborative planning with stakeholders, educational awareness of hydrogen technology, tracking and reporting on water use and water quality, and including monetized environmental and social benefits in life-cycle cost estimates. This document is the final technical report for the Hydrogen Sustainability Assessment Methods for Project Development project. While the main focus of the report is to provide guidelines for applying sustainability to hydrogen infrastructure, there are sections within the appendix providing completed project tasks and methodology.

08 HYDROGEN↗