Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Advanced subsystems development

The concept design for a small (less than 10 MWe) solar thermal electric generating plant was completed using projected 1985 technology. The systems requirements were defined and specified. The components, including an engineering prototype for one 15 kWe module of the generating plant, were conceptually designed. Significant features of the small solar thermal power plant were identified as the following: (1) 15 kWe Stirling-cycle engine/alternator with constant power output; (2) 10 meter point-focusing paraboloidal concentrator with cantilevered cellular glass reflecting panels; (3) primary heat pipe with 800 C output solar cavity receiver; (4) secondary heat pipe with molten salt thermal energy storage unit; (5) electric energy transport system; and (6) advanced battery energy storage capability.

Livingston, F. R.↗

Phase 1 of the First Solar Small Power System Experiment (experimental System No. 1). Volume 1: Technical Studies for Solar Point-focusing, Distributed Collector System, with Energy Conversion at the Collector, Category C

The technical and economic feasibility of a solar electric power plant for a small community is evaluated and specific system designs for development and demonstration are selected. All systems investigated are defined as point focusing, distributed receiver concepts, with energy conversion at the collector. The preferred system is comprised of multiple parabolic dish concentrators employing Stirling cycle engines for power conversion. The engine, AC generator, cavity receiver, and integral sodium pool boiler/heat transport system are combined in a single package and mounted at the focus of each concentrator. The output of each concentrator is collected by a conventional electrical distribution system which permits grid-connected or stand-alone operation, depending on the storage system selected.

Clark, T. B.↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Effects of CO2 Concentration on Leaf Photosynthesis and Stomatal Conductance of Potatoes Grown Under Different Irradiance Levels and Photoperiods

Potato (Solanum tuberosum L.) cvs. Russet Burbank, Denali, and Norland, were grown in environmental rooms controlled at approx 350 micro mol/mol (ambient during years 1987/1988) and 1000 micro mol/mol (enriched) CO2 concentrations. Plants and electric lamps were arranged to provide two irradiance zones, 400 and 800 micro mol/mol/square m/S PPF and studies were repeated using two photoperiods (12-h light / 12-h dark and continuous light). Leaf photosynthetic rates and leaf stomatal conductance were measured using fully expanded, upper canopy leaves at weekly intervals throughout growth (21 through 84 days after transplanting). Increasing the CO2 from approx 350 to 1000 micro mol/mol under the 12-h photoperiod increased leaf photosynthetic rates by 39% at 400 micro mol/mol/square m/S PPF and 27% at 800 micro mol/mol/square m/S PPF. Increasing the CO2 from approx 350 to 1000 micro mol/mol under continuous light decreased leaf photosynthetic rates by 7% at 400 micro mol/mol/square m/S PPF and 13% at 800 micro mol/mol/square m/S PPF. Increasing the CO2 from approx 350 to 1000 micro mol/mol under the 12-h photoperiod plants decreased stomatal conductance by an average of 26% at 400 micro mol/mol/square m/S PPF and 42% at 800 micro mol/mol/square m/S PPF. Under continuous light, CO2 enrichment resulted in a small increase (2%) of stomatal conductance at 400 micro mol/mol/square m/S PPF, and a small decrease (3%) at 800 micro mol/mol/square m/S PPF. Results indicate that CO2 enrichment under the 12-h photoperiod showed the expected increase in photosynthesis and decrease in stomatal conductance for a C3 species like potato, but the decreases in leaf photosynthetic rates and minimal effect on conductance from CO2 enrichment under continuous light were not expected. The plant leaves under continuous light showed more chlorosis and some rusty flecking versus plants under the 12-h photoperiod, suggesting the continuous light was more stressful on the plants. The increased rates of leaf photosynthesis with increased CO2 concentration paralleled trends in biomass production (published previously) but were not proportional to the biomass yields.

Wheeler, R. M.↗

Cost and Performance Baseline for Fossil Energy Plants, Volume 5: Natural Gas Electricity Generating Units for Flexible Operation

To address the data needs of energy system designers and to serve as a baseline for research and development, NETL has carried out a study to characterize the flexibility attributes - both performance and cost - of nine common commercial natural gas-fueled electricity generating units. The intermittent output of low-carbon, renewable power generation sources such as wind and solar create challenges to grid stability and reliability. Fossil-fueled power generation technologies are currently used to provide reliable, on-demand power during periods of reduced renewable output. Dispatchable generators must be able to accommodate increasing renewable generation as the nation pursues the Administration’s target of a decarbonized energy sector by 2035. As energy system experts seek to identify least-cost approaches to decarbonization, accurate cost and performance data characterizing dispatchable fossil generators that operate flexibly, at capacity factors that have been declining over time, and are needed to inform models for capacity expansion. Furthermore, these technologies continue to be a significant source of carbon dioxide emissions, providing the impetus for research and development, including the advancement and potential incorporation of carbon capture technologies. This study characterizes the cost and performance of select state-of-the-art natural gas-fueled power generation technologies: reciprocating internal combustion engines (RICE), simple cycle combustion turbines, and natural gas combined cycles (NGCC). An emphasis is placed on flexibility characteristics, such as part-load heat rate, ramp rates, start up times, and start up costs.

03 NATURAL GAS↗

Electricity and natural gas tariffs at United States wastewater treatment plants

Abstract Wastewater treatment plants (WWTPs) are large electricity and natural gas consumers with untapped potential to recover carbon-neutral biogas and provide energy services for the grid. Techno-economic analysis of emerging energy recovery and management technologies is critical to understanding their commercial viability, but quantifying their energy cost savings potential is stymied by a lack of well curated, nationally representative electricity and natural gas tariff data. We present a dataset of electricity tariffs for the 100 largest WWTPs in the Clean Watershed Needs Survey (CWNS) and natural gas tariffs for the 54 of 100 WWTPs with on-site cogeneration. We manually collected tariffs from each utility’s website and implemented data checks to ensure their validity. The dataset includes facility metadata, electricity tariffs, and natural gas tariffs (where cogeneration is present). Tariffs are current as of November 2021. We provide code for technical validation along with a sample simulation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lithium, a path to make fusion energy affordable

In this tutorial article, we review the technological, physics, and economic basis for a magnetic fusion device utilizing a flowing liquid lithium divertor (molten metal velocity in the range of cm/s) and operating in a low-recycling plasma regime. When extrapolated to magnetic fusion reactor scale, the observed effects of a liquid lithium boundary on recycling reduction, confinement increase, and anomalous heat transport mitigation may offer a fundamentally distinct and promising alternative route to fusion energy production. In addition, this lithium-driven low recycling regime could accelerate fusion’s commercial viability since such a device would be smaller, dramatically decreasing plant and electricity costs if all technological complexities are solved. First, the theoretical basis of the energy confinement and fusion performance as well as the related possibilities of low recycling regimes driven by flowing lithium plasma-facing components are reviewed. Then the paper emphasizes the technological obstacles that need to be overcome for developing the necessary systems for such a flowing liquid lithium solution at reactor scale and details how many of these have been overcome at laboratory and/or proof-of-concept scale. Finally, the current and planned scientific and engineering endeavors being performed at the University of Illinois at Urbana-Champaign regarding this alternative reactor option are discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Modeling of Additively Manufactured Ceramic Heat Exchangers with Semi-Elliptical Cross-Section Flow Channels

An approximate and easily applied analytical model was developed for heat transfer calculations of heat exchangers consisting of multiple rows and columns of heat transfer fluid flow channels with semi-elliptical cross sections. Heat exchangers of this type are being developed by using ceramic material and additive manufacturing for high temperature and pressure-concentrating solar electric power plants. Calculations using the model require only the geometrical dimensions and flow conditions of the heat exchanger. Comparisons of modeling predictions, with both simulation results and experimental data, were conducted to verify the viability of the model. The results showed good agreement where almost all the modeling predictions were within 20% of the simulation results or the experimental data. Finally, the proposed modeling approach is more generally applicable to heat transfer analysis of heat exchangers with similar flow channel configurations to those considered in this study.

Ceramic↗

PacWave South SeaRAY k2 Risk Registers

The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. Failure Modes, Effects, and Criticality Analysis (FMECA) is conducted to systematically identify all potential failure modes and their effects on the system, and to analyze the criticality of each risk based on the likelihood of the event and the severity of the impact. Actions may then be recommended to mitigate the criticality of a risk, either by reducing the likelihood of the risk or the severity of its impact. Risk assessment is executed iteratively as an integral part of the design process. By incorporating risk assessment early in the development cycle, mitigation of risk can be achieved cost effectively. The actions recommended to mitigate risk may be subsequently executed, and as the design progresses the risk assessment is reviewed and revised. Review of the risk assessment is integrated into structured design reviews, ensuring that critical risks are comprehended and that the Project will not progress to e.g. fabrication while intolerable risks remain. The risk assessment process results in the population and maintenance of Risk Registers (RRs). Each major system (and as needed, subsystem) will have a distinct RR. This allows each system or subsystem to be assessed individually, rendering the RRs to a manageable size for review.

16 TIDAL AND WAVE POWER↗

Integration of energy storage with diesel generation in remote communities

Highlights Battery energy storage may improve energy efficiency and reliability of hybrid energy systems composed by diesel and solar photovoltaic power generators serving isolated communities. In projects aiming update of power plants serving electrically isolated communities with redundant diesel generation, battery energy storage can improve overall economic performance of power supply system by reducing fuel usage, decreasing capital costs by replacing redundant diesel generation units, and increasing generator system life by shortening yearly runtime. Fast-acting battery energy storage systems with grid-forming inverters might have potential for improving drastically the reliability indices of isolated communities currently supplied by diesel generation. Abstract This paper will highlight unique challenges and opportunities with regard to energy storage utilization in remote, self-sustaining communities. The energy management of such areas has unique concerns. Diesel generation is often the go-to power source in these scenarios, but these systems are not devoid of issues. Without dedicated maintenance crews as in large, interconnected network areas, minor interruptions can be frequent and invasive not only for those who lose power, but also for those in the community that must then correct any faults. Although the immediate financial benefits are perhaps not readily apparent, energy storage could be used to address concerns related to reliability, automation, fuel supply concerns, generator degradation, solar utilization, and, yes, fuel costs to name a few. These ideas are shown through a case study of the Levelock Village of Alaska. Currently, the community is faced with high diesel prices and a difficult supply chain, which makes temporary loss of power very common and reductions in fuel consumption very impactful. This study will investigate the benefits that an energy storage system could bring to the overall system life, fuel costs, and reliability of the power supply. The variable efficiency of the generators, impact of startup/shutdown process, and low-load operation concerns are considered. The technological benefits of the combined system will be explored for various scenarios of future diesel prices and technology maintenance/replacement costs as well as for the avoidance of power interruptions that are so common in the community currently. Graphic abstract Discussion In several cases, energy storage can provide a means to promote energy equity by improving remote communities’ power supply reliability to levels closer to what the average urban consumer experiences at a reduced cost compared to transmission buildout. Furthermore, energy equity represents a hard-to-quantify benefit achieved by the integration of energy storage to isolated power systems of under-served communities, which suggests that the financial aspects of such projects should be questioned as the main performance criterion. To improve battery energy storage system valuation for diesel-based power systems, integration analysis must be holistic and go beyond fuel savings to capture every value stream possible.

25 ENERGY STORAGE↗

Reversible Solid Oxide Fuel Cell Systems for Energy Storage and Hydrogen Production

FuelCell Energy (FCE) studied the performance, design, and economics of a reversible solid-oxide fuel cell/electrolyzer integrated with a natural gas-based electricity generation plant and used as an energy storage system. Increased market penetration of renewable energy is challenging for operators of fossilbased plants which are not suited for quick turndown and ramp-up. Process simulations studies show that with utilization of waste heat from the power plant, a high roundtrip efficiency (RTE) around 70% is possible, providing excellent market potential for this energy storage technology, potentially providing improved economics and lifetime for such power plant. The market potential and economics as a function of production volume are analyzed in detail. FCE is continuing the development and commercialization of its solid oxide technology.

08 HYDROGEN↗