Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

Cioletti, Louis↗

A practical approach to astronomy mission replanning

The schedule editing concept called EDTRON is presented and its features and functions in the overall mission planning scheme and the experience obtained from its first use during the Astro-1 mission are presented. This EDTRON program was designed specifically to edit the astronomy schedules generated by the ASTAR project, but any schedule with the same on/off format can be successfully changed. Though designed for the real-time environment concept, it can also be employed premission for schedule modification in situations where elements of the baseline schedule need to be preserved or when new requirements emerge that cannot be defined in existing scheduling algorithms.

Guffin, O. T.↗

Lunar Reconnaissance Orbiter (LRO) Rapid Thermal Design Development

The Lunar Reconnaissance Orbiter (LRO) project had a rapid development schedule starting with project conception in spring of 2004, instrument and launch vehicle selection late in 2005 and then launch in early 2009. The lunar thermal environment is one of the harshest in our solar system with the heavy infrared loading of the moon due to low albedo, lack of lunar atmosphere, and low effective regolith conduction. This set of constraints required a thermal design which maximized performance (minimized radiator area and cold control heater power) and minimized thermal hardware build at the orbiter level (blanketing, and heater service). The orbiter design located most of the avionics on an isothermalized heat pipe panel called the IsoThermal Panel (ITP). The ITP was coupled by dual bore heat pipes to an Optical Solar Reflector (OSR) covered heat pipe radiator. By coupling all of the avionics to one system, the hardware was simplified. The seven instruments were mainly heritage instruments which resulted in their desired radiators being located by their heritage design. This minimized instrument redesigns and therefore allowed them to be delivered earlier, though it resulted in a more complex orbiter level blanket and heater service design. Three of the instruments were mounted on a tight pointing M55J optical bench that needed to be covered in heaters to maintain pointing. Two were mounted to spacecraft controlled radiators. One was mounted to the ITP Dual Bores. The last was mounted directly to the bus structure on the moon facing panel. The propulsion system utilized four-20 pound insertion thrusters and eight-5 pound attitude control thrusters (ACS) in addition to 1000 kg of fuel in two large tanks. The propulsion system had a heater cylinder and a heated mounting deck for the insertion thrusters which coupled most of the propulsion design together simplifying the heater design. The High Gain Antenna System (HGAS) and Solar Array System (SAS) used dual axis actuator gimbal systems. HGAS required additional boom heaters to cool the approximately 10 W of RF losses thru the rotary joints and wave guides from the 40 W Ka system. By design this module needed a fair amount of heater, blanketing, and radiator complexity. The SAS system required a separate cable wrap radiator to help cool the Solar Array harness which dissipated 30 W thru the actuators and cable wraps. This module also was complex.

Baker, Charles↗

TPSAS-NF1676L-17243-DND

This presentation captures ERA Project's effort in using integrated cost-schedule-risk analysis tool, identifying and capturing explicit relationships between program funds, schedule, and discrete risks. The project team merged a myriad of cost and schedule data for timely, objective, uncertainty analysis of the ITD's budget and schedule. The project team conducted detailed schedule uncertainty analysis showing schedule activities and how their interrelationships were impacted, representing an impressive advance beyond routine Gantt charts. Furthermore, the ERA Project collected discrete risk events including their impacts to costs and/or schedule and interwove these risks into cost and schedule logic networks, providing the foundation to conduct cost and schedule analyses. The team integrated this data into the analysis model, providing probabilistic results that were then used by the ERA Project's senior management for decision-making purposes. The ERA Project management team, through technical and pathfinder expertise in integrating cost, schedule, risk, and technical content, consistently provided risk-informed recommendations to Implementing Centers and ISRP senior management which ultimately ensured the successful ARMD Key Decision Point (KDP) review of the ERA Phase 2 ITD Portfolio and increased the likelihood of achieving technical objectives within cost and schedule constraints.

Gaudy M Bezos-O'Connor↗

Particle Engulfment and Pushing by Solidifying Interfaces (PEPSI)

The preliminary definition phase included the following actions: producing a science requiring document (draft), producing a science requirements document (preliminary), updating the flight program proposal, project review at NASA Marshall Space Flight Center, and research work as defined in the statement of work. The first three items of this plan have been delivered by the University of Alabama to NASA according to schedule. A project review meeting was held at MSFC on June 29, 1993. Consequently, this part of the report will address the results of the research work performed in the Solidification Laboratory at the University of Alabama during the first six months of the project.

Stefanescu, Doru Michael↗

Project Interface Requirements Process Including Shuttle Lessons Learned

Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

Bauch, Garland T.↗

Summary of spacecraft technology, systems reliability, and tracking data acquisition

Goddard activities are reported for 1973. An eight-year flight schedule for projected space missions is presented. Data acquired by spacecraft in the following disciplines are described: stellar ultraviolet, stellar X-rays, stellar gamma rays, solar radiation, radio astronomy, particles/fields, magnetosphere, aurora, and the upper atmosphere.

Source record↗

Evaluation of routing and scheduling considerations for possible future commercial hypersonic transport aircraft

Travel markets which would be served by high speed commercial transport aircraft and the ability of the airlines to schedule and route the aircraft in a way that would achieve good daily utilization and productivity are examined. The following areas are considered: (1) identification of the major long-haul city pairs that would most likely demand nonstop service; (2) selection of flight tracks observing alternative sonic boom restrictions; (3) estimation of flight times for all city pairs for the various sonic boom constraints; (4) impact of airport curfews on possible departure and arrival schedules; (5) projection of passenger traffic volumes on the selected city pairs; and (6) potential daily utilization and aircraft productivity.

Feir, J. B.↗

Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

Source record↗

Composites for Advanced Space Transportation Systems (CASTS)

A summary is given of the in-house and contract work accomplished under the CASTS Project. In July 1975 the CASTS Project was initiated to develop graphite fiber/polyimide matrix (GR/PI) composite structures with 589K (600 F) operational capability for application to aerospace vehicles. Major tasks include: (1) screening composites and adhesives, (2) developing fabrication procedures and specifications, (3) developing design allowables test methods and data, and (4) design and test of structural elements and construction of an aft body flap for the Space Shuttle Orbiter Vehicle which will be ground tested. Portions of the information are from ongoing research and must be considered preliminary. The CASTS Project is scheduled to be completed in September 1983.

Davis, J. G., Jr.↗

A development of logistics management models for the Space Transportation System

A new analytic queueing approach was described which relates stockage levels, repair level decisions, and the project network schedule of prelaunch operations directly to the probability distribution of the space transportation system launch delay. Finite source population and limited repair capability were additional factors included in this logistics management model developed specifically for STS maintenance requirements. Data presently available to support logistics decisions were based on a comparability study of heavy aircraft components. A two-phase program is recommended by which NASA would implement an integrated data collection system, assemble logistics data from previous STS flights, revise extant logistics planning and resource requirement parameters using Bayes-Lin techniques, and adjust for uncertainty surrounding logistics systems performance parameters. The implementation of these recommendations can be expected to deliver more cost-effective logistics support.

Carrillo, M. J.↗

Trajectories and orbital maneuvers for the ISEE-3/ICE comet mission

The ISEE-3/ICE spacecraft, (launched in 1978), and expected to obtain the first measurements of comet Giacobinni-Zinner in September 1985, has undertaken a combination of propulsive maneuvers, lunar swing-bys, and solar perturbations to produce its present trajectory profile. ISEE-3 is a drum-shaped, spin-stabilized spacecraft equipped with a redundant pair of high-resolution sun sensors, a medium-gain S-band antenna, a hydrazine propulsion system and a science experiment payload. After being placed into a sun-earth libration halo orbit in late 1978, ISEE-3 was retargeted to the geomagnetotail in mid-1982 and became the first spacecraft to explore the geomagnetic tail between 80 and 237 earth radii in 1983. These types of maneuvers may prove important for future scientific missions planned as follow-ons to ISEE-3/ICE, such as a joint NASA/ISAS project spacecraft scheduled for Shuttle launch in 1991, and a possible encounter with two comets in 1996 anad 1998.

Farquhar, R.↗

Trajectory determination support and analysis for ISEE-3 from halo orbit to escape from the earth/moon system

The analyses performed in altering the ISEE-3 spacecraft path from a liberation point to a helicocentric orbit for intercepting the Giacobini-Zimmer cometary tail are reviewed. The initial calculations considered the expected accuracy, the best temporal lengths to be used for the calculations and the maneuver points. The early maneuvers were also constrained to a maximum number of crossings of the terrestrial magnetotail for data collection purposes. Three earth-based tracking stations trajectory data collection schedules were projected, and programs were prepared for comparing tracking data with predictions. Delta- V maneuvers were set for perigee locations in order to conserve fuel. A 21-day span was selected for tracking, expect during maneuver periods. Accuracies of 0.1-10 km and 0.3-2.0 cm/sec were obtained.

Joyce, J. B.↗

Application of decomposition techniques to the preliminary design of a transport aircraft

A nonlinear constrained optimization problem describing the preliminary design process for a transport aircraft has been formulated. A multifaceted decomposition of the optimization problem has been made. Flight dynamics, flexible aircraft loads and deformations, and preliminary structural design subproblems appear prominently in the decomposition. The use of design process decomposition for scheduling design projects, a new system integration approach to configuration control, and the application of object-centered programming to a new generation of design tools are discussed.

Rogan, J. E.↗

Application of decomposition techniques to the preliminary design of a transport aircraft

A multifaceted decomposition of a nonlinear constrained optimization problem describing the preliminary design process for a transport aircraft has been made. Flight dynamics, flexible aircraft loads and deformations, and preliminary structural design subproblems appear prominently in the decomposition. The use of design process decomposition for scheduling design projects, a new system integration approach to configuration control, and the application of object-centered programming to a new generation of design tools are discussed.

Rogan, J. E.↗

The experiments of LIPS 3

LIPS 3 is a member of the Living Plume Shield series of spacecraft. In each LIPS project, the plume shield, a simple sheet metal cone, was structurally stiffened, and an active satellite was then built around it. The original purpose of the plume shield was to prevent the plume from solid propellent engines, which are fired outside the atmosphere after the aerodynamic shroud is jettisoned, from reaching the primary payload. The surface of LIPS 3 facing the plume also functioned in this manner, but the anterior surfaces were unaffected, and it was there that all solar arrays, sensors, and experiments were mounted. The purpose of LIPS 3 was to provide a test bed for new space power sources. With the long delays projected for schedules of the STS and other major launch systems, it appeared that a decade might pass before long term flight data could be obtained on many new and innovative power sources. The fact that a launch scheduled for early in 1987 required a plume shield was seen as a unique opportunity to obtain some of this data in a timely manner. The LIPS 3 system, the experiments placed aboard, and the experiment data acquisition subsystem are described. Various problems were encountered during integration and after launch; those which appear to effect the accuracy of experimental results are discussed. A preliminary description is given of the accuracy of the flight experiment data.

Severns, J. G.↗

Evolutionary Space Station fluids management

The demand for and management issues associated with fluids usage at the evolutionary Space Station are examined. A variety of fluids such as N2, He, methane and rare gases for research and development activities as well as massive quantities of cryogenic propellants for geosynchronous orbit and planetary exploration missions will need to be accommodated at the Space Station. A data base of fluid types, quantities, and projected usage schedules suggested, and potential accommodation concepts defined. Impacts to the Space Station operational configuration and necessary 'hooks and scars' to be included in the baseline design are addressed. Also presented is an operational scenario of the delivery of a cryogenic propellant tank set to the Space Station, attachment to the Space Station, and propellant transfer to and launch of a space transfer vehicle (STV). Results indicate that the cryogenic propellant requirements of STV and lunar missions may be met by tank sets attached to the Space Station, but those of Mars missions would require off-station methods.

Stevenson, Steve↗