Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reporting Format”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Development and Processing Improvement of Aerospace Aluminum Alloys-Development of AL-Cu-Mg-Ag Alloy (2139)

This final report supplement in presentation format describes a comprehensive multi-tasked contract study to continue the development of the silver bearing alloy now registered as aluminum alloy 2139 by the Aluminum Association. Two commercial scale ingots were processed into nominal plate gauges of two, four and six inches, and were extensively characterized in terms of metallurgical and crystallographic structure, and resulting mechanical properties. This report includes comparisons of the property combinations for this alloy and 2XXX and 7XXX alloys more widely used in high performance applications. Alloy 2139 shows dramatic improvement in all combinations of properties, moreover, the properties of this alloy are retained in all gauge thicknesses, contrary to typical reductions observed in thicker gauges of the other alloys in the comparison. The advancements achieved in this study are expected to result in rapid, widespread use of this alloy in a broad range of ground based, aircraft, and spacecraft applications.

Cho, Alex↗

Covariance Data File Formats for Whisper-1.0 & Whisper-1.1

Whisper is a statistical analysis package developed in 2014 to support nuclear criticality safety (NCS) validation. It uses the sensitivity profile data for an application as computed by MCNP6 along with covariance files for the nuclear data to determine a baseline upper-subcritical-limit (USL) for the application. Whisper version 1.0 was first developed and used at LANL in 2014. During 2015-2016, Whisper was updated to version 1.1 and is to be included with the upcoming release of MCNP6.2. This report describes the file formats used for the covariance data in both Whisper-1.0 and Whisper-1.1.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DIRECT OBSERVATIONS OF MAGNETIC FLUX ROPE FORMATION DURING A SOLAR CORONAL MASS EJECTION

Coronal mass ejections (CMEs) are the most spectacular eruptive phenomena in the solar atmosphere. It is generally accepted that CMEs are the results of eruptions of magnetic flux ropes (MFRs). However, there is heated debate on whether MFRs exist prior to the eruptions or if they are formed during the eruptions. Several coronal signatures, e.g., filaments, coronal cavities, sigmoid structures, and hot channels (or hot blobs), are proposed as MFRs and observed before the eruption, which support the pre-existing MFR scenario. There is almost no reported observation of MFR formation during the eruption. In this Letter, we present an intriguing observation of a solar eruptive event that occurred on 2013 November 21 with the Atmospheric Imaging Assembly on board the Solar Dynamic Observatory, which shows the formation process of the MFR during the eruption in detail. The process began with the expansion of a low-lying coronal arcade, possibly caused by the flare magnetic reconnection underneath. The newly formed ascending loops from below further pushed the arcade upward, stretching the surrounding magnetic field. The arcade and stretched magnetic field lines then curved in just below the arcade vertex, forming an X-point. The field lines near the X-point continued to approach each other and a second magnetic reconnection was induced. It is this high-lying magnetic reconnection that led to the formation and eruption of a hot blob (∼10 MK), presumably an MFR, producing a CME. We suggest that two spatially separated magnetic reconnections occurred in this event, which were responsible for producing the flare and the hot blob (CME)

79 ASTRONOMY AND ASTROPHYSICS↗

Ion imaging study of reaction dynamics in the N{sup +}+ CH{sub 4} system

The velocity map ion imaging method is applied to the ion-molecule reactions of N{sup +} with CH{sub 4}. The velocity space images are collected at collision energies of 0.5 and 1.8 eV, providing both product kinetic energy and angular distributions for the reaction products CH{sub 4}{sup +}, CH{sub 3}{sup +}, and HCNH{sup +}. The charge transfer process is energy resonant and occurs by long-range electron transfer that results in minimal deflection of the products. The formation of the most abundant product, CH{sub 3}{sup +}, proceeds by dissociative charge transfer rather than hydride transfer, as reported in earlier publications. The formation of HCNH{sup +} by C-N bond formation appears to proceed by two different routes. The triplet state intermediates CH{sub 3}NH{sup +} and CH{sub 2}NH{sub 2}{sup +} that are formed as N{sup +}({sup 3}P) approaches CH{sub 4} may undergo sequential loss of two hydrogen atoms to form ground state HCNH{sup +} products on a spin-allowed pathway. However, the kinetic energy distributions for formation of HCNH{sup +} extend past the thermochemical limit to form HCNH{sup +}+ 2H, implying that HCNH{sup +} may also be formed in concert with molecular hydrogen, and requiring that intersystem crossing to the singlet manifold must occur in a significant ({approx}25%) fraction of reactive collisions. We also report GAUSSIAN G2 calculations of the energies and structures of important singlet and triplet [CNH{sub 4}{sup +}] complexes that serve as precursors to product formation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Microstructure and bonding between calcium aluminate cement‐containing gahnite–alumina matrix and refractory aggregates

Calcium aluminate cement enhances the thermomechanical properties of refractory castables through the formation of acicular calcium hexaluminate (CaO·6Al 2 O 3 ), Ca 2 Mg 2 Al 28 O 46 (CAM-I), and CaMg 2 Al 16 O 27 (CAM-II) phases in MgO- or MgAl 2 O 4 -containing castables. The compatibility of CA 6 with gahnite (ZnAl 2 O 4 ), and acicular Ca 2 Zn 2 Al 28 O 46 (CAZ-I) and CaZn 2 Al 16 O 27 (CAZ-II) phases formation have been previously reported. Here, in this work, the interaction between a CAC binder containing ZnAl 2 O 4 -Al 2 O 3 matrix with commonly used refractory aggregates such as tabular alumina (TA), alumina-rich (AR90, AR78) and stoichiometric (SM72) MgAl 2 O 4 spinels, and fused and dead-burned magnesia (FM, DBM, respectively) were investigated at 1650°C for 5 h. Microstructural analysis, using digital microscopy, scanning electron microscopy, and energy dispersive spectroscopy, revealed the formation of acicular CaZn 0.18 Al 11.82 O 18.91 , CAZ-I and CAZ-II grains, and strong interfacial bonding between the matrix and TA and spinel aggregates. FM and DBM were found to debond from the matrix. Thick interface layers were observed between the matrix and all the aggregates but TA. Null hypothesis significance testing (NHST) shows that the difference in the number of acicular grains between the interface zone and the bulk matrix (Z) is statistically significant for AR90/Z, SM72/Z, FM/Z, and DBM/Z interfaces, but not significant for TA/Z and AR78/Z. The role of the aggregates’ chemistry on the interfacial bonding and microstructure evolution is discussed.

Ramteke, Rajat Durgesh [Univ. of Alabama, Birmingh↗

Regime-Dependence of Nocturnal Nitrate Formation via N 2 O 5 Hydrolysis and Its Implication for Mitigating Nitrate Pollution

The heterogeneous hydrolysis of dinitrogen pentoxide (N 2 O 5 ) is an important pathway in nitrate formation; however, its formation rate and relative contribution to total particulate nitrate (pNO 3 - ) are highly variable. Here we report that nocturnal pNO 3 - formation via N 2 O 5 hydrolysis is dependent on the regime defined by the ratio of NO 2 to O 3 . Nocturnal pNO 3 - formation via N 2 O 5 hydrolysis is suppressed in an O 3 -limited regime but enhanced in a NO 2 -limited regime. The results have crucial implications for effective control of nitrate pollution in the future. An exclusive decrease in NO 2 will decrease nocturnal pNO 3 - formation in a NO 2 -limited regime but may be less effective or even increase nocturnal pNO 3 - formation in an O 3 -limited regime.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2016

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2016. The format and content of this report satisfy the requirements of both DOE Order 231.1B Admin Chg 1, Environment, Safety, and Health Reporting, and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). Activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. Berkeley Lab implements an Environmental Management System (EMS) to oversee these compliance activities and improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the operating contract’s performance evaluation process. For fiscal year (FY) 2016, which began October 1, 2015, and ended September 30, 2016, the EMS was given a performance rating of A minus for its management of environmental activities (on a scale from A plus as the highest grade to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2016 rating was based on how Berkeley Lab met the objective in DOE’s FY 2017 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. To support this rating, Berkeley Lab prepared a list of projects completed during the performance period that achieved reduced environmental impacts. The EMS was also graded through the federal Office of Management and Budget’s EMS Annual Report Data, in which elements of the International Organization for Standardization (ISO) 14001 standard are rated and the degree of integration between the EMS and Berkeley Lab’s sustainable practices is measured. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2016, Berkeley Lab received a score of green, as described in more detail in Chapter 2. An overview of environmental protection and restoration programs is provided (Chapter 3), including information about compliance activities, operating permits, and regulatory agency inspections that occurred during 2016. Six minor violations issued during these inspections are discussed, one of which was rescinded in 2017. This report also includes information on environmental monitoring performed in 2016 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions continue to show improving conditions, and all emissions and discharges from LBNL operations were within environmental compliance release limits with the exception of some stormwater discharges. While most stormwater discharges measured throughout the LBNL site fall within acceptable levels established by the state's stormwater permit, iron and aluminum exceeded permitted levels. Berkeley Lab is aggressively implementing controls to reduce iron and aluminum discharge levels. The controls include construction of asphaltic berms to restrain and filter runoff to storm drains, and installation of filtration units in storm drain basins to absorb metal contaminants. The radiological dose assessments (Chapter 5) performed in 2016 concluded that the maximum dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.12% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/year); the dose from all radiation sources at Berkeley Lab was approximately 0.1% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.4% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2017

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2017. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). Activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. Berkeley Lab implements an Environmental Management System (EMS) to oversee these compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2017, which began October 1, 2016, and ended September 30, 2017, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2017 rating was based on how Berkeley Lab met the objective in DOE’s FY 2017 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2017, Berkeley Lab received a score of green, as described in more detail in Chapter 2. An overview of environmental protection and restoration programs is provided, including information about compliance activities, operating permits, and regulatory agency inspections that occurred during 2017. Thirteen minor violations issued during City of Berkeley inspections of above and underground storage tanks, treatment units, and hazardous waste storage areas are discussed in this chapter. This report also includes information on environmental monitoring performed in 2017. The results of these monitoring activities confirmed that groundwater cleanup actions continue to show improving conditions, and all emissions and discharges from LBNL operations were within environmental compliance release limits, with the exception of some stormwater discharges. Most stormwater discharges measured throughout the LBNL site fall within acceptable levels established by the state’s stormwater permit; however, iron and aluminum exceeded Numeric Action Levels. To reduce iron and aluminum discharge levels, Berkeley Lab is aggressively implementing controls such as construction of asphaltic berms and check dams to restrain and filter runoff to storm drains, and installation of filtration units in storm drain basins to collect sediment and absorb metal contaminants. The radiological dose assessments performed in 2017 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.1% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.06% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.2% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Site Environmental Report for 2018

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences, with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2018. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). LBNL activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. As presented in Chapter 2, Berkeley Lab implements an Environmental Management System (EMS) to oversee environmental compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2018, which began October 1, 2017, and ended September 30, 2018, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade, to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2018 rating was based on how Berkeley Lab met the objective in DOE’s FY 2018 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2018, Berkeley Lab received a score of green. A week-long formal conformity audit of the EMS was conducted at the end of July by a qualified external party, as is required every three years. The audit team found that Berkeley Lab’s EMS continues to conform to the ISO standard with no major nonconformance. An overview of environmental protection and restoration programs is provided in Chapter 3, including information about compliance activities, operating permits, and regulatory agency inspections and audits that occurred during 2018. Twenty-one minor violations and two Class II violations were issued during agency inspections of programs governing aboveground and underground storage tanks, hazardous waste treatment units, hazardous waste storage areas, hazardous materials management, and wastewater, stormwater, and air emission sources. This report also includes information on environmental monitoring performed in 2018 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions have been effective in reducing concentrations of volatile organic compounds (VOCs) in the groundwater, although concentrations appear to be reaching asymptotic levels in some areas. Site groundwater plumes are stable or are attenuating, and VOCs are not migrating off site. All emissions and discharges from LBNL operations were within environmental compliance release limits except oxides of nitrogen and carbon monoxide from boilers (under 5 million BTUs) from Buildings 2, 66, and 88. The radiological dose assessments (Chapter 5) performed in 2018 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.04% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.15% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.5% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Experimental Studies of Mars-Analog Brines

Evaporite deposits may represent significant sinks of mobile cations (e.g., those of Ca, N, Mg, and Fe) and anions (e.g., those of C, N, S, and Cl) among the materials composing the Martian surface and upper crust. Carbon and nitrogen are especially interesting because of their role as atmospheric gases which can become incorporated into crustal rocks. However, the nature of evaporite precursor brines formed under Martian conditions is poorly understood. To date, only a very limited number of laboratory investigations have been reported which have any bearing on a better understanding of various processes related to brine or evaporite formation on Mars. Here we report on preliminary laboratory experiments that exposed igneous minerals analogous to those in Martian (Shergottites, Nakhlites, and Chassigny (SNC) group) meteorites to a simulated Martian atmosphere and pure, deoxygenated water. Analysis of the water over intervals of time approaching 1 year showed that atmospheric gases dissolved to form carbonate and nitrate ions while minerals dissolved to form sulfate and chloride along with various cations. On an annual basis, ion formation gave a carbonate/sulfate ratio that is comparable to the ratio found among salts in SNC meteorites. The sulfate/chloride ratio of the experimental brines is higher than in SNC meteorites but lower than in surface soils measured at the Viking and Pathfinder landing sites.

Moore, Jeffrey M.↗

Conversion Preliminary Safety Analysis Report for the NIST Research Reactor

The NIST Center for Neutron Research (NCNR) is a reactor-laboratory complex providing the National Institute of Standards and Technology (NIST) and the nation with a world-class facility for the performance of neutron-based research. The heart of this facility is the NIST research reactor (aka NBSR); a heavy water moderated and cooled reactor operating at 20 MW. It is fueled with high-enriched uranium (HEU) fuel elements. A Global Threat Reduction Initiative (GTRI) program is underway to convert the reactor to low-enriched uranium (LEU) fuel. This program includes the qualification of the proposed fuel, uranium and molybdenum alloy foil clad in an aluminum alloy, and the development of the fabrication techniques. This report is a preliminary version of the Safety Analysis Report (SAR) that would be submitted to the U.S. Nuclear Regulatory Commission (NRC) for approval prior to conversion. The report follows the recommended format and content from the NRC codified in NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-power Reactors,” Chapter 18, “Highly Enriched to Low-Enriched Uranium Conversions.” The emphasis in any conversion SAR is to explain the differences between the LEU and HEU cores and to show the acceptability of the new design; there is no need to repeat information regarding the current reactor that will not change upon conversion. Hence, as seen in the report, the bulk of the SAR is devoted to Chapter 4, Reactor Description, and Chapter 13, Safety Analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Steam oxidation of chromium corrosion barrier coatings for sic-based accident tolerant fuel cladding

SiC-based materials are currently being considered for accident tolerant fuel (ATF) cladding, however, there are concerns regarding hydrothermal corrosion rates and hermeticity. These issues may be addressed with the utilization of a Cr corrosion barrier coating (CBC) but the interaction of Cr with SiC under loss of coolant accident (LOCA) conditions needs to be investigated. In the present work, Cr coatings were deposited onto chemically vapor deposited (CVD) SiC with either high power impulse magnetron sputtering (HiPIMS), cathodic arc (CA), or a combination of both. Annealing and steam thermogravimetric analysis (TGA) was used to study reaction product formation with and without oxidation. Additionally, after 1200 °C annealing, formation of a Cr x C y carbide layer at the ambient interface and a Cr x Si y C z silicide layer at the SiC interface was observed. After 1200 °C TGA exposure, similar carbide and silicide layers were observed but with a Cr 2 O 3 outer reaction layer and a Si and O rich interfacial layer forming between the carbide and silicide layers. Initial mass gain of the coatings during the 1200 °C TGA exposure was parabolic and were similar to reported rates of chromia formation. Mass gain behavior and observed transitions in chromia microstructure indicate that metallic Cr may be consumed within the first ~1 h at 1200 °C and that subsequent chromia formation occurs at the expense of the underlying Cr carbide layer. Overall, the results show no detrimental impact of Cr coatings on the steam oxidation resistance of SiC up to 4 h at 1200 °C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spatially coherent beam formation and mode locking of an array of solid-state lasers

A study is reported on the spatially coherent beam formation from an array of four Nd-glass lasers and on mode locking of their longitudinal modes. The results indicate a nearly 16 times increase in radiance. For mode locking, only a single modulator is required. A spatial filter in the optical cavity performs the spatially coherent beam formation and the precision synchronization of the mode-locked pulses at the output mirror of the optical cavity.

Philipp-Rutz, E. M.↗

Photothermal effects during nanodiamond synthesis from a carbon aerogel in a laser-heated diamond anvil cell

Nanodiamonds have emerged as promising materials for quantum computing, biolabeling, and sensing due to their ability to host color centers with remarkable photostability and long spin-coherence times at room temperature. Recently, a bottom-up, high-pressure, high-temperature (HPHT) approach was demonstrated for growing nanodiamonds with color centers from amorphous carbon precursors in a laser-heated diamond anvil cell (LH-DAC) that was supported by a near-hydrostatic noble gas pressure medium. However, a detailed understanding of the photothermal heating and its effect on diamond growth, including the phase conversion conditions and the temperature-dependence of color center formation, has not been reported. In this work, we measure blackbody radiation during LH-DAC synthesis of nanodiamond from carbon aerogel to examine these temperature-dependent effects. Blackbody temperature measurements suggest that nanodiamond growth can occur at 16.3 GPa and 1800 K. We use Mie theory and analytical heat transport to develop a predictive photothermal heating model. This model demonstrates that melting the noble gas pressure medium during laser heating decreases the local thermal conductivity to drive a high spatial resolution of phase conversion to diamond. In conclusion, we observe a temperature-dependent formation of nitrogen vacancy centers and interpret this phenomenon in the context of HPHT carbon vacancy diffusion.

36 MATERIALS SCIENCE↗

An attached microalgae platform for recycling phosphorus through biologically mediated fertilizer formation and biomass cultivation

Nutrient management is a global challenge for protecting water bodies from eutrophication and for retaining and sustainably recycling phosphorus within the biosphere. This challenge is especially important for water resource recovery facilities (WRRFs) in jurisdictions that limit nutrient loads in plant effluent. A microalgae-based biofilm platform has been designed, constructed, and tested to remove phosphorus and nitrogen from anaerobic digester (AD) effluent filtrate through cultivating biomass and inducing the precipitation of a mineral called struvite (NH₄MgPO₄ · 6H₂O) using a rotating algae biofilm reactor (RABR). RABRs function by rotating a growth substratum through nutrient rich water and then into the atmosphere, immersing microalgae in both sunlight and water. Photosynthesis is utilized in RABR operation to enhance struvite formation by increasing the pH value within the biofilm through the uptake of carbon dioxide from solution. Measurements of pH trended higher with depth through the biofilm when exposed to light confirming the function of photosynthesis in increasing pH and, as a consequence, struvite formation. In addition, reducing RPM allows more time for water to evaporate through exposure of the biofilm to the atmosphere and provides a management option to exceed struvite solubility product. Struvite precipitation was predicted based on chemical analysis and MINTEQ modeling of ADE, was confirmed using Scanning Electron Microscopy and Energy Dispersive X-ray Spectroscopy, and quantified by determining ash content. Increase in pH within the biofilm was confirmed as photosynthetic photon flux density increased. While struvite precipitation and removal from wastewater is conventionally accomplished through physicochemical methods, this research is the first report of struvite enhanced formation through algae biofilm-based photosynthesis processes.

09 BIOMASS FUELS↗

Infrared Spectroscopy of Star Formation in Galactic and Extragalactic Regions

This report details work done in a project involving spectroscopic studies, including data analysis and modeling, of star-formation regions using an ensemble of archival space-based data including some from the Infrared Space Observatory's Long Wavelength Spectrometer and Short Wavelength Spectrometer, and other spectroscopic databases. We will include four kinds of regions: (1) disks around more evolved objects; (2) young, low or high mass pre-main sequence stars in star-formation regions; (3) star formation in external, bright IR (infrared) galaxies; and (4) the galactic center. During this period, work proceeded fully on track and on time. Details on workshops and conferences attended and research results are presented. A preprint article entitled 'The Far Infrared Lines of OH as Molecular Cloud Diagnostics' is included as an appendix.

Smith, Howard A.↗

Planning Document for an NBSR Conversion Safety Analysis Report

The NIST Center for Neutron Research (NCNR) is a reactor-laboratory complex providing the National Institute of Standards and Technology (NIST) and the nation with a world-class facility for the performance of neutron-based research. The heart of this facility is the National Bureau of Standards Reactor (NBSR). The NBSR is a heavy water moderated and cooled reactor operating at 20 MW. It is fueled with high-enriched uranium (HEU) fuel elements. A Global Threat Reduction Initiative (GTRI) program is underway to convert the reactor to low-enriched uranium (LEU) fuel. This program includes the qualification of the proposed fuel, uranium and molybdenum alloy foil clad in an aluminum alloy, and the development of the fabrication techniques. This report is a planning document for the conversion Safety Analysis Report (SAR) that would be submitted to, and approved by, the Nuclear Regulatory Commission (NRC) before the reactor could be converted. This report follows the recommended format and content from the NRC codified in NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-power Reactors,” Chapter 18, “Highly Enriched to Low-Enriched Uranium Conversions.” The emphasis herein is on the SAR chapters that require significant changes as a result of conversion, primarily Chapter 4, Reactor Description, and Chapter 13, Safety Analysis. The document provides information on the proposed design for the LEU fuel elements and identifies what information is still missing. This document is intended to assist ongoing fuel development efforts, and to provide a platform for the development of the final conversion SAR. This report contributes directly to the reactor conversion pillar of the GTRI program, but also acts as a boundary condition for the fuel development and fuel fabrication pillars.

42 ENGINEERING↗