Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Ultra Efficient Light Duty Powertrain with Gasoline Low Temperature Combustion (Final Report)

This document details the work completed during Project DE-EE0006839 ‘Ultra Efficient Light Duty Powertrain with Gasoline Low Temperature Combustion’. All tasks from the project’s Statement of Project Objectives are discussed. Final demonstration data is also presented and discussed. Further project details can be found in the Quarterly Technicial Reports that were submitted during the course of the project and are stored on the EERE Project Management Center Website. The goal of this project was to develop, implement and demonstrate a low temperature combustion approach called Gasoline Direct Injection Compression Ignition (GDCI) that provides high thermal efficiency with low NOx and PM emissions. The project target was to demonstrate a 35% fuel economy improvement over the baseline vehicle while meeting Tier 3 emissions levels. At the start of this project, GDCI was a moderately mature combustion technology, due in large part to advances made during a Delphi Technologies program funded through an earlier Department of Energy Advanced Technology Powertrains (ATP) opportunity; under that earlier contract, DE-EE0003258, Delphi Technologies assembled a team with complementary industrial and academic experience, and led this team to advance the technology from the original fundamental work to the state of art embodied by a first-generation (Gen 1) multi-cylinder GDCI engine. Key activities during that project centered on engine and combustion chamber design, and development of fuel injection equipment, valvetrain and advanced controls. Performance results with the Gen 1 engine in a development vehicle demonstrated that GDCI had the capability to operate using Low Temperature Combustion (LTC) over a broad speed-load range. Based on benchmarking work, efficiency for the Gen 1 GDCI engine compared favorably overall to production light-duty diesel engines. The second DOE funded project, DE-EE0006839, focused on a number of technical risks and issues that were left to be resolved for GDCI to become a production-viable technology. These risks were:GDCI combustion system refinement to achieve near-ideal air/fuel mixture preparation for high efficiency and low HC and CO emissions; Transient control development for low temperature combustion with high EGR levels during real-world transient driving maneuvers and over a broader range of ambient conditions; Aftertreatment system design that is effective in dealing with the low-temperature challenges of a highly efficient engine. The project was executed in two phases. Phase 1 leveraged the development vehicle from the Advanced Technologies Powertrain 1 (ATP1) project, DE-EE0003258. That vehicle was used as an initial test bed in the development of a high performance low temperature exhaust aftertreatment system. The vehicle was also used to develop calibration refinements for improved exhaust emissions and fuel efficiency. Samples of a new GDCI development level engine, called Gen2 GDCI (and developed outside of the first DOE funded project), were also used during Phase 1 to develop refined controller hardware and control algorithms, as well as improved sensors and actuators. The Gen2 engine was then retrofitted into the development vehicle from the ATP1 project and used for controls refinement and calibration of GDCI to achieve improved cold start, drivability and robustness to real world environments and fuel variations. During Phase 2 of the project, Gen3 versions of the GDCI engine were designed and built specifically for this project based on experience from the earlier engines. These engines were designed to be production-like in construction and, when combined with refined control systems and project specific low temperature exhaust aftertreatment, were intended to support the goal of meeting Tier 3 emissions levels at a vehicle level. Though great progress had been made advancing the GDCI combustion process, and despite extensive presentations of our work on the technology at various conferences and in direct meetings with automotive companies, none of the US domestic automotive OEMs had shown an interest in adopting this combustion process as part of their technology planning as the project approached the Go/No-Go point at the end of Budget Period 3. As a result of this low-level of interest both the US Department of Energy and Delphi Technologies received in this technology from domestic auto manufactures, Delphi Technologies elected a ‘No-Go’ status for the gate between Budget Period 3 and Budget Period 4 which terminated the project without spending any Budget Period 4 funds. The project team concluded that the dynamometer mapping of the most recent level of hardware, combined with the vehicle level simulation by Argonne National Laboratory, was sufficient to document the capabilities and potential of the combustion process without spending the time and money to do the controls development and full calibration necessary for a demonstration vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Ocean Thermal Energy Conversion Life Cycle Cost Assessment, Final Technical Report, 30 May 2012

The Ocean Thermal Energy Conversion (OTEC) Life Cycle Cost Assessment (OLCCA) is a study performed by members of the Lockheed Martin (LM) OTEC Team under funding from the Department of Energy (DOE), Award No. DE-EE0002663, dated 01/01/2010. OLCCA objectives are to estimate procurement, operations and maintenance, and overhaul costs for two types of OTEC plants: -Plants moored to the sea floor where the electricity produced by the OTEC plant is directly connected to the grid ashore via a marine power cable (Grid Connected OTEC plants) -Open-ocean grazing OTEC plant-ships producing an energy carrier that is transported to designated ports (Energy Carrier OTEC plants) Costs are developed using the concept of levelized cost of energy established by DOE for use in comparing electricity costs from various generating systems. One area of system costs that had not been developed in detail prior to this analysis was the operations and sustainment (O&S) cost for both types of OTEC plants. Procurement costs, generally referred to as capital expense and O&S costs (operations and maintenance (O&M) costs plus overhaul and replacement costs), are assessed over the 30 year operational life of the plants and an annual annuity calculated to achieve a levelized cost (constant across entire plant life). Dividing this levelized cost by the average annual energy production results in a levelized cost of electricity, or LCOE, for the OTEC plants. Technical and production efficiency enhancements that could result in a lower value of the OTEC LCOE were also explored. The thermal OTEC resource for Oahu, Hawaii and projected build out plan were developed. The estimate of the OTEC resource and LCOE values for the planned OTEC systems enable this information to be displayed as energy supplied versus levelized cost of the supplied energy; this curve is referred to as an Energy Supply Curve. The Oahu Energy Supply Curve represents initial OTEC deployment starting in 2018 and demonstrates the predicted economies of scale as technology and efficiency improvements are realized and larger more economical plants deployed. Utilizing global high resolution OTEC resource assessment from the Ocean Thermal Extractable Energy Visualization (OTEEV) project (an independent DOE project), Global Energy Supply Curves were generated for Grid Connected and Energy Carrier OTEC plants deployed in 2045 when the predicted technology and efficiencies improvements are fully realized. The Global Energy Supply Curves present the LCOE versus capacity in ascending order with the richest, lowest cost resource locations being harvested first. These curves demonstrate the vast ocean thermal resource and potential OTEC capacity that can be harvested with little change in LCOE.

99 GENERAL AND MISCELLANEOUS↗

Manhattan Project 1940s research on the prompt fission neutron spectrum

We describe how the prompt fission neutron spectrum (PFNS) was determined for the Manhattan Project at Los Alamos. Early work before World War II at American and British universities is described, together with theoretical work by Feather at Cambridge and Bethe at Los Alamos. As the Manhattan Project was being planned in 1942, two experiments on natural uranium were commissioned that proved to be influential: 1) An integral experiment at Chicago by Christy and Manley that accurately determined the average PFNS spectrum energy, 2.2 ± 0.2 MeV; 2) Bloch and Staub’s Stanford cyclotron measurement of the PFNS spectrum, which obtained an average energy of 1.70 ± 0.34 MeV. These two papers, previously unavailable outside of Los Alamos, are reproduced in the Supplementary Appendix. From these data, at the beginning of the project in 1943 Serber estimated an average 235 U PFNS energy of 2 MeV, and indeed this agrees with today’s best estimate. The challenges facing the scientists involved both the availability of only very small samples of enriched uranium and plutonium targets, and fast neutron detection technologies. During the project, 235 U and 239 Pu PFNS were measured by Nicodemus and Staub. These also proved to be quite accurate and gave an average spectrum energy of 2 MeV for 235 U. [This is not reproduced in the Appendix because it was published after the war in Physical Review 89, 1288 (1953)]. New methods were developed to enable more accurate measurements, and this paper describes how the PFNS was determined surprisingly well by 1945. We end by describing the post-war measurements in the 50s, including the PFNS data used by Ford and Wheeler in their simulations in 1951, the Bonner 1952 data, the seminal 1952 Watt paper with a new empirical parametrization of the PFNS, and the accurate PFNS measurement undertaken at Los Alamos by Cranberg et al. in 1956. We compare the measurements with our best understanding today as embodied in the Evaluated Nuclear Data File ENDF/B-VIII.0. Some images from historical documents in our Los Alamos National Security Research Center (NSRC) archives are shown.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

The SMART Cables Initiative for Ocean and Geophysical Observing [Slides]

SMART Cables are becoming a reality, and have the potential to revolutionize submarine oceanographic and geophysical sensing. Pilot / demonstration projects are underway to test the technology and explore the feasibility of incorporating both in-repeater standardized sensor packets but also ancillary sensor types on external, branching nodes. The projects currently in planning will set the standard and influence the norms for the future of SMART systems. The interest of all potential stakeholders and users, and input as to needs and concerns, is welcomed as testing proceeds.

54 ENVIRONMENTAL SCIENCES↗

Autonomous Energy Management Software System for Small Commercial Buildings in Support of Decarbonization (Abstract)

The primary goal for the project is to develop and validate an autonomous energy management software (AEMS) system that will continuously optimize small commercial building operations by minimizing energy consumption and cost, providing a solution for maximizing decarbonization benefits from electrification of buildings. The work will leverage vast experience of Pacific Northwest National Laboratory (PNNL) research and development staff who have over two decades of experience in developing and successfully transferring software technologies to the private sector. This solution will be jointly developed with Intellimation LLC who plans to use it to scale their building energy efficiency offering. The project plan will include collaboratively working with Intellimation to package a set of solutions into the AEMS system, validate and demonstrate their capability, and value proposition through field demonstrations. If the deployment of the AEMS system optimizes RTUs’ set points, schedules, setbacks and optimal start and results in energy consumption reduction of 20%, the technical potential savings is approximately 675 trillion Btus of site energy savings and 2,000 trillion Btus of source energy. It will also result in carbon reductions of approximately 2.4 MMTCO2 and contribute to the climate change mitigation plans of many cities and states across the United States. Additional cost savings and emissions reduction are possible from management of peak electricity demand. The primary outcome will be an AEMS system that can be deployed at scale on small commercial buildings to improve operating efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A two-level structure for advanced space power system automation

The tasks to be carried out during the three-year project period are: (1) performing extensive simulation using existing mathematical models to build a specific knowledge base of the operating characteristics of space power systems; (2) carrying out the necessary basic research on hierarchical control structures, real-time quantitative algorithms, and decision-theoretic procedures; (3) developing a two-level automation scheme for fault detection and diagnosis, maintenance and restoration scheduling, and load management; and (4) testing and demonstration. The outlines of the proposed system structure that served as a master plan for this project, work accomplished, concluding remarks, and ideas for future work are also addressed.

Loparo, Kenneth A.↗

Apollo-Soyuz test project - The American-Soviet space enterprise

The preflight mission plan of the Apollo-Soyuz project is summarized, and the scientific experiments planned for the flight are described. Emphasis is on coupling procedures and docking modules. Experiments discussed comprise astronomical studies, geophysical studies, bioscientific studies, and application-oriented studies. The unique gravity-free space environment will provide favorable conditions for uniform materials construction. In addition, biological electrophoresis investigations in a perturbation-free medium will have substantial scientific contributions to make.

Von Puttkamer, J.↗

Wave energy in season: a comparative approach to feasibility of seasonal deployments for remote coastal communities

Remote coastal communities, which could be early adopters of wave energy projects, have concerns over costs, conflicts, and potential risks of development. Designers and developers are challenged to address these community concerns as they continue to develop wave energy technologies. One potential means of reducing costs, conflicts, and risks, especially for demonstration and pilot-scale projects, could be planning a deployment that operates for only a portion of the year—a seasonal deployment. Here, in this paper, we examine the impacts of a seasonal deployment in terms of cost, electricity production, operations and maintenance, environmental impacts, and community benefits. We take a holistic, comparative approach to feasibility that can be replicated for other comparative studies. We estimate electricity production using a point absorber WEC modeled near Sitka, AK, USA and optimized for the given sea conditions. We determine that, for remote community sized projects, seasonal deployments could result in small cost savings (less than 10 %), but larger decreases in annual energy production (around 30 % for our case study area). Seasonal deployments could be preferable in places with seasonal energy needs, if failures and device access become a major hindrance to wave energy technology development, or as a cautionary approach to introducing new technology to the oceans. We also determine that a highly seasonal wave resource is not necessarily a requirement for seasonal deployments to be considered. Seasonal deployments are an alternative to year-round deployments that can be considered in places where marine spatial conflict is a seasonal concern.

WEC optimizations↗

Technical Note: A novel leaf sequencing optimization algorithm which considers previous underdose and overdose events for MLC tracking radiotherapy

Purpose: Multileaf collimator (MLC) tracking radiotherapy is complex as the beam pattern needs to be modified due to the planned intensity modulation as well as the real-time target motion. The target motion cannot be planned; therefore, the modified beam pattern differs from the original plan and the MLC sequence needs to be recomputed online. Current MLC tracking algorithms use a greedy heuristic in that they optimize for a given time, but ignore past errors. To overcome this problem, the authors have developed and improved an algorithm that minimizes large underdose and overdose regions. Additionally, previous underdose and overdose events are taken into account to avoid regions with high quantity of dose events. Methods: The authors improved the existing MLC motion control algorithm by introducing a cumulative underdose/overdose map. This map represents the actual projection of the planned tumor shape and logs occurring dose events at each specific regions. These events have an impact on the dose cost calculation and reduce recurrence of dose events at each region. The authors studied the improvement of the new temporal optimization algorithm in terms of the L1-norm minimization of the sum of overdose and underdose compared to not accounting for previous dose events. For evaluation, the authors simulated the delivery of 5 conformal and 14 intensity-modulated radiotherapy (IMRT)-plans with 7 3D patient measured tumor motion traces. Results: Simulations with conformal shapes showed an improvement of L1-norm up to 8.5% after 100 MLC modification steps. Experiments showed comparable improvements with the same type of treatment plans. Conclusions: A novel leaf sequencing optimization algorithm which considers previous dose events for MLC tracking radiotherapy has been developed and investigated. Reductions in underdose/overdose are observed for conformal and IMRT delivery.

61 RADIATION PROTECTION AND DOSIMETRY↗

The Earth Resources Data Project

The Council of State Planning Agencies, in consultation with the National Governor's Association and NASA, initiated the Earth Resources Data Project to encourage the appropriate application of cost-effective science and technology to state natural resources issues and problems. This project was established to provide a focal point for identifying those issues associated with state use of remote sensing and related technology. One project goal is to elevate to the consciousness of state policy and program officials new technologies, such as LANDSAT, by association with major issues to which policy officials are attuned. The project assists the coordination between the states and NASA and promotes communication on those issues. A related project objective is to encourage technical assistance opportunities for states that will promote better use of remote sensing and natural resources data in state programs.

Harwood, P.↗

Robust highly durable solid oxide fuel cell cathodes – Improved materials compatibility & self-regulating surface chemistry

Solid oxide fuel cells (SOFCs) are electrochemical conversion devices that directly transform hydrogen or hydrocarbon fuels to electricity, with energy efficiencies as high as 90%, coupled with reduced emissions. Several factors, however, remain to be addressed when considering scale-up of SOFC technology, including the need to overcome decreased performance due to sluggish rates of the oxygen reduction reaction (ORR) at the cathode under reduced temperatures and susceptibility to degradation in performance from surface poisoning e.g. from chromia, while limiting the use of critical raw materials (lanthanides and transition metals) present in high performing mixed ionic electronic conducting electrodes like (La,Sr)CoO 3 (LSC). In this project we explored the key descriptors for determining ORR activity in SOFC electrodes and tried to recover performance degradation by applying them to SOFC electrodes. In order to do this, we first selected a model mixed ionic electronic conducting (MIEC) oxide, Pr-doped CeO 2 (Pr 0.1 Ce 0.9 O 2-δ , PCO), which is a chemically stable fluorite and free of inherent poison sources (e.g. Sr segregation in LSC) that potentially react with external impurities such as Cr-species vaporized from the interconnect. The three approaches originally planned in this project are as follows: 1) evaluation of scavenger exsolution characteristics, 2) study of scavengers gettering efficacy following Cr and Si poisoning and 3) integration of new compositions into porous electrodes. Among them, exceptional progress has been made in 2) and 3), especially understanding the role of surface infiltrants in impacting electrode performance and degradation of PCO materials. We found that the Smith acidity scale for binary oxides serves as a powerful descriptor for tuning and predicting the oxygen exchange kinetics on MIEC PCO surfaces. As a result, with infiltration with binary oxides, ranging from strongly basic (Li 2 O) to strongly acidic (SiO 2 ) onto the surface of porous PCO, it was possible to systematically vary the chemical surface exchange coefficient (k chem ) by 6 orders of magnitude! L i2 O increased k chem by nearly 1,000 times over that of pristine PCO, while SiO 2 decreased k chem by nearly the same factor. Strikingly, although the pre-exponential of k chem scales linearly with the acidity of the infiltrated binary oxide, there is nearly no change in the activation energy. With this insight, we attributed the origin of these dramatic changes in k chem values to the systematic increase and decrease in the surface electron density induced by infiltrated binary oxides. More interestingly, although both Cr 2 O 3 and SiO 2 were determined to be acidic by Smith, suggesting that this feature could likely be the primary reason that these compounds serve to poison the ORR on SOFC cathodes, the effect of poisoning could be subsequently tuned by adding multiple infiltrants and controlling their relative surface acidities. We also systematically examined the effect of serial infiltration of basic and acidic oxides. It turned out that serial infiltration of Li not only recovers approximately 20-fold degraded k chem of PCO by acidic Cr 2 O 3 but its k chem is enhanced even beyond that of the non-infiltrated PCO by more than three orders of magnitude. This was further verified with a screen-printing PCO symmetric cell in terms of the electrode performance (area-specific resistance, ASR) related to approach 3). These observations point to acidity as a key descriptor not only in tuning and predicting the ORR activity of SOFC cathodes that largely determines the overall performance of SOFC, but in mitigating and reactivating poisoned electrode performance. This work provides novel guidelines for making the electrode performance much more active and robust in SOFCs, which can further be applied to all applications requiring oxygen exchange reaction, such as electrolyzers, permeation membranes and gas sensors.

30 DIRECT ENERGY CONVERSION↗

Adaptive management: a paradigm for remediation of public facilities

Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far more complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.

99 GENERAL AND MISCELLANEOUS↗

Grid connection barriers to renewable energy deployment in the United States

Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Geologic Modeling and Simulation Report for the Aquistore Project

The Plains CO 2 Reduction (PCOR) Partnership, through the Energy & Environmental Research Center (EERC), is collaborating with the Petroleum Technology Research Centre (PTRC) on site characterization; modeling and simulation; risk assessment; public outreach; and monitoring, verification, and accounting (MVA) activities for the Aquistore project. The Aquistore project is a carbon capture, utilization, and storage (CCUS) project situated near the town of Estevan, Saskatchewan, Canada, and the U.S.–Canada border. This project is managed by PTRC and will serve as buffer storage of carbon dioxide (CO 2 ) from the SaskPower Boundary Dam CCUS project, the world’s first commercial-scale postcombustion CCUS project from a coal-fired electric generating facility. To date, an injection well and an observation research well (~500 ft apart) have been drilled and completed at the Aquistore site, with injection anticipated to begin in 2014. Using a combination of site characterization data provided by PTRC and independently acquired information, the PCOR Partnership has constructed a static geologic model to assess the potential storage capacity of the Aquistore site and provide the foundation for dynamic simulation. The geologic model and the results of the predictive simulations will be used in the risk assessment process to help define an overall monitoring plan for the project and to assure stakeholders that the injected CO 2 will remain safely stored at the Aquistore site.

54 ENVIRONMENTAL SCIENCES↗

Advances in the PIP-II Project and the Indian Institutions & Fermilab Collaboration

The Proton Improvement Plan – II (PIP-II) project at Fermi National Accelerator Laboratory (Fermilab) is the first particle accelerator project in the USA to receive significant in-kind contributions from international partners. Partnering countries include the USA, India, Italy, the United Kingdom, France, and Poland. When completed, PIP-II will accelerate protons to 800 MeV, and power the world’s most intense neutrino beam for the Deep Underground Neutrino Experiment (DUNE). Technological advancements for PIP-II across the entire collaboration have significantly matured, with the project currently in the construction phase. The Indian Institutions & Fermilab Collaboration (IIFC) for PIP-II has a 14+ years history. The IIFC R&D phase concluded with the validation of various prototypes and defined the beginning of the construction phase. This presentation highlights the advances of the synergistic PIP-II collaboration. Work supported, in part, by the U.S. Department of Energy, Office of Science, Office of High Energy Physics, under U.S. DOE Contract No. 89243024CSC000002.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Including health in environmental impact assessments of three mega transport projects in Sydney, Australia: A critical, institutional, analysis

This article details how health impacts came to be assessed in three mega, billion dollar, transport infrastructure projects, two road tunnels and one light rail, in Sydney Australia. The known health impacts of transport decisions include environmental, behavioural and social factors. EIA practice prioritises environmental risks, and there has been scant attention to understanding why this is persistently the case. Here we provide a critical theory lens, using critical realist methodology, to analyse empirical data collected through interviews and documents for the three cases. Our analysis focusses on EIA practice within its institutional context, building on ‘new institutional’ approaches to policy analysis that emphasise actors (the stakeholders involved in the EIA), structures (the ‘rules of the game’ that influence practice in systems), and power. We find that the various actors engaged in the EIAs principally to address particular goals that were pre-determined by the system in which they worked or belonged. Structurally, each EIA was undertaken as a compliance process relatively late in the planning process. Considering project options was not part of the EIA's purpose. Resources to undertake the EIAs were provided by those funding the projects (“the proponents”) and determined the types of issues to be considered. The full range of links between transport and health were not identified. Concerning power, health impacts were considered through inter-professional technical negotiation. The inability to engage in the fundamental options driving projects meant impacted communities questioned the validity of the EIA, and the health assessment within this. Our institutional analysis provides important knowledge about how the EIAs preferenced a focus on specific health risks to the detriment of the known broader determinants that shape the health impacts of transport.

54 ENVIRONMENTAL SCIENCES↗

High-Temperature Latent Heat Storage System using Transportable Heat Pipes for Versatile Integration with Emerging Microreactors

With the growing interest in the development of micro nuclear reactors and their application to microgrid, high-temperature thermal energy storage (TES) has also been receiving great attention as a technology to reinforce the energy utilization and profitability of this class of reactors. Given the importance and research needs of the TES technology, a research project is underway at Idaho National Laboratory (INL) to develop high-temperature TES that can be easily interfaced with emerging micro nuclear reactors. Currently under development is the Heat pipe-Integrated Thermal Battery (HITB), a novel latent heat storage design that enables flexible and robust integration with any design of currently considered micro nuclear reactors. The development of detailed design based on the proposed TES concept, HITB, requires not only development and validation of modeling and simulation capabilities, but also research that spans thermal performance analysis, component- and system-scale design optimization, and experimental demonstrations including high-temperature feasibility testing. The current research efforts (and plans) are divided into the following four areas: (i) Thermal and structural modeling and analysis at both system- and component-scales for evaluating performance and conducting design optimization, (ii) Small-scale experimental demonstrations for the key components of the proposed HITB design, (iii) Modelica-based dynamic model development for developing a control strategy under dynamic operation within integrated energy systems configuration, (iv) Integrated experimental testing and demonstration. This paper introduces the overall research efforts that have been and are being conducted to develop and demonstrate the novel design of the high-temperature latent heat storage device, HITB. The key design features, ongoing research efforts including the development of modeling and simulation capabilities, small-scale demonstrations of the HITB’s key functionalities prior to scaled-up experimental demonstration, are discussed. Then, this paper concludes with a remark on the future research plans for this project.

25 ENERGY STORAGE↗