Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Privacy-Protected Simultaneous Provision of Energy and Primary Frequency Control Reserve

This paper investigates a Mixed Integer Linear Programming (MILP) model for simultaneous scheduling of energy and primary frequency control reserve. Given the model’s unique structure and growing concerns about privacy, we adopt Dantzig-Wolfe Decomposition (DWD) algorithm to solve the problem in a decentralized fashion while obfuscating the privacy of the energy and reserve resources. Additionally, we present a novel criterion for checking the model’s feasibility. Finally, simulation results are given and discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Plutonium Finishing Plant (PFP) 241-Z Liquid Waste Treatment Facility Deactivation and Demolition

Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique within the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site. The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site. All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individuals confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STS-108 Mission Highlights Resource Tape

This video is a continuation of 'STS-108 Mission Highlights Resource Tape: Part 1 of 3' (Internal ID 2002049331). Flight day four footage continues with a video tour of the International Space Station (ISS). During flight day five, an exterior view of the Multipurpose Logistics Module (MPLM) is seen, followed by the crew unloading the supplies and equipment from the MPLM. Commander Dominic Gorie and Mission Specialist Linda Godwin are seen making preparations for the Extravehicular Activity (EVA) scheduled for the following day. Footage of an exterior view of the ISS is also shown. Flight day six footage includes Godwin and Mission Specialist Daniel Tani suiting up for their EVA and the installation of thermal blankets around the solar array wings of the ISS. Expedition 3 Commander Frank Culbertson is seen working in the ISS laboratory during flight day seven. Views are shown of Saudi Arabia and the Red Sea, the western coast of Australia, Cuba and Florida, and Switzerland and Northern Italy. During flight day eight, the crew is seen stowing objects in the MPLM for return to earth. The video concludes with footage of the treadmill used by the astronauts for physical exercise. Flight days nine through twelve are included in 'STS-108 Mission Highlights Resource Tape: Part 3 of 3' (Internal ID 2002049329).

Source record↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2016, Revision 0

This report covers the reporting period calendar year 2016 and the fourth quarter of 2015 (October 2015 through December 2016). This change to the reporting periods (i.e., fiscal to calendar) is to gain efficiencies during report development and to better align with other environmental report schedules.

54 ENVIRONMENTAL SCIENCES↗

Volt-VAR Optimization in Distribution Networks Using Twin Delayed Deep Reinforcement Learning

Modern distribution grids are undergoing new challenges due to the stochastic nature of distributed energy resources (DERs). High penetration of DERs has a significant impact on Volt-VAR profile and system power losses. This work proposes a deep reinforcement learning (DRL)-based Volt-VAR optimization approach for improving voltage profile and reducing system power loss under high penetration of distributed energy resources, such as battery energy storage and solar photovoltaic units in distribution grids. The twin delayed deep deterministic policy gradient (TD3) method-based DRL agent is proposed to configure optimal set-points of reactive power outputs of fast responding smart inverters. The agent schedules the reactive power of inverters according to their physical capabilities, such as minimum allowed power factor, e.g., 0.9 leading/lagging. The reward function of the proposed DRL scheme is designed carefully to ensure a proper voltage profile of the grids with effective scheduling of reactive power outputs from inverters. The performance of the proposed model is verified on modified IEEE 34- and 123-bus systems and compared with base case with no reactive supply by inverters, and local droop Volt-VAR control approach. The results show that the proposed method performs better than the local droop control and deep deterministic policy gradient (DDPG)-based DRL method for reducing voltage fluctuation and minimizing power loss.

Hossain, Rakib↗

Energy Transitions Initiative Partnership Project: Alaska Longline Fishermen’s Association Alternative Fuels Review

This report provides information about additional options in electrifying the Alaska Longline Fishermen’s Association (ALFA) fishing fleet. Currently, the Energy Transitions Initiative Partnership Project is prioritizing electric hybrid and battery electric options for retrofit of select fishing vessels in the fleet. However, there are other options for reducing carbon emissions among the fleet, namely hydrogen, ammonia, and biofuels. The use of these alternative fuels may be an option for the fleet in the future as ALFA addresses its vulnerabilities. A literature review of available resources on these fuels was conducted to provide information on several topics associated with implementation of these technologies, including current applications, commercially available power modules, necessary components, infrastructure, and safety codes and standards. An additional aspect that this report investigates is general sizing and refueling schedule based on operating records of multiple ships in the fleet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Transitions Initiative Partnership Project: Alaska Longline Fishermen’s Association Alternative Fuels Review

This report provides information about additional options in electrifying the Alaska Longline Fishermen’s Association (ALFA) fishing fleet. Currently, the Energy Transitions Initiative Partnership Project is prioritizing electric hybrid and battery electric options for retrofit of select fishing vessels in the fleet. However, there are other options for reducing carbon emissions among the fleet, namely hydrogen, ammonia, and biofuels. The use of these alternative fuels may be an option for the fleet in the future as ALFA addresses its vulnerabilities. A literature review of available resources on these fuels was conducted to provide information on several topics associated with implementation of these technologies, including current applications, commercially available power modules, necessary components, infrastructure, and safety codes and standards. An additional aspect that this report investigates is general sizing and refueling schedule based on operating records of multiple ships in the fleet.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Prediction-based dynamic load-sharing heuristics

The authors present dynamic load-sharing heuristics that use predicted resource requirements of processes to manage workloads in a distributed system. A previously developed statistical pattern-recognition method is employed for resource prediction. While nonprediction-based heuristics depend on a rapidly changing system status, the new heuristics depend on slowly changing program resource usage patterns. Furthermore, prediction-based heuristics can be more effective since they use future requirements rather than just the current system state. Four prediction-based heuristics, two centralized and two distributed, are presented. Using trace driven simulations, they are compared against random scheduling and two effective nonprediction based heuristics. Results show that the prediction-based centralized heuristics achieve up to 30 percent better response times than the nonprediction centralized heuristic, and that the prediction-based distributed heuristics achieve up to 50 percent improvements relative to their nonprediction counterpart.

Goswami, Kumar K.↗

Runway Operations Planning: A Two-Stage Heuristic Algorithm

The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

Anagnostakis, Ioannis↗

Online Small-Sat Knowledge Repositories and Modeling Tools for Risk Reduction and Enhanced Mission Success

Developers of small satellites face the challenges of a short development schedule, incomplete information about parts from vendors, and limited budgets. The situation is complicated by the need to use commercial electronic parts rather than radiation hardened parts to meet performance and budget constraints. Fortunately, a number of organizations are standing up new modeling and data resources that are available for free online. Motivation for sharing models, part data, and lessons learned include shorter development times, increased mission success likelihood, and training the next generation of space professionals. The purpose of this paper is to make these resources and their complementary capabilities known to the small satellite community.

Small Satellites↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

Optimizing End-to-End Big Data Transfers over Terabits Network Infrastructure

While future terabit networks hold the promise of significantly improving big-data motion among geographically distributed data centers, significant challenges must be overcome even on today's 100 gigabit networks to realize end-to-end performance. Multiple bottlenecks exist along the end-to-end path from source to sink, for instance, the data storage infrastructure at both the source and sink and its interplay with the wide-area network are increasingly the bottleneck to achieving high performance. In this study, we identify the issues that lead to congestion on the path of an end-to-end data transfer in the terabit network environment, and we present a new bulk data movement framework for terabit networks, called LADS. LADS exploits the underlying storage layout at each endpoint to maximize throughput without negatively impacting the performance of shared storage resources for other users. LADS also uses the Common Communication Interface (CCI) in lieu of the sockets interface to benefit from hardware-level zero-copy, and operating system bypass capabilities when available. It can further improve data transfer performance under congestion on the end systems using buffering at the source using flash storage. With our evaluations, we show that LADS can avoid congested storage elements within the shared storage resource, improving input/output bandwidth, and data transfer rates across the high speed networks. We also investigate the performance degradation problems of LADS due to I/O contention on the parallel file system (PFS), when multiple LADS tools share the PFS. We design and evaluate a meta-scheduler to coordinate multiple I/O streams while sharing the PFS, to minimize the I/O contention on the PFS. Finally, with our evaluations, we observe that LADS with meta-scheduling can further improve the performance by up to 14 percent relative to LADS without meta-scheduling.

97 MATHEMATICS AND COMPUTING↗

Managing genomic variant calling workflows with Swift/T

Bioinformatics research is frequently performed using complex workflows with multiple steps, fans, merges, and conditionals. This complexity makes management of the workflow difficult on a computer cluster, especially when running in parallel on large batches of data: hundreds or thousands of samples at a time. Scientific workflow management systems could help with that. Many are now being proposed, but is there yet the “best” workflow management system for bioinformatics? Such a system would need to satisfy numerous, sometimes conflicting requirements: from ease of use, to seamless deployment at peta- and exa-scale, and portability to the cloud. We evaluated Swift/T as a candidate for such role by implementing a primary genomic variant calling workflow in the Swift/T language, focusing on workflow management, performance and scalability issues that arise from production-grade big data genomic analyses. In the process we introduced novel features into the language, which are now part of its open repository. Additionally, we formalized a set of design criteria for quality, robust, maintainable workflows that must function at-scale in a production setting, such as a large genomic sequencing facility or a major hospital system. The use of Swift/T conveys two key advantages. (1) It operates transparently in multiple cluster scheduling environments (PBS Torque, SLURM, Cray aprun environment, etc.), thus a single workflow is trivially portable across numerous clusters. (2) The leaf functions of Swift/T permit developers to easily swap executables in and out of the workflow, which makes it easy to maintain and to request resources optimal for each stage of the pipeline. While Swift/T’s data-level parallelism eliminates the need to code parallel analysis of multiple samples, it does make debugging more difficult, as is common for implicitly parallel code. Nonetheless, the language gives users a powerful and portable way to scale up analyses in many computing architectures.

Science & Technology - Other Topics↗

Frito-Lay North America/NREL CRADA: Cooperative Research and Development (Final Report)

Frito Lay North America (FLNA) requires technical assistance for the evaluation and implementation of renewable energy and energy efficiency projects in production facilities and distribution centers across North America. Services provided by NREL do not compete with those available in the private sector, but rather provide FLNA with expertise to create opportunities for the private sector renewable/efficiency industries and to inform FLNA decision making regarding cost-effective projects. Services include: identifying the most cost-effective project locations based on renewable energy resource data, utility data, incentives and other parameters affecting projects; assistance with feasibility studies; procurement specifications; design reviews; and other services to support FNLA in improving resource efficiency at facilities. This Cooperative Research and Development Agreement (CRADA) establishes the terms and conditions under which FLNA may access capabilities unique to the laboratory and required by FLNA. Each subsequent task issued under this umbrella agreement would include a scope-of-work, budget, schedule, and provisions for intellectual property specific to that task.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Designing an Optimal LSST Deep Drilling Program for Cosmology with Type Ia Supernovae

The Vera C. Rubin Observatory's Legacy Survey of Space and Time (LSST) is forecast to collect a large sample of Type Ia supernovae (SNe Ia) expected to be instrumental in unveiling the nature of dark energy. The feat, however, requires accurately measuring the two components of the Hubble diagram, distance modulus and redshift. Distance is estimated from SN Ia parameters extracted from light-curve fits, where the average quality of light curves is primarily driven by survey parameters. An optimal observing strategy is thus critical for measuring cosmological parameters with high accuracy. We present in this paper a three-stage analysis to assess the impact of the deep drilling (DD) strategy parameters on three critical aspects of the survey: redshift completeness, the number of well-measured SNe Ia, and cosmological measurements. We demonstrate that the current DD survey plans (internal LSST simulations) are characterized by a low completeness (z ~ 0.55–0.65), and irregular and low cadences (several days), which dramatically decrease the size of the well-measured SN Ia sample. We propose a method providing the number of visits required to reach higher redshifts. We use the results to design a set of optimized DD surveys for SN Ia cosmology taking full advantage of spectroscopic resources for host galaxy redshift measurements. The most accurate cosmological measurements are achieved with deep rolling surveys characterized by a high cadence (1 day), a rolling strategy (at least two seasons of observation per field), and ultradeep (z ≳ 0.8) and deep (z ≳ 0.6) fields. A deterministic scheduler including a gap recovery mechanism is critical to achieving a high-quality DD survey.

79 ASTRONOMY AND ASTROPHYSICS↗

Computer system evolution requirements for autonomous checkout of exploration vehicles

This study, now in its third year, has had the overall objective and challenge of determining the needed hooks and scars in the initial Space Station Freedom (SSF) system to assure that on-orbit assembly and refurbishment of lunar and Mars spacecraft can be accomplished with the maximum use of automation. In this study automation is all encompassing and includes physical tasks such as parts mating, tool operation, and human visual inspection, as well as non-physical tasks such as monitoring and diagnosis, planning and scheduling, and autonomous visual inspection. Potential tasks for automation include both extravehicular activity (EVA) and intravehicular activity (IVA) events. A number of specific techniques and tools have been developed to determine the ideal tasks to be automated, and the resulting timelines, changes in labor requirements and resources required. The Mars/Phobos exploratory mission developed in FY89, and the Lunar Assembly/Refurbishment mission developed in FY90 and depicted in the 90 Day Study as Option 5, have been analyzed in detailed in recent years. The complete methodology and results are presented in FY89 and FY90 final reports.

Davis, Tom↗

TDRS MA phased-array antenna simulations

The NASA's Space Network (SN) nominal user services are prescheduled to allocate service type and required equipment to a user of the network. The availability of a resource for a given user is then communicated back to the user prior to requested service time. A proposed Demand Assignment Multiple Access (DAMA) system for NASA's SN to make it easier to allow a real time changes to add new user to the service schedule, is presented. The goals of the project are to improve the current operational modes by (1) reducing the support overhead required to maintain the overall scheduling requirements in this area; (2) allowing for more users to access the system especially those who traditionally have not considered SN access available to them; and (3) providing additional scheduling flexibility.

Caballero, Ruben↗

Risk Assessment Challenges in the Ares I Upper Stage

NASA Marshall Space Flight Center (MSFC) is currently at work developing hardware and systems for the Ares I rocket that will send future astronauts into orbit. Built on cutting-edge launch technologies, evolved powerful Apollo and Space Shuttle propulsion elements, and decades of NASA spaceflight experience, Ares I is the essential core of a safe, reliable, cost-effective space transportation system -- one that will carry crewed missions back to the moon, on to Mars and out into the solar system. Ares I is an in-line, two-stage rocket configuration topped by the Orion crew vehicle and its launch abort system. In addition to the vehicle's primary mission -carrying crews of four to six astronauts to Earth orbit --Ares I may also use its 25-ton payload capacity to deliver resources and supplies to the International Space Station, or to "park" payloads in orbit for retrieval by other spacecraft bound for the moon or other destinations. Crew transportation to the International Space Station is planned to begin no later than 2014. The first lunar excursion is scheduled for the 2020 timeframe. This paper presents the challenges in designing the Ares I upper stage for reliability and safety while minimizing weight and maximizing performance.

Stott, James E.↗