Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTERCONNECTED POWER SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Chromium Vapor Sensor for Monitoring Solid Oxide Fuel Cell Systems

One of the major degradation mechanisms in solid oxide fuel cells (SOFCs) is cathode poisoning by chromium due to vaporization from the metallic interconnect or balance-of-plant materials. Information on the chromium content in an operating fuel cell would be useful to anticipate degradation and take appropriate precautions. In this project, sensors for measuring the concentration of chromium-containing gases in a SOFC system were developed. The sensors are electrochemical sensors based on solid electrolytes with an auxiliary electrode to provide the sensitivity to chromium. Two different solid electrolyte materials were used: An oxygen ion conducting electrolyte, yttria stabilized zirconia, and a sodium ion conducting electrolyte, beta” alumina. The sensor based on beta” alumina generated a larger response to the presence of chromium. The concept of using a thin-film conducting oxide to measure the cumulative amount of chromium was also evaluated. The sensor was based on amanganese-copper oxide thin film and underwent an increase in resistance upon exposure to a chromium-containing gas.

20 FOSSIL-FUELED POWER PLANTS↗

Shifts in hydropower operation to balance wind and solar will modify effects on aquatic biota

To avoid negative consequences to freshwater biota from climate change, society must complete the transition from fossil to renewable electricity sources. However, temporal patterns in hydropower generation (and flow releases that affect aquatic biota) may change with increased wind and solar penetration. We used power cost modeling to characterize current and future within-day and seasonal patterns in hydropower generation across the Eastern Interconnection in a wet and a dry year. Compared to the baseline, future hydropower generation across the grid decreased during the day and increased before dawn and after dusk. At a project level, such a pattern would suggest 'double peaking' operation (up- and down-ramping before dawn and after dusk, with lower releases midday). Variation in generation was higher in wet years than dry years, foreshadowing possible flow constraints on hydropower flexibility. At the grid scale, projected ramping rates were higher in all seasons. A review of the ecological literature suggests that these changes would shift the timing of invertebrate drift and elevate the risk of nest scouring during up-ramping and the risk of stranding or dewatering during down ramping. Thermal conditions may be moderated by increased ramping. Strategies for adapting to future shifts in the renewable portfolio range from re-regulation in reservoir cascades to providing flow refuge (structures and vegetation) below individual projects. Coordinated basin-scale operation can distribute peaking operation to maintain grid support while restricting local ramping at critical ecological times. In addition, research to design hybrid renewable systems that add battery storage is needed to understand how we can mitigate future risks to aquatic communities while promoting the use of renewable energy. This study, which is among the first to examine ecological side-effects of the shift to renewable energy in freshwater ecosystems, lays out a path toward understanding and navigating changes to flow regimes under the energy transition.

54 ENVIRONMENTAL SCIENCES↗

Impacts of Alternative Operations and Renewable Energy Deployment on Columbia River Hydropower

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, one of the world's most productive salmon rivers and a critical resource for these tribes. However, the tribes have expressed that current operating regimes of hydropower dams throughout the Columbia River Basin (CRB) do not fully account for tribal fishing rights and have negatively impacted fish populations. Four tribes acting together through the Columbia River Inter-Tribal Fish Commission (CRITFC)'s 2022 Energy Vision stated that current power system models often do not fully account for the many constraints faced by hydropower facilities in the CRB. As the deployment of variable renewable energy (VRE) like solar and wind continues to increase, power system flexibility will become increasingly important. As a result, there is a growing need to better understand the true capabilities of the hydropower generation fleet while accurately accounting for ecological constraints (Northwest Power and Conservation Council 2022). Understanding hydropower's role in a future grid with a higher share of VRE can inform water resources planning to address ecological needs. The goal of this study is to examine the impacts of alternative hydropower operation rules and weather variability on hydropower generation and grid operations in VRE and transmission infrastructure deployment scenarios. The study evaluates how hydropower scheduling practices can reduce ecological impacts to the region's salmon populations. More specifically, the study examines the impact of today's dam water release rules (called "adjusted base water rules" in this study) and new, ecologically informed water release rules (called "ecosystem water rules" in this study) on two VRE scenarios (current renewable energy levels and higher renewable energy levels) using six weather years for each scenario (2008-2013). CRITFC developed the ecosystem water rules, which capture a portion of the changes they recommend for CRB hydropower operations. These analyses use a water resource planning model (OASIS) and a production cost model (PLEXOS) to simulate CRB reservoir cascade and Western Interconnection power grid operation.

13 HYDRO ENERGY↗

Event Screening Methods for the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS)

The Eastern Interconnection Situational Awareness and Monitoring System (ESAMS) is a tool developed to explore the applications and advantages of sharing phasor measurement unit (PMU) data among operating entities. An initial conclusion from testing was that detected events required further screening before being reported to ensure that events would be of interest to system operators. The methods described in this report were integrated into ESAMS to meet this need. First, an event is screened for whether the change in voltage angle measurements indicates that the detected disturbance is sufficiently large. Next, an event is classified to determine if it was related to a loss of generation. Finally, a neural network is used to determine if the system’s response to the disturbance is normal or abnormal. These methods were tested with one month of field-measured PMU data. Results indicate that the additional information provided by these additional screening tools will improve selection of events for inclusion in the daily event reports automatically generated by ESAMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Voltage Reference for Droop-Based DERs in Distribution Systems

Due to the newly issued standards on distributed energy resources (DERs), the droop-based operation modes (Q-V and P-V droops) become a requirement for all the interconnected DER units at the distribution level. Voltage references of the DER units can be assigned to improve the operational behavior of the distribution system in the smart grid context. This paper presents a novel formulation for optimally setting voltage reference of the droop-based DER units in distribution systems with the objective of minimizing the system ohmic loss. This problem is formulated as a mixed-integer quadratic convex optimization problem in MATLAB and solved by the MATLAB and CPLEX solvers. The IEEE 123-bus system and the EPRI test system Ckt5 are used to validate the proposed formulation. The result obtained from the proposed formulation is compared with the result of the original problem solved by the heuristic method. Based on the numerical study results, system loss can be reduced after the proposed voltage reference assignment. The computational expense of the new formulation is also much lower than that of the heuristic approach.

distributed energy resource integration↗

Statistical Analysis of Inter-Area Oscillations in the U.S. Eastern Interconnection: A 2017-2023 Perspective

Recent advancements and the accumulation of high-resolution, long-term phasor measurement unit (PMU) data have provided detailed insights into inter-area oscillations in power grids. This study conducts a comprehensive statistical analysis of inter-area oscillations within the United States Eastern Interconnection from 2017 to 2023. Utilizing data captured by the advanced wide-area Frequency Monitoring Network (FNET/GridEye), this investigation examines the occurrence patterns, dominant frequencies, damping ratios, and excitation mechanisms of these oscillations. Our analysis sheds light on the evolving statistical behaviors of inter-area oscillations, offering updated and critical information for grid operators and planners. The insights gained from this study can be instrumental in enhancing the operational resilience of the power network and guiding strategic developments in grid infrastructure to accommodate future challenges. Additionally, the study discusses emerging challenges associated with the modernization of the power grid, including increased renewable penetration, dynamic load variability, and cyber-physical vulnerabilities that complicate oscillation monitoring and control.

Inter-area oscillations↗

2018 Wind Technologies Market Report

The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. Highlights of this year’s report include: ~Wind power capacity additions continued at a robust pace in 2018: $11 billion was invested in new wind power plants in 2018. In 2018, wind energy contributed 6.5% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and more than 30% in three of those states—Kansas, Iowa, and Oklahoma. 232 gigawatts of wind are seeking transmission interconnection, 2% of which represents proposed wind plants paired with storage. ~Bigger turbines are enhancing wind project performance: Increased blade lengths have dramatically increased wind project capacity factors, one measure of project performance, and taller towers are on the horizon. The average 2018 capacity factor among projects built from 2014 through 2017 was 42%, compared to an average of 31% among projects built from 2004 to 2011 and 24% among projects built from 1998 to 2001. Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen to $700–$900/kW. The average installed cost of wind projects in 2018 was $1,470/kW, down 40 percent since the peak in 2009 and 2010. ~Wind energy prices are at historical lows: After topping out at 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to below 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country. These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. Solar PPA prices have declined precipitously, pressuring wind’s competitive position. ~The grid-system value of wind has declined over the last decade, but rebounded over the last two years. The value of wind in wholesale power markets is impacted by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind in 2018 was the lowest in the Southwest Power Pool and Texas (average of $17/MWh and $18/MWh, respectively) whereas the highest-value market was New England (at $41/MWh). Wind energy prices are generally competitive with these value estimates. ~The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>90%), towers (75-90%), and blades and hubs (50-70%), but is much lower (<20%) for most components internal to the nacelle. Wind sector employment reached a new high of more than 114,000 full-time workers at the end of 2018. ~Continued strong growth in wind capacity is anticipated in the near term: With federal tax incentives still available, various forecasts for the domestic market show expected wind power capacity additions of 9,000-12,000 MW in 2019 and 11,000-15,000 in 2020, with market contraction anticipated beginning in 2021 as those tax incentives are phased out.

17 WIND ENERGY↗

Commercialization of Distribution System Load Modeling Tool for Improved DER Interconnection Studies

Residential and commercial buildings have huge potential to contribute value to improve grid resilience by participating grid services. To reveal the significant value, it is critical to estimate the grid service capability from these buildings. Unlike the large-scale distributed energy resources such as wind and solar farms, those buildings need to participate grid services in aggregation, not by individual. Therefore, it is important to appropriately group buildings for aggregation. The load profiles in the same group will have similar characteristics at the same time step, so grid operators can send the grid service signal to the customer group with a higher chance to respond at that time step. In this paper, we develop a load profile clustering method to classify the building-level load profiles for grid service capability estimation. In our two-step clustering approach, we first calculate the total load consumption for each building, clustering the load profiles based on energy consumption level. Then, we further cluster the load profiles in each energy cluster based on the load shape. The parameter selection for each clustering step is discussed. The proposed method is applied on actual building-level load profiles, and the results have proved the effectiveness of this method.

14 SOLAR ENERGY↗

Line Faults Classification Using Machine Learning on Three Phase Voltages Extracted from Large Dataset of PMU Measurements

An end-to-end supervised learning method is developed to classify transmission line faults in a twoyear field-recorded dataset that includes synchronized measurements of three-phase voltages recorded by 38 Phasor Measurement Units (PMU) sparsely located in in the US Western Grid interconnection. Statistical analysis is performed to extract features from this large dataset to train Support Vector Machine (SVM), Random Forest (RF), and eXtreme Gradient Boosting (XGBoost) classifiers initially. The training further leverages a simulated dataset from a synthetic grid with 12 PMUs to increase the number of faults of types infrequently seen in the field-recorded dataset. Training the classification models with the combined dataset resulted in a classification accuracy of 97.7%. This is a significant improvement over 89.7% to 92.5% accuracy obtained by relying on the field-recorded dataset alone.

47 OTHER INSTRUMENTATION↗

Using Energy Storage-Based Grid Forming Inverters for Operational Reserve in Hybrid Diesel Microgrids

In remote arctic communities, where access to a bulk electrical grid interconnection is not available, the implementation of islanded microgrids has been the most viable way to produce and distribute electricity services to their inhabitants. Historically, these islanded grids have relied primarily on diesel generators or hydropower resources to supply the baseload. However, this practice can result in increased expense due to the high costs associated with fuel transportation and the significant amounts of on-site storage necessary when fuel transportation is unavailable during winter months. In order to mitigate this problem, arctic microgrids have started to transition to a hybrid-source operational mode by incorporating renewable energy sources that are inherently variable in nature, such as wind or solar. Due to their highly stochastic behavior, these hybrid-source islanded microgrids can pose potential issues related to power quality due to introduction of rapid net load fluctuations and inability of diesel generators to respond rapidly. In addition, non-firm stochastic sources can require significant idling diesel generator resources to serve as spinning reserves, which is inefficient and wasteful. This work studies the problems that may arise in the transient dynamics of a real-world hybrid diesel microgrid when subjected to a loss of wind generation. Moreover, this work proposes a transition from a diesel spinning reserve to a battery energy-storage system (BESS) operating reserve scheme. The study of the proposed transition is important in establishing the fundamental implication of transient dynamics and the potential benefits of integrating a BESS as a spinning reserve in terms of stability, frequency nadir, and transient voltage deviation. The methods to investigate and validate the transient dynamics relied on both electromagnetic simulation models of GFMIs and a commercially available GFMI in an experimental power hardware-in-the-loop setup. The simulation results showed that the proposed operating reserve scheme improves the power quality of the system in terms of voltage deviation and frequency nadir when the microgrid is subjected to a loss of wind generation scenario. Depending on the simulation cases, adding a GFMI reduced the frequency nadir between 65.3% and 86.7%. Moreover, the reductions in the voltage deviations improved between 3.6% and 23.0%. From these results it can be concluded that the integration of a GFMI can reduce the frequency nadir in a hybrid diesel microgrid, and in turn, reduce diesel consumption, which improves system reliability while reducing fuel expenses. Furthermore, the novelty of this work relies on the fact that the offline simulation results were validated using a power hardware-in-the-loop platform that incorporated a 100 kVA commercially available GFMI as the device under test.

Hernandez-Alvidrez, Javier↗

Large Load Integration - Task List and Overview

Large Load Integration Tasks: Task 1 – Workshops Support stakeholder engagement across industry to promote collaboration and identify solutions to challenges that will guide other work Task 2 – Ancillary Services Characterize different types of large loads to assess under what conditions they may be utilized to provide grid stability services Task 3 – Communications Explore the cybersecurity and communications infrastructure required to enable large loads to interface with grid operations to provide ancillary services Task 4 – Nuclear Integration Explore risks and methods for supporting large load energy needs with SMRs and incorporating them into the wider power system Task 5 – Decision Support and TA Provide support to stakeholders through the creation of planning tools and direct technical assistance.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Silicon-Embedding Approaches to 3-D Toroidal Inductor Fabrication

This paper presents complementary-metal-oxide-semiconductor-compatible silicon-embedding techniques for on-chip integration of microelectromechanical-system devices with 3-D complex structures. By taking advantage of the "dead volume" within the bulk of the silicon wafer, functional devices with large profile can be embedded into the substrate without consuming valuable die area on the wafer surface or increasing the packaging complexity. Furthermore, through-wafer interconnects can be implemented to connect the device to the circuitry on the wafer surface. The key challenge of embedding structures within the wafer volume is processing inside deep trenches. To achieve this goal in an area-efficient manner, straight-sidewall trenches are desired, adding additional difficulty to the embedding process. Two approaches to achieve this goal are presented in this paper, i.e., a lithography-based process and a shadow-mask-based process. The lithography-based process utilizes a spray-coating technique and proximity lithography in combination with thick epoxy processing and laminated dry-film lithography. The shadow-mask-based process employs a specially designed 3-D silicon shadow mask to enable simultaneous metal patterning on both the vertical sidewall and the bottom surface of the trench during deposition, eliminating multiple lithography steps and reducing the process time. Both techniques have been demonstrated through the embedding of the topologically complex 3-D toroidal inductors into the silicon substrate for power supply on-chip (PwrSoC) applications. Embedded 3-D inductors that possess 25 turns and a diameter of 6 mm in a silicon trench of 300-mu m depth achieve overall inductances of 45-60 nH, dc resistances of 290-400 m Omega, and quality factors of 16-17.5 at 40-70 MHz.

Yu, XH↗

A Pattern Language for High-Performance Computing Resilience

High-performance computing systems (HPC) provide powerful capabilities for modeling, simulation, and data analytics for a broad class of computational problems. They enable extreme performance of the order of quadrillion floating-point arithmetic calculations per second by aggregating the power of millions of compute, memory, networking and storage components. With the rapidly growing scale and complexity of HPC systems for achieving even greater performance, ensuring their reliable operation in the face of system degradations and failures is a critical challenge. System fault events often lead the scientific applications to produce incorrect results, or may even cause their untimely termination. The sheer number of components in modern extreme-scale HPC systems and the complex interactions and dependencies among the hardware and software components, the applications, and the physical environment makes the design of practical solutions that support fault resilience a complex undertaking. To manage this complexity, we developed a methodology for designing HPC resilience solutions using design patterns. We codified the well-known techniques for handling faults, errors and failures that have been devised, applied and improved upon over the past three decades in the form of design patterns. In this paper, we present a pattern language to enable a structured approach to the development of HPC resilience solutions. The pattern language reveals the relations among the resilience patterns and provides the means to explore alternative techniques for handling a specific fault model that may have different efficiency and complexity characteristics. Using the pattern language enables the design and implementation of comprehensive resilience solutions as a set of interconnected resilience patterns that can be instantiated across layers of the system stack.

Hukerikar, Saurabh↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Clemson University Wind Turbine Drivetrain Test Facility

In November of 2009, Clemson University was awarded a competitive grant from the U.S. Department of Energy to design, build and operate a facility for full-scale, highly accelerated mechanical testing of next-generation wind turbine drivetrain technologies. The primary goal of the project was to design, construct, commission, and operate a state-of-the-art sustainable facility that permits full-scale highly accelerated testing of advanced drivetrain systems for large wind turbines. The secondary goal was to meet the objectives of the American Recovery and Reinvestment Act of 2009, especially in job creation, and provide a positive impact on economically distressed areas in the United States, and preservation and economic recovery in an expeditious manner. The project was executed according to a managed cooperative agreement with the Department of Energy and was an extraordinary success. The resultant new facility is located in North Charleston, SC, providing easy transportation access by rail, road or ship and operates on an open access model such that it is available to the U.S. Wind Industry for research, analysis, and evaluation activities. The 72 m by 97 m facility features two mechanical dynamometer test bays for evaluating the torque and blade dynamic forces experienced by the rotors of wind turbine drivetrains. The dynamometers are rated at 7.5 MW and 15 MW of low speed shaft power and are configured as independent test areas capable of simultaneous operation. All six degrees of freedom, three linear and three rotational, for blade and rotor dynamics are replicated through the combination of a drive motor, speed reduction gearbox and a controllable hydraulic load application unit (LAU). This new LAU setup readily supports accelerated lifetime mechanical testing and load analysis for the entire drivetrain system of the nacelle and easily simulates a wide variety of realistic operating scenarios in a controlled laboratory environment. The development of these two dynamometer test rigs is the first significant achievement for the project. These test rigs embody a new manner of test due to the system configuration and completely new design with a free floating loading hub in the LAU. This project provided the catalyst for the advancement to this new test rig configuration that has been adopted by every significant wind turbine test rig constructed since the inception of this project. There are currently two different vendors supplying these new systems. Catalyzing this new design is the second major success of the project. With the increased market penetration of wind energy over the past decade, many regions and countries have developed specific electrical grid specifications and performance codes for large wind farms to ensure operational reliability and stability. These grid codes provide requirements for interconnection with the grid during low or high voltage phenomena, typically encountered during and after system fault events. Given the installed infrastructure of the Wind Turbine Drivetrain Testing Facility (WTDTF), a natural expansion of facility capability was to include the necessary equipment for performing fault ride-through evaluations of wind turbines to the Low Voltage Ride Through (LVRT) codes. Once the decision was made to expand the scope of the original grant into fault ride-through testing, it was clear that there are several markets, not just wind, which could benefit from this type of test and that simple fault ride-through testing could be extended into a broader scope of electrical testing capabilities. It was at this point that Clemson University was awarded a second grant to build a 15 MW Hardware-In-the-Loop (HIL) Grid Simulator in order to establish world class electrical testing capabilities to compliment the mechanical testing at the WTDTF. This third significant achievement resulted in the 15 MW HIL Grid Simulator as the corner stone of the Duke Energy eGRID Center and is collocated with the WTDTF in the SCE&G Energy Innovation Center at the new Facility in North Charleston, SC, USA. Before the eGRID was completed, it was recognized that the ability to test solar farm equipment was but a small step away thru the addition of enhanced equipment to provide for DC testing. In yet another expansion/success, a 2.5 MW rectifier system was designed and implemented by Clemson staff to enhance the Center’s capabilities. The program required over 250,000 man-hours of on-site construction labor reworking the brownfield facility on the former Navy Base, clearly satisfying one of the major goals of the Reinvestment Act. This was done while winning numerous awards for design and construction of the facility, including the Top US Project for 2014 from the Trade Journal Engineering News Record. The project was a major collaborative developmental activity managed by Clemson University staff that involved the DOE and many partners and organizations.

17 WIND ENERGY↗

Dust Abrasion Damage on Martian Solar Arrays: Experimental Investigation and Opportunity Rover Performance Analysis

Here we investigate the effects of erosion and weathering that occur on III-V cover-glass interconnected cells (CICs) after exposure to Mars dust storm conditions. The durability of these materials in a Martian environment is not well characterized so we perform analogous experimentation. To replicate the dust impingement, test coupons were placed in an enclosure and sandblasted with Mars dust simulant. We show the J-V response dependency on both incident angle and exposure times. We find that the simulated Martian dust storm often results in damage to the anti-reflective coating and subsequent reduced short circuit current. Reduction in the open circuit voltage is observed, likely caused by structural damage to the crystal lattice after CIC fracture. We employ data-driven modeling to determine a performance degradation rate that is consistent with zero within uncertainty. We also quantify the soiling contribution and power degradation of the photovoltaic cells on Mars through analysis of 4.95 Martian years of report-out power conditions from the Opportunity rover. We find that atmospheric dust suspended due to a weather event does not result in instantaneous settled dust on the PV cells. We calculate via autocorrelation function that the dust settling rate is approximately 21 Sols from atmospheric dust suspension. The findings presented here deliver a realistic approximation for the insolation values and subsequent PV power expected over time on the Martian surface thus informing future dust abatement systems.

McMillon-Brown, Lyndsey↗

Dust Abrasion Damage on Martian Solar Arrays: Experimental Investigation and Opportunity Rover Performance Analysis

Here we investigate the effects of erosion and weathering that occur on III-V cover-glass interconnected cells (CICs) after exposure to Mars dust storm conditions. The durability of these materials in a Martian environment is not well characterized so we perform analogous experimentation. To replicate the dust impingement, test coupons were placed in an enclosure and sandblasted with Mars dust simulant. We show the J-V response dependency on both incident angle and exposure times. We find that the simulated Martian dust storm often results in damage to the anti-reflective coating and subsequent reduced short circuit current. Reduction in the open circuit voltage is observed, likely caused by structural damage to the crystal lattice after CIC fracture. We employ data-driven modeling to determine a performance degradation rate that is consistent with zero within uncertainty. We also quantify the soiling contribution and power degradation of the photovoltaic cells on Mars through analysis of 4.95 Martian years of report-out power conditions from the Opportunity rover. We find that atmospheric dust suspended due to a weather event does not result in instantaneous settled dust on the PV cells. We calculate via autocorrelation function that the dust settling rate is approximately 21 Sols from atmospheric dust suspension. The findings presented here deliver a realistic approximation for the insolation values and subsequent PV power expected over time on the Martian surface thus informing future dust abatement systems.

McMillon-Brown, Lyndsey↗