Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOCUMENTATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,225 records · Page 68

Vadose Zone Model for B-3A/B Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain. The Hanford Site Central Plateau was subdivided into 26 individual vadose zone models, with 13 in the 200 East Area and 13 in the 200 West Area. Waste sites that have a completed performance assessment (PA) or past-leak analysis were not included as sources of radionuclides. Instead the vadose zone to groundwater transfer rates of the Environmental Restoration Disposal Facility, Integrated Disposal Facility, US Ecology, and Waste Management Area C (WMA C) PAs and the past-leak analysis for WMA C were used as direct input to the P2R model. Each of the vadose zone models is documented in separate environmental calculation files (ECFs). This ECF describes the B-3A/B Ponds model. The scope of this ECF is to document the development and results of the B-3 A/B Ponds vadose zone model. CP-63515, Model Package Report: Central Plateau Vadose Zone Models, describes the approach, assumptions, process of determining the number of models required and domain of each model, input data, and processing common to all the models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Amendment Delivery and Distribution Methods, and Relevance to Potential In Situ Source Area Treatment at the Hanford Site

The U.S. Department of Energy’s Hanford Site in southeastern Washington State is a complex of multiple facilities where historical release events in the Central Plateau area have resulted in subsurface contamination of the vadose zone, a perched-water zone, and underlying aquifer. Although some contaminants have already migrated through the vadose zone into the groundwater, contaminants remaining in the unsaturated zone are a potential long-term risk as a source for further groundwater contamination. Moreover, a perched-water zone located in the 200-DV-1 Operable Unit at Hanford creates further remediation difficulties. Remediation options are limited for contaminants located in the vadose and perched-water zones within the Central Plateau due to considerable depth, co-located contaminants, and complexities associated with physical and biogeochemical heterogeneities. Existing comprehensive reviews discuss potential remedial technologies relevant to Hanford Site conditions (e.g., deep vadose zone and perched water) and provide treatment technology recommendations. Many of the recommended in situ remediation technologies rely on introduction of amendments into the subsurface to achieve remedial goals. However, there are currently few review or guidance documents that provide a comprehensive look at mechanisms and considerations related to amendment delivery and distribution. This document summarizes amendment types, delivery techniques, subsurface access methods, and the applicability of delivery methods and amendments for specific subsurface target zones, including in the context of Hanford Central Plateau applications. Guidance on the appropriateness of a remedial technology for a specific site and contaminant is not included within this document. Rather, this document is intended to be used when considering remediation technologies and the associated amendments. An overview of amendment types (i.e., liquid, gas, and solids) and access/distribution methods used in subsurface remediation is provided, along with discussion of the maturity level (low, medium, or high), advantages, and limitations that relate to the potential effectiveness of each approach in the context of site-specific factors (subsurface geology, geochemistry, contaminant properties, etc.). There are many Hanford Site-specific factors that influence the suitability and appropriateness of amendment delivery strategies. Excluding amendment delivery approaches that are unsuitable for the Hanford context, each approach was assessed for applicability to the following target zones: unsaturated high permeability, unsaturated low permeability, perched water, saturated high permeability, and saturated low permeability zones. This compilation and discussion related to amendment delivery mechanisms provides a useful resource for evaluating remedial alternatives for source area contamination in the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for SALDS for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP) is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain. The Hanford Site Central Plateau was subdivided into 26 individual vadose zone models, with 13 in the 200 East Area and 13 in the 200 West Area. Waste sites that have a completed performance assessment (PA) or past-leak analysis were not included as sources of radionuclides. Instead the vadose zone to groundwater transfer rates of the Environmental Restoration Disposal Facility, Integrated Disposal Facility, US Ecology, and Waste Management Area C (WMA C) PAs and the past-leak analysis for WMA C were used as direct input to the P2R model. Each of the vadose zone models is documented in separate environmental calculation files (ECFs). This ECF describes the State-Approved Land Disposal Site (SALDS) model. The scope of this ECF is to document the development and results of the SALDS vadose zone model. CP-63515, Model Package Report: Central Plateau Vadose Zone Models, describes the approach, assumptions, process of determining the number of models required and domain of each model, input data, and processing common to all the models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data call questions related to potential NEPA/Data gaps

Based on review of the related NEPA documents, and consideration of the potential gaps in NEPA coverage, a number of questions have been generated. These questions are generally higher level (less detailed) questions that should help to establish the applicability of analyses in existing NEPA documents and the ability of these documents to provide NEPA coverage for the Proposed Action. These questions do not request detailed information about SRS facilities/activities and the Proposed Action like typically would be requested when performing impacts analyses for an EIS. We do not believe detail information is needed; if it is needed, it may be an indication that an SA is not the appropriate level of NEPA documentation for the Proposed Action.

54 ENVIRONMENTAL SCIENCES↗

Xyce Parallel Electronic Simulator Reference Guide (Version 7.2)

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users Guide.

42 ENGINEERING↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Draft Operating Procedures for a Generic Repository Licensing Organization

This document is milestone M4FT-15SN0826021: Draft Summary of principle operating procedures for a generic repository licensing organization, the result of efforts under work package FT-15SN082602 DOE Managed HLW and SNF Research: Generic Operating Procedures; e.g., Quality Assurance — Sandia National Laboratories (SNL). The objective of this effort was to develop this draft document identifying and summarizing the principle operating procedures for a generic repository licensing organization. The FY16 follow on work package is FT-165N050303: Develop and Implement Operating Procedures — SNL, having a consistent objective to develop a draft document identifying and summarizing the principle operating procedures for a generic repository licensing organization. This document identifies and describes the principle operating procedures for a hypothetical and generic organization with the responsibility to site, characterize, design, license, construct and operate a repository for the disposal of high-level radioactive waste (HLW) and spent nuclear fuel (SNF) managed by the Department of Energy. These principle operating procedures reflect practices that facilitate compliance with U.S. Nuclear Regulatory Commission (NRC) expectations and NQA-1 quality standards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Draft Infrastructure Framework for a Generic Repository Licensing Organization

This document is milestone M4FT-15SN0826011: Draft Summary of generic repository licensing infrastructure, the result of efforts under work Package FT-15SN082601 DOE Managed HLW and SNF Research: Establish a generic organization framework for records management, IT infrastructure, quality assurance, and systems engineering - Sandia National Laboratories (SNL). The objective of this effort was to develop this draft document identifying and summarizing the principle elements of a generic repository licensing infrastructure organizational framework. The FY16 follow on work package is FT-16SN050302- Establish organizational framework to meet regulator expectations - SNL, having the consistent objective to 'Develop a draft document identifying and summarizing the principle elements of a generic repository licensing infrastructure and organizational framework.' This document describes the framework for a generic hypothetical organization with the responsibility to site, characterize, design, license construct and operate a repository for the disposal of high-level radioactive waste (HLW) and spent nuclear fuel ( F) managed by the Department of Energy. organizational framework suggested is intended to be agnostic of the facility location and disposal medium. It is assumed that the facility is to be licensed under U.S. Nuclear Regulatory Commission (NRC) regulation with DOE as the applicant (licensee). Detailed organizational elements reflect a workforce composition and practices that facilitate compliance with NRC expectations and NQA-1 quality standards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Waste stream knowledge assessment memorandum

To ensure that the Acceptable Knowledge (AK) documentation relating to the management of potentially reactive, corrosive, ignitable, and incompatible transuranic (TRU) waste materials is adequate, current, and accurately described in existing AK Summary Reports (AKSR), an Acceptable Knowledge Assessment (AKA) will be performed for each waste stream with unshipped containers or containers that are not emplaced. The primary focus of the AKA will be to review and verify the AK documentation associated with the historic and current use of absorbents, immobilization products, and neutralization agents used in the management of potentially corrosive, ignitable, or reactive liquids. In addition, the AKA will assess the specific management of other potentially incompatible or reactive materials generated at the Building 6580 Hot Cell Facility (HCF) and repackaged at the Auxiliary Hot Cell Facility (AHCF) at the Sandia National Laboratory (SNL). The AKA is performed in accordance with Section 4.13 of the Central Characterization Procedure (CCP) CCPTP- 005, CCP Acceptable Knowledge Documentation. This AKA specifically addresses the subpopulation of containers previously certified by CCP for waste stream SNL-HCF-S5400-RH during AHCF repackaging campaigns 11, 12, 14, and 17 and primarily consists of fuel examination waste (FEW). This subpopulation of containers was generated primarily at the HCF from the late 1970s to mid-1990s, and repackaging history as well as historical information are listed in Attachment 1, Waste Stream SNL-HCF-S5400-RH (FEW lnventory) Containers List. Attachment 2, Waste Stream SNL-HCF-S5400-RH (FEW lnventory) Container Evaluations, presents a summary review of site container documentation and the descriptions from the CCP visual examination (VE) during repackaging at the AHCF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia National Laboratories Advanced Simulation and Computing (ASC) Appraisal Method for the Implementation of the ASC Software Quality Engineering Practices (V.2.0)

This document provides a guide to the process of conducting software appraisals under the Sandia National Laboratories (SNL) ASC Program. The goal of this document is to describe a common methodology for planning, conducting, and reporting results of software appraisals thereby enabling: 1) Identification of improvements in implementation of the software quality engineering (SQE) practices identified in the ASC Software Quality Plan across the ASC Program against objective baselines. 2) Feedback from project teams on SQE opportunities for improvement. 3) Identification of strengths and opportunities for improvement for individual project teams. 4) Guidance to the ASC Program on the focus of future SQE activities. Document contents include process descriptions, templates to promote consistent conduct of appraisals, and an explanation of the relationship of this procedure to the SNL ASC software program. The activities described by this document are under the oversight of SNL ASC Program Director and SNL ASC Program Manager.

42 ENGINEERING↗

Xyce Parallel Electronic Simulator Reference Guide (V.7.1)

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users' Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users' Guide.

42 ENGINEERING↗

TCR Postulated Accident and MHA Dose Assessment

Oak Ridge National Laboratory (ORNL) is engaged in regulatory activities to gain US Department of Energy (DOE) approval to build and operate a small high-temperature gas reactor, the Transformational Challenge Reactor (TCR). ORNL uses advanced manufacturing techniques to produce select reactor components. The TCR is unique in its mission: the reactor’s at-power operating lifetime will be less than one effective full-power day to limit the radiological source term to very low values, thus facilitating approval to operate. The primary regulatory documents governing construction and operation of the facility are NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors” and DOE-STD-3009, “Preparation of Nonreactor Nuclear Facility Documented Safety Analysis.” Although this document is not a safety basis document, it provides a conservative indication of the magnitude of onsite and offsite radiological doses for specific scenarios, thus informing future design and regulatory activities. As required by NUREG-1537, scenarios included in this analysis are (1) a worstcase depressurized loss-of-forced-circulation accident, and (2) a maximum hypothetical accident. Details on the analysis of dose consequences with various system configurations are also provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Xyce™ Parallel Electronic Simulator Reference Guide, Version 7.3

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users' Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users' Guide.

42 ENGINEERING↗

Verification and Validation of the PLTEMP/ANL Code for Thermal-Hydraulic Analysis of Experimental and Test Reactors (Code Version 4.3)

The document compiles in a single volume the verification and validation works done for the PLTEMP/ANL code during the years of its development and improvement. The verification of sixteen capabilities of the PLTEMP/ANL Version 4.3 code that were identified by research reactor analysts as frequently used in their thermal-hydraulic analysis are described and documented. Each chapter of the document deals with the verification or validation of a specific part of the software that calculates a specific phenomenon, e.g., channel flow calculation, coolant property calculation, heat transfer calculation, and flow instability calculation. The software verification work is usually done by comparing the code with hand calculation, Microsoft spreadsheet calculation, or Mathematica calculation. The software validation is done by comparing the code with experimental data or a widely tested code like the RELAP5 code. In addition, some PLTEMP/ANL verification works that are available in the open literature are simply referenced and not included in the document. PLTEMP/ANL has been used in conversion safety analysis reports of several US and foreign research reactors that have been licensed and converted. A list of such reactors is given.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Agile Strategy Living Laboratory Reflection Paper

Getting my team members to all agree that we needed to pursue possible solutions for our documentation review process was an idea that came across very well with the team. This specific topic has be something that as a team we have been having struggles with recently due to the shear amount of documents that have been flowing through the team’s hands to review. We all realized that the process had areas that we could change that would eliminate confusion for new employees, reduce backload, and improve efficiency and quality of the documentation reviews. The key personnel on our team that have the most direct control and impact over this process are the production control specialists, documentation preparation and review is their primary job function. They are denoted in the action pack as “doc spec 1” and this individual has 12 years of expertise in their role. The engineers are denoted as “engineer 1, 2, 3” respectively. Engineer 1 has 10 years of experience in this team, engineer 3 has 38 years of experience on the team, and engineer 2 is myself with 5 years of expertise with this team and 5 with the department of defense.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Xyce™ Parallel Electronic Simulator Reference Guide (V.7.4)

This document is a reference guide to the Xyce Parallel Electronic Simulator, and is a companion document to the Xyce Users' Guide. The focus of this document is (to the extent possible) exhaustively list device parameters, solver options, parser options, and other usage details of Xyce. This document is not intended to be a tutorial. Users who are new to circuit simulation are better served by the Xyce Users' Guide.

97 MATHEMATICS AND COMPUTING↗

November 2021 Operational Highlights

Completed: 1. the initial tests of document workflows for Titan on the Red, which included standing up a software encryption capability to test data ingestion; 2. a software encryption capability in order to ingest the first data source by the end of the month; 3. a stand-alone computer for classified ontology data entry. Titan on the Red is an artificial intelligence/machine learning system to make digitizing, cataloging, and searching NSRC collections easier and more efficient. Created Online Vault backups, with one copy stored at LANL and one shipped to Lawrence Livermore National Laboratory. The Online Vault is a classified, searchable library of LANL’s nuclear weapons design and test history. Imported new Laboratory Directed Research and Development (LDRD) documents based on revised access categories. Bulk ingested nearly 10,000 documents via java-based PowerLoader. This application ingests metadata and content into the Online Vault to meet the requirements for the NSRC collections. Rehoused 300 linear feet of weapons physics documents in archival, acid-free storage folders and boxes.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Background Information on the Protection Requirements in IEEE Std 1547-2018

As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗