Prognostic Health Monitoring System: Component Selection Based on Risk Criteria and Economic Benefit Assessment
Prognostic health monitoring (PHM) is a proactive approach to monitor the ability of structures, systems, and components (SSCs) to withstand structural, thermal, and chemical loadings over the SSCs planned service lifespans. The current efforts to extend the operational license lifetime of the aging fleet of U.S. nuclear power plants from 40 to 60 years and beyond can benefit from a systematic application of PHM technology. Implementing a PHM system would strengthen the safety of nuclear power plants, reduce plant outage time, and reduce operation and maintenance costs. However, a nuclear power plant has thousands of SSCs, so implementing a PHM system that covers all SSCs requires careful planning and prioritization. This paper therefore focuses on a component selection that is based on the analysis of a component's failure probability, risk, and cost. Ultimately, the decision on component selection depend on the overall economical benefits arising from safety and operational considerations associated with implementing the PHM system.