Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,153 records · Page 64

DOE Support for the 8th International Conference on Attosecond Science (Final Technical Report)

The 8th International Conference on Attosecond Science and Technology (ATTO VIII) was held on the campus of the University of Central Florida in Orlando, FL from July 10-16, 2022. The main objectives of the conference were (i) to outline the state of the art of attosecond research; (ii) to jump-start national and international collaborations that had been hindered by the pandemic; (iii) to promote recruiting and training of postdocs and tenure-track candidates; and (iv) to consolidate the global and diverse identity of the attosecond community.

74 ATOMIC AND MOLECULAR PHYSICS↗

Nuclear Physics of Compact Binaries with GADGET

The research goal of this project was to experimentally constrain the thermonuclear rate of the 15 O(α, Υ) 19 Ne reaction, whose uncertainty has a strong influence on the modeling of astrophysical Type-I X-ray bursts on accreting neutron stars. To this end, Experiment 21072 was run in November 2022 at the Facility for Rare Isotope Beams using the GADGET II detection system. The limited scope and duration of this award included work in the year following the experiment: drafting a technical paper on the time projection chamber of the GADGET II detection system, and analysis of data from Experiment 21072. The award contributed to the education and development of the scientific and technical workforce by partially supporting one postdoctoral Research Associate who did this work.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Model Guidance to Address Barriers to Combined Heat and Power and Waste Heat to Power

Congress directed that the US Department of Energy (DOE) initiate a review of interconnection rules to identify barriers to interconnection and ways to better integrate combined heat and power (CHP) and waste heat to power (WHP) in the electric grid. Oak Ridge National Laboratory (ORNL) supports DOE by providing technical assistance for CHP. DOE tasked ORNL with the interconnection review and development of model guidance to enable developers and CHP owners to interconnect more CHP. This report summarizes the work that DOE initiated in response to the congressional request.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chlorine Nuclear Data Evaluation Aided Through New LANSCE Measurements

The collaboration between the Los Alamos National Laboratory Neutron Science Center (LANSCE) and TerraPower LLC enables the enhanced understanding of fast spectrum critical systems consisting of chlorine. Specifically, TerraPower is interested in updating the nuclear data for the stable isotopes of chlorine, 35 Cl and 37 Cl, because these nuclides are the primary constituents of the chloride fuel salt in the Molten Chloride Reactor Experiment (MCRE), for which TerraPower is leading the design. The Cooperative Research and Development Agreement (CRADA) between the parties is funded by DOE’s Office of Nuclear Energy’s Gateway for Accelerated Innovation in Nuclear (GAIN) initiative to provide the nuclear community with access to the technical, regulatory, and financial support necessary to motivate innovative nuclear reactor technologies toward commercialization. New measurements of 35 Cl(n,p total ) and 35 Cl(n,α total ) were completed at LANSCE to constrain the reaction theory models that are used to generate the updated evaluations. The updated evaluations were then tested across the sensitivities of the MCRE by TerraPower to provide direct feedback to the evaluation for application specific sensitivities.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Floating Offshore Wind US Manufacturing and Commercialization: Cooperative Research and Development (Final Report)

NREL assessed the supply chain and workforce considerations for the OCG-Wind floater technology, a floating semi-submersible offshore wind substructure, as well sharing vessel needs to inform their installation strategy. This technical assistance was in support of the FLoating Offshore Wind ReadINess (FLOWIN) Prize Phase 2 submission. NREL provided an assessment of domestic supplier capabilities for the main components of their floating offshore wind platform design and analyzed US regional and national supply chain constraints and gaps. Thirteen interviews with companies including steel distributors, forges, foundries, ports, large component fabricators, subcomponent fabricators, and secondary suppliers provided key insights such as 1) assembly ports are the key infrastructure barrier standing in the way of unlocking the domestic assembly and component fabrication for steel-based FOW platforms, 2) domestic steel producers can supply the types and quantities of steel necessary for FOW platforms, and 3) coordination between stakeholders will be a vital part of successfully developing the supply chain and infrastructure needed to domestically produce FOW platforms. In the workforce assessment, NREL documented a step-by-step approach to conduct a place-based assessment of the foundational workforce consideration for recruiting, upskilling, and retaining a workforce, such as supportive local and state policy, nearby education and training programs, and existing relevant industry. This approach was applied to Tacoma, Washington. Tacoma was indicated to have the potential be a successful location for fabrication and assembly of floating offshore wind energy in terms of workforce development. To share data on vessel requirements to install the OCG-Wind floater, NREL compiled resources that help answer the questions related to anchor handling tug vessels, shared a database of cable laying vessels, and answered questions on complying with the Jones Act.

17 WIND ENERGY↗

MPACT Verification and Validation Manual (rev 1)

The MPACT code provides the capability to calculate the steady-state and transient reactor core neutron distribution for operating nuclear power plant (PWR) conditions across multiple fuel cycles. As required in the CASL SQA plan, it is the responsibility of UM and ORNL as joint owners of MPACT to ensure that verification and validation activities are performed and documented in a V&V manual with supporting publications and CASL technical reports which can be distributed for reference and distribution within VERA. This document provides the first revision of the MPACT verification and validation (V&V) manual and describes the current state of MPACT V&V and updates the framework for future MPACT V&V activities. During FY16, MPACT V&V activities in the areas of code verification have continued to mature and work has progressed on code error evaluation using the Method of Manufactured Solutions (MMS). Several specific tasks have also been completed to improve MPACT code verification to include tasks to improve the unit and regression test coverage. A joint UM/ORNL task was completed to develop standardize coding standards and workflow for the continued collaborative development of MPACT. During the past year, MPACT validation work has continued in both the areas of measured data from critical experiments as well as measured data from operating nuclear power plants. Preliminary work was also performed in FY16 on the use of post-irradiation examinations for evaluation and validation of the isotopic depletion capability in MPACT. Based on the results of V&V efforts this past year, the confidence level has increased in the ability of MPACT to model an operational Pressurized Water Reactor. Areas were identified which require increased emphasis during FY17 to include updating all the V&V problems with the new 51-group library, the completion of cycle 2 of the BEAVRS benchmark, initial validation for BWR applications, the addition of Uncertainty Quantification results into the benchmark results, and the completion of specific validation tasks for the CASL Challenge problems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

MPACT Verification and Validation Manual (rev 6)

The MPACT code provides the capability to calculate the steady-state and transient reactor core neutron distribution for operating nuclear power plant (PWR) conditions across multiple fuel cycles. As required in the CASL SQA plan, it is the responsibility of UM and ORNL as joint owners of MPACT to ensure that verification and validation activities are performed and documented in a V&V manual with supporting publications and CASL technical reports which can be distributed for reference and distribution within VERA. This document provides the fifth revision of the MPACT verification and validation (V&V) manual and describes the current state of MPACT V&V and updates the framework for future MPACT V&V activities. During FY19 MPACT V&V activities in the areas of code / solution verification and code validation have continued to mature. Several specific tasks have also been completed to include the Ganapol and IPEN Benchmarks which have provided significant improvements in MPACT verification and validation, respectively. Based on the results of V&V efforts this past year, the confidence level has increased in the ability of MPACT to model an operational Pressurized Water Reactor. Specific areas in both verification and validation were identified which require increased emphasis during FY20.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

Analysis of sheltering and evacuation strategies for an urban nuclear detonation scenario.

Development of an effective strategy for shelter and evacuation is among the most important planning tasks in preparation for response to a low yield, nuclear detonation in an urban area. This study examines shelter-evacuate policies and effectiveness focusing on a 10 kt scenario in Los Angeles. The goal is to provide technical insights that can support development of urban response plans. Results indicate that extended shelter-in-place can offer the most robust protection when high quality shelter exists. Where less effective shelter is available and the fallout radiation intensity level is high, informed evacuation at the appropriate time can substantially reduce the overall dose to personnel. However, uncertainties in the characteristics of the fallout region and in the exit route can make evacuation a risky strategy. Analyses indicate that only a relatively small fraction of the total urban population may experience significant dose reduction benefits from even a well-informed evacuation plan.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building Oakland, CA

This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration Project 209 - Control Tower and Support Building, Las Vegas, NV

This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be built in Las Vegas, Nevada by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ARRA FEMP Technical Assistance -- Federal Aviation Administration Project 209 -- Control Tower and Support Building, Palm Springs, CA

This report represents findings of a design review team that evaluated construction documents (at the 100% level) and operating specifications for a new control tower and support building that will be built in Palm Springs, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

99 GENERAL AND MISCELLANEOUS↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building, Reno, Nevada

Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2024 NSUF Annual Program Review

The Department of Energy - Office of Nuclear Energy’s (DOE-NE) Nuclear Science User Facilities (NSUF) program held its annual review on Monday, April 15 through Thursday, April 18, 2024. The meeting involved in-person participation at Idaho National Laboratory as well as a virtual component. The NSUF program review included overview presentations by the NSUF program office and select partner facilities, as well as technical highlights from NSUF supported research projects and the user community. For questions regarding this event, please contact our program office at nsuf@inl.gov.

Author, Unknown↗

Apollo Program Management, Kennedy Space Center, Florida

The evolution of the Kennedy Space Center as the launch organization for Apollo/ Saturn V involved the concurrent solution of numerous complex problems. A significant increase in manpower was involved. Large and complex checkout and launch facilities were to be designed and constructed. Expansion of operational capabilities required the establishment and integration of a Government-Contractor operational team. From an initial cadre of approximately 200 civil service personnel of the Army Ballistic Missile Agency, transferred to NASA in 1960 following its establishment, expansion to the present civil service level of 2,900 occurred in the last seven years. Established within NASA as a directorate of the Marshall Space Flight Center, KSC achieved center status in 1962. With its designation as a Center, KSC accomplished the development and staffing of an organization that could perform procurement, resources, financial, and other management requirements formerly provided by the parent organization. In addition to continuing launch operations for established programs, KSC undertook the design and construction of large, new, and unique launch facilities for Apollo/Saturn V. With the expansion of the civil service work force, KSC integrated contractor organizations employing 23,000 personnel at the Center to perform specific operational and support missions under the technical supervision and observation of the Government team. The management techniques, organizational concepts, and continuing efforts utilized to meet the Apollo goals and challenges are discussed in this document.

Source record↗

Project management in the Apollo program: An interdisciplinary study

Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

Drucker, E. E.↗