At least 127 records · Page 7

On-orbit checkout study

The spaceborne testing equipment carried by the orbiter and the measuring equipment onboard the satellite (telemetry) is tested to verify that each is operating satisfactorily. The satellite command system is also checked. Thermal stabilization with the satellite in the orbiter shadow is achieved in six to eight hours. Satellite subsystem tests are run, and thermal control by heaters is checked. Thermal stabilization with the satellite exposed to the sun (when the orbiter is in sunlight) is again achieved in an estimated six to eight hours. Subsystem tests are again run in the hot condition, and heat rejection tests are made.

Pritchard, E. I.↗

Large Space Telescope - Orbital crew EV maintenance operations

The paper shows that orbital EV maintenance by the crew has a tremendous impact on several areas of the program, including operations, Shuttle interfaces, support equipment rendezvous and berthing, checkout and verification, levels of servicing achievable, logistics and spares and scientific instruments in order to permit changeout and possible future refurbishment. To achieve on-orbit EV maintenance, such challenges as designing for suited-astronaut access to all subsystem equipment elements, minimization for contamination, handling of extremely sensitive instruments, development of translation techniques, and use of existing GFE and hardware must be faced early in the preliminary design and operations analysis phases. All studies to date indicate that on-orbit EV manned maintenance of the LST (Large Space Telescope) is not only feasible but can be designed to be readily within the capability of the EV functioning astronaut. Both 1-g and neutral buoyancy man-in-the-loop simulations further support this point.

Fisher, H. T.↗

SYSTEMS CHECKOUT FOR APOLLO

Discussion of the checkout procedure for the equipment associated with the manned lunar landing program

GROUND SUPPORT SYSTEM↗

Repair of major system elements on Skylab

In-flight maintenance, as conceived and preplanned for the Skylab mission was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Tools and spares were provided accordingly. However, failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs included the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment, and tapping into and recharging a cooling system. The repairs were conducted both inside the spacecraft and during extravehicular activities. Some of the repair tasks required team effort on the part of the crewmen including close procedural coordination between internal and extravehicular crewmen. The Skylab experience indicates that crewmen can, with adequate training, make major system repairs in space using standard or special tools. Design of future spacecraft systems should acknowledge this capability and provide for more extensive in-flight repair and maintenance.

Pace, R. E., Jr.↗

Repair of major system elements on Skylab

In-flight maintenance, as conceived and pre-planned for the Skylab Mission, was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs include the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment and tapping into and recharging a cooling system. The Skylab experience proves conclusively that crewmen can, with adequate training, make major system repairs in space using standard or special tools.

Pace, R. E., Jr.↗

HELIOS dual swept frequency radiometer

The HELIOS dual swept frequency radiometer, used in conjunction with a dipole antenna, was designed to measure electromagnetic radiation in space. An engineering prototype was fabricated and tested on the HELIOS spacecraft. Two prototypes and two flight units were fabricated and three of the four units were integrated into the HELIOS spacecraft. Two sets of ground support equipment were provided for checkout of the radiometer.

White, J. R.↗

Definition study for an extended manned test of a regenerative life support system

A program was defined which consists of extended ground-based manned tests of regenerative life support systems. The tests are to evaluate prototypes of advanced life support systems under operational, integrated conditions, thus providing data for the design of efficient environmental control and life support systems for use in long-duration space missions. The requirements are defined for test operations to provide a simulation of an orbiting space laboratory. The features of Phase A and B programs are described. These tests use proven backup equipment to ensure successful evaluation of the advanced subsystems. A pre-tests all-systems checkout period is provided to minimize equipment problems during extended testing and to familiarize all crew and operating staff members with test equipment and procedures.

Source record↗

Robotic lunar surface operations: Engineering analysis for the design, emplacement, checkout and performance of robotic lunar surface systems

The assembly, emplacement, checkout, operation, and maintenance of equipment on planetary surfaces are all part of expanding human presence out into the solar system. A single point design, a reference scenario, is presented for lunar base operations. An initial base, barely more than an output, which starts from nothing but then quickly grows to sustain people and produce rocket propellant. The study blended three efforts: conceptual design of all required surface systems; assessments of contemporary developments in robotics; and quantitative analyses of machine and human tasks, delivery and work schedules, and equipment reliability. What emerged was a new, integrated understanding of hot to make a lunar base happen. The overall goal of the concept developed was to maximize return, while minimizing cost and risk. The base concept uses solar power. Its primary industry is the production of liquid oxygen for propellant, which it extracts from native lunar regolith. Production supports four lander flights per year, and shuts down during the lunar nighttime while maintenance is performed.

Woodcock, Gordon R.↗

Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

Gonzalez, Guillermo A.↗

Firing Room Remote Application Software Development

The Engineering and Technology Directorate (NE) at National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) is designing a new command and control system for the checkout and launch of Space Launch System (SLS) and future rockets. The purposes of the semester long internship as a remote application software developer include the design, development, integration, and verification of the software and hardware in the firing rooms, in particular with the Mobile Launcher (ML) Launch Accessories (LACC) subsystem. In addition, a software test verification procedure document was created to verify and checkout LACC software for Launch Equipment Test Facility (LETF) testing.

Pathways↗

A guide to onboard checkout. Volume 7: RF communications

The radio frequency communications subsystem for a space station is considered, with respect to onboard checkout requirements. The subsystem comprises all equipment necessary for transmitting and receiving, tracking and ranging, command, multiple voice and television information, and broadband experiment data. The communications subsystem provides a radio frequency interface between the space station and ground stations, either directly or indirectly, through a data relay satellite system, independent free-flying experiment modules, and logistics vehicles. Reliability, maintenance, and failure analyses are discussed, and computer programming techniques are presented.

Source record↗

Command module/service module reaction control subsystem assessment

Detailed review of component failure histories, qualification adequacy, manufacturing flow, checkout requirements and flow, ground support equipment interfaces, subsystem interface verification, protective devices, and component design did not reveal major weaknesses in the command service module (CSM) reaction control system (RCS). No changes to the CSM RCS were recommended. The assessment reaffirmed the adequacy of the CSM RCS for future Apollo missions.

Weary, D. P.↗

Study of solid rocket motor for space shuttle booster, volume 2, book 2

A technical analysis of the solid propellant rocket engines for use with the space shuttle is presented. The subjects discussed are: (1) solid rocket motor stage recovery, (2) environmental effects, (3) man rating of the solid propellant rocket engines, (4) system safety analysis, (5) ground support equipment, and (6) transportation, assembly, and checkout.

Source record↗

New Compressor Added to Glenn's 450- psig Combustion Air System

In September 1999, the Central Process Systems Engineering Branch and the Maintenance and the Central Process Systems Operations Branch, released for service a new high pressure compressor to supplement the 450-psig Combustion Air System at the NASA Glenn Research Center at Lewis Field. The new compressor, designated C-18, is located in Glenn s Central Air Equipment Building and is remotely operated from the Central Control Building. C-18 can provide 40 pounds per second (pps) of airflow at pressure to our research customers. This capability augments our existing system capacity (compressors C 4 at 38 pps and C-5 at 32 pps), which is generated from Glenn's Engine Research Building. The C-18 compressor was originally part of Glenn's 21-Inch Hypersonic Tunnel, which was transferred from the Jet Propulsion Laboratory to Glenn in the mid-1980's. With the investment of construction of facilities funding, the compressor was modified, new mechanical and electrical support equipment were purchased, and the unit was installed in the basement of the Central Air Equipment Building. After several weeks of checkout and troubleshooting, the new compressor was ready for long-term, reliable operations. With a total of 110 pps in airflow now available, Glenn is well positioned to support the high-pressure air test requirements of our research customers.

Swan, Jeffrey A.↗