Project Title: Demonstration High Temperature Superconducting NonPlanar Stellarator Magnet with Advanced Manufactured Assemblies

This is the final report for the project “Demonstration High Temperature Superconducting Non- Planar Stellarator Magnet with Advanced Manufactured Assemblies”, funded by DOE, and performed by Type One Energy from September, 2020, to March 2024 involving the Fusion Technology Institute at the University of Wisconsin–Madison, the Plasma Science and Fusion Center (PSFC) at the Massachusetts Institute of Technology (MIT) and Commonwealth Fusion Systems (CFS) to design and fabricate the first non-planar HTS (REBCO) coil for a high-field stellarator based on the SPARC tokamak’s VIPER cable concept. Stellarators at high fields make high-temperature superconducting magnets necessary for a compact fusion device. But the asymmetric and non-planar nature of its components, especially the magnets make it difficult for scalable producibility. To address these challenges, two promising technologies have emerged: advanced manufacturing (AM) for the supporting plates for forming the magnets, and high-temperature superconducting (HTS) cables inside the plates. AM has advanced enough to produce stellarator components with the necessary geometric complexity, size, and the precision, leading to potentially significant reductions in production time, cost, and waste. The cost of HTS tape has decreased dramatically, and progress in HTS planar magnet development has reached a point where it can be proposed for application to complex 3D non-planar magnets. The main objective of this project is to develop, demonstrate and pre-commercialize a novel, non-planar HTS coil shape that remains superconducting to achieve production scalable reductions in time and cost and performance. The proposed technology is based on the novel concept of a precision sub-scale HTS nonplanar coil assembly. This project focuses on the design, fabrication, material optimization of cable design, and validation and demonstration of the high current carrying capability of superconducting magnets and their support in a complex 3D shape needed for application to stellarator magnetic plasma confinement. The specific objectives of this research program include: (1) The successful application of metal AM to build a precision sub-scale HTS nonplanar coil, (2) An HTS cable and cross-section design that can conform to the required nonplanar coil shape (bend radii as tight as 10-cm) and remains superconducting at an engineering current density of 1.35 kA/cm 2 at 77 K and 1 tesla at the conductor (5 kA in the cable). To achieve the above challenging goals, we have formed a multidisciplinary research team consisting of members from Type One Energy and UW-Madison, MIT PSFC and CFS with complementary skills and strong facilities. The team worked collaboratively on fundamental and applied research on the following three major technical areas: (1) Design, fabrication, and optimization of non-planar HTS Cable The ultimate goal of the project is to determine if commercial REBCO tapes and additive manufacturing can be used to fabricate high field (≥ 10T) non-planar coils with tight bending radii (≃ 100mm) and with a degradation of the critical current (Ic) smaller than 20% with respect to the expected performance. We started with shorter length cable to evaluate the scalability of the production process and eventually reached multiple turns for higher magnetic fields. Our findings suggest that a stellarator coil system of a relevant size, characterized by its asymmetric and non-planar components, can be fabricated using a formed cable in plate method. This system can be simulated using a large-scale modeling approach. The use of hybrid modeling 3 techniques will be pivotal in reducing the complexity of the model and in assessing expected performance in designs. (2) Modeling and simulation of the non-planar HTS Cable Multiphysics simulations are performed using the commercial software and are carried out in self-field conditions, involving 2D and 3D models and twisted around one slot of twist-pitched VIPER cable. Multiphysics simulations are mainly focused on the coil for the critical current evaluation, the magnetic field map, self-Lorentz forces and mechanical, and magnetothermal behavior and the quench dynamics. The detailed model and prediction of the superconducting performance of a stellarator-relevant demonstration cable from numerical simulations supports the results from the actual testing backing the results. A detailed description and results are provided in the later sections. (3) Design, fabrication, and optimization of support for the non-planar HTS Cable The team developed an additive manufactured (AM) coil positioning plate that formed into the required non-planar geometry (with bend radii as tight as 10-cm) and to acceptable tolerances required for a stellarator magnet: (+0.25-mm from ideal on dimensions of coil positioning plates and up to +1-mm from ideal for position of wound coil). The plate materials is also included in this selection process from fabrication and 3D printing perspective and commensurate with eventual application to a fusion reactor. From the cost effectiveness point of view, the HTS coil and plate has the potential to cost less than that made in conventional methods with less waste (<75% waste) reducing time (<50%) and cost (<50%), especially as the AM field matures. The application of advanced manufacturing in the construction of the support plates will also lead to cost reduction, as the cables can be easily replaced, thereby making the assembly modular. With such high primary cost and time savings, high current densities and magnetic field, the funded R&D work has validated the designs, proven the feasibility, and characterized the performance of the HTS coil and plate assembly, paving the way for a relevant-size stellarator coil system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4

The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.

43 PARTICLE ACCELERATORS↗

Post-2026 Environmental Impact Statement Rate Analysis for the Colorado River Storage Project

The Glen Canyon Dam (GCD) is a principal power-generating asset within the Colorado River Storage Project (CRSP), accounting for approximately 70–80% of CRSP power production over the past two decades. In June 2023, the U.S. Bureau of Reclamation (Reclamation) issued a Notice of Intent to prepare an Environmental Impact Statement (EIS) outlining operational guidelines and strategies for Colorado River Basin reservoirs after 2026 (Reclamation, 2023). Power generation is among CRSP’s statutory purposes under the Colorado River Storage Project Act of 1956 (U.S. Congress, 1956). Assessing how alternative policy frameworks affect CRSP power production and the resulting electricity rates for U.S. customers is therefore essential to inform decision-making. This report evaluates projected electricity rates and the market value of electricity from the Western Area Power Administration (WAPA) CRSP GCD under multiple post-2026 policy scenarios to support Reclamation’s EIS development. Results from advanced econometric and machine learning models indicate that the Enhanced Coordination alternative (EnhanCoor), Maximum Operational Flexibility alternative (CCA), and Supply Driven - 55 alternative (SD55) alternatives yield more favorable hydropower generation and capacity outcomes, which are objectives outlined in Reclamation’s documentations (Reclamation, 2007; Reclamation, 2016). Specifically, these scenarios are associated with higher electricity production, lower projected rate trajectories, and greater economic value to the U.S. power system from CRSP generation. The remaining five scenarios generally produce lower generation, higher rate trajectories, and reduced long-term market values.

13 HYDRO ENERGY↗

STILGAR End-of-Project Report

The Subsurface Tunnel Imaging LeveraGed by Analysis of Rayleigh wave ellipticity (STILGAR) project demonstrated an integrated geophysical approach for detecting, locating, and characterizing underground structural changes using dense seismic arrays and advanced inversion techniques. Field campaigns were conducted at two operational mines—the Redmond salt mine (Utah) and Graymont Pleasant Gap limestone mine (Pennsylvania)—providing real-world testbeds for monitoring anthropogenic subsurface activity. At the Redmond salt mine, seismic interferometry combined with back-projection inversion successfully identified continuous, low-amplitude signals from mining operations. The approach differentiated stationary from migrating anthropogenic sources, captured daily operational cycles, and validated the potential of passive seismic monitoring for remote detection of underground activity. At the Graymont Pleasant Gap mine, two dense seismic deployments in the spring and fall of 2023 generated over 4 TB of high-resolution data. Key outcomes included the relocation of 199 underground and 8 surface explosions with accuracies within tens of meters and the development of a 3D P-wave velocity model using the triple-difference tomography algorithm (tomoTD) that resolved major structural features such as the mine entrance, low-velocity tunnels, and roof-collapse areas. Ambient noise cross-correlation and back-projection analyses revealed persistent sources linked to ongoing mining activity, whereas horizontal-to-vertical spectral ratio (HVSR) and ellipticity studies confirmed stable site responses across seasons and identified soil thickness trends consistent with regional erosional and depositional processes. Checkerboard and sensitivity tests further validated the robustness of the tomographic results. Overall, the findings emphasize that although significant progress has been made in subsurface imaging, further work is needed to enhance the detection and localization of underground structures. Accurate imaging requires higher frequencies, yet anthropogenic sources tend to dominate the seismic record at those frequencies, and high-frequency surface waves are affected by higher modes that complicate interpretation. The improved detection and localization of human-induced signals enabled detailed temporal and spatial mapping of daily mine operations, demonstrating the feasibility of continuous anthropogenic source monitoring. Sensitivity to signals from nontraditional sources, such as fan operations, highlights the broader applicability of this approach to other industrial environments in which continuous and impulsive signals are present. The field campaigns produced a substantial volume of high-quality seismic data, supporting the development and testing of new methods for seismic source characterization and subsurface imaging. Future deployments should include sensors capable of recording lower frequencies to probe deeper structures, increase bandwidth to enhance resolution and sensitivity to both shallow and deep targets, and collect additional large-scale datasets to refine imaging and source characterization techniques. Moreover, conducting 3D modeling studies of seismic wavefields at higher frequencies will provide a better understanding of wave scattering and cavity–wavefield interactions in complex underground environments. In conclusion, the STILGAR project demonstrated that integrated seismic monitoring can effectively characterize underground operations, capturing both natural and anthropogenic signals. The approaches developed provide a foundation for improved detection, localization, and imaging of subsurface structures and are directly transferable to broader industrial monitoring applications.

58 GEOSCIENCES↗

Meadowview Neighborhood Electrification Project

Awarded a Congressionally Directed Spend (CDS) in 2023, Sacramento Municipal Utility District (SMUD) has successfully executed the Meadowview Neighborhood Electrification Project designed to demonstrate the efficacy of residential energy efficiency and weatherization upgrades for under-resourced communities positively impacting energy use reductions, financial metrics, and indoor air quality. Initially, the project sought to electrify and upgrade 300 homes in Sacramento’s Meadowview neighborhood. However, as interest and momentum grew, the project team proved increasingly efficient and was able to retrofit 374 homes. The project built on SMUD’s years of effort increasing energy efficiency, weatherization, and electrification for low-income residential customers—moving beyond incremental improvements toward full home electrification where it was both feasible and cost-effective.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reese Housing Power Project (Final Technical Report)

The Reese Housing Power Project is located on Tribal trust land in Colusa, CA and expands existing medium-voltage distribution to seven new households with the addition of medium-voltage cabling, step down transformers, smart meters, and street lighting for the new development. The Tribe utilized their existing Co-Generation power plant and micro grid to supply the new homes with highly reliable power with fewer interruptions and at a reduced rate compared with the local utility. The project gives the Tribe greater independence from traditional power sources and provides jobs for the community. The project reduces electric energy costs, increases Tribe self-reliance, and provides highly reliable electric power to seven tribal members’ homes. Construction of the project also provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying Barriers to Solar and Storage Hybrids: Modeled vs. empirical wholesale market value and net-value for co-located solar + storage projects [Slides]

Large-scale (1MW+) co-located solar and battery storage projects are expanding rapidly in the United States, but their realized contribution to the bulk power system remains poorly understood because public project-level operating data are limited. The Lawrence Berkeley National Laboratory estimates the wholesale market value of 280 operational photovoltaic-plus-storage (PV+S) projects across the seven ISOs/RTOs and 19 additional balancing authorities, representing roughly 95% of the U.S. PV+S fleet in 2024. We model optimized hourly dispatch under energy, capacity, and ancillary-service market opportunities and compare the resulting value with standalone PV value, project-specific levelized cost estimates, and empirical operating or revenue data where available.

14 SOLAR ENERGY↗

Aniak Energy Efficiency Retrofit Project

The Native Village of Aniak (NVA) is a remote Yup’ik community in western Alaska. NVA is proposing to install energy efficiency measures in the Tribal Office, Community Center, Association of Village Council Presidents (AVCP) Office, and Duplex. The goal of the project is to reduce the overall energy use of the NVA by implementing energy efficiency measures in four high-use tribal buildings. This project expects to have the following outcomes: projected annual energy savings of approximately $24,238; projected annual reduction in fuel oil of roughly 1,802 gallons and electricity of around 24,537 kWh; and annual reduction in carbon dioxide emissions of approximately 84,594 pounds/year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

A Recipe for ABC Multifamily Retrofits: Technologies, Financing, and Project Delivery

This report documents the final technical accomplishments and outcomes of Rocky Mountain Institute’s project under the U.S. Department of Energy (DOE) Award DE-EE0009064. The project aimed to develop, validate, and scale whole building retrofit solutions for multifamily buildings, including two configurations of Integrated Mechanical System Pods (IMSP-C and IMSP-U), in alignment with DOE Advanced Building Construction (ABC) initiative's decarbonization and energy efficiency goals. While the project made significant progress in Budget Period 1 (Phase 1) and throughout Budget Period 2 (Phase 2), activities were discontinued as of March 26, 2025, following a Stop Work Order issued by DOE. As such, this report reflects all completed work through that date. The project did not enter Budget Periods 3 and 4 (Phase 2), and demonstration site implementation, field M&V, and final commercialization execution were not conducted.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The need for carbon-emissions-driven climate projections in CMIP7

Abstract. Previous phases of the Coupled Model Intercomparison Project (CMIP) have primarily focused on simulations driven by atmospheric concentrations of greenhouse gases (GHGs), for both idealized model experiments and climate projections of different emissions scenarios. We argue that although this approach was practical to allow parallel development of Earth system model simulations and detailed socioeconomic futures, carbon cycle uncertainty as represented by diverse, process-resolving Earth system models (ESMs) is not manifested in the scenario outcomes, thus omitting a dominant source of uncertainty in meeting the Paris Agreement. Mitigation policy is defined in terms of human activity (including emissions), with strategies varying in their timing of net-zero emissions, the balance of mitigation effort between short-lived and long-lived climate forcers, their reliance on land use strategy, and the extent and timing of carbon removals. To explore the response to these drivers, ESMs need to explicitly represent complete cycles of major GHGs, including natural processes and anthropogenic influences. Carbon removal and sequestration strategies, which rely on proposed human management of natural systems, are currently calculated in integrated assessment models (IAMs) during scenario development with only the net carbon emissions passed to the ESM. However, proper accounting of the coupled system impacts of and feedback on such interventions requires explicit process representation in ESMs to build self-consistent physical representations of their potential effectiveness and risks under climate change. We propose that CMIP7 efforts prioritize simulations driven by CO2 emissions from fossil fuel use and projected deployment of carbon dioxide removal technologies, as well as land use and management, using the process resolution allowed by state-of-the-art ESMs to resolve carbon–climate feedbacks. Post-CMIP7 ambitions should aim to incorporate modeling of non-CO2 GHGs (in particular, sources and sinks of methane and nitrous oxide) and process-based representation of carbon removal options. These developments will allow three primary benefits: (1) resources to be allocated to policy-relevant climate projections and better real-time information related to the detectability and verification of emissions reductions and their relationship to expected near-term climate impacts, (2) scenario modeling of the range of possible future climate states including Earth system processes and feedbacks that are increasingly well-represented in ESMs, and (3) optimal utilization of the strengths of ESMs in the wider context of climate modeling infrastructure (which includes simple climate models, machine learning approaches and kilometer-scale climate models).

54 ENVIRONMENTAL SCIENCES↗

ISMIP6-based Antarctic projections to 2100: simulations with the BISICLES ice sheet model

The contribution of the Antarctic Ice Sheet is one of the most uncertain components of sea level rise to 2100. Ice sheet models are the primary tool for projecting future sea level contribution from continental ice sheets. The Ice Sheet Model Intercomparison for the Coupled Model Intercomparison Phase 6 (ISMIP6) provided projections of the ice sheet contribution to sea level over the 21st century, quantifying uncertainty due to ice sheet model, climate model, emission scenario, and uncertain parameters. We present simulations following the ISMIP6 framework with the BISICLES ice sheet model and new experiments extending the ISMIP6 protocol to more comprehensively sample uncertainties in future climate, ice shelf sensitivity to ocean melting, and their interactions. These results contributed to the land ice projections of Edwards et al. (2021), which formed the basis of sea level projections for the Sixth Assessment Report of the Intergovernmental Panel on Climate Change (AR6). Our experiments show the important interplay between surface mass balance processes and ocean-driven melt in determining Antarctic sea level contribution. Under higher-warming scenarios, high accumulation offsets more ocean-driven mass loss when sensitivity to ocean-driven melt is low. Conversely, we show that when sensitivity to ocean warming is high, ocean melting drives increased mass loss despite high accumulation. Overall, we simulate a sea level contribution range across our experiments from 2 to 178 mm. Finally, we show that collapse of ice shelves due to surface warming increases sea level contribution by 25 mm relative to the no-collapse experiments, for both moderate and high sensitivity of ice shelf melting to ocean forcing.

54 ENVIRONMENTAL SCIENCES↗

DEPRECATED - Sharing the Sun Community Solar Project Data (December 2023)

This data set is no longer current – The most current data and all historical data sets can be found at https://data.nrel.gov/submissions/244 This database represents a list of community solar projects identified through various sources as of Dec 2023. In addition, this dataset updated the low-income (LI) and low- and moderate-income (LMI) provisions for both complete and pending projects, based on the most recent program data we collected as of March 2024. The list has been reviewed but errors may exist and the list may not be comprehensive. Errors in the sources e.g. press releases may be duplicated in the list. Blank spaces represent missing information. NREL invites input to improve the database including to - correct erroneous information - add missing projects - fill in missing information - remove inactive projects. Updated information can be submitted to the contact(s) located on the current data set page linked at the top.

14 SOLAR ENERGY↗

Sharing the Sun Community Solar Project Data

This database represents a list of community solar projects, complete and pending, identified through various sources. The dataset is updated multiple times per year. The current version is the first file located below. Previous versions of the dataset published before June of 2024 can be found in the dataset below labeled “ARCHIVE_Sharing the Sun Community Solar Project Data_Before 06.24.“ The list has been reviewed but errors may exist, and the list may not be comprehensive. Errors in the sources e.g. press releases may be duplicated in the list. Blank spaces represent missing information. NLR invites input to improve the database including, to correct erroneous information, add missing projects, fill in missing information, and remove inactive projects. Updated information can be submitted to Sudha Kannan ( sudha.kannan@nlr.gov ).

14 SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

The Observed and Projected Changes of Global Monsoons: Current Status and Future Perspectives

The global monsoon system, encompassing the Asian-Australian, African, and American monsoons, sustains two-thirds of the world’s population by regulating water resources and agriculture. Monsoon anomalies pose severe risks, including floods and droughts. Recent research associated with the implementation of the Global Monsoons Model Intercomparison Project under the umbrella of CMIP6 has advanced our understanding of its historical variability and driving mechanisms. Observational data reveal a 20th-century shift: increased rainfall pre-1950s, followed by aridification and partial recovery post-1980s, driven by both internal variability (e.g., Atlantic Multidecadal Oscillation) and external forcings (greenhouse gases, aerosols), while ENSO drives interannual variability through ocean-atmosphere interactions. Future projections under greenhouse forcing suggest long-term monsoon intensification, though regional disparities and model uncertainties persist. Models indicate robust trends but struggle to quantify extremes, where thermodynamic effects (warming-induced moisture rise) uniformly boost heavy rainfall, while dynamical shifts (circulation changes) create spatial heterogeneity. Volcanic eruptions and proposed solar radiation modification (SRM) further complicate predictions: tropical eruptions suppress monsoons, whereas high-latitude events alter cross-equatorial flows, highlighting unresolved feedbacks. The emergent constraint approach is booming in terms of correcting future projections and reducing uncertainty with respect to the global monsoons. Critical challenges remain. Model biases and sparse 20th-century observational data hinder accurate attribution. The interplay between natural variability and anthropogenic forcings, along with nonlinear extreme precipitation risks under warming, demands deeper mechanistic insights. Additionally, SRM’s regional impacts and hemispheric monsoon interactions require systematic evaluation. Addressing these gaps necessitates enhanced observational networks, refined climate models, and interdisciplinary efforts to disentangle multiscale drivers, ultimately improving resilience strategies for monsoon-dependent regions.

climate extreme events↗

Projective Representations, Bogomolov Multiplier, and Their Applications in Physics

We present a pedagogical review of projective representations of finite groups and their physical applications in quantum many-body systems. Some of our physical results are new. We begin with a self-contained introduction to projective representations, highlighting the role of group cohomology, representation theory, and classification of irreducible projective representations. We then focus on a special subset of cohomology classes, known as the Bogomolov multiplier, which consists of cocycles that are symmetric on commuting pairs but remain nontrivial in group cohomology. Such cocycles have important physical implications: they characterize (1+1)D SPT phases that cannot be detected by string order parameters and give rise, upon gauging, to distinct gapped phases with completely broken non-invertible Rep(G) symmetry. We construct explicit lattice models for these phases and demonstrate how they are distinguished by the fusion rules of local order parameters. We show that a pair of completely broken Rep(G) SSB phases host nontrivial interface modes at their domain walls. As an example, we construct a lattice model where the ground state degeneracy on a ring increases from 32 without interfaces to 56 with interfaces.

Bogomolov multiplier↗