Conceptual Design of the Moderator Test Station at the Spallation Neutron Source

We describe the Moderator Test Station (MTS), under construction at the Spallation Neutron Source. We will leverage the Beam Test Facility (BTF) at the Spallation Neutron Source to provide a moderator neutronics test stand with which we will verify the anticipated performance gains expected and required from the innovative moderator concepts central to the SNS Second Target Station (STS) and the future of the First Target Station (FTS). These concepts include large-volume para-hydrogen moderators and high-brightness tube moderators. The MTS will add to the existing BTF a proton beam chopper similar to that already used in the SNS at the RFQ exit (the so-called MEBT chopper), various proton beam transport components, a neutron-producing target, a cryogenic moderator test stand, a reflector-shielding assembly, and a performance assessment neutron beamline. The MTS will provide the ability to test a wide variety of moderators in a prototypic configuration, simultaneously measuring the neutronic performance of the moderator concept central to the anticipated STS gains and developing the instrumentation necessary to provide that performance in a production environment. The presentation will describe the MTS, its progress, and the way we optimize the prototypic nature of the moderators we will test.

Iverson, Erik B↗

High gradient off-axis coupled C-band Cu and CuAg accelerating structures

Here, we report the high gradient testing results of two single-cell off-axis coupled standing wave accelerating structures. Two brazed standing wave off-axis coupled structures with the same geometry were tested: one made of pure copper (Cu) and one made of a copper–silver (CuAg) alloy with a silver concentration of 0.08%. A peak surface electric field of 450 MV/m was achieved in the CuAg structure for a klystron input power of 14.5 MW and a 1 μs pulse length, which was 25% higher than the peak surface electric field achieved in the Cu structure. The superb high gradient performance was achieved because of the two major optimizations in the cavity's geometry: (1) the shunt impedance of the cavity was maximized for a peak surface electric field to accelerating gradient ratio of ~2 for a fully relativistic particle, and (2) the peak magnetic field enhancement due to the input coupler was minimized to limit pulse heating. These tests allow us to conclude that C-band accelerating structures can operate at peak fields similar to those at higher frequencies while providing a larger beam iris for improved beam transport.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Direct drive with the argon fluoride laser as a path to high fusion gain with sub-megajoule laser energy

Argon fluoride (ArF) is currently the shortest wavelength laser that can credibly scale to the energy and power required for high gain inertial fusion. ArF's deep ultraviolet light and capability to provide much wider bandwidth than other contemporary inertial confinement fusion (ICF) laser drivers would drastically improve the laser target coupling efficiency and enable substantially higher pressures to drive an implosion. Our radiation hydrodynamics simulations indicate gains greater than 100 are feasible with a sub-megajoule ArF driver. Our laser kinetics simulations indicate that the electron beam-pumped ArF laser can have intrinsic efficiencies of more than 16%, versus about 12% for the next most efficient krypton fluoride excimer laser. We expect at least 10% ‘wall plug' efficiency for delivering ArF light to target should be achievable using solid-state pulsed power and efficient electron beam transport to the laser gas that was demonstrated with the U.S. Naval Research Laboratory's Electra facility. These advantages could enable the development of modest size and lower cost fusion power plant modules. This would drastically change the present view on inertial fusion energy as being too expensive and the power plant size too large.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Single-particle dynamics of microbunching

The mechanism of steady-state microbunching (SSMB) has been proposed [D. F. Ratner and A. W. Chao, Phys. Rev. Lett. 105, 154801 (2010)] to generate high-power coherent radiation at a high repetition rate or in continuous-wave mode using electron storage rings. In this paper, the related single-particle dynamics are theoretically and numerically studied, and important results are presented. The investigated effects are longitudinal quantum radiation excitation, nonlinear momentum compaction, and linear and nonlinear coupling of the transverse and longitudinal motion. Although this analysis is oriented toward SSMB, some of the analyzed effects are also crucial in cases such as coherent harmonic generation, bunch slicing, bunch compression, free-electron laser beam transport lines, and quasi-isochronous rings, which involve precise longitudinal phase-space manipulations.

43 PARTICLE ACCELERATORS↗

Wiggler-based electron beam microbunching amplifier study

The wiggler-based amplifier of the microbunching instability in the electron beam is considered and compared to a longitudinal space charge amplifier consisting of the drifts and chicanes. The gain in the magnitude of a seed perturbation of the electron beam density is evaluated analytically as a function of the period of the perturbation, the electron beam parameters, the wiggler parameters, and the amplifier lattice parameters. The theory is compared with the results of the numerical calculations of the gain based on simulations of the electron beam transport through the amplifier lattice. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Shielding Analyses for SNS Accelerator Power Upgrade

The Proton Power Upgrade (PPU) project [1] at Spallation Neutron Source (SNS) is aiming at increasing the neutron beam intensities at the First Target Station (FTS) and advancing accelerator capability to additionally power a future Second Target Station (STS) [2]. PPU will involve upgrading the SNS accelerator complex to double the currently available proton beam power from 1.4 to 2.8 MW, by increasing the proton beam energy from 1 GeV to 1.3 GeV and by increasing the proton beam current.PPU will enable new science capabilities enhancing the experiment throughput of the 19 existing FTS instruments, which are heavily oversubscribed. STS will include 22 additional neutron scattering instruments. Numerous neutronics analyses are performed to support PPU evaluating the FTS systems for higher beam power and for system upgrades. Part of the PPU scope is an extension of the Ring to Target Beam Transport (RTBT) line, a stub out of the accelerator tunnel for the future Ring to STS Transport (RTST) line[3]. As the RTST tunnel will not be built within the PPU project, the stub will be shielded by a plug, which is planned to be made from regular concrete.In order to provide radiation protection safety, analyses are required to design adequate plug thickness for the stub. The thickness of the stub is driven by the criterion that the area downstream of the plug is “unrestricted access area”, demanding the dose rate downstream the stub be below 0.25 mrem/h at 30 cm from the surface at normal operation and below 20 Rem/hr for accident cases. Additionally, analyses verifying the amount of soil for shielding the accelerator tunnel to the above stated requirements are performed.

Popova, Irina I.↗

Bunch Extinction Measurements at PIP-II Injector Test Facility

The PIP2 particle accelerator is a new upgrade to the Fermilab accelerator complex, featuring an 800-MeV H-superconducting linear accelerator that will inject the beam into the present Fermilab Booster. A test accelerator known as PIP-II Injector Test (PIP2IT) has been built to validate the concept of the front-end of such a machine. One of the paramount challenges of PIP2IT was to validate the bunch by bunch chopping system in the Medium Energy Beam Transport (MEBT). This paper aims to present the direct extinction measurements at PIP2IT and their analysis. These measurements have been taken by two Resistive Wall Current Monitors (RWCM) and recorded by a high bandwidth oscilloscope.

43 PARTICLE ACCELERATORS↗

Real-Time Longitudinal Profile Measurement of Operational H⁻ Beam at the SNS Linac Using a Laser Comb

We demonstrate a novel technique to measure the longitudinal profile of an operational hydrogen ion (H⁻) beam in a non intrusive, real-time fashion. The measurement is conducted based on the photo-ionization of the ion beam with a phase modulated laser comb pico-second laser pulses with controllable temporal structure. The measurement technique has been applied to a 1-GeV, 1.4-MW H⁻ beam at the Spallation Neutron Source (SNS) high energy beam transport (HEBT). A stroboscopic photo-graph of H⁻ beamμbunch can be obtained by using a phase modulated laser comb. The entire measurement takes only 700 us.

Liu, Yun↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Start-to-End Simulation of the Drive-Beam Longitudinal Dynamics for Beam-Driven Wakefield Acceleration

Collinear beam-driven wakefield acceleration (WFA) relies on shaped driver beam to provide higher accelerating gradient at a smaller cost and physical footprint. This acceleration scheme is currently envisioned to accelerate electron beams capable of driving free-electron laser *. Start-to-end simulation of drive-bunch beam dynamics is crucial for the evaluation of the design of accelerators built upon WFA. We report the start-to-end longitudinal beam dynamics simulations of an accelerator beamline capable of producing high charge drive beam. The generated wakefield when it passes through a corrugated waveguide results in a transformer ratio of 5. This paper especially discusses the challenges and criteria associated with the generation of temporally-shaped driver beam, including the beam formation in the photoinjector, and the influence of energy chirp control on beam transport stability.

43 PARTICLE ACCELERATORS↗

WNR Facility Flight Path 90L Advanced Collimation Development

In November 2020, an advanced neutron beam transport and collimation system was installed and commissioned at flight path (FP) 90L within the Weapons Neutron Research (WNR) facility. This new collimation system was developed as a replacement for the legacy neutron collimation present at WNR FP90L. The need for this upgrade, design of this collimation system, installation at the experimental flight path, and results of this recent effort will be detailed.

43 PARTICLE ACCELERATORS↗

Physics Flash (Summer 2021)

The Summer 2021 issue of Physics Flash includes a note from Physics Division Leader Tanja Pietraß, Physics Division staff in the news, LANSCE neutron beam transport, novel application of 'computer vision' techniques and using pRad to visualize electromagnetic fields.

43 PARTICLE ACCELERATORS↗

Start to End Modeling of a LAMP Strawman Design- the MEBT (From exit of RFQ to entrance to DTL)

A strawman design is being put together to exercise the codes that the LAMP group has available to perform a start to end modeling of a system that includes the basic elements of LAMP. In a previous report the Start to End Modeling of a LAMP Strawman Design (From Source to end of RFQ) was presented. In this report we extend the modeling to include the next section of LAMP: the Medium Energy Beam Transport System (MEBT). The last section of LAMP, the DTL is not included in this report.

43 PARTICLE ACCELERATORS↗

Digital Twin Framework for PIP-II Linac: AI-Driven Multi-Scale Modeling from Ion Source to 800 MeV

The PIP-II linac will enable >1.2 MW beam power for DUNE, requiring unprecedented operational reliability across its warm front-end (RFQ, MEBT) and five distinct SRF sections operating at 162.5/325/650 MHz. We present a comprehensive digital twin framework uniquely combining a fully differentiable fast beam transport code with neural network surrogates trained on high-fidelity PIC simulations, capturing space charge and nonlinear dynamics beyond traditional envelope codes while achieving 10⁴ speedup at <1% accuracy. End-to-end differentiability enables gradient-based optimization across 500+ parameters simultaneously previously impossible with conventional tools while the model incorporates static/dynamic errors and serves as a virtual commissioning platform for diverse hardware integration. The framework facilitates reinforcement learning for pulsed/CW mode transitions, predictive maintenance through anomaly detection, and autonomous tuning algorithm development with real-time execution capability. Validation against physics simulations shows excellent agreement for the front-end, with initial results demonstrating potential for 30% commissioning time reduction and proactive fault mitigation, providing a scalable blueprint for operating next-generation high-intensity accelerators.

Pathak, Abhishek [Fermilab] (ORCID:000000021704208↗

Automating Orbit Correction In The Main Injector 8 GeV Line

The Main Injector 8 GeV line (MI8 line) transports beam from Fermilab s Booster accelerator to either the Booster Neutrino experiments (BNB), the Recycler or the Main Injector. Often the orbit of the beam through the MI8 line differs depending on the beam destination. The beam is collimated in the MI8 line, so increasing intensities and repetition rates make controlling orbits through the collimators a necessity. The current method of regulating the MI8 line orbit with DC corrector settings is insufficient. A system named MITUNE is being developed to sample and categorize all beams through the MI8 line and automatically calculate and apply proper dipole corrector ramps to maintain desired orbits for pulses to any destination.

Hazelwood, K. J. [Fermilab]↗

Ion optical design with applications to a solar wind mass spectrometer

The design of charged particle beam transport systems at lower energies is discussed. Topics discussed include: index of refraction, photometry, phase space, matrices, lenses and imaging, charged particle trajectories in crossed electric and magnetic fields, design parameters for the Wien filter, and electrostatic energy analyzer design, an annotated bibliography is presented.

Coplan, M.↗

Half-life of Si-32 from tandem-accelerator mass spectrometry

A newly developed mass-spectrometry technique employing a tandem Van de Graaff accelerator together with a special beam-transport system and heavy-ion detector has been used to determine the half-life of Si-32. The result obtained, 108 plus or minus 18 yr, disagrees with the accepted value of 330 plus or minus 40 yr. The implications of the new half-life of Si-32, which is used for dating studies, are discussed.

Elmore, D.↗