Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Digitalization Guiding Principles and Method for Nuclear Industry Work Processes

The commercial U.S. light-water reactor fleet has been operating at historical efficiency, reliability, and safety over the last decade. Nuclear power has the highest capacity factor of any other power generation technology while also serving as the largest baseload source for carbon-free energy. Despite this remarkable achievement, continued operations for many plants are threatened due to fierce electricity market competition and rising operations and maintenance costs of which continued maintenance of obsolete analog equipment is a contributor. The digital age and associated technologies are where the future lies in process control, and nuclear has yet to take full advantage of the capabilities offered therein. The Light Water Reactor Sustainability Program (LWRS) at Idaho National Laboratory (INL), sponsored by the Department of Energy, has a mission to help the light-water reactor fleet manage its foundational capabilities to continue providing safe and reliable carbon-free power. LWRS helps support that mission by providing scientific, technology-based solutions for advanced concepts of operations with a more viable business model that will allow the fleet to continue to operate at peak levels through extended plant operation. The LWRS Digitalization Project at INL seeks to leverage digital technologies to synthesize and transform work processes. We provide a state-of-the-art analysis of digitalized work processes in nuclear power and investigate ways in which researchers at INL and the nuclear industry can work together to identify what data to access, how to access it, what to do with the data, and most importantly, how to use the insights for decision-making across all levels within the business. Borne from these considerations, we present four guiding principles for digitalization: develop a coherent digitalization plan, apply human factors engineering, establish data governance, and anticipate unintended consequences. Together, these principles form a method that plants can use to effectively to digitalize nuclear industry work processes. Our guiding principles are informed by multiple knowledge sources. First, we document activities from the Work Digitalization Initiative, which was conceived as a means for nuclear organizations to help define and standardize the industry’s approach to digitalizing work. Second, we detail primary research conducted with industry professionals regarding drivers and barriers to digitalization adoption. We present survey results that demonstrate what the industry hopes to get out of digitalization and the ways that INL can continue to support the industry’s digital transformation. Third, we present a digitalization use case with industry partners NextAxiom Technology and Xcel Energy. The project objective was to transform the current condition report work process from paper to digital, incorporating digitalized principles. We report the development of the application and lessons learned. The accomplishments achieved by this research and development serve to identify critical needs for plant guidance in support of digitalization implementation and contribute to the knowledge and strategies available for utilities considering or undertaking digitalization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experience with Chemical Looping Combustion of Coal in a 200 kW Dual Fluidized Bed Reactor

The University of Utah recently commissioned a dual fluidized bed process development unit (PDU) for investigating chemical looping combustion (CLC) and chemical looping with oxygen uncoupling (CLOU) of coal. The reactors and supporting systems were sized to support at least 200 kW of coal input based on available reaction rate data. Both the air reactor and fuel reactor are circulating fluidized beds and bed material passes between the reactors via loop seals. The reactors are refractory-lined rather than electrically heated, so the system must be preheated with natural gas before chemical looping combustion can begin. Air and steam are preheated through a combination of electric heating and natural gas burners and reactor product gas flows through heat exchangers and bag houses to cool and clean the gas of particulate. As is typical with pilot-scale systems, several operational challenges were encountered as the system was brought online and operation progressed from heatup and initial testing with gaseous fuels towards full CLOU processing of coal. The system hardware and operational procedures have undergone several modifications, but the PDU can now reliably be preheated to the operating temperature and coal can be fed at the target feed rate. This paper presents the PDU, describes the procedures for evaluating carbon conversion, CO2 capture and CO2 purity, and presents initial results from chemical looping combustion of coal with non-CLOU and CLOU carriers. General experience of operating the plant and notable challenges and solutions are also presented.

Whitty, Kevin J.↗

ICRH operations and experiments during the JET-ILW tritium and DTE2 campaigns

2021 has culminated with the completion of the JET-ILW DTE2 experimental campaign. This contribution summarizes Ion Cyclotron Resonance Heating (ICRH) operations from system and physics point of view. Improvements to the (ICRH) system, to operation procedures and to real time RF power control were implemented to address specific constraints from tritium and deuterium-tritium operations and increase the system reliability and power availability during D-T pulses. ICRH was operated without the ITER-Like Antenna (ILA) because water leaked from an in-vessel capacitor into the vessel on day-2 of the D-T campaign. Three weeks were required to identify and isolate the leak and resume plasma operations. Dedicated RF-Plasma Wall Interaction (PWI) experiments were conducted; tritium plasmas exhibit a higher level of Be sputtering on the outer wall and impurity content when compared to deuterium or hydrogen plasmas. The JET-DTE2 campaigns provided the opportunity to characterize ICRH schemes foreseen for the ITER operation, in the ITER like wall environment in ELMy H-mode scenarios aiming at maximizing fusion performance. The second harmonic tritium resonance heating and to a lesser extent minority 3He heating (ITER D-T ICRH reference schemes) lead to improved ion temperature and fusion performance when compared to hydrogen minority ICRH. However, these discharges suffered from a lack of stationarity and gradual impurity accumulation potentially because of a deficit of ICRH power when using JET antennas at lower frequencies. Fundamental deuterium ICRH was used in tritium-rich plasmas and with deuterium Neutral Beam Heating; this ICRH scheme proved to be very efficient boosting ion temperature and fusion performance in these plasmas.

Klepper, C. Christopher↗

Tangible Solutions for Grid Operation Upgrade

Many countries worldwide are setting clean energy targets to decarbonize the energy sector and add higher wind and solar capacities. Given their distributed nature, variable renewable energy (VRE) assets can have unique grid integration considerations, and require grid operation practices to be modernized. When transitioning to higher renewable energy levels, many system operators configure a dedicated renewable energy desk to manage renewable energy resource operation in the system control center. Further, system operation planning is conducted with VRE and load forecasting to enable reliable real-time system operation. NREL has partnered with many system operators in the region to identify appropriate technology and grid modernization solutions. NREL and partners from system operators in the region will present on the challenges and some solutions that have been applied and share best practices such as energy management system upgrades, VRE forecasting framework, grid flexibility improvements, and staff training.

emerging economies↗

Stochastic multi-period optimal dispatch of energy storage in unbalanced distribution feeders

This report presents a convex, multi-period, AC-feasible Optimal Power Flow (OPF) framework that robustly dispatches flexible demand-side resources in unbalanced distribution feeders against uncertainty in very-short timescale solar Photo-Voltaic (PV) forecasts. This is valuable for power systems with significant behind-the-meter solar PV generation as their operation is affected by uncertainty from forecasts of demand and solar PV generation. The aim of this work is then to ensure the feasibility and reliability of distribution system operation under high solar PV penetration. We develop and present a novel, robust OPF formulation that accounts for both the nonlinear power flow constraints and the uncertainty in forecasts. This is achieved by linearizing an optimal trajectory and using first-order methods to systematically tighten voltage bounds. Case studies on a realistic distribution feeder shows the effectiveness of a receding-horizon implementation.

25 ENERGY STORAGE↗

Real Time Applications Using Linear State Estimation Technology (RTA/LSE)

Electric Power Group, LLC (EPG) was awarded DOE OE0000849 to design, develop, and demonstrate three real-time applications for monitoring power system stability. The applications use phasor measurements and processing by a linear state estimator (LSE) to improve system visibility and accuracy. These applications leverage the large and expanding phasor measurement systems being deployed by utilities throughout the world, and specifically in the United States. Phasor measurements provide a much more detailed view of the power systems than traditional SCADA systems, so can provide better visibility of events and an early warning of developing problems. These three applications are real-time contingency analysis (RTCA), area angle monitoring (AAM), and a voltage stability index (VSI). The project was fully completed as proposed. All three applications were successfully implemented and demonstrated. There were challenges the caused project delays, however. While the RTCA is based on well-known concepts and readily available tools, its deployment using phasor measurements meant it needed to be adapted to sometimes sparse measurements and limited coverage areas. EPG met these challenges with extensive modeling and testing. The AAM is based on unproven research, so EPG had to deal with a lot of unknowns and develop additional methods for practical implementation. These activities took more time than anticipated, so required extra time for development. In addition, there was difficulty getting adequate measurement locations for successful deployment and utility installation delays. Consequently, the project required a time extension to complete. These three real-time applications, RTCA, AAM, and VSI, use only phasor measurement input. Since they do not require the EMS or other measurement systems, they can serve as a backup and security check for the EMS. Phasor measurements are validated and extended by an LSE. The LSE will always produce an output even when some inputs are impaired, so the RT applications will operate even when the EMS state estimator does not converge and the applications it supports cannot function. Consequently, these RT applications can provide valuable additional reliability for control center operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LAROMance Grade 91 Model Integration in NEML2

New reactor designs are targeting higher operating temperatures for increased thermal efficiency when compared to the current fleet of light water reactors. Designing structural components for these high temperature environments with reliable long-term operations requires material models that can accurately capture the deformation mechanisms active in these environments. The LAROMance surrogate material models are based on a database of mechanistic crystal plasticity simulations for high-temperature conditions. Inputs to the LAROMance models reflect the microstructural pedigree of the material, like dislocation densities and precipitate contents. Based on the evolution of these microstructural features, the LAROMance model provides the engineering scale constitutive model response. The LAROMance model was recently parameterized for Grade 91, a high temperature alloy. In the present work, the Grade 91 LAROMance model is implemented in the New Material Model Library, version 2 (NEML2). NEML2 provides a modular way to build material models from smaller blocks and was developed to vectorize the material update to efficiently run on modern computational architectures with graphics processing unit accelerators. NEML2 constitutive models can be used in simulations based on the multiphysics object-oriented simulation environment (MOOSE). This report provides details on the implementation of the Grade 91 LAROMance model in NEML2 and its verification of engineering scale finite element simulations in MOOSE.

42 - ENGINEERING↗

Midwest Consortium for Wind Turbine Reliability and Optimization

This report provides an overview of the efforts aimed to establish a student focused laboratory apparatus that will enhance Purdue's ability to recruit and train students in topics related to the dynamics, operations and economics of wind turbines. The project also aims to facilitate outreach to students at Purdue and in grades K-12 in the State of Indiana by sharing wind turbine operational data. For this project, a portable wind turbine test apparatus was developed and fabricated utilizing an AirX 400W wind energy converter. This turbine and test apparatus was outfitted with an array of sensors used to monitor wind speed, turbine rotor speed, power output and the tower structural dynamics. A major portion of this project included the development of a data logging program used to display real-time sensor data and the recording and creation of output files for data post-processing. The apparatus was tested in an open field to subject the turbine to typical operating conditions and the data acquisition system was adjusted to obtain desired functionality to facilitate use for student projects in existing courses offered at Purdue University and Indiana University. Data collected using the data logging program is analyzed and presented to demonstrate the usefulness of the test apparatus related to wind turbine dynamics and operations.

17 WIND ENERGY↗

Systematic Evaluation of Stochastic Methods in Power System Scheduling and Dispatch with Renewable Energy

As more wind power and other renewable resources are being integrated into the electric power grid, the forecast uncertainty brings operational challenges for the power system operators. In this report, different operational strategies for uncertainty management are presented and evaluated. A comprehensive and consistent simulation framework is developed to analyze the performance of different reserve policies and scheduling techniques under uncertainty in wind power. Numerical simulations are conducted on a modified version of the IEEE 118-bus system with a 20% wind penetration level, comparing deterministic, interval, and stochastic unit commitment strategies. The results show that stochastic unit commitment provides a reliable schedule without large increases in operational costs. Moreover, decomposition techniques, such as load shift factor and Benders decomposition, can help in overcoming the computational obstacles to stochastic unit commitment and enable the use of a larger scenario set to represent forecast uncertainty. In contrast, deterministic and interval unit commitment tend to give higher system costs as more reserves are being scheduled to address forecast uncertainty. However, these approaches require a much lower computational effort Choosing a proper lower bound for the forecast uncertainty is important for balancing reliability and system operational cost in deterministic and interval unit commitment. Finally, we find that the introduction of zonal reserve requirements improves reliability, but at the expense of higher operational costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reserve and energy scarcity pricing in United States power markets: A comparative review of principles and practices

Here, errors in forecasting load and renewable-based generation in restructured power systems mean that independent system operators (ISOs) must procure sufficient operating reserves to keep the real-time operation of the system reliable and secure. But when procured reserves turn out to be insufficient in real-time due to the lack of resource capacity or ramp capability, operators often set higher prices for reserves and energy to encourage more supply, and to motivate consumers to decrease usage or shift it to other times. This procedure, which is called scarcity or shortage pricing, is a core feature of U.S. electricity markets. It is receiving increased attention from market designers and stakeholders because scarcity will become more important for spot price formation in the future with the increased penetration of zero-marginal cost renewables, and the shrinking role of fuel costs in setting prices. Scarcity pricing is implemented in various ways by different ISOs. These differences have practical implications for the level of prices and incentives for investment, operations, and demand modification. In this paper, general approaches and specific calculation procedures for reserve and energy scarcity pricing practices and calculations across the seven ISO-based U.S. power markets are reviewed and compared. A consistent terminology is used to facilitate the comparison. Current scarcity pricing practices are grouped into three approaches: (1) imposing an adder after the spot market is run; (2) including stepwise demand curves within market clearing procedures for non-contingency reserve products (e.g., the novel flexiramp product), which tends to yield longer right tails for energy scarcity premium curves; and (3) having stepwise demand curves for traditional contingency reserve products only, which results in shorter right tails in energy scarcity curves. A generic numerical example is presented to highlight the large practical differences among the reserve scarcity pricing approaches and specific implementations. To further investigate factors that contribute the most to demand curves differences among ISOs, a sensitivity analysis is performed. This analysis shows that the largest source of differences among the curves is the scarcity prices assumed in the case of severe scarcity, while the number of steps used and whether flexiramp is considered also yields important differences in scarcity prices. As renewable penetration increases, it will become increasingly crucial to employ administrative demand curves so that spot prices more effectively motivate supply and demand adjustments exactly when and where they are needed. This study shows that the different assumptions yield very different scarcity premiums for reserves and energy, and are likely to provide divergent incentives for resources to respond to shortages. It is concluded that to promote market efficiency, a reserve shortage demand curve should have at least three features: inclusion of the marginal value of reserve products at each shortage level, consideration of the magnitude and probability of supply contingencies, and avoidance of abrupt price discontinuities that can cause excessively volatile market outcomes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Recent developments and operation of polarized photocathodes at Jefferson Lab

Spin-polarized electron sources are critical to a wide range of accelerator-based applications for nuclear and particle physics. At Thomas Jefferson National Accelerator Facility, they play a central role in delivering high-quality polarized beams for precision nuclear physics experiments and next-generation parity-violation measurements, where stringent control of systematic uncertainties is essential. These sources are also expected to be key components of other initiatives, including the Electron-Ion Collider and the potential future positron capabilities at Jefferson Lab. In this talk, I will present ongoing research and development efforts at Jefferson Lab focused on the design, fabrication and optimization of spin-polarized photocathodes. This includes growth using molecular beam epitaxy (MBE) or metal-organic chemical vapor deposition (MOCVD), along with detailed characterization of their performance metrics, such as quantum efficiency (QE), electron spin polarization and QE anisotropy, all of which are increasingly important metrics for polarized electron sources at Jefferson Lab and the Electron-Ion Collider. Strategies to mitigate QE anisotropy, which is critical for reducing helicity-correlated beam asymmetries in precision experiments such as MOLLER will be highlighted. Finally, I will present recent efforts aimed at improving the operational lifetime of spin-polarized photocathodes in injector environments, particularly under high-voltage conditions in DC electron guns. These developments are essential for enabling reliable, high-performance operation of polarized sources for current and future accelerator programs.

Kachwala, Alimohammed [Thomas Jefferson National A↗

Techno-Economic Assessment of Data Center Load Demand Powered by Small Modular Reactors and Distributed Energy Resources

The rapid increase in data center energy demand, driven by AI and large-scale data processing, poses significant challenges to global energy infrastructure. Data centers require substantial and reliable energy for continuous operations and high-performance computing. Current electrical grids face issues such as transmission bottlenecks and aging infrastructure, making it difficult to meet these demands. Integrating inverter-based-resources (IBRs) like solar and wind presents both opportunities and challenges due to their intermittent nature. Small Modular Reactors (SMRs) offer a promising solution with their enhanced safety, modularity, reliability, and scalability, providing consistent base load power ideal for data center operations. This study presents a comprehensive techno-economic assessment of powering data center load demand using a combination of SMRs and IBRs with grid-connected and islanded mode. This study utilized Idaho National Laboratory’s (INL) HPC data center hourly load profiles and Xendee microgrid optimization platform to conduct the analysis. In this configuration, SMRs serves as the primary base load power source, consistently providing a steady supply of electricity necessary to meet the minimum load demand of the data center with support from the IBRs. Key performance indicators such as Levelized Cost of Electricity (LCOE), Net Present Value (NPV) has been calculated to assess the economic feasibility. The findings from this research will underscore the strategic benefits of integrating SMR plant with DERs – particularly for critical infrastructure load such as data centers.

14 - SOLAR ENERGY↗

Statistical tools for prognostics and health management of complex systems

Prognostics and Health Management (PHM) is increasingly important for understanding and managing today's complex systems. These systems are typically mission- or safety-critical, expensive to replace, and operate in environments where reliability and cost-effectiveness are a priority. We present background on PHM and a suite of applicable statistical tools and methods. Our primary focus is on predicting future states of the system (e.g., the probability of being operational at a future time, or the expected remaining system life) using heterogeneous data from a variety of sources. We discuss component reliability models incorporating physical understanding, condition measurements from sensors, and environmental covariates; system reliability models that allow prediction of system failure time distributions from component failure models; and the use of Bayesian techniques to incorporate expert judgments into component and system models.

42 ENGINEERING↗

Advanced High Torque Density Magnetically Geared Generator

The objective of this research project was to investigate the fundamental torque density limitations of multistage flux focusing magnetic gears and magnetically geared direct-drive generators for wind turbines. Magnetic gears create non-contact speed amplification by modulating the air-gap magnetic field harmonics created by magnetic rotors. By integrating a stator into the magnetic gear structure a very high torque density direct-drive generator can be created. Magnetic geared systems offer unique capabilities that are currently not available using existing mechanically geared systems, such as overload protection. Magnetic gears also offer the potential for higher reliability, higher efficiency and quieter operation than is currently achievable using a mechanically geared generator. By increasing reliability and design life magnetic gears could decrease the overall life-cycle costs when compared with equivalent mechanical or direct-drive drivetrains. This research project investigated and experimentally testing two sub-scale magnetic gearboxes (0.12 m diameter) and two large diameter magnetic gearboxes (0.56m and 0.63m diameter). The goal of the project was to demonstrate a torque density >300Nm/L for a multistage magnetic gearbox with integrated stator. A nested multistage magnetic gear structure was first proposed and studied. However, it was shown that the nested design greatly increased mechanical complexity and therefore a two-stage series typology was utilized. A multi-stage magnetic gear with a 59:1 gear ratio was successfully experimentally tested. A peak torque of 4.25 kN·m was measured and this resulted in an overall active region torque density of 141 N·m/L (when including support rings). The torque density was significantly reduced from what was computed using 2-D electromagnetic analysis. This reduction was due to the 3-D edge effects, increased power losses and the inclusion of additional mechanical support rings as well as other mechanical assembly design changes. At large diameters contiguous lamination parts could not be fabricated and so a segmented laminated rotor design had to be used. This reduced the mechanical strength of the design when compared to small diameter magnetic gears and resulted in the need for the addition of mechanical support rings to prevent deflection. The final experimentally tested design also had a high torque ripple and the power loss within the magnetic gear did not change significantly with load. This therefore resulted in the efficiency being high only at peak loads. Despite not experimentally achieving the 2-D calculated high torque density the analysis has shown that the problems encountered with the scaling can be overcome with careful design changes. For example, understanding the unique mechanical deflection requirements during the electromagnetic design of the large diameter magnetic gears is key to achieving both a high torque density based on the electromagnetic analysis and a high torque density based on the mechanical support needs. Furthermore, ensuring that end plates are made of non-conductive material and minimizing other conductive support elements within the magnetic structure is a key requirement for reducing eddy current losses. In summary, if the mechanical design can be made more robust and eddy current loss mitigation strategies are used in the mechanical design phase then the magnetic gear is capable of being scaled up whilst operating at a very high torque density. This will then enable it to be potentially performance and cost competitive with alternative direct-drive and mechanically geared wind turbine drivetrains.

17 WIND ENERGY↗

Reliability of emergency and standby diesel generators: Impact on energy resiliency solutions

Emergency diesel generators are the most common form of backup power for critical loads when the grid fails and are most often deployed as stand-alone generators (<2000 kW) tied to individual buildings for hospitals, emergency services, military bases, ports, airports, industries, and commercial facilities. Understanding the finite reliability of emergency diesel generators during continuous operation is critical for energy planners, managers, and end-users. A new analysis of two large non-public emergency diesel generator operational data sets shows that commonly used reliability metrics are inadequate to predict the performance during a grid outage. Additional metrics addressing the likelihood of an emergency diesel generator to be available at the time an outage starts, successfully start and carry load, and constantly run for the duration of the outage are needed to predict the continuous run-time reliability of emergency diesel generators during a grid outage. This is the first analysis of the reliability of modern generators that follow standard maintenance protocols commonly used for backup power and these new metrics are shown to be dependent on the level of emergency diesel generator maintenance with values that can vary by more than an order of magnitude. Even using the new metrics for well-maintained emergency diesel generators, the analysis shows that the single emergency diesel generators configurations are only 80% likely to provide power for the duration of a two-week grid outage.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Over 8 hours of continuous operation of a free-electron laser driven by a laser-plasma accelerator

Since the emergence of laser-plasma accelerators (LPAs), substantial work has been dedicated to using LPAs to drive free-electron lasers (FELs) for a broad range of applications. Despite recent breakthroughs, which have proven the fundamental feasibility of operating FELs with an LPA source, stable FEL operation over multiple hours without operator input had yet to be achieved. In this work, we report significant improvements to the stability of a hundred terawatt laser system, resulting in successful demonstration of reliable, long-term operation of an LPA-driven FEL in the self-amplified spontaneous emission (SASE) regime at 420 nm. The LPA source delivered 100 MeV electron beams at 1 Hz with high stability over more than 10 h, enabling over 8 h of continuous FEL operation without operator input. The acquired data were subsequently used to investigate correlations between the measured undulator radiation and parameters of the drive laser, plasma source, and electron beam. The revealed connections between LPA and FEL performance gave important additional insights into ways to further improve and stabilize the system, thus demonstrating the capability of our setup to serve as a powerful platform for future studies of LPA-driven FEL operation. The one-of-a-kind integration of multiple stabilization concepts onto the LPA facility discussed in this manuscript yielded significant accelerator and light source improvements (with residual correlations suggesting even more is possible), which will positively impact LPA applications at large.

Kohrell, Finn [Lawrence Berkeley National Laborato↗

Testing of the KRI-developed Silicon PIN Radioxenon Detector

Radioxenon detectors are used for the verification of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) in a network of detectors throughout the world called the International Monitoring System (IMS). The Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) Provisional Technical Secretariat (PTS) has tasked Pacific Northwest National Laboratory (PNNL) with testing a V.G. Khlopin Radium Institute (KRI) and Lares Ltd-developed Silicon PIN detector for radioxenon detection. PNNL measured radioxenon with the silicon PIN detector and determined its potential compared to current plastic scintillator beta cells. While the PNNL tested Si detector experienced noise issues, a second detector was tested in Russia at Lares Ltd, which did not exhibit the noise issues. Without the noise issues, the Si detector produces much better energy resolution and isomer peak separation than a conventional plastic scintillator cell used in the SAUNA systems in the IMS. Under the assumption of 1 cm 3 of Xe in laboratory-like conditions, 24-hr count time (12-hr count time for the SAUNA), with the respective shielding the minimum detectable concentrations for the Si detector tested by Lares Ltd (and a conventional SAUNA system) were calculated to be: 131m Xe – 0.12 mBq/m 3 (0.12 mBq/m 3 ); 133 Xe – 0.18 mBq/m 3 (0.21 mBq/m 3 ); 133m Xe – 0.07 mBq/m 3 (0.15 mBq/m 3 ); 135 Xe – 0.45 mBq/m 3 (0.67 mBq/m 3 ). Detection limits, which are one of the important factors in choosing the best detection technique for radioxenon in field conditions, are significantly better than for SAUNA-like detection systems for 131m Xe and 133m Xe, but similar for 133 Xe and 135 Xe. Another important factor is the amount of “memory effect” or carry over signal from one radioxenon measurement to the subsequent sample. The memory effect is reduced by a factor of 10 in the Si PIN detector compared to the current plastic scintillator cells. There is potential for further reduction with the removal of plastics within the cell, which will need to be explored in future work. A third important parameter in choosing the best detection technique for radioxenon is the resolution of the electron detection. While the resolution is important in determining the minimum detectable concentration, it plays a larger role in source identification when there is a visible signal. The Silicon PIN diodes generated improved resolution over a similar plastic scintillator cell. With the improved resolution, it becomes easier to distinguish the radioxenon isomers ( 133m Xe and 131m Xe) from the 133 Xe beta continuum background. With the beta background from 133 Xe ever present with the detection of the isomers, the improved resolution proves vital in calculating the ratios of the three isotopes. With an accurate measurement of the isotopic ratios, the anthropogenic sources of radioxenon (medical isotope production and nuclear reactors) can be more accurately distinguished. Based on the results shown within this report, a Si PIN beta cell shows the potential to aid in the operation and discriminating power of the IMS for the CTBTO. However, there are a number of issues that need attention before a detector of this design would be reliable enough for field operations in the IMS. Issues that need develop include, but are not limited to: studying the robustness of the design in field conditions, eliminating or minimizing the noise and variability of individual Si detector elements, understanding the long-term gain stability of the Si detectors, and reducing the non-Si materials within the cell (i.e. the plastic housing).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Energy Storage Improves Power Plant Flexibility and Economic Performance

Most existing coal-fired power plants were designed for sustained operation at full load to maximize efficiency, reliability, and revenue, as well as to operate air pollution control devices at design conditions. Depending on plant type and design, these plants can adjust output within a fixed range in response to plant operating or market conditions. The need for flexibility driven by increased penetration of variable and non-dispatchable power generation, such as wind and solar, is shifting the traditional mission profile of thermoelectric power plants in three ways: more frequent shutdowns when market or grid conditions warrant, more aggressive load ramp rates (rate of output change), and a lower minimum sustainable load, which provides a wider operating range and helps avoid costly plant shutdowns. Recent studies have shown that the flexibility of a coal-fired power plant can be improved by energy storage. The objective of this work was to analyze a set of energy storage options and determine their impact on the flexibility and economics of a representative coal-fired power plant. The effect of three energy storage systems integrated with a coal power plant on plant flexibility and economics was investigated. The results obtained in this project show that energy storage systems integrated with a thermal power plant improve plant flexibility and participation in the energy and ancillary services markets, which improves plant financial performance.

20 FOSSIL-FUELED POWER PLANTS↗