Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrals”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,171 records · Page 65

Tools and Models for Integrating Multiple Cellular Networks

In this grant, we have systematically investigated the integrated networks, which are responsible for the coordination of activity between metabolic pathways in prokaryotes. We have developed several computational tools to analyze the topology of the integrated networks consisting of metabolic, regulatory, and physical interaction networks. The tools are all open-source, and they are available to download from Github, and can be incorporated in the Knowledgebase. Here, we summarize our work as follow. Understanding the topology of the integrated networks is the first step toward understanding its dynamics and evolution. For Aim 1 of this grant, we have developed a novel algorithm to determine and measure the hierarchical structure of transcriptional regulatory networks [1]. The hierarchy captures the direction of information flow in the network. The algorithm is generally applicable to regulatory networks in prokaryotes, yeast and higher organisms. Integrated datasets are extremely beneficial in understanding the biology of a system in a compact manner due to the conflation of multiple layers of information. Therefore for Aim 2 of this grant, we have developed several tools and carried out analysis for integrating system-wide genomic information. To make use of the structural data, we have developed DynaSIN for protein-protein interactions networks with various dynamical interfaces [2]. We then examined the association between network topology with phenotypic effects such as gene essentiality. In particular, we have organized E. coli and S. cerevisiae transcriptional regulatory networks into hierarchies. We then correlated gene phenotypic effects by tinkering with different layers to elucidate which layers were more tolerant to perturbations [3]. In the context of evolution, we also developed a workflow to guide the comparison between different types of biological networks across various species using the concept of rewiring [4], and Furthermore, we have developed CRIT for correlation analysis in systems biology [5]. For Aim 3, we have further investigated the scaling relationship that the number of Transcription Factors (TFs) in a genome is proportional to the square of the total number of genes. We have extended the analysis from transcription factors to various classes of functional categories, and from individual categories to joint distribution [6]. By introducing a new analytical framework, we have generalized the original toolbox model to take into account of metabolic network with arbitrary network topology [7].

09 BIOMASS FUELS↗

High-Voltage LED Light Engine with Integrated Driver

LED luminaires have seen dramatic changes in cost breakdown over the past few years. The LED component cost, which until recently was the dominant portion of luminaire cost, has fallen to a level of the same order as the other luminaire components, such as the driver, housing, optics etc. With the current state of the technology, further luminaire performance improvement and cost reduction is realized most effectively by optimization of the whole system, rather than a single component. This project focuses on improving the integration between LEDs and drivers. Lumileds has developed a light engine platform based on low-cost high-power LEDs and driver topologies optimized for integration with these LEDs on a single substrate. The integration of driver and LEDs enables an estimated luminaire cost reduction of about 25% for targeted applications, mostly due to significant reductions in driver and housing cost. The high-power LEDs are based on Lumileds’ patterned sapphire substrate flip-chip (PSS-FC) technology, affording reduced die fabrication and packaging cost compared to existing technology. Two general versions of PSS-FC die were developed in order to create the desired voltage and flux increments for driver integration: (i) small single-junction die (0.5 mm 2 ), optimal for distributed lighting applications, and (ii) larger multi-junction die (2 mm 2 and 4 mm 2 ) for high-power directional applications. Two driver topologies were developed: a tapped linear driver topology and a single-stage switch-mode topology, taking advantage of the flexible voltage configurations of the new PSS-FC die and the simplification opportunities enabled by integration of LEDs and driver on the same board. A prototype light engine was developed for an outdoor “core module” application based on the multi-junction PSS-FC die and the single-stage switch-mode driver. The light engine meets the project efficacy target of 128 lm/W at a luminous flux greater than 4100 lm, a correlated color temperature (CCT) of 4000K and a color rendering index (CRI) greater than 70.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Surface/subsurface flow modeling in PFLOTRAN

Understanding soil water, groundwater, and shallow surface water dynamics as an integrated hydrological system is critical for understanding the Earth’s critical zone, the thin outer layer at our planet’s surface where vegetation, soil, rock, and gases interact to regulate the environment. Computational tools that take this view of soil moisture and shallow surface flows as a single integrated system are typically referred to as integrated surface/subsurface hydrology models. We extend the open-source, highly parallel, subsurface flow and reactive transport simulator PFLOTRAN to accommodate surface flows. In contrast to most previous implementations, we do not represent a distinct surface system. Instead, the vertical gradient in hydraulic head at the land surface is neglected, which allows the surface flow system to be eliminated and incorporated directly into the subsurface system. This tight coupling approach leads to a robust capability and also greatly simplifies implementation in existing subsurface simulators such as PFLOTRAN. Successful comparisons to independent numerical solutions build confidence in the approximation and implementation. Example simulations of the Walker Branch and East Fork Poplar Creek watersheds near Oak Ridge, Tennessee demonstrate the robustness of the approach in geometrically complex applications. The lack of a robust integrated surface/subsurface hydrology capability had been a barrier to PFLOTRAN’s use in critical zone studies. This work addresses that capability gap, thus enabling PFLOTRAN as a community platform for building integrated models of the critical zone.

58 GEOSCIENCES↗

Well Integrity for Natural Gas Storage in Depleted Reservoirs and Aquifers

Introduction Motivation The 2015-2016 Aliso Canyon/Porter Ranch natural gas well blowout emitted approximately 100,000 tonnes of natural gas (mostly methane, CH 4 ) over four months. The blowout impacted thousands of nearby residents, who were displaced from their homes. The high visibility of the event has led to increased scrutiny of the safety of natural gas storage at the Aliso Canyon facility, as well as broader concern for natural gas storage integrity throughout the country. Federal Review of Well Integrity In April of 2016, the U.S. Department of Energy (DOE), in conjunction with the U.S. Department of Transportation (DOT) through the Pipeline and Hazardous Materials Safety Administration (PHMSA), announced the formation of a new Interagency Task Force on Natural Gas Storage Safety. The Task Force enlisted a group of scientists and engineers at the DOE National Laboratories to review the state of well integrity in natural gas storage in the U.S. The overarching objective of the review is to gather, analyze, catalogue, and disseminate information and findings that can lead to improved natural gas storage safety and security and thus reduce the risk of future events. The “Protecting our Infrastructure of Pipelines and Enhancing Safety Act of 2016’’ or the ‘‘PIPES Act of 2016,’’which was signed into law on June 22, 2016, created an Aliso Canyon Natural Gas Leak Task Force led by the Secretary of Energy and consisting of representatives from the DOT, Environmental Protection Agency (EPA), Department of Health and Human Services, Federal Energy Regulatory Commission (FERC), Department of Commerce and the Department of Interior. The Task Force was asked to perform an analysis of the Aliso Canyon event and make recommendations on preventing similar incidents in the future. The PIPES Act also required that DOT/PHMSA promulgate minimum safety standards for underground storage that would take effect within two years. Background on the DOE National Laboratories Well Integrity Work Group One of the primary areas that the Task Force is studying is integrity of natural gas wells at storage facilities. The DOE Office of Fossil Energy (FE) took the lead in this area and asked scientists and engineers from the National Energy Technology Laboratory (NETL), Lawrence Livermore National Laboratory (LLNL), Sandia National Laboratories (SNL), and Lawrence Berkeley National Laboratory (LBNL)) to form a Work Group to address this area. This Work Group is an expansion of the original “Lab Team” comprising scientists and engineers from SNL, LLNL, and LBNL which was formed to support the State of California’s response to the Aliso Canyon incident and operated under the Governor of California’s Aliso Canyon Emergency Order (1/6/2016). The Lab Team played a key role in advising the State of California’s Department of Conservation (DOC) in its oversight of SoCalGas during and after the incident.

03 NATURAL GAS↗

DISTINCT: Diversity in Solar Talent Through INnovative Curriculum and Training: An Integrated Research and Education Approach towards Creating Diversity and Advancing Utility-Scale Solar Technology

The DISTINCT project research objective is to develop an innovative N-port power converter for a utility-scale PV system that is modular, compact and cost-effective and that will enable the integration of a high-frequency, high-voltage solid-state transformer. The novelty of the proposed research is the electrical power conversion architecture using an N-port converter system that replaces the output 60Hz transformer with an integrated high-frequency low-weight solid-state transformer reducing power electronics and BOS costs to meet SunShot goals through modularity and direct high-voltage interconnection. A challenge in direct integration with a 13.8kV line is the high voltage handling capacity of the converters combined with high efficiency operation. The front-end converter for each port is a Neutral-Point Clamped (NPC) Multi-Level dc-dc Dual-Active Bridge (ML-DAB) which allows Maximum Power Point Tracking (MPPT). The integrated high frequency transformer provides the galvanic isolation between the PV and grid side and also steps up the low dc voltage from PV source. Following the ML-DAB stage, in each port, is an inverter with H-bridge configuration or NPC configuration. N number of NPC inverters’ outputs are cascaded to attain the per-phase line-to-neutral voltage to connect directly to the distribution grid (i.e. 13.8 kV). The cascaded inverters have the inherent advantage of using lower rated devices, smaller filters and low Total Harmonic Distortion (THD) required for PV grid interconnection. Our analysis and simulation results show improved performance on cost, efficiency, service life with zero downtime and THD. A comprehensive control scheme is presented to ensure the maximum power from each port and each phase are sent to the grid. A functional prototype of a 2-port converter with ML-DAB and cascaded H-bridges has been designed, built, and tested in a laboratory setup to verify the target technical metrics. The N-port converter system due to its modular structure with individual control per port can be easily adapted to integrate functionalities that go well beyond the conventional grid support functions and mitigates impacts of forecasted fast ramp downs or ramp ups and single-fault conditions by automatic reconfiguration of the output.

14 SOLAR ENERGY↗

An Integrated Supercritical System for Efficient Produced Water Treatment and Power Generation

The main goal of this project was to evaluate the feasibility of an integrated supercritical (SC) water desalination and power generation system for treatment of produced waters from CO 2 sequestration, oil production, and coal-bed methane recovery. This system may offer a transformative approach to generating power from coal or natural gas (NG) and purifying saline water or produced water with high total dissolved solids (TDS) in a zero-liquid discharge plant. The closed-loop steam cycle of conventional power plants was replaced with an open-loop steam cycle that heated the pretreated produced water above the SC point of water (374 °C and 221 bar) to precipitate and separate the salts dissolved in the water. After separation of the precipitated salt, the SC steam required further treatment to reduce the salt content from ~100 mg/L (ppm) to <1 ppm to make it suitable for use in turbines for power generation. A SC membrane distillation unit was used to polish the SC steam, which could be sent through a series of turbines for power generation, and the steam exiting the low-pressure turbine could be condensed by cooling water to produce pure water. Project tasks included a process simulation and a techno-economic evaluation of the integrated system; design and assembly of SC salt precipitation and membrane distillation systems; development and characterization of advanced carbon membranes for SC membrane distillation; and pretreatment, desalination, and purification of different produced water samples with salt concentrations of 30,000–200,000 ppm to a high-purity (<1 ppm) level. Process simulations were performed for 550 MW SC coal-fired or NG baseline cases and various scenarios for the proposed integrated SC system using produced water as the water source and coal or NG as the fuel source. Simulation results indicated that the net plant efficiency loss of the proposed SC cogeneration process would be in the range of <1% to ~4%, in which NG and lower TDS produced water cases would have higher efficiencies. The proposed process for coal-fired cases could provide all water needs for the power generation process and generate additional pure water for beneficial use. A techno-economic analysis was performed to estimate the cost of produced water treatment (dollars /kgal of treated water) by conventional treatment processes compared with the proposed cogeneration process. The cost estimation for the proposed cogeneration system included the cost of pretreatment, the cost of power loss to integrate the water desalination process into the power generation system, and the cost of plant modification or retrofitting. The cost of produced water treatment was calculated by assuming three different scenarios in which converting a baseline power plant to the proposed cogeneration plant would increase the cost of the boiler and feed water system by 10%, 50%, and 100%. Results indicated that the cost of produced water treatment, even with a 100% cost increase, was in the range of $8.6–11.6 dollars per kgal, which is about half of the treatment cost by conventional methods. The cost of produced water treatment by the proposed cogeneration system could be further reduced or a considerable income could be generated if the values of saltwater and freshwater products are considered. Overall, the techno-economic analysis results indicated that the proposed integrated SC system could potentially treat produced water at a cost significantly lower than the cost of produced water treatment by conventional technologies. To evaluate the feasibility of the proposed treatment system at a laboratory scale, a SC salt precipitation and membrane distillation system was designed and fabricated to treat a simulated brine or pretreated produced water by precipitating salts and further polishing the SC steam containing ~100 ppm salts to a high-purity steam. Through baseline tests with NaCl solutions, with concentrations ranging from 30,000 to 200,000 ppm, it was demonstrated that concentrated feed solutions could be treated by precipitating salt at SC conditions to a TDS level of 130 ppm. Produced water samples were collected from a potential CO 2 sequestration site, a coal-bed methane site, and an oilfield in Illinois. Representative samples were characterized for various water quality parameters, including pH; turbidity; conductivity; and concentrations of selected anions, cations, alkalinity, dissolved organic carbon, total suspended solids, TDS, and total petroleum hydrocarbons. The produced water samples were first treated by conventional pretreatment methods to remove residual oil, dissolved organic matter, and scale-forming species. Pretreatment methods included coagulation, sedimentation, filtration, activated carbon adsorption, and ion-exchange adsorption. Pretreated produced waters were treated at SC conditions in which salts were precipitated. Analysis of treated samples revealed that the concentration of Na (the main cation) in produced waters was reduced dramatically from 14,000–47,400 ppm in the feed to 21–80 ppm in treated waters. Concentrations of other main cations (Ca, Mg, Sr, K) also decreased significantly from initial values of ~1,000–22,000 ppm to ~1 ppm or less. However, a significant increase in the concentrations of Fe, Ni, Cu, and Co was observed, mainly caused by leaching of these elements from the system (vessels, filters, tubing), which is manufactured from alloys containing Fe, Ni, Cu, and Co. To polish the SC steam containing a salt content of ~100 ppm to a high-purity level of <1 ppm, a SC membrane distillation treatment using carbon membranes was employed. Different types of self-standing or supported carbon membranes were developed from graphite, graphene, carbon nanotubes, carbon nanofibers, and pyrolytic carbon. Screening tests revealed that only a limited number of developed carbon membranes were suitable for the purification of steam at SC conditions. Membranes that were either fragile and lacked mechanical strength or had large pores and showed limited salt rejection (<20%) were found to be unsuitable for the purification of SC steam. Promising carbon membranes that were successfully tested for purifying SC steam included two graphite membranes (i.e., AF-5, a porous graphite material, and FGS, a flexible graphite sheet) and a carbon nanotube membrane grown on a Hastelloy substrate and then further modified using a proprietary method (i.e., membrane C). The AF-5 membrane exhibited a stable water flux of ~50 kg/m 2 ∙h and ~40% salt rejection. The FGS membrane had a high salt rejection of 95%–98% but a lower water flux of ~15 kg/m 2 ∙h. Membrane C showed an extremely high flux of 200-800 kg/m 2 ∙h, which is one order of magnitude higher than the water flux of conventional membranes. Membrane C also exhibited 87%–93% salt rejection. Overall, a two-stage or multistage polishing treatment by these membranes could lower the salt content of the SC steam from initial values of ~100–200 ppm to the steam quality of <1 ppm or to parts per billion levels required for the power cycle.

20 FOSSIL-FUELED POWER PLANTS↗

Integrated Pre-Feasibility Assessment for a Northern Michigan Basin CarbonSAFE CO 2 Storage Complex

One of the key gaps in the critical path toward carbon capture and storage (CCS) deployment is the development of commercial-scale (50+ million metric tons carbon dioxide [CO2]) geologic storage sites for CO 2 from industrial sources. There has been relatively little effort by the private sector to identify and certify (i.e., regulatory permit) geologic storage sites that are capable of storing commercial-scale volumes of CO 2 , primarily because of the lack of immediate economic incentives. As a result, commercial-scale CO 2 sources that want to develop CCS projects face the risk of not finding a suitable saline storage site for their captured CO 2 . Carbon Storage Assurance Facility Enterprise (CarbonSAFE) is a U.S. Department of Energy (DOE)-sponsored effort to develop an integrated CCS storage complex constructed and permitted for operation in the 2025 timeframe over a series of sequential phases of development: Integrated CCS Pre-Feasibility, Storage Complex Feasibility, Site Characterization, and Permitting and Construction. Subject to availability of funds, a series of funding opportunity announcements (FOAs) are planned to accomplish this mission. This document describes a project that addresses DOE FOA-1584 Phase I: Integrated Carbon Capture and Storage (CCS) Pre-Feasibility. The objective of this project was to take the first step in developing an integrated commercial geologic CO 2 storage complex in the Northern Michigan Basin, herein referred to as the CarbonSAFE – Northern Michigan Basin (CS-NMB) storage complex. This includes demonstrating that the storage sites within the complex have the potential to store more than 50 million metric tons (MMT) of industrially-sourced CO 2 emissions safely, permanently and economically. To achieve the overall objective of the Phase I pre-feasibility study, FOA-1584 required three activities: • Perform a high-level technical sub-basinal evaluation to identify a potential storage complex with storage site(s), including a description of the geology and risks associated with the potential storage site; identify and evaluate potential CO 2 sources. • Develop a plan for the storage complex and storage site(s) including a strategy that would enable an integrated capture and storage project to be economically feasible and publicly acceptable. • Form a CCS coordination team capable of addressing regulatory, legislative, technical, public policy, commercial, financial, etc. challenges specific to commercial-scale deployment of the CO 2 storage project.

20 FOSSIL-FUELED POWER PLANTS↗

Integrated Optimization and Control of a Hybrid Gas Turbine/sCO 2 Power System

During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.

03 NATURAL GAS↗

Integration of the Back End of the Nuclear Fuel Cycle

Management of spent nuclear fuel and high-level radioactive waste consists of three main phases – storage, transportation, and disposal – commonly referred to as the back end of the nuclear fuel cycle. Current practice for commercial spent nuclear fuel management in the United States (US) includes temporary storage of spent fuel in both pools and dry storage systems at operating or shutdown nuclear power plants. Storage pools are filling to their operational capacity, and management of the approximately 2,200 metric tons of spent fuel newly discharged each year requires transferring older and cooler spent fuel from pools into dry storage. Unless a repository becomes available that can accept spent fuel for permanent disposal, projections indicate that the US will have approximately 136,000 metric tons of spent fuel in dry storage systems by mid-century, when the last plants in the current reactor fleet are decommissioned. Current designs for dry storage systems rely on large multi-assembly canisters, the most common of which are so-called “dual-purpose canisters” (DPCs). DPCs are certified for both storage and transportation, but are not designed or licensed for permanent disposal. The large capacity (greater number of spent fuel assemblies) of these canisters can lead to higher canister temperatures, which can delay transportation and/or complicate disposal. This current management practice, in which the utilities continue loading an ever-increasing inventory of larger DPCs, does not emphasize integration among storage, transportation, and disposal. This lack of integration does not cause safety issues, but it does lead to a suboptimal system that increases costs, complicates storage and transportation operations, and limits options for permanent disposal. This paper describes strategies for improving integration of management practices in the US across the entire back end of the nuclear fuel cycle. The complex interactions between storage, transportation, and disposal make a single optimal solution unlikely. However, efforts to integrate various phases of nuclear waste management can have the greatest impact if they begin promptly and continue to evolve throughout the remaining life of the current fuel cycle. A key factor that influences the path forward for integration of nuclear waste management practices is the identification of the timing and location for a repository. The most cost-effective path forward would be to open a repository by mid-century with the capability to directly dispose of DPCs without repackaging the spent fuel into disposalready canisters. Options that involve repackaging of spent fuel from DPCs into disposalready canisters or that delay the repository opening significantly beyond mid-century could add 10s of billions of dollars to the total system life cycle cost.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Status of the NEAMS and ARC fast reactor tools integration to the NEAMS Workbench

The Workbench initiative was launched in FY-2017 within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program to facilitate the transition from conventional tools to high-fidelity tools. The NEAMS Workbench provides a common user interface for model creation, real-time validation, execution, output processing, and visualization for integrated codes. The integration of the Argonne Reactor Computation (ARC) suite of codes into the NEAMS Workbench through the PyARC module was initiated in FY-2017. The ARC codes, which focus on fast reactor multiphysics analysis, contain both legacy codes like DIF3D and REBUS-3 that were developed with over 30 years of experience, and newer NEAMS additions like MC 2 -3, PERSENT, and PROTEUS. Recent work expended this integration to other tools to support the U.S. fast reactor community such as DASSH for sub-channel thermal-hydraulics, Griffin for high-fidelity deterministic transport calculations, and OpenMC for Monte Carlo simulations (with Shift integration planned for FY-2023). The integration of the “extended ARC” suite of codes into the NEAMS Workbench interface relies on the PyARC and PyGriffin modules to handles the pre- and post-processing of these codes input, and the runtime environment. The PyARC module together with the NEAMS Workbench interface are both released under Open Source Software licenses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of Microreactor Automated Control System (MACS): Surrogate Plant-level Modeling and Control Algorithms Integration

This report discusses progress on the modeling and integration task as part of the development of Microreactor Automated Control System (MACS). What follows is a discussion of the software tools used to develop a surrogate microreactor plant-level model, MACS module development, and a summary of the findings from integration with a hardware-in-the-loop (HIL) setup at Idaho National Laboratory (INL). Oak Ridge National Laboratory worked with INL to understand available hardware at INL (such as existing control platforms). With this information and using a preliminary framework for MACS with software interfaces defined, surrogate models and initial automated control algorithms were created for integration into the hardware to provide a HIL demonstration platform for MACS. Available reduced order reactor models that leverage existing microreactor neutronics and thermal hydraulics models have been integrated in the surrogate plant-level model. The surrogate model has been evaluated for sensitivity of all parameters and the MACS software modules (including the surrogate model) have been demonstrated to interact with the hardware. The integration, however, pointed to the need for further improvements to the framework—and specifically improvements to the interfaces to ensure that the HIL simulator is capable of longer-term stable operation with MACS in the loop. These improvements will be the focus of future research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

BUILD: Binary Understanding and Integration Logic for Dependencies (Final Report)

Increasingly diverse mission needs, the emergence of AI and cloud, and increasing hardware diversity are driving HPC software to be more complex. Modern codes are built from hundreds of small, complex components, and much of the software development process involves integrating these components rather than developing new components from scratch. The goal of the BUILD project was to ease the task of software integration for developers across LLNL’s programs. The project focused on (1) modeling software compatibility, (2) modeling ABI compatibility with binary analysis, (3) developing solver techniques to reason about compatibility, and (4) developing AI/ML models to fill gaps in our understanding of software compatibility. The project has developed several key technologies that help developers—by accelerating development workflows, removing the need for rebuilds, and enabling faster, automatic, and less error-prone code sharing. These technologies are used in LLNL codes and will be ready for the new El Capitan Exascale system in Livermore Computing. Many of these technologies have been hardened and integrated with LLNL’s Spack package manager, and they are already in use by production code teams. Results of BUILD have laid the groundwork for future advances in software integration—the ML and binary modification techniques developed in this project still need to be operationalized but have great potential to further speed up software integration.

97 MATHEMATICS AND COMPUTING↗

Performance Demonstration of an Occupancy Sensor-enabled Integrated Solution for Commercial Buildings

Traditionally, a single-loop fixed-gain controller is applied to supply fan (SF) and cooling coil (CC) valve controls while a fixed-damper position control is applied to outdoor air (OA) damper control at air handling units (AHUs) in commercial buildings. With the increasing application of occupancy sensors, the information generated by occupancy sensors is applied to not only reduce the electricity loads from lighting and controllable plug loads, but also reset OA intake and minimum supply airflow setpoints. Meanwhile, these intermittent operation actions greatly elevate the dynamics of AHU systems, which may introduce unstable SF and CC valve operations and inaccurate OA flow control at AHUs and consequently degrade maximum energy efficiency gains. With virtual fan and valve flow meter technologies, two advanced controls, including cascade control and gain scheduling control, can be implemented on both the SF and CC valve, and an advanced control using a virtual OA flow meter can be implemented on OA damper integrated with occupancy sensors. The goal of this project is to demonstrate the savings, cost, and performance of an integrated solution that integrates the three advanced HVAC controls with occupancy sensors to allow accurate and stable AHU operations in real buildings. The project objectives are to: 1) develop and validate an advance SF control algorithm; 2) develop and validate an advanced CC valve control algorithm; 3) validate an algorithm to implement a virtual OA flow meter; and 4) demonstrate the savings, cost, and performance of the integrated solution in real buildings. The technical approaches are to: 1) select a test system at the University of Oklahoma; 2) develop and implement the algorithms of advanced SF and CC valve controls and validate the performance; 3) develop and implement the advanced OA control using a virtual OA flow meter and validate the performance; 4) demonstrate the savings, cost, and performance of the proposed integrated solution with and without three advanced HVAC controls; and 5) disseminate the project results through publications and presentations. For the SF control, both the gain scheduling and cascade controls can improve the fan energy performance by reducing the fan power during the transient period and the fan control performance at lower speeds by reducing fan speed variation. Moreover, the gain scheduling control provides a simple and low-cost solution and is recommended. The fan power savings can reach 30% in a transient period. For the CC valve control, the gain scheduling control can considerably reduce the supply air temperature oscillation range and frequency under both higher and lower load conditions and the control valve response is much more stable. As a result, the gain scheduling control is recommended. The projected pump energy consumption can be reduced by 68.5%. With the developed virtual OA flow meter, the OA can be accurately controlled at its setpoint, which is determined based on the actual number of occupants in the building provided by occupancy sensors. The RMSE of the proposed OA control is 15.9 L/s. The energy data shows that the fan power and CC cooling energy were significantly reduced. On the other hand, the energy savings majorly results from the occupancy sensors and the energy savings by the advanced HVAC controls is minimal because that the controllers in the test AHU were tuned with very slow response. An annual technical savings potential is estimated as 0.5 quads in the commercial sector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation

This is the final scientific / technical report for Front End Engineering Design (FEED) study “Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation” funded by the US Department of Energy (DOE), Office of Fossil Energy and Carbon Management (FECM), Carbon Capture R&D Program under award DE-FE0032131. The prime recipient is General Electric Company working through its Gas Power division (GEGP) with subrecipients Southern Company and Linde Engineering plus subcontractor Kiewit. Southern Company’s Plant Barry, a 2x1 7F.04 CCGT, is the host site. GEGP led the overall integration of the carbon capture system (CCS) with the existing natural gas combined cycle (NGCC) facility. Linde provided the detailed process engineering and equipment costing for the carbon capture island. Kiewit focused on plant layout, constructability, and installation. With the FEED study finished, the engineering is approximately 50% complete towards the detailed design package needed to proceed to procure, install, build, commission, and operate the integrated NGCC+CCS facility. This FEED study focuses on retrofitting a 95% CO 2 capture system with attention on plant integration. The study was particularly challenging due to unique and substantial cost impacts related to global sourcing challenges associated with COVID. Additional incentives, regulatory support, and dispatch certainty are needed to move forward with implementing CCS at this or other sites in the US. This FEED study highlights the value of integrating NGCC+CCS and is a template for future CCS retrofit studies.

42 ENGINEERING↗

Data Integration Aggregated Model and Ontology for Nuclear Deployment (DIAMOND): Preliminary Model and Ontology

The data of a nuclear utility or plant are stored in various isolated forms in different systems. These data have different structures and tools and are, therefore, used independently. The integration of data sources is often performed manually and on an as-needed basis to achieve a targeted cost saving. A holistic approach to the integration of the data would enable creating a data warehouse for a single nuclear power plant (NPP) or multiple plants. A data warehouse results in direct and indirect cost saving because it automates the manual search for data, enables sharing and comparison of data from various tools of a single or multiple plants, enable digital transformation of data, increase frequencies of needed data that are sparse in nature (such as failures signatures), reduces the need for training on various tools for plant staff, enables a holistic staff perception of plant activities, reveals cost-saving opportunities, and improves the visual perception of all parts a plant necessary for operations and maintenance. One of the main challenges to deploy a data warehouse is associated with the integration of data sources into a consistent data model using a standard ontology that is developed by and for the nuclear power industry. This model is non-existent and is a necessity to enable the nuclear data warehouse role. A data model contains objects that make up a given domain along with their attributes and relationships. It provides domain standardization and maintainability, setting forth the objects, attributes, and relationships within that domain and acting as the guide by which the various applications within that domain will structure their data and interchange. An ontology is defined as “a set of concepts and categories in a subject area or domain that shows their properties and the relations between them”. Ontologies consist of a taxonomy or directed rooted tree. A survey of the models and ontologies available to support a data integration aggregated model and ontology for nuclear deployment (DIAMOND) was performed and different standards that address specific aspects of the needed model and ontology were leveraged and integrated in this effort. In specific, the Basic Formal Ontology (BFO) and Lifecycle Modeling Language (LML) were leveraged for the base ontology. The ISO 4224 and 15926 were leveraged in the development of the overlapping nuclear and fossil data aspects. The electric power research institute (EPRI) power distribution common information model (CIM) was also reviewed and the experience gained was leveraged in the power generation scope of DIAMOND. The initial aim targeted by this effort was to develop the ontology definitions and model structure. This report documents the resulting model and ontology to develop DIAMOND. The report describes the various elements of the model development based on a growing tree development approach, i.e. DIAMOND’s tree structure is established with the core data aspects and is populated with a preliminary level of details. Fifteen sources of data in a nuclear power plant were considered and incorporated into DIAMOND at this stage of development, representing the majority of operations data sources in nuclear power plants. Additional data sources, scope, and a higher level of fidelity will be incorporated into DIAMOND next in collaboration with the nuclear industry and relevant stakeholders.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Integrated Energy Systems

Leveraging the synergies among different energy technologies, Integrated Energy Systems (IES) can achieve greater efficiency, higher flexibility, and better CO2 removal concurrently. However, system integration in reality faces various challenges and difficulties. To integrate with other components, off-the-shelf equipment needs case-by-case modifications and redesigns. This presentation will use two integrated systems as examples to reveal the challenges in system integration.

Zhou, Nana↗