X-ray diffraction and scanning electron microscope characterizations of the salt waste processing facility tank 101 and tank 104 solid samples

The “as-received” Salt Waste Processing Facility (SWPF) Tank 101 and two Tank 104 samples (pre-wash and washed solids) have been characterized using x-ray diffraction (XRD) and scanning electron microscope/energy dispersive x-ray (SEM/EDX) techniques to address the concerns for the existence of solids, which may interfere with the operational performance of the SWPF crossflow filtration process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Review of the Literature on the Radiolytic Stability of the Next-Generation Solvent

The Original Caustic-Side Solvent Extraction (CSSX) solvent (based on the BOBCalixC6 extractant) currently in use at the Salt Waste Processing Facility (SWPF) is set to be replaced by the Next-Generation Solvent (NGS, based on the MaxCalix extractant). Current SWPF flammability safety controls use G-values for volatile gases obtained from radiolysis studies with the Original CSSX solvent. A review of past irradiation tests of both solvent systems was performed to assess the radiolytic stability of NGS with respect to flammable gas generation from radiolysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Literature Review on Next Generation Solvent Isopar ® L Vapor Pressure Curve and the Partitioning of its Modifier and Extractant

The Next Generation Solvent (NGS) is set to replace the Original Caustic Side Solvent Extractant (CSSX) at the Salt Waste Processing Facility (SWPF). The Savannah River National Laboratory (SRNL) was requested by Savannah River Mission Completion (SRMC), formerly Savannah River Remediation (SRR), to perform a literature review on the following topics to address flammability concerns with the current solvent: Isopar ® L vapor pressure curve for NGS, partitioning ratio for the extractant MaxCalix and the modifier Cs-7SB, and high cesium concentration impacts on NGS radiolysis and potential solvent degradation rates in high cesium concentrations. The following conclusions and recommendations are made based on previous experimental work and literature: (1) Current SWPF flammable gas generation calculations use an Isopar ® L vapor pressure curve based on experimental testing with the Original CSSX solvent. No such testing to date has been performed with NGS. It is suggested that the decrease in Cs-7SB concentration for NGS compared to the Original CSSX solvent would lead to a slightly higher vapor pressure at all temperatures in SWPF vessels. A bounding NGS vapor pressure curve has been provided; it is recommended to see if these values would challenge current flammability controls and to perform testing if needed.(2) The partitioning ratio for Cs-7SB is known in the Original CSSX solvent with dilute nitric acid and caustic solutions. No tests could be found for the partitioning of Cs-7SB to dilute boric acid solutions; however, a similar partitioning ratio is expected. Due to the lipophilic alkyl chains on MaxCalix, it is expected to be even less soluble than BOBCalixC6 in the aqueous phase and should not be considered a significant contributor to the f organic term. Additionally, the reaction rate of N,N’,N’’-Tris(3,7-dimethyloctyl)guanidine (TiDG) or its degradation products with a hydrogen radical should be estimated/determined if they are found to be significant contributors to the f organic term. (3) NGS is expected to see much higher Cs concentrations at SWPF in comparison to its use at the Modular CSSX Unit (MCU). These higher Cs concentrations could influence radiolytic degradation rates of the solvent. NGS appears to be fairly stable to radiolytic degradation based on previous testing and its use at MCU. However, there has not been radiolytic flammable gas generation testing with NGS to date. There is a risk that the continued use of G-values obtained for flammable gases produced from the irradiation of the Original CSSX solvent is not bounding for NGS, but this is considered a very low risk due to the similarities in the composition of the solvents, as well as the conservatisms in the experimental design of the Original CSSX testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Analyses of the SRNL Solvent Components

At the request of the Savannah River Mission Completion (SRMC), personnel at Savannah River Site (SRS) performed analyses on the remaining solvent components that are being stored at the Savannah River National Laboratory (SRNL). This was done to determine if the remaining stock of materials were still suitable for use for the Salt Waste processing Facility (SWPF). Two drums of Modifier, two drums BOBCalix, four drums of MAXCalix, and four jars of TiDG*HCl were analyzed. All were found to be of acceptable purity for use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 49H solids disturbance analysis

Tank 49H serves as the feed tank for the Salt Waste Processing Facility (SWPF). Transfers into Tank 49H may disturb any solids that have settled to the bottom of the tank, resulting in feed that may exceed the insoluble solids content limit of 1,200 mg/L of the SWPF Waste Acceptance Criteria (WAC). During a transfer into Tank 49H, material that free falls into Tank 49H through a downcomer could potentially disturb any solids on the bottom of the tank and scour or suspend solids from a settled solids layer or turbid region. A previous analysis and report evaluated the potential to disturb solids when transferring into Tank 49H through the B4 riser and recommended a minimum tank level of 120 inches to prevent disturbing any solids in the bottom of the tank. The scope of this task is to perform additional fluid flow analysis to determine whether accounting for disturbed particle settling and particle mixing and dispersion during transfer could allow the minimum liquid level to be reduced below 120 inches. The analysis utilized models from the technical literature to calculate the size and shape of the “plunging jet” as a function of input parameters such as initial velocity, initial jet diameter, elevation of the initial jet, liquid level in the tank, and solids depth. The analysis relied on the M-Star® simulations performed for the previous analysis to provide bounding estimates of the amount of solid particles disturbed and used the MStar® software to calculate the dispersion and mixing of the disturbed solids with other liquid in the tank as the solids are transported to the transfer pump. The analysis showed that with a solid particle size of 5 micron or less, a liquid level of 120 inches should be maintained to prevent significant disturbance of the solid layer at the bottom of Tank 49H.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of the Soluble and Insoluble Portions of Solids from the Salt Waste Processing Facility Tank 201 and Tank 202 Samples

The Salt Waste Processing Facility (SWPF) Tank 201 and Tank 202 samples have been characterized using X-ray diffraction (XRD), scanning electron microscope/energy dispersive x-ray (SEM/EDX), particle size analysis (PSA-Microtrac), Fourier transform-infrared (FT-IR) and nuclear magnetic resonance ( 1 H NMR) spectroscopic techniques to characterize and identify organic and inorganic components in Tanks 201 and 202 as part of efforts to understand the problems occurring at SWPF due to the presence of solids in the recovered solvent.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Physical Properties of the Salt Waste Processing Next Generation Solvent Formulation

In 2020, a review team examined the risks associated with the implementation of a new solvent formulation, similar to what was used in Modular Caustic-Side Solvent Extraction Unit (MCU). The team identified a number of risks associated with the change and pathways to mitigate some of the risks. SRNL has been tasked with examination and testing of a Salt Waste Processing Facility (SWPF) formulation for a Next Generation Solvent (NGS) intended for use at that facility. This formulation is known as the “$NGS\tiny{OPTIMUM}$”. This formulation consists of: 50 mM MAXCalix; 3 mM TiDG•HCl; 0.65 M Modifier; Remainder Isopar-L™. SRNL examined several physical aspects of this solvent in order to confirm its suitability for use at SWPF, such as viscosity, dispersion, surface tension, and third phase formation. Results indicate no unusual properties of this solvent when compared to the current “BOBCalix” solvent in use at SWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Generation Solvent Vapor Pressure Testing

Previous work by Savannah River National Laboratory (SRNL) indicated that the actual Next Generation Solvent vapor pressure would be higher than the Original Caustic Side Solvent Extraction (CSSX) solvent vapor pressure, but below a bounding vapor pressure using Raoult’s Law. Since solvent vapor pressure has a significant impact on Composite Lower Flammability Limits (CLFL) and attendant accident analyses, obtaining an additional margin from the bounding NGS vapor pressure would be valuable. In order to quantify how much margin might be gained from the NGS bounding solvent, SRNL researchers were requested to perform vapor pressure testing with the Next Generation Solvent (NGS) by Savannah River Mission Completion (SRMC). The vapor pressure curve for the NGS formulation set to be deployed at the Salt Waste Processing Facility (SWPF) has been determined by SRNL up to 55°C (131°F) using headspace Gas Chromatography (GC). It was expected that NGS would have a higher vapor pressure than the Original CSSX solvent; however, experimental results indicate a lower vapor pressure. At this time, it is uncertain if this difference is due to the 7x increase in concentration of the large calixarene in the solvent (0.007M BOBCalix in Original CSSX solvent vs. 0.05M MaxCalix in NGS) or to minor batch-to-batch variations in Isopar-L constituents. The NGS and the Original CSSX solvent vapor pressure data were fitted to the Antoine Equation. The Antoine equation gives a more accurate representation of the expected vapor pressure of the solvents outside of the temperature range tested. The Antoine equation fitting for NGS is given below: $P=10^{6.364⁻\frac{1788.4}{T+219.3}}$. Where, p is the vapor pressure (partial pressure) of NGS in mmHg and T is the temperature in °C. It is recommended that SRMC either continue using the more conservative Isopar-L vapor pressure calculations at SWPF with the equation developed for the Original CSSX solvent, or the equation presented above for the NGS solvent. Additionally, it is recommended to study the variability in Isopar-L vapor pressure between lots.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation Of Glass Density to Support the Estimation of Fissile Mass Loadings in Sludge Batch 10 Glasses

Per a directive from the Department of Energy Savannah River Operations Office (DOE-SR) in 2008, the fissile mass loading concentration must remain below 897 g/m 3 in each high-level waste (HLW) glass canister produced by the Defense Waste Processing Facility (DWPF). To support Sludge Batch 5 (SB5) processing, the Savannah River National Laboratory (SRNL) developed a technical basis that facilitates the evaluation of fissile mass loading of the glass product. The calculation is based on the iron (Fe) concentration in the glass as determined by measurements from the Slurry Mix Evaporator acceptability analysis as well as the glass density. In April 2022, a subsequent DOE-SR directive increased the fissile mass loading limit to 2500 g/m 3 beginning with Sludge Batch 11. Thus, the 897 g/m 3 limit still applies to Sludge Batch 10 (SB10) processing. For SB5 through initial Sludge Batch 9 (SB9) processing prior to coupled operation with the Salt Waste Processing Facility (SWPF), SRNL provided DWPF a bounding glass density value that was based on a statistical evaluation of density measurements. To eliminate the need for experimental work, a composition-based density model for HLW glasses was developed at SRNL in 2019. The objective of this report is to present the bounding glass density determined with the composition-based density model for SB10 sludge-only (SO) and coupled processing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of the Soluble and Insoluble Portions of Solids from the Salt Waste Processing Facility Tank 201 and Tank 202 Samples

The Salt Waste Processing Facility (SWPF) Tank 201 and Tank 202 samples have been characterized using X-ray diffraction (XRD), scanning electron microscope/energy dispersive x-ray (SEM/EDX), particle size analysis (PSA-Microtrac), Fourier transform-infrared (FT-IR) and nuclear magnetic resonance ( 1 H NMR) spectroscopic techniques to characterize and identify organic and inorganic components in Tanks 201 and 202 as part of efforts to understand the problems occurring at SWPF due to the presence of solids in the recovered solvent.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10 Based on November 2022 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System glass property models and their associated Measurement Acceptance Region constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Compatibility of Tefzel™ and Viton™ B with Caustic-Side Solvent Extraction Solvents

The Salt Waste Processing Facility (SWPF) plans to switch from the current Caustic-Side Solvent Extraction (CSSX) solvent to the Next Generation Solvent-Phase II (NGS-Phase II). SRNL was requested to evaluate the compatibility between polymeric materials of construction at SWPF and NGS-Phase II solvent. The work presented here concentrated on two materials of interest: Tefzel™ and Viton™ B.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extraction, Scrub, and Strip Test Results for the IBC BOBCalix Solvent Samples

A second vendor for solvent extraction components has been chosen for use at the Salt Waste Processing Facility (SWPF). IBC Advanced Technologies (IBC) has provided samples of their BOBCalix, as well as complete solvent. These samples were tested for quality assurance purposes to ensure their use at SWPF is acceptable. Two Extraction, Scrub, and Strip (ESS) tests were performed on solvent samples from IBC. The purpose of testing these samples was to determine if the solvents are displaying the correct extraction and stripping behavior with cesium.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Process Chemical Modeling to Optimize Radioactive Waste Disposal at the Savannah River Site - 24242

The Technical Optimization Model (TOM) is used by Savannah River Mission Completion (SRMC) to carry out facility-wide material balance and validate chemistrydependent processes for the purpose of their System Plan.The TOM simulates material movement and chemical reactions at the Tank Farm (TF), Salt Waste Processing Facility (SWPF) and Defense Waste Processing Facility (DWPF).

Georgiou, Andreas↗

Uranium Solubility and Supernate Enrichment Testing for Accelerated Basin De-Inventory Discards to Concentration, Storage, and Transfer Facilities

After future Accelerated Basin De-inventory (ABD) enriched uranium discards into sludge batches (SB), portions of supernate decants during SB preparation will be blended into salt batches (StB) and the resulting feeds must meet the nuclear safety requirements for the Salt Waste Processing Facility (SWPF). During previous SB10 sampling and testing, which involved H-Canyon material containing enriched uranium being mixed with Tank 51 sludge shortly after the H-Canyon stream was neutralized, it was identified that the uranium isotopic enrichment in the supernate deviated from the uranium isotopic enrichment in the slurry. The higher uranium isotopic enrichment in the supernate introduced the risk of challenging the feed requirements of SWPF. The ABD material added to SB11 was isotopically diluted with depleted uranium, mitigating any downstream impacts. However, H-Canyon desires to eliminate or minimize future depleted uranium additions in order to meet the mission schedule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Time-Temperature-Transformation (TTT) Diagram for a Sludge Batch 9 Glass Composition Based on Coupled-Operation with the Salt Waste Processing Facility

The amorphous structure of a glass waste form has the potential to rearrange into crystalline phases at temperatures between the liquidus temperature and the glass transition temperature (Tg). Certain phases that can form will be detrimental to the durability of the glass and it is important to know the conditions that promote devitrification. The canister-centerline-cooling (CCC) profile is used to replicate the area within the center of the Defense Waste Processing Facility (DWPF) canister with the slowest cooling during the initial cool down after pouring, which has the greatest potential for crystallization. Other time-temperature conditions that cause significant changes in either phase structure or phase composition are identified by a time-temperature-transformation (TTT) study. The phase stability of a waste form must be determined as a part of the Waste Acceptance Product Specifications (WAPS) if it is to eventually be stored in a geologic repository. This requires the creation of a TTT diagram and analysis of the Tg, as defined by the Department of Energy (DOE). The previous TTT study for a DWPF glass waste form was completed in 2010 prior to coupled operation with the Salt Waste Processing Facility (SWPF). SWPF transfers two high activity waste streams to DWPF for vitrification: a cesium-containing strip effluent and a stream containing monosodium titanate/sludge solids. These SWPF streams were first transferred to DWPF for vitrification during Sludge Batch 9 (SB9) in 2021. The impact of these SWPF streams on crystallization behavior was not determined in previous studies and the need for data to satisfy WAPS Specification 1.4 for SB9 was identified.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗