Search NASA⌕ Search

SEARCH · Search NASA

Results for “Document Generation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Particle/Ray Interaction Simulation Manager (PRISM) Assessment Report

The Particle/Ray Interaction Simulation Manager (PRISM) is a software tool developed by Triple Ring Technologies (TRT), http://www.tripleringtech.com/, under a Small Business Innovation Research Award from the Department of Homeland Security (DHS) to investigate the utility of simulations in X-ray-based explosive detection systems. The PRISM tool is intended to provide a standardized and intuitive user interface to control and configure realistic simulations of X-ray imaging systems. It includes a command-line interface that enables the user to configure simulated X-ray radiography and computed tomography (CT) systems. It allows the import of computer-aided design (CAD) models of objects and it supports Monte Carlo simulation engines such as GEANT4. PRISM is designed to simulate realistic X-ray projection images including scatter, noise, and various detector effects such as quantum efficiency, lag, and veiling glare. At the request of DHS, the authors assessed PRISM’s capabilities to simulate data generated by a Micro-CT test-bed system (MCT-TB) housed at the Lawrence Livermore National Laboratory (LLNL). This document describes the results of that assessment.

42 ENGINEERING↗

Performance Assessment for the Environmental Restoration Disposal Facility (FY 2019 Annual Status Report)

DOE O 435.1 and DOE M 435.1-1 require that a determination of continued adequacy of the performance assessment (PA), composite analysis, and disposal authorization statement (DAS) be annually, and it must consider the results of data collection and analysis from research, field studies, and monitoring as well as update any Radioactive Waste Management Basis documents. Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) has accepted low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells (currently 10) or disposal areas and can accommodate future design expansions as needed. During this reporting period (fiscal year 2019, October 1, 2018, to September 30, 2019). approximately 139,721 U.S. tons of waste was disposed at ERDF. From inception through September 30, 2019, ERDF has received approximately 18.5 million U.S. tons of waste, which equates to consumption of approximately 88% of the disposal volume. As a condition of the DAS, disposal operations within ERDF must be in accordance with the waste acceptance criteria (WAC) that provide specific radionuclide disposal limits, waste from restrictions, and descriptions of acceptable waste packages in compliance with DOE M 435-1.1 requirements. The ERDF WAC stipulates that waste destined for disposal at ERDF be controlled based on source, physical form, and containment concentration and activity levels

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Workspace and Office Design: A Review of the Literature

The Systems Analysis & Decision Support (02150) group completed a review of the research literature on workspace and office design in 2016 for the Asset Management Department (04853). The goal was to characterize results and lessons learned from existing research to understand the effectiveness of current workspaces at Sandia National Laboratories and inform guidance for future workspace design. The study team reviewed 96 documents, published primarily since the year 2000, covering a range of factors associated with workspace design - workspace costs, acoustics, collaboration and privacy, generational preferences, employee health, performance and productivity, organizational retention, and workspace satisfaction. The research literature consistently highlighted the relative deficiencies of open-plan office spaces as compared to traditional private enclosed offices for knowledge workers. While open-plan offices can provide some cost savings, they may not be cost effective in the long term due to future hidden costs incurred by degradations in employee productivity, increased attrition, and increased sickness absences as well as any post-construction modifications needed to resolve emerging workspace issues. The chief deficiencies of open-plan offices include lower levels of employee satisfaction due to reduced visual and auditory privacy, increased interruptions, distractions from irrelevant background speech, less physical space, and more ambient noise. The drawbacks reported in the literature tend to outweigh any benefits associated with potential facilitation of coworker interactions and collaboration. Key suggestions identified in the literature to guide and optimize workspace and office design are provided.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Flux Isotope Reactor Low-Enriched Uranium Low Density Silicide Fuel Design Parameters

High Flux Isotope Reactor (HFIR) highly enriched uranium (HEU) to low-enriched uranium (LEU) conversion activities are ongoing as part of the Department of Energy (DOE) National Nuclear Security Administration (NNSA)’s nuclear nonproliferation mission. Design activities studying the conversion of HFIR from HEU to LEU fuel explored different fuel design features and shapes with a low density uranium-silicide dispersion (U 3 Si 2 -Al) fuel, which has a uranium density of 4.8 gU/cm 3 . The goal of these studies is to generate several HFIR LEU fuel designs of varying fuel fabrication complexity that meet the current HEU performance metrics and safety requirements. The documented designs will serve as references for fuel fabrication and qualification activities. Recent advancements in modeling and simulation tools enable quick prototyping of fuel designs. Shift, a Monte Carlo neutron transport and depletion tool optimized for high-performance computing (HPC) architectures, is used for efficient fuel cycle and performance metrics calculations. The HFIR Steady State Heat Transfer Code (HSSHTC) is used to vet the thermal safety margin. Also, a new automation tool that connects all fuel design analysis steps, named Python HFIR Analysis and Measurement Engine (PHAME), has been developed to expedite the design study in an efficient and reproducible manner. Leveraging these tools, several candidate fuel designs were selected for varying fabrication complexity. This report provides design feature details for four selected HFIR LEU low density U 3 Si 2 -Al fuel designs and their corresponding performance and safety metrics. Nominal, best-estimate design parameters and irradiation conditions, including fission rate densities, power densities, heat fluxes, and cumulative fission densities are provided for candidate fuel designs relevant to framing irradiation experiments to support fuel qualification efforts. Simulations show that the low density U 3 Si 2 -Al, with design features to enhance safety, can meet HEU core performance metrics and safety requirements if the reactor power is increased from 85 MW (HEU) to 95 MW (LEU) and if the active fuel length is increased from 50.80 cm (HEU) to 55.88 cm (LEU).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SRNL Sludge Batch 10 Qualification SRAT and SME Off-Gas Results

Savannah River National Laboratory (SRNL) completed a small-scale demonstration of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) utilizing the nitric-glycolic acid (NGA) flowsheet to support Sludge Batch 10 (SB10) qualification. The demonstration utilized a Tank 51 slurry sample washed by SRNL (with added H-canyon material). The purpose of this document is to report the observed off-gas results from the demonstration. With the NGA flowsheet, DWPF has a CPC hydrogen generation limit of 2.4×10 -2 lb/h. The peak observed rate was nearly 90 times less than that limit during SRNL testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Environmental Restoration Disposal Facility (Annual Status Report FY 2022)

DOE O 435.1 and DOE M 435.1-1 require that a determination of continued adequacy of the performance assessment (PA) (CP-60089), composite analysis (CA), and disposal authorization statement (DAS) be made on an annual basis, and that the determination must consider the results of data collection and analysis from research, field studies, and monitoring as well as the need to update any Radioactive Waste Management Basis (RWMB) documents. Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period (fiscal year 2022, extending from October 1, 2021, through September 30, 2022), approximately 8.52E+04 metric tons (9.39E+04 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2022, approximately 17.0 million metric tons (18.7 million U.S. tons) of waste has been disposed at ERDF, which equates to consumption of approximately 89.1% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed. As a condition of the DAS, disposal operations within ERDF must be in accordance with the waste acceptance criteria (ERDF-00011) that provide specific radionuclide disposal limits, waste form restrictions, and descriptions of acceptable waste packages in compliance with the requirements of DOE M 435-1.1. The ERDF waste acceptance criteria stipulate that waste destined for disposal at ERDF be controlled based on source, physical form, and contaminant concentration and activity levels. There have been no changes to the physical configuration of ERDF or to the waste forms (source, physical form, etc.). No new unreviewed disposal question screenings or evaluations have been generated in this reporting period. Therefore, there are no noted impacts to the PA, CA, DAS, or RWMB resulting from the evaluations and screenings. Sum-of-fractions analysis shows that the disposed inventory meets both the concentration and inventory threshold requirements. A sum-of-fractions value is computed for ERDF sensitive radionuclides contributing to the groundwater pathways and the air pathway inventory limits. Computed values were 5.50E-04 and 3.30E-03, respectively. The disposed waste inventory remained well under the PA imposed limits, as shown in Table 4 and Table 5 in the main text of this report. Required monitoring was satisfactorily completed during the fiscal year reporting period. Compliance with performance objectives were met as each of the reported values were well below the established limit. Overall, there are no substantive changes to primary PA assumptions or changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the DAS is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of SAS4A/SASSYS-1 for Sodium-Cooled Fast Reactor Authorization and Licensing (Final CRADA Report)

This project focuses on assessment and qualification of the SAS4A/SASSYS-1 advanced reactor safety analysis code and its capacity to fulfill requirements associated with license/authorization of a sodium-cooled fast reactor (SFR). Specific objectives of this proposal include: development of a formal documentation requirements matrix that complies with a vendor’s NQA-1 program to identify needs for qualification documentation; completion of software methods qualification gap analysis to identify and close gaps in the verification and validation basis of the software; generation of an Acceptance Test Report to confirm compliance with the software requirements specification; and closure of gaps in Software Design Description (SDD) to assist with the eventual generation of a Modeling Licensing Topic Report (LTR).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PV Stormwater Management Research and Testing (PV-SMaRT) (Final Technical Report)

The objective of the Photovoltaic Stormwater Management Research and Testing (PV-SMaRT) project was to develop and disseminate research-based, solar-specific resources for estimating stormwater runoff at ground-mounted PV facilities and detail stormwater management and water quality best practices. The intended use of stormwater management and water quality best practices and stormwater runoff estimation resources is to reduce balance of system soft costs associated with stormwater infrastructure requirements and improve water quality through research-tested best practices. Currently, stormwater regulations and guidelines vary by jurisdiction and can lead to regulatory uncertainty and increased compliance costs for managing stormwater runoff at solar sites. To address these concerns, the NREL team and its partners (University of Minnesota, Great Plains Institute, and Fresh Energy) established and engaged an advisory Water Quality Task Force (WQTF); conducted field research on stormwater infiltration and runoff at five ground-mounted PV sites; validated a 3-D hydrologic model to predict water runoff and generate stormwater runoff coefficients for a range of site conditions and PV designs; developed a stormwater management and water quality best practices document; and engaged with local jurisdictions and other stakeholders to disseminate best practices, stormwater runoff coefficients, and other tools. Key outputs of this project were a PV-SMaRT Runoff Calculator developed by University of Minnesota, a webinar detailing project outcomes and how to use the PV-SMaRT runoff calculator, and a document on Best Practices for regulators and developers regarding stormwater runoff at PV sites.

14 SOLAR ENERGY↗

Multi-Source Machine Learning and Thermoplastics Enhanced Aerostructure Manufacturing (mTEAM)

RTX Technology Research Center (RTRC), together with Collins Aerospace (Collins) and Oak Ridge National Laboratory (ORNL) has developed an Artificial Intelligence (AI) / Machine Learning (ML) guided solution to advance the manufacturing and assembly of high performance and lightweight thermoplastic composite (TPC) aerospace products. The solution aims to lower risk, cost and lead time for induction heating based welding and consolidation processes for TPC structure. The cost and lead time of part and material specific process development for induction welding (IW) and induction consolidation will be reduced by replacing traditional empirical methods with optimization methods that merge AI/ML and physics-based process simulations and process experiments with sensing and controls. TPC-IW process development is empirical in nature, and uncertainties in material & process behavior exist near & far from the induction coil. Physics-based simulations can be leveraged directly for process optimization but can be too computationally expensive to run in high fidelity and real time to do robust process optimization. The key impact of successful TPC induction consolidation and welding is cost & lead time reduction for part & material specific consolidation and welding recipes. This is an enabler for more rapid deployment of TPC structures via joining assembly, which can reduce energy & cost intensive usage of autoclaves & ovens. The solution aimed to advance the U.S. Department of Energy’s interests in using thermoplastics and automation in composite manufacturing for improvement of products for existing markets via increased production speeds, reduced costs, and lowered use of energy. Welded TPC structures can offer significant weight & energy savings for high-value commercial aerospace & industrial applications compared to metal & thermoset composite structures assembled by mechanical fastening and/or adhesive bonding. The project was organized into two Budget Periods. Budget Period 1 (BP1) was 15 months and its goal was to perform ML process optimization framework development & deployment on lab-coupon aerostructure components. A Go/No-Go Review was performed at the end of BP1 to verify fulfilment of key tasks & milestones to justify a Go Decision to move into the next Budget Period. Budget Period 2 (BP2) was 12 months and its goal was the deployment of the ML framework for ML process optimization of pilot industrial scale aerostructure components. The overall project aim was to develop & demonstrate ML-enhanced modeling framework that learns process-property mapping from multiple data sources at different fidelities. During BP1, the team accomplished key tasks & milestones to demonstrate the concept of multi-source ML for TPC aerostructure consolidation and assembly. First, the team completed documentation of induction based TPC heating requirements including baseline metrics to compare measured results against. Next the team completed demonstration of data generation from physics-based simulations for ML surrogate model generation and demonstrated the integration of physics-based simulation data into multi-source AI/ML algorithms. In parallel, the team established the lab-coupon scale induction welding system and completed a process to label and reduce generated data from physics-based simulation and experiments for ML surrogate models to enable multi-source ML model training & testing. To complete BP1, the team integrated physics-based simulation data and experimental data into multi-source ML algorithms. This was based on the team completing ML deployment of the induction welding on a lab system at RTRC and AI/ML deployment on existing induction welding line at Collins. ORNL visited both Collins and RTRC sites to witness the TPC induction welding process. Then, ORNL designed and constructed a new version of their vision-based sensing system better adapted to acquire process signals of the TPC induction welding process for process anomaly and defect detection. In BP2, the team accomplished key tasks & milestones to scale up multi-source ML for TPC aerostructure consolidation and assembly from the lab-coupon scale to the pilot-industrial scale. In BP2, the team demonstrated real time anomaly & defect detection via experiments performed by ORNL & RTRC. The team completed ML-optimization heating trials for TPC induction consolidation at Collins, and the team confirmed pilot industrial scale experimental data from Collins was compatible with the developed ML pipeline from RTRC. The team completed sub-element scale ML process optimization demonstration at RTRC, where the team leveraged RTRC’s robotic TPC welding setup to de-risk the ML process optimization by performing ML analysis of recorded temperatures to account for complex part features. Then, the team applied its ML-derived control strategies and ML process optimization framework at Collins to the pilot-industrial scale on a demo skin-stiffener part representative of a nacelle aerostructure fan cowl section. The key innovation is the AI/ML framework enabling effective process development of high performance, lightweight, energy efficient TPCs for composite aircraft structures.

36 MATERIALS SCIENCE↗

Data Integration Aggregated Model and Ontology for Nuclear Deployment (DIAMOND): Preliminary Model and Ontology

The data of a nuclear utility or plant are stored in various isolated forms in different systems. These data have different structures and tools and are, therefore, used independently. The integration of data sources is often performed manually and on an as-needed basis to achieve a targeted cost saving. A holistic approach to the integration of the data would enable creating a data warehouse for a single nuclear power plant (NPP) or multiple plants. A data warehouse results in direct and indirect cost saving because it automates the manual search for data, enables sharing and comparison of data from various tools of a single or multiple plants, enable digital transformation of data, increase frequencies of needed data that are sparse in nature (such as failures signatures), reduces the need for training on various tools for plant staff, enables a holistic staff perception of plant activities, reveals cost-saving opportunities, and improves the visual perception of all parts a plant necessary for operations and maintenance. One of the main challenges to deploy a data warehouse is associated with the integration of data sources into a consistent data model using a standard ontology that is developed by and for the nuclear power industry. This model is non-existent and is a necessity to enable the nuclear data warehouse role. A data model contains objects that make up a given domain along with their attributes and relationships. It provides domain standardization and maintainability, setting forth the objects, attributes, and relationships within that domain and acting as the guide by which the various applications within that domain will structure their data and interchange. An ontology is defined as “a set of concepts and categories in a subject area or domain that shows their properties and the relations between them”. Ontologies consist of a taxonomy or directed rooted tree. A survey of the models and ontologies available to support a data integration aggregated model and ontology for nuclear deployment (DIAMOND) was performed and different standards that address specific aspects of the needed model and ontology were leveraged and integrated in this effort. In specific, the Basic Formal Ontology (BFO) and Lifecycle Modeling Language (LML) were leveraged for the base ontology. The ISO 4224 and 15926 were leveraged in the development of the overlapping nuclear and fossil data aspects. The electric power research institute (EPRI) power distribution common information model (CIM) was also reviewed and the experience gained was leveraged in the power generation scope of DIAMOND. The initial aim targeted by this effort was to develop the ontology definitions and model structure. This report documents the resulting model and ontology to develop DIAMOND. The report describes the various elements of the model development based on a growing tree development approach, i.e. DIAMOND’s tree structure is established with the core data aspects and is populated with a preliminary level of details. Fifteen sources of data in a nuclear power plant were considered and incorporated into DIAMOND at this stage of development, representing the majority of operations data sources in nuclear power plants. Additional data sources, scope, and a higher level of fidelity will be incorporated into DIAMOND next in collaboration with the nuclear industry and relevant stakeholders.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ESAC v1: Enhanced AI-Powered Chatbot for EQ-SANS Experiment Automation Improvements and Updates

ESAC (EQ-SANS Assisting Chatbot) is an advanced AI-powered application designed to streamline the workflow of neutron scattering experiments at the Spallation Neutron Source (SNS). This report documents the significant advancements in ESAC v1, which include the integration of a combined In-Context Learning (ICL) + Retrieval-Augmented Generation (RAG) capability, a robust integrated development environment, and standalone executable distribution. These enhancements address the limitations of the original version, making ESAC v1 a transformative tool for researchers. The report also discusses the technical challenges encountered during development and their resolution, highlighting the impact of these improvements on the neutron scattering research community.

36 MATERIALS SCIENCE↗

Habitat Evaluation Procedures Report; Graves Property - Yakama Nation.

A habitat evaluation procedures (HEP) analysis was conducted on the Graves property (140 acres) in June 2007 to determine the number of habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the property as partial mitigation for habitat losses associated with construction of McNary Dam. HEP surveys also documented the general ecological condition of the property. The Graves property was significantly damaged from past/present livestock grazing practices. Baseline HEP surveys generated 284.28 habitat units (HUs) or 2.03 HUs per acre. Of these, 275.50 HUs were associated with the shrubsteppe/grassland cover type while 8.78 HUs were tied to the riparian shrub cover type.

13 HYDRO ENERGY↗

2022 Annual Technology Baseline (ATB) Cost and Performance Data for Electricity Generation Technologies

These data provide the 2022 update of the Electricity Annual Technology Baseline (ATB). Starting in 2015 NREL has presented the ATB, consisting of detailed cost and performance data, both current and projected, for electricity generation and storage technologies. The ATB products now include data (Excel workbook, Tableau workbooks, and structured summary csv files), as well as documentation and user engagement via a website, presentation, and webinar. Starting in 2021, the data are cloud optimized and provided in the OEDI data lake. The data for 2015 - 2020 are can be found on the NREL Data Search Page. The website documentation can be found on the ATB Website.

Array↗

2023 Annual Technology Baseline (ATB) Cost and Performance Data for Electricity Generation Technologies

These data provide the 2023 update of the Electricity Annual Technology Baseline (ATB). Starting in 2015 NREL has presented the ATB, consisting of detailed cost and performance data, both current and projected, for electricity generation and storage technologies. The ATB products now include data (Excel workbook, Tableau workbooks, and structured summary csv files), as well as documentation and user engagement via a website, presentation, and webinar. Starting in 2021, the data are cloud optimized and provided in the OEDI data lake. The data for 2015 - 2020 are can be found on the NREL Data Search Page. The website documentation can be found on the ATB Website.

Array↗

2024 Annual Technology Baseline (ATB) Cost and Performance Data for Electricity Generation Technologies

These data provide the 2024 update of the Electricity Annual Technology Baseline (ATB). Starting in 2015 NREL has presented the ATB, consisting of detailed cost and performance data, both current and projected, for electricity generation and storage technologies. The ATB products now include data (Excel workbook, Tableau workbooks, and structured summary csv files), as well as documentation and user engagement via a website, presentation, and webinar. Starting in 2021, the data are cloud optimized and provided in the OEDI data lake. The data for 2015 - 2020 are can be found on the NREL Data Search Page. The website documentation can be found on the ATB Website.

Array↗

Half a degree additional warming, prognosis and projected impacts (HAPPI): background and experimental design

The Intergovernmental Panel on Climate Change (IPCC) has accepted the invitation from the UNFCCC to provide a special report on the impacts of global warming of 1.5 °C above pre-industrial levels and on related global greenhouse-gas emission pathways. Many current experiments in, for example, the Coupled Model Inter-comparison Project (CMIP), are not specifically designed for informing this report. Here, we document the design of the half a degree additional warming, projections, prognosis and impacts (HAPPI) experiment. HAPPI provides a framework for the generation of climate data describing how the climate, and in particular extreme weather, might differ from the present day in worlds that are 1.5 and 2.0 °C warmer than pre-industrial conditions. Output from participating climate models includes variables frequently used by a range of impact models. The key challenge is to separate the impact of an additional approximately half degree of warming from uncertainty in climate model responses and internal climate variability that dominate CMIP-style experiments under low-emission scenarios. Large ensembles of simulations (> 50 members) of atmosphere-only models for three time slices are proposed, each a decade in length: the first being the most recent observed 10-year period (2006–2015), the second two being estimates of a similar decade but under 1.5 and 2 °C conditions a century in the future. We use the representative concentration pathway 2.6 (RCP2.6) to provide the model boundary conditions for the 1.5 °C scenario, and a weighted combination of RCP2.6 and RCP4.5 for the 2 °C scenario.

54 ENVIRONMENTAL SCIENCES↗

Pointing History Engine for the Spitzer Space Telescope

The Pointing History Engine (PHE) is a computer program that provides mathematical transformations needed to reconstruct, from downlinked telemetry data, the attitude of the Spitzer Space Telescope (formerly known as the Space Infrared Telescope Facility) as a function of time. The PHE also serves as an example for development of similar pointing reconstruction software for future space telescopes. The transformations implemented in the PHE take account of the unique geometry of the Spitzer telescope-pointing chain, including all data on relative alignments of components, and all information available from attitude-determination instruments. The PHE makes it possible to coordinate attitude data with observational data acquired at the same time, so that any observed astronomical object can be located for future reference and re-observation. The PHE is implemented as a subroutine used in conjunction with telemetry-formatting services of the Mission Image Processing Laboratory of NASA s Jet Propulsion Laboratory to generate the Boresight Pointing History File (BPHF). The BPHF is an archival database designed to serve as Spitzer s primary astronomical reference documenting where the telescope was pointed at any time during its mission.

Bayard, David↗

Upgrades of Two Computer Codes for Analysis of Turbomachinery

Major upgrades have been made in two of the programs reported in "ive Computer Codes for Analysis of Turbomachinery". The affected programs are: Swift -- a code for three-dimensional (3D) multiblock analysis; and TCGRID, which generates a 3D grid used with Swift. Originally utilizing only a central-differencing scheme for numerical solution, Swift was augmented by addition of two upwind schemes that give greater accuracy but take more computing time. Other improvements in Swift include addition of a shear-stress-transport turbulence model for better prediction of adverse pressure gradients, addition of an H-grid capability for flexibility in modeling flows in pumps and ducts, and modification to enable simultaneous modeling of hub and tip clearances. Improvements in TCGRID include modifications to enable generation of grids for more complicated flow paths and addition of an option to generate grids compatible with the ADPAC code used at NASA and in industry. For both codes, new test cases were developed and documentation was updated. Both codes were converted to Fortran 90, with dynamic memory allocation. Both codes were also modified for ease of use in both UNIX and Windows operating systems.

Chima, Rodrick V.↗