Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Non-Powered Dam Retrofit Exemplary Design for Hydropower Applications

Non-powered dams (NPDs) represent complex systems, situated at the intersection of natural stream environments and the built environment. The presence and operations of NPDs affect stream constituents (e.g., fish, recreational craft, sediment, water) and serve one or more engineered purposes (e.g., recreation, flood control, water supply, irrigation, tailings and debris control, navigation). By definition, NPDs do not provide hydropower generation. However, every NPD contains some untapped hydropower resource potential, represented by the pre-existing hydraulic head created by the dam and presence of flowing water. Adding power generation to an NPD requires retrofitting the NPD, which could involve the addition of any new component or function beyond that currently installed. Because this research is funded by the US Department of Energy Water Power Technologies Office, adding hydropower to NPDs is among the primary objectives for research investment. However, NPD retrofitting extends beyond the purview of hydropower additions. This report provides background information regarding NPD development in the United States, including an overview of the US NPD population, development potential, and recent development. It also summarizes challenges and opportunities facing NPD retrofit development, highlights the importance of maintaining or improving stream and dam functionality, notes key NPD characteristics, describes NPD retrofit methods, and identifies innovation areas for spurring future NPD retrofit development. Section 4 describes retrofit exemplary design principles and concepts that could apply to a wide range of NPD projects. These principles and concepts inform an NPD Retrofit Exemplary Design Specification (REDS), as included in Appendix A. The NPD REDS is heavily influenced by prior work under the standard modular hydropower technology acceleration research initiative, especially the work documented in the Exemplary Design Envelope Specification for Standard Modular Hydropower Technology (Witt et al., 2017). Whereas this prior work focuses on a particular technology class that applies most intentionally for new stream-reach development (i.e., greenfield sites), the NPD REDS contained herein applies more broadly to the NPD resource class and is technology-agnostic (i.e., the specific technologies intended to be described are not explicitly prescribed). This report serves as a part of early-phase research on NPD retrofit development, aimed toward spurring additional, follow-on efforts to specifically address development challenges, capitalize on development opportunities, and inspire innovation. As documented in the landmark “Hydropower Vision” report (DOE 2016), “transformative technical innovations able to meet the co-objectives of environmental sustainability and low-carbon energy will be critical to enabling additional hydropower growth.” This report serves as an important step in steering transformation of US non-powered dam infrastructure.

13 HYDRO ENERGY↗

Results of a 2000 hour wear test of the NEXIS ion engine

The Nuclear Electric Xenon Ion System (NEXIS) ion thruster was developed for potential outer planet robotic missions under NASA's Prometheus program. This engine was designed to operate at power levels ranging from 16 to over 20 kWe at specific impulses of 6000 to 7500 s for burn times of up to 10 years, satisfying the requirements of nuclear electric propulsion systems such as that on the proposed Prometheus 1 mission to explore the icy moons of Jupiter. State-of-the-art performance and life assessment tools were used to design the thruster. Following the successful performance validation of a Laboratory Model thruster, Development Model hardware was fabricated and subjected to vibration and wear testing. The results of a 2000-hour wear test are reported herein. Thruster performance achieved the target requirements and was steady for the duration of the test. Ion optics performance was similarly stable. Discharge loss increases of 6 eV/ion were observed in the first 500 hours of the test and were attributed to primary electron energy decreases due to cathode insert conditioning. Relatively high recycle rates were observed and were identified to be high-voltage-to-ground arcs in the back of the thruster caused by wire insulation outgassing and electron penetration through the plasma screen. Field emission of electrons between the accelerator and screen grids was observed and attributed to evolution of field emitter sites at accelerator grid aperture edges caused by ion bombardment. Preliminary modeling and analysis indicates that the NEXIS engine can meet mission performance requirements over the required lifetime. Finally, successful validation of the NEXIS design methodology, design tools, and technologies with the results of the wear test and companion performance and vibration tests presents significant applicability of the NEXIS development effort to missions of near-term as well as long-term interest for NASA.

Nuclear Electric Xenon Ion System (NEXIS)Thruster ↗

Results of a 2000 Hour Wear Tof the NEXIS Ion Engine

The Nuclear Electric Xenon Ion System (NEXIS) ion thruster was developed for potential outer planet robotic missions under NASA's Prometheus program. This engine was designed to operate at power levels ranging from 16 to over 20 kWe at specific impulses of 6000 to 7500 s for burn times of up to 10 years, satisfying the requirements of nuclear electric propulsion systems such as that on the proposed Prometheus 1 mission to explore the icy moons of Jupiter. State-of-the-art performance and life assessment tools were used to design the thruster. Following the successful performance validation of a Laboratory Model thruster, Development Model hardware was fabricated and subjected to vibration and wear testing. The results of a 2000-hour wear test are reported herein. Thruster performance achieved the target requirements and was steady for the duration of the test. Ion optics performance was similarly stable. Discharge loss increases of 6 eV/ion were observed in the first 500 hours of the test and were attributed to primary electron energy decreases due to cathode insert conditioning. Relatively high recycle rates were observed and were identified to be high-voltage-to-ground arcs in the back of the thruster caused by wire insulation outgassing and electron penetration through the plasma screen. Field emission of electrons between the accelerator and screen grids was observed and attributed to evolution of field emitter sites at accelerator grid aperture edges caused by ion bombardment. Preliminary modeling and analysis indicates that the NEXIS engine can meet mission performance requirements over the required lifetime. Finally, successful validation of the NEXIS design methodology, design tools, and technologies with the results of the wear test and companion performance and vibration tests presents significant applicability of the NEXIS development effort to missions of near-term as well as long-term interest for NASA.

Thruster performance↗

Ion optics of RHIC electron beam ion source

RHIC electron beam ion source has been commissioned to operate as a versatile ion source on RHIC injection facility supplying ion species from He to Au for Booster. Except for light gaseous elements RHIC EBIS employs ion injection from several external primary ion sources. With electrostatic optics fast switching from one ion species to another can be done on a pulse to pulse mode. The design of an ion optical structure and the results of simulations for different ion species are presented. In the choice of optical elements special attention was paid to spherical aberrations for high-current space charge dominated ion beams. The combination of a gridded lens and a magnet lens in LEBT provides flexibility of optical control for a wide range of ion species to satisfy acceptance parameters of RFQ. The results of ion transmission measurements are presented.

43 PARTICLE ACCELERATORS↗

HERMeS Thruster Magnetic Field Topology Optimization Study: Plasma Plume Results

NASA’s Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Technology Demonstration Unit-1 (TDU-1) has been the subject of extensive technology maturation in preparation for flight system development. The magnetic optimization study aims to explore and investigate alternate magnetic field topologies. Four candidate magnetic field topologies that reduce the effectiveness of the shielding along the discharge channel walls with the intent to also reduce the erosion rates along the front pole covers were designed. Three of the four candidate magnetic field topologies (B1, B2, and B4) have been manufactured and were subjected to an extensive test campaign that included laser induced fluorescence (LIF), performance, stability, wear, and plume characterization. In Phase I, LIF measurements along the discharge chamber centerline found that upstream retraction of the thruster’s peak magnetic field does result in an upstream shift of the acceleration zone, but the magnitude of the shift does not correspond one-to-one to the shift in the location of the peak radial magnetic field magnitude. Phase II test segment results found that at a normalized thruster magnetic field setting of 1, the thruster performance and discharge current oscillations were very similar for configurations B0-B2. Also in Phase II abbreviated wear tests found that average inner front pole cover erosion rates for configuration B1 were approximately 65% of those at B0, and the average erosion rates for configuration B2 were approximately 35% of those at B0. This paper reports on the detailed plasma plume mapping results for configurations B0-B4. Faraday probe results indicate that, at 600 V operation, the plume divergence increased slightly for the B4 configuration when compared to B0-B2. Wien filter spectrometer results found that at 600 V, lower multiply-charged species fractions were attained as the thruster transitioned from configurations B0 to B4. Finally, retarding potential analyzer results found that at 600 V operation and at angles above 60,˚ significantly lower high-energy ion content was found for configurations B2 and B4 when compared to B0 and B1.

Electric propulsion,.Hall thruster, laser diagnost↗

Performance of a beam-multiplexing diamond crystal monochromator at the Linac Coherent Light Source

A double-crystal diamond monochromator was recently implemented at the Linac Coherent Light Source. It enables splitting pulses generated by the free electron laser in the hard x-ray regime and thus allows the simultaneous operations of two instruments. Both monochromator crystals are High-Pressure High-Temperature grown type-IIa diamond crystal plates with the (111) orientation. The first crystal has a thickness of ∼100 μm to allow high reflectivity within the Bragg bandwidth and good transmission for the other wavelengths for downstream use. The second crystal is about 300 μm thick and makes the exit beam of the monochromator parallel to the incoming beam with an offset of 600 mm. Here we present details on the monochromator design and its performance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development and Validation of a Simulation Testbed for the Intelligent Building Agents Laboratory (IBAL) Using TRNSYS

This paper documents the development and validation of a dynamic primary cooling and thermal storage system simulation testbed. The system simulation testbed, sIBAL, is based on the Intelligent Building Agents Laboratory (IBAL) at the National Institute of Standards and Technology (NIST), which is a research infrastructure and testbed for the development, evaluation, and demonstration of intelligent control algorithms. The sIBAL testbed developed in this project will serve as a virtual twin of the real facility for future control algorithm development. The details of the methodologies used to develop and validate the simulation testbed, which replicates the dynamic behaviors of the primary cooling and ice storage system in the IBAL facility, are presented. The simulation testbed was developed in TRNSYS using built-in component models and MATLAB functions to replicate the two water-cooled chillers, a thermal storage tank, pumps, valves and other components for four different operation modes. Experiments on IBAL components were designed and executed to generate experimental data for model development and verification of the simulation platform. The validation of the simulation results was carried out in two phases: 1) independent component simulations for the chillers and thermal storage tank, and 2) a combined testbed simulation of the entire hydronic system. Comparison of simulation results to the experimental data obtained from the IBAL facility showed errors within 1 °C for the temperatures outputs of both the chiller and the thermal storage model. The error is within an acceptable range for further intelligent control algorithms development. The findings from the study are summarized and presented along with areas where additional research is needed. In addition, data filtering procedures and model refinement measures utilized to improve the accuracy and accelerate the computation time of the simulation are presented.

cooling systems↗

Test Planning Approach and Lessons

As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

Parkinson, Douglas A.↗

A sub-5 ps jitter time-to-digital converter ASIC with back-gate delay tuning in 22 nm CMOS

We present the design of a Time-to-Digital Converter (TDC) ASIC together with performance characterization results at cryogenic temperature (6-8 K), and at room temperature using emulated Low-Gain Avalanche Detector (LGAD) signals. The TDC design uses a two-step architecture with a ring-oscillator based counter and a Vernier delay line fine TDC. The TDC is implemented in an FD-SOI process, and back-gate tuning is used not only to correct threshold variation due to cryogenic operation, but also as a novel way to tune TDC delay elements with very little overhead. Using this technique, we demonstrate a design with very low power (0.5 mW) and area (0.003 mm 2 ). We present test results using the Fermilab Constant Fraction Discriminator (FCFD) ASIC to produce discriminated signals from an internal charge injection mechanism that mimics the waveform and signal amplitude of minimum ionizing particles impinging on LGAD sensors. We characterize the time precision of the full system and verify that the TDC ASIC contributes a negligible amount to the total system time precision, fully consistent with the expected jitter contribution of less than 5 ps. In conclusion, the results presented here demonstrate the utility of our TDC for applications in physics and quantum communications.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Renewable Energy and Efficiency Technologies in Scenarios of U.S. Decarbonization in Two Types of Models: Comparison of GCAM Modeling and Sector-Specific Modeling

Energy system projections from quantitative models inform actions ranging from short-term and local decisions, such as those about technology and infrastructure deployment, and global and long-term negotiations and targets. Computational limits require model designers to balance coverage and resolution (i.e., breadth versus depth). Some models, such as the Global Change Analysis Model (GCAM), represent all energy sources and uses with less resolution than models that focus on a single sector's energy use. GCAM balances global supply and demand of all energy carriers projecting prices using internal calculations for energy sources and costs of greenhouse gas mitigation while capturing interlinkages between the energy system, water, agriculture and land use, the economy, and the climate. This globally comprehensive model was used to frame the Long-Term Strategy of the United States: Pathways to Net-Zero Greenhouse Gas Emissions by 2050, which the White House released in 2021 and has been used to inform national and global economy-wide climate change mitigation discussions and strategy development for decades. Unlike GCAM, sectoral models focus on a portion of the energy sector and with greater detail and resolution. The Regional Energy Deployment System (ReEDS) electricity-sector model, for example, projects electricity system capacity expansion and operation with high-fidelity representation of emerging technologies for deep decarbonization, such as variable renewable energy and energy storage, and integration of these technologies into the electric grid. The Transportation Energy and Mobility Pathway Options (TEMPO) transportation-sector model enables analysis of household choices, with a focus on adoption, charging, and use of electric vehicles. The Scout buildings-sector model supports detailed consideration of the policies and markets that can accelerate the adoption of electrification and energy conservation measures in buildings. Such sector-specific models are instrumental in informing technology research, sectoral planning strategies, and sector-specific aspects of greenhouse gas mitigation strategies in the United States. The integrated multisector and sector-specific modeling approaches represented by GCAM and these sectoral models are complementary. The integrated multisector approach calculates energy pricing and resource allocation within the model, which is important for consistency when future conditions substantially diverge from current conditions in transformative scenarios. The sector-specific approach facilitates representation of granular details across spatial, temporal, technological, and market dimensions that enable exploration of particular interactions and trade-offs. This report presents the results of recent work to explore the differences and trade-offs between these approaches by comparing GCAM with the sector-specific ReEDS, TEMPO, and Scout models. The report compares both model structures and results, and it addresses their potential relevance and applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design and Prototyping of a Novel Toroid Magnet System for the MOLLER Experiment at Jefferson Lab

The Thomas Jefferson National Accelerator Facility (JLab) has designed a unique spectrometer system to measure the weak interaction between electrons. The experiment ?Measurement of Lepton-Lepton Electroweak Reaction? (MOLLER) requires leveraging the recent 12 GeV electron beam upgrade and will run in JLab for 3 years. Focusing the signal for the MOLLER experiment requires five water-cooled toroidal magnets, each with unique geometry and with 7-fold symmetry. This system of magnets provides the magnetic field required to separate the incident beam electrons scattered from the target electrons (Møller scattering) and protons (elastic e-p scattering) in a liquid hydrogen target. The conceptual design was developed by the MOLLER collaboration and was given to JLab in the form of amp turns and physical location, with additional physics requirements. This paper presents prototyping of the coils and magnet support system and discusses the lessons learned during the process along with the plans for full magnet testing and installation. The JLab Magnet Group along with the MOLLER collaboration developed the specification document that includes keep out zones to design the set of magnets. JLab contracted the design of the first toroid magnet in the magnet (TM0) to Massachusetts Institute of Technology. The other four toroid magnets (TM1 through TM4) have been designed by JLab and are in the process of fabrication and assembly. Prototype coils of TM1-TM4 have been fabricated by Everson-Tesla Incorporated, PA (USA). The manuscript presents the unique challenges of the design, alignment, high current density, operating range, high radiation dose, and vacuum environment.

Kashy, David↗

An Advanced Extreme-Environment Wireless Telemetry System for Turbine Blade Instrumentation

As advanced natural gas power generation systems evolve, the thrust for increased efficiencies and reduced emissions results in increasingly harsh conditions inside the turbine environment. These high temperatures, pressures, and corrosive atmospheres result in accelerated rates of degradation, leading to failure of turbine materials and components. Wolfspeed, A Cree Company, Siemens Energy, and Siemens Corporate Technology, in collaboration with the Department of Energy (DOE)'s National Energy Technology Laboratory, are developing a reliable and long-term monitoring capability in the turbine hot gas path in the form of novel ceramic-based thermocouples and wide bandgap instrumentation electronics that will contribute to the overall reliability of gas turbines. When equipped with better monitoring and controls, power plants can operate with increased fuel-burning efficiency, improved process dynamics and gas concentrations, and increased overall longevity of the power plant components. This will result in increased turbine availability and a reduction in outages and maintenance costs. The technology being developed in this program is based on advanced techniques and innovations in nearly every aspect of high-temperature electronics, including materials, semiconductor devices, subcomponents, electronic packaging, and system integration. The environment in which this wireless system must operate has continuous centrifugal loads with a gravitation force on the order of 16,000 times the force of gravity (16,000 g) and temperatures exceeding 400°C. This article will specifically discuss the background and motivation for the high-temperature instrumentation system and will explain the high-level electrical system, the construction of the instrumentation package, the techniques used for integration onto rotating components, as well as the wireless power and data transmission systems. In addition to the electrical and mechanical design, this article will also discuss results from laboratory bench testing as well as heated spin rig testing. Lastly, this article will highlight the future direction of the instrumentation system evolution, with a final objective of insertion into Siemens natural gas turbine power plants.

47 OTHER INSTRUMENTATION↗

Pantechnik new superconducting ion source: PantechniK Indian Superconducting Ion Source

The new ECR ion source PantechniK Indian Superconducting Ion Source (PKISIS) was recently commissioned at Pantechnik. Three superconducting coils generate the axial magnetic field configuration, while the radial magnetic field is done with the multi-layer permanent magnets. Special care was devoted to the design of the hexapolar structure, allowing a maximum magnetic field of 1.32 T at the wall of the 82 mm diameter plasma chamber. The three superconducting coils using low temperature superconducting wires are cooled by a single double stage cryo-cooler (4.2 K). Cryogen-free technology is used, providing reliability and easy maintenance at low cost. The maximum installed RF power (18.0 GHz) is of 2 kW. Metallic beams can be produced with an oven (T{sub max}= 1400 deg. C) installed with an angle of 5 deg. with respect to the source axis or a sputtering system, mounted on the axis of the source. The beam extraction system is constituted of three electrodes in accel-decel configuration. The new source of Pantechnik is conceived for reaching optimum performances at 18 GHz RF frequencies. PKISIS magnetic fields are 2.1 T axial B{sub inj} and 1.32 T radial field in the wall, variable B{sub min} with an independent coil and a large and opened extraction region. Moreover, PKISIS integrates modern design concepts, like RF direct injection (2 kW availability), dc-bias moving disk, out-of-axis oven and axial sputtering facility for metal beams. Finally, PKISIS is also conceived in order to operate in a high-voltage platform with minor power consumption.

43 PARTICLE ACCELERATORS↗

PEM-INST-001: Instructions for Plastic Encapsulated Microcircuit (PEM) Selection, Screening, and Qualification

Potential users of plastic encapsulated microcircuits (PEMs) need to be reminded that unlike the military system of producing robust high-reliability microcircuits that are designed to perform acceptably in a variety of harsh environments, PEMs are primarily designed for use in benign environments where equipment is easily accessed for repair or replacement. The methods of analysis applied to military products to demonstrate high reliability cannot always be applied to PEMs. This makes it difficult for users to characterize PEMs for two reasons: 1. Due to the major differences in design and construction, the standard test practices used to ensure that military devices are robust and have high reliability often cannot be applied to PEMs that have a smaller operating temperature range and are typically more frail and susceptible to moisture absorption. In contrast, high-reliability military microcircuits usually utilize large, robust, high-temperature packages that are hermetically sealed. 2. Unlike the military high-reliability system, users of PEMs have little visibility into commercial manufacturers proprietary design, materials, die traceability, and production processes and procedures. There is no central authority that monitors PEM commercial product for quality, and there are no controls in place that can be imposed across all commercial manufacturers to provide confidence to high-reliability users that a common acceptable level of quality exists for all PEMs manufacturers. Consequently, there is no guaranteed control over the type of reliability that is built into commercial product, and there is no guarantee that different lots from the same manufacturer are equally acceptable. And regarding application, there is no guarantee that commercial products intended for use in benign environments will provide acceptable performance and reliability in harsh space environments. The qualification and screening processes contained in this document are intended to detect poor-quality lots and screen out early random failures from use in space flight hardware. However, since it cannot be guaranteed that quality was designed and built into PEMs that are appropriate for space applications, users cannot screen in quality that may not exist. It must be understood that due to the variety of materials, processes, and technologies used to design and produce PEMs, this test process may not accelerate and detect all failure mechanisms. While the tests herein will increase user confidence that PEMs with otherwise unknown reliability can be used in space environments, such testing may not guarantee the same level of reliability offered by military microcircuits. PEMs should only be used where due to performance needs there are no alternatives in the military high-reliability market, and projects are willing to accept higher risk.

Teverovsky, Alexander↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluation of a hybrid hydrostatic bearing for cryogenic turbopump application

A hybrid hydrostatic bearing was designed to operate in liquid hydrogen at speeds to 80,000 rpm and radial loads to 440 n (100 lbf). The bearing assembly consisted of a pair of 20-mm angular-contact ball bearings encased in a journal, which was in turn supported by a fluid film of liquid hydrogen. The size and operating conditions of the bearing were selected to be compatible with the operating requirements of an advanced technology turbopump. Several test parameters were varied to characterize the bearing's steady-state operation. The rotation of the tester shaft was varied between 0 and 80,000 rpm. Bearing inlet fluid pressure was varied between 2.07 and 4.48 MPa (300 and 650 psia), while the fluid sump pressure was independently varied between 0.34 and 2.07 MPa (50 and 300 psia). The maximum radial load applied to the bearing was 440 N (110 lbf). Measured hybrid-hydrostatic-bearing stiffness was 1.5 times greater than predicted, while the fluid flow rate through the bearing was 35 to 65 percent less than predicted. Under two-phase fluid conditions, the stiffness was even greater and the flow rate was less. The optimal pressure ratio for the bearing should be between 0.2 and 0.55 depending on the balance desired between bearing efficiency and stiffness. Startup and shutdown cyclic tests were conducted to demonstrate the ability of the hybrid-hydrostatic-bearing assembly to survive at least a 300-firing-duty cycle. For a typical cycle, the shaft was accelerated to 50,000 rpm in 1.8 sec. The bearing operated for 337 start-stop cycles without failure.

Spica, P. W.↗

High Flux FRC Facility for the Stability, Confinement and ITER Divertor Studies

The TCS (Translation, Confinement, & Sustainment) program was begun on 7 August, 1996 to renew basic studies of the Field Reversed Configuration (FRC). The program made use of the old LSX (Large s Experiment) device, which was constructed at STI during the period from 1986 to 1990, but only operated for one year due to a DOE decision at the time to focus exclusively on the tokamak configuration. LSX was transferred to the University of Washington in 1992 and modified (LSX/mod) to perform Tokamak Refueling by Accelerated Plasmoids (TRAP) experiments. The TRAP program was funded from 7 August, 1992 until 6 August, 1996, but was utilized for an additional year while TCS was being constructed. During the first TCS funding period TCS was completed and initial experiments were begun. A large multi-megawatt RF power supply was built by Los Alamos National Laboratory (LANL) for use with a Rotating Magnetic Field (RMF) system, and LANL has been a continuing participant in our experimental program. A smaller prototype facility, called the Star Thrust Experiment (STX) was also built and operated in this period, partly with NASA funding, before TCS came on-line. A final report for this construction period was submitted in September 2000. A first renewal period (2.5 years) provided operating funds for the period between July 7, 2000 and January 6, 2003. A great deal of progress was made in understanding the use of RMF to both form and sustain FRCs during this period. The principal result of the experimental program was the formation of quasi steady-state (as long as RMF power was available) FRCs with densities in the 1-3x10 19 m -3 range. However, the plasma temperature (T e or T i ) was limited to sub-25 eV, except transiently during start-up, by the rapid accumulation of impurities. This is not surprising since TCS was only designed to demonstrate RMF flux build-up and was not provided with either fueling capabilities or modern vacuum conditioning technology. (The unplanned for long time steady-state operation was due entirely to recycling.) TCS employed a multi-section quartz vacuum vessel with greased “O”-ring seals. A final report for this second funding period was submitted in May of 2003.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Oppenheimer's Box of Chocolates: Remediation of the Manhattan Project Landfill at Los Alamos National Laboratory - 12283

Material Disposal Area B (MDA B) is the oldest radioactive waste disposal facility at Los Alamos National Laboratory. Operated from 1944-48, MDA B was the disposal facility for the Manhattan Project. Recognized as one of the most challenging environmental remediation projects at Los Alamos, the excavation of MDA B received $110 million from the American Recovery and Reinvestment Act of 2009 to accelerate this complex remediation work. Several factors combined to create significant challenges to remediating the landfill known in the 1940's as the 'contaminated dump'. The secrecy surrounding the Manhattan Project meant that no records were kept of radiological materials and chemicals disposed or of the landfill design. An extensive review of historical documents and interviews with early laboratory personnel resulted in a list of hundreds of hazardous chemicals that could have been buried in MDA B. Also, historical reports of MDA B spontaneously combusting on three occasions -with 50-foot flames and pink smoke spewing across the mesa during the last incident in 1948-indicated that hazardous materials were likely present in MDA B. To complicate matters further, though MDA B was located on an isolated mesa in the 1940's, the landfill has since been surrounded by a Los Alamos commercial district. The local newspaper, hardware store and a number of other businesses are located directly across the street from MDA B. This close proximity to the public and the potential for hazardous materials in MDA B necessitated conducting remediation work within protective enclosures. Potential chemical hazards and radiological inventory were better defined using a minimally intrusive sampling method called direct push technology (DPT) prior to excavation. Even with extensive sampling and planning the project team encountered many surprises and challenges during the project. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. More than three years of effort by the LANL project team went into the planning for remediation of Material Disposal Area B. Hundreds of historical documents were reviewed; retired personnel were extensively interviewed and noninvasive techniques were used to characterize the site. The information collected was incorporated into the safety requirements, cost estimate, schedule and primary execution plan for the project. Ultimately the waste volume managed by the project approached 40000 m{sup 3}, more than double the original project estimate. This increase had a major impact on both project cost and schedule. Nuclear safety requirements for the project were based on an estimated MDA B radionuclide inventory of 12 PE-Ci. When excavation was complete over 123 PE-Ci had been removed from the trenches. The radionuclide inventory at MDA B was an order of magnitude higher than estimated. Work at MDA B could not have proceeded without the safety basis exemption from DOE-HQ. The one area where planning did not fail to meet reality was safety. There were no serious worker injuries and the minor injuries recorded were those common to construction type activities. Extensive monitoring along the site boundary demonstrated that no hazardous chemicals were released and radiological dose to the public was within administrative limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗