Search NASA⌕ Search

SEARCH · Search NASA

Results for “Trigger”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Design and Evaluation of the LAr Trigger Digitizer Board in the ATLAS Phase-I Upgrade

The Phase-I upgrade of the trigger readout electronics for the ATLAS Liquid Argon (LAr) calorimeters will be installed during the second long shutdown of the Large Hadron Collider (LHC) in 2019-2020 which will enable enhanced instantaneous luminosities during LHC Run 3 from 2021 through 2023. In this trigger upgrade, so-called supercells are introduced to provide higher granularity, higher resolution and longitudinal shower shape information from the LAr calorimeters to the Level-1 trigger processors. A new LAr Trigger Digitizer Board (LTDB) will process and digitize up to 320 channels of supercell signals, and transmit them via 40 fiber optical links to the back end where the data are further processed and transmitted to the trigger processors. Five pairs of bidirectional GBT links are used for slow control and monitoring between LTDB and the Front-End LInk eXchange (FELIX) in the ATLAS Trigger and Data Acquisition (TDAQ) system. Here, the LTDB also outputs 64 summed analog legacy signals to the current Tower Builder Board via a new baseplane. A test system for the production of 124 LTDBs has been developed, supporting configuration and calibration of all ASICs

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The CDF level 2 calorimetric trigger upgrade

CDF II upgraded the calorimeter trigger to cope with the higher detector occupancy due to the increased Tevatron instantaneous luminosity ({approx} 2.8 x 10{sup 32} cm{sup -2} s{sup -1}). While the original system was implemented in custom hardware and provided to the L2 trigger a limited-quality jet clustering performed using a reduced resolution measurement of the transverse energy in the calorimeter trigger towers, the upgraded system provides offline-quality jet reconstruction of the full resolution calorimeter data. This allows to keep better under control the dependence of the trigger rates on the instantaneous luminosity and to improve the efficiency and purity of the trigger selections. The upgraded calorimeter trigger uses the general purpose VME board Pulsar, developed at CDF II and already widely used to upgrade the L2 tracking and L2 decision systems. A battery of Pulsars is used to merge and send the calorimeter data to the L2 CPUs, where software-implemented algorithms perform offline-like clustering. In this paper we review the design and the performance of the upgraded system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Kinetic simulation studies of laser-triggering in the Z gas switch

Advanced z-pinch accelerators require precise timing of multiple mega-ampere drivers to deliver terawatt power. The triggering of these drivers is now largely initiated by laser ionization of gas switches. In this paper, we discuss detailed fully kinetic simulation of the Z laser-triggered gas switch involving detailed finite-difference time-domain particle-in-cell Monte Carlo modeling of the trigger section of the switch. Other components of the accelerator from the Marx bank through the pulse-forming line are described as circuit elements. The simulations presented here build on a recently developed model of electro-negative gas breakdown and streamer propagation that included photons produced from de-excited neutrals. New effects include multi-photon ionization of the gas in a prescribed laser field. The simulations show the sensitivity of triggering to laser parameters including focal plane within the anode-cathode gap of the trigger section of the switch, intensity at focus, and laser pulse length. Detailed electromagnetic simulations of the trigger section with circuit modeling of the upstream and downstream components are largely in agreement with Z data and demonstrate a new capability.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design and investigation of a multichannel laser-triggered vacuum switch

A laser-triggered vacuum switch (LTVS) is an advanced closing switch with nanosecond delay and jitter. In order to enhance hold-off voltage and extend the service lifetime of an LTVS, we designed a multichannel laser-triggered vacuum switch (MLTVS) utilizing a cone-shaped target electrode placed on the cathode platform. The fabrication and testing of the MLTVS is described in this paper. Experimental results show that the working voltage of the MLTVS with a gap distance of 12 mm is from 30 V to 20 kV. The threshold energy for triggering the switch is 0.4 mJ corresponding to a peak power density of 27.9 MW/cm{sup 2}. The triggering lifetime of a spot can reach up to 18 000 shots. In addition, the relationship between triggering lifetime and target materials is analyzed using a field emission scanning electron microscope. A hypothesis of the vacuum gap’s triggering mechanism is discussed based on the measured results.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Note: Triggering behavior of a vacuum arc plasma source

Axial symmetry of discharge is very important for application of vacuum arc plasma. It is discovered that the triggering method is a significant factor that would influence the symmetry of arc discharge at the final stable stage. Using high-speed multiframe photography, the transition processes from cathode-trigger discharge to cathode-anode discharge were observed. It is shown that the performances of the two triggering methods investigated are quite different. Arc discharge triggered by independent electric source can be stabilized at the center of anode grid, but it is difficult to achieve such good symmetry through resistance triggering. It is also found that the triggering process is highly correlated to the behavior of emitted electrons.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The ATLAS Electron and Photon Triggers

Electron and photon triggers covering transverse energies from 5 GeV to several TeV are essential for signal selection in a wide variety of ATLAS physics analyses to study Standard Model processes and to search for new phenomena. The ATLAS trigger system is divided in a hardware-based Level-1 trigger and a software-based high-level trigger, both of which were upgraded during the LHC shutdown in preparation for Run 2 operation. To cope with the increasing luminosity and more challenging pile-up conditions at a centre-of-mass energy of 13 TeV, the trigger selections at each level are optimised to control the rates and keep efficiencies high. To achieve this goal multivariate analysis techniques are used. The ATLAS electron and photon triggers and their performance with Run 2 data are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

NOvA Event Building, Buffering and Data-Driven Triggering From Within the DAQ System

To make its core measurements, the NOvA experiment needs to make real-time data-driven decisions involving beam-spill time correlation and other triggering issues. NOvA-DDT is a prototype Data-Driven Triggering system, built using the Fermilab artdaq generic DAQ/Event-building tools set. This provides the advantages of sharing online software infrastructure with other Intensity Frontier experiments, and of being able to use any offline analysis module--unchanged--as a component of the online triggering decisions. The NOvA-artdaq architecture chosen has significant advantages, including graceful degradation if the triggering decision software fails or cannot be done quickly enough for some fraction of the time-slice ``events.'' We have tested and measured the performance and overhead of NOvA-DDT using an actual Hough transform based trigger decision module taken from the NOvA offline software. The results of these tests--98 ms mean time per event on only 1/16 of th e available processing power of a node, and overheads of about 2 ms per event--provide a proof of concept: NOvA-DDT is a viable strategy for data acquisition, event building, and trigger processing at the NOvA far detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

High performance FPGA embedded system for machine learning based tracking and trigger in sPhenix and EIC

We present a comprehensive end-to-end pipeline to classify triggers versus background events in this paper. This pipeline makes online decisions to select signal data and enables the intelligent trigger system for efficient data collection in the Data Acquisition System (DAQ) of the upcoming sPHENIX and future EIC (Electron-Ion Collider) experiments. Starting from the coordinates of pixel hits that are lightened by passing particles in the detector, the pipeline applies three-stage of event processing (hits clustering, track reconstruction, and trigger detection) and labels all processed events with the binary tag of trigger versus background events. The pipeline consists of deterministic algorithms such as clustering pixels to reduce event size, tracking reconstruction to predict candidate edges, and advanced graph neural network-based models for recognizing the entire jet pattern. In particular, we apply the message-passing graph neural network to predict links between hits and reconstruct tracks and a hierarchical pooling algorithm (DiffPool) to make the graph-level trigger detection. We obtain an impressive performance (≥70% accuracy) for trigger detection with only 3200 neuron weights in the end-to-end pipeline. We deploy the end-to-end pipeline into a field-programmable gate array (FPGA) and accelerate the three stages with speedup factors of 1152, 280, and 21, respectively.

Instruments & Instrumentation↗

Commissioning of the CMS High Level Trigger

The CMS experiment will collect data from the proton-proton collisions delivered by the Large Hadron Collider (LHC) at a centre-of-mass energy up to 14 TeV. The CMS trigger system is designed to cope with unprecedented luminosities and LHC bunch-crossing rates up to 40 MHz. The unique CMS trigger architecture only employs two trigger levels. The Level-1 trigger is implemented using custom electronics, while the High Level Trigger (HLT) is based on software algorithms running on a large cluster of commercial processors, the Event Filter Farm. We present the major functionalities of the CMS High Level Trigger system as of the starting of LHC beams operations in September 2008. The validation of the HLT system in the online environment with Monte Carlo simulated data and its commissioning during cosmic rays data taking campaigns are discussed in detail. We conclude with the description of the HLT operations with the first circulating LHC beams before the incident occurred the 19th September 2008.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

TRIGGER MECHANISM OF SOLAR SUBFLARES IN A BRAIDED CORONAL MAGNETIC STRUCTURE

Fine-scale braiding of coronal magnetic loops by continuous footpoint motions may power coronal heating via nanoflares, which are spontaneous fine-scale bursts of internal reconnection. An initial nanoflare may trigger an avalanche of reconnection of the braids, making a microflare or larger subflare. In contrast to this internal triggering of subflares, we observe external triggering of subflares in a braided coronal magnetic field observed by the High-resolution Coronal Imager (Hi-C). We track the development of these subflares using 12 s cadence images acquired by SDO/AIA in 1600, 193, 94 Å, and registered magnetograms of SDO/HMI, over four hours centered on the Hi-C observing time. These data show numerous recurring small-scale brightenings in transition-region emission happening on polarity inversion lines where flux cancellation is occurring. We present in detail an example of an apparent burst of reconnection of two loops in the transition region under the braided coronal field which is appropriate for releasing a short reconnected loop downward and a longer reconnected loop upward. The short loop presumably submerges into the photosphere, participating in observed flux cancellation. A subflare in the overlying braided magnetic field is apparently triggered by the disturbance of the braided field by the reconnection-released upward loop. At least 10 subflares observed in this braided structure appear to be triggered this way. How common this external trigger mechanism for coronal subflares is in other active regions, and how important it is for coronal heating in general, remain to be seen.

79 ASTRONOMY AND ASTROPHYSICS↗

Muon enhancements at sea level in association with Swift-BAT and MILAGRO triggers

Recently, triggers occurring during high background rate intervals have been reporter by the Swift-BAT gamma-ray burst detector. Among them, there were two on January 24, two on January 25, and two on February 13 and 18, all in 2008. These Swift-BAT triggers in most cases are probably noise triggers that occurred while Swift was entering the South Atlantic Anomaly (SAA). In fact, we show that they happen during a plentiful precipitation of high energy particles in the SAA, producing muons in the atmosphere detected by two directional telescopes at sea level, inside the SAA region (Tupi experiment). They look like sharp peaks in the muon counting rate. In the same category are two triggers from the MILAGRO ground-based detector, on January 25 and 31, 2008, respectively. In addition, the trigger coordinates are close to (and, in two cases, inside) the field of view of the telescopes. From an additional analysis in the behavior of the muon counting rate, it is possible to conclude that the events are produced by precipitation of high energy charged particles in the SAA region. Thus, due to its localization, the Tupi experiment constitutes a new sensor of high energy particle precipitation in the SAA, and it can be useful in the identification of some triggers of gamma-ray burst detectors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Configuration and performance of the ATLAS b -jet triggers in Run 2

Several improvements to the ATLAS triggers used to identify jets containing b-hadrons (b-jets) were implemented for data-taking during Run 2 of the Large Hadron Collider from 2016 to 2018. These changes include reconfiguring the b-jet trigger software to improve primary-vertex finding and allow more stable running in conditions with high pile-up, and the implementation of the functionality needed to run sophisticated taggers used by the offline reconstruction in an online environment. These improvements yielded an order of magnitude better light-flavour jet rejection for the same b-jet identification efficiency compared to the performance in Run 1 (2011–2012). The efficiency to identify b-jets in the trigger, and the conditional efficiency for b-jets that satisfy offline b-tagging requirements to pass the trigger are also measured. Correction factors are derived to calibrate the b-tagging efficiency in simulation to match that observed in data. The associated systematic uncertainties are substantially smaller than in previous measurements. In addition, b-jet triggers were operated for the first time during heavy-ion data-taking, using dedicated triggers that were developed to identify semileptonic b-hadron decays by selecting events with geometrically overlapping muons and jets.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The ATLAS inner detector trigger performance in pp collisions at 13 TeV during LHC Run 2

The design and performance of the inner detector trigger for the high level trigger of the ATLAS experiment at the Large Hadron Collider during the 2016–2018 data taking period is discussed. In 2016, 2017, and 2018 the ATLAS detector recorded 35.6 fb –1 , 46.9 fb –1 , and 60.6 fb –1 respectively of proton–proton collision data at a centre-of-mass energy of 13 TeV. In order to deal with the very high interaction multiplicities per bunch crossing expected with the 13 TeV collisions the inner detector trigger was redesigned during the long shutdown of the Large Hadron Collider from 2013 until 2015. An overview of these developments is provided and the performance of the tracking in the trigger for the muon, electron, tau and b-jet signatures is discussed. The high performance of the inner detector trigger with these extreme interaction multiplicities demonstrates how the inner detector tracking continues to lie at the heart of the trigger performance and is essential in enabling the ATLAS physics programme.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Injected mass deposition thresholds for lithium granule instigated triggering of edge localized modes on EAST

The ability of an injected lithium granule to promptly trigger an edge localized mode (ELM) has been established in multiple experiments. By horizontally injecting granules ranging in diameter from 200 microns to 1mm in diameter into the low field side of EAST H-mode discharges we have determined that granules with diameter > 600 microns are successful in triggering ELMs more than 95% of the time. It was also demonstrated that below 600 microns the triggering efficiency decreased roughly with granule size. Granules were radially injected from the outer midplane with velocities ~ 80 m/s into EAST upper single null discharges with an ITER like tungsten monoblock divertor. These granules were individually tracked throughout their injection cycle in order to determine their efficacy at triggering an ELM. For those granules of sufficient size, ELM triggering was a prompt response to granule injection. By simulating the granule injection with an experimentally benchmarked neutral gas shielding (NGS) model, the ablatant mass deposition required to promptly trigger an ELM is calculated and the fractional mass deposition is determined.

H-mode↗

Joint Actinide Shock Physics Experimental Research (JASPER): System Design Requirements: Trigger Unit

One of the key systems required for the Joint Actinide Shock Physics Experimental Research (JASPER) facility is the timely triggering of the Prompt System (PS). The Trigger Unit (TU) is the critical component that determines when the PS is to be triggered. There are two redundant TUs within the JASPER system, and each TU creates three redundant triggers for the PS. In this fashion, the Prompt Trigger System (PTS) can suffer the loss of one sensor, as well as the loss of one TU, and still function correctly. The TU is designed to receive signals from five separate sensors along the flight of the projectile on its way to the target. The TU uses three pairs of these detectors to create a trigger pulse at the appropriate time, based on the actual velocity of the projectile as it passes between the two sensors.

42 ENGINEERING↗

Locating rocket triggered lightning using the LLP lightning locating system at the NASA Kennedy Space Center

Five rocket-triggered cloud-to-ground lightning flashes were detected by the operational lightning-locating system at the NASA Kennedy Space Center on August 17, 1984. The locating system, which was designed to detect natural lightning, detected at least 2 and as many as 6 strokes in the triggered flashes, suggesting that some of the strokes in the triggered lightning had signal-amplitude and waveshape characteristics similar to natural lightning. However, not all triggered strokes were detected, indicating that some strokes were atypical in nature. Since the ground-strike points of the triggered flashes were known quite precisely, the accuracy of the lightning-locating system was also evaluated. The three direction finders were found to have a mean bearing accuracy of + or - 0.5-0.6 deg. The distance errors of the real-time position solutions of the locating system on the triggered flashes were in the range of 195-770 m, with a mean of 480 m.

Maier, M. W.↗

Influence of central set on anticipatory and triggered grip-force adjustments

The effects of predictability of load magnitude on anticipatory and triggered grip-force adjustments were studied as nine normal subjects used a precision grip to lift, hold, and replace an instrumented test object. Experience with a predictable stimulus has been shown to enhance magnitude scaling of triggered postural responses to different amplitudes of perturbations. However, this phenomenon, known as a central-set effect, has not been tested systematically for grip-force responses in the hand. In our study, predictability was manipulated by applying load perturbations of different magnitudes to the test object under conditions in which the upcoming load magnitude was presented repeatedly or under conditions in which the load magnitudes were presented randomly, each with two different pre-load grip conditions (unconstrained and constrained). In constrained conditions, initial grip forces were maintained near the minimum level necessary to prevent pre-loaded object slippage, while in unconstrained conditions, no initial grip force restrictions were imposed. The effect of predictable (blocked) and unpredictable (random) load presentations on scaling of anticipatory and triggered grip responses was tested by comparing the slopes of linear regressions between the imposed load and grip response magnitude. Anticipatory and triggered grip force responses were scaled to load magnitude in all conditions. However, regardless of pre-load grip force constraint, the gains (slopes) of grip responses relative to load magnitudes were greater when the magnitude of the upcoming load was predictable than when the load increase was unpredictable. In addition, a central-set effect was evidenced by the fewer number of drop trials in the predictable relative to unpredictable load conditions. Pre-load grip forces showed the greatest set effects. However, grip responses showed larger set effects, based on prediction, when pre-load grip force was constrained to lower levels. These results suggest that anticipatory processes pertaining to load magnitude permit the response gain of both voluntary and triggered rapid grip force adjustments to be set, at least partially, prior to perturbation onset. Comparison of anticipatory set effects for reactive torque and lower extremity EMG postural responses triggered by surface translation perturbations suggests a more general rule governing anticipatory processes.

Non-NASA Center↗

The Upgrade Path from Legacy VME to VXS Dual Star Connectivity for Large Scale Data Acquisition and Trigger Systems

New instrumentation modules have been designed by Jefferson Lab and to take advantage of the higher performance and elegant backplane connectivity of the VITA 41 VXS standard. These new modules are required to meet the 200KHz trigger rates envisioned for the 12GeV experimental program. Upgrading legacy VME designs to the high speed gigabit serial extensions that VXS offers, comes with significant challenges, including electronic engineering design, plus firmware and software development issues. This paper will detail our system design approach including the critical system requirement stages, and explain the pipeline design techniques and selection criteria for the FPGA that require embedded Gigabit serial transceivers. The entire trigger system is synchronous and operates at 250MHz clock with synchronization signals, and the global trigger signals distributed to each front end readout crate via the second switch slot in the 21 slot, dual star VXS backplane. The readout of the buffered detector signals relies on 2eSST over the standard VME64x path at >200MB/s. We have achieved 20Gb/s transfer rate of trigger information within one VXS crate and will present results using production modules in a two crate test configuration with both VXS crates fully populated. The VXS trigger modules that reside in the front end crates, will be ready for production orders by the end of the 2011 fiscal year. VXS Global trigger modules are in the design stage now, and will be complete to meet the installation schedule for the 12GeV Physics program.

99 GENERAL AND MISCELLANEOUS↗