Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Beam Echoes in the Presence of Coupling

Transverse beam echoes could provide a new technique of measuring diusion characteristics orders of magnitude faster than the current methods; however, their interaction with many accelerator parameters is poorly understood. Using a program written in C, we explored the relationship between coupling and echo strength. We found that echoes could be generated in both dimensions, even with a dipole kick in only one dimension. We found that the echo eects are not destroyed even when there is strong coupling, falling o only at extremely high coupling values. We found that at intermediate values of skew quadrupole strength, the decoherence time of the beam is greatly increased, causing a destruction of the echo eects. We found that this is caused by a narrowing of the tune width of the particles. Results from this study will help to provide recommendations to IOTA (Integrable Optics Test Accelerator) for their upcoming echo experiment.

43 PARTICLE ACCELERATORS↗

Five-Segment Interconnection For Electromigration Tests

Proposed integrated-circuit conductive pattern intended for use in electromigration lifetime testing of interconnection lines of integrated circuits. Designed for collection of statistics on electromigration from smallest possible area. Includes 5 interconnection segments with Kelvin voltage taps, with total of 12 contact pads, and provides for simultaneous measurements on all of segments. Attempts to minimize thermal gradients within each segment and conforms to guidelines on electromigration test structures promulgated by National Institute of Standards and Technology (NIST).

Hannaman, David J.↗

Design and Test Plan for an Integrated Iodine Scrubber and Polishing Bed System

The capture and subsequent immobilization of four regulated volatile radionuclides ( 3 H, 14 C, 85 Kr, and 129 I) and relevant semivolatile species from the off-gas streams of a used nuclear fuel (UNF) reprocessing facility has been a topic of significant research interest on the part of the US Department of Energy and other international organizations. Significant research and development has been conducted over the past decade. In 2016 an initial engineering evaluation and design of the off-gas abatement systems required for a hypothetical 1000 t/yr UNF reprocessing facility treating 5 yr–cooled, 60 GWd/tIHM UNF was completed. One of the key findings of that report was that the consumption rate of silver-based iodine sorbents in the dissolver off-gas primary iodine capture bed is very high and may warrant the evaluation of alternative methods to capture the bulk of the iodine that could significantly reduce the associated frequent remote handing of the iodine filter beds. This report is intended to describe the design of an experimental system that can be used to examine the use of aqueous scrubbing to remove the bulk of the iodine from the dissolver off-gas stream prior to a silver-based solid sorbent that would be used to provide the final iodine capture or polishing step. This report also provides a description of the initial series of tests that are proposed for this system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrated detector array technology for infrared astronomy

The status of laboratory and telescope tests of integrated infrared detector array technology for astronomical applications is described. The devices tested represent a number of extrinsic and intrinsic detector materials and various multiplexer designs. Infrared arrays have now been used in successful astronomical applications. These have shown that device sensitivities can be comparable to those of discrete detector systems and excellent astronomical imagery can be produced.

Mccreight, c. R.↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Adoption of Test Driven Development and Continuous Integration for the Development of the Trick Simulation Toolkit

This paper describes the adoption of a Test Driven Development approach and a Continuous Integration System in the development of the Trick Simulation Toolkit, a generic simulation development environment for creating high fidelity training and engineering simulations at the NASA/Johnson Space Center and many other NASA facilities. It describes what was learned and the significant benefits seen, such as fast, thorough, and clear test feedback every time code is checked-in to the code repository. It also describes a system that encourages development of code that is much more flexible, maintainable, and reliable. The Trick Simulation Toolkit development environment provides a common architecture for user-defined simulations. Trick builds executable simulations using user-supplied simulation-definition files (S_define) and user supplied "model code". For each Trick-based simulation, Trick automatically provides job scheduling, checkpoint / restore, data-recording, interactive variable manipulation (variable server), and an input-processor. Also included are tools for plotting recorded data and various other supporting tools and libraries. Trick is written in C/C++ and Java and supports both Linux and MacOSX. Prior to adopting this new development approach, Trick testing consisted primarily of running a few large simulations, with the hope that their complexity and scale would exercise most of Trick's code and expose any recently introduced bugs. Unsurprising, this approach yielded inconsistent results. It was obvious that a more systematic, thorough approach was required. After seeing examples of some Java-based projects that used the JUnit test framework, similar test frameworks for C and C++ were sought. Several were found, all clearly inspired by JUnit. Googletest, a freely available Open source testing framework, was selected as the most appropriate and capable. The new approach was implemented while rewriting the Trick memory management component, to eliminate a fundamental design flaw. The benefits became obvious almost immediately, not just in the correctness of the individual functions and classes but also in the correctness and flexibility being added to the overall design. Creating code to be testable, and testing as it was created resulted not only in better working code, but also in better-organized, flexible, and readable (i.e., articulate) code. This was, in essence the Test-driven development (TDD) methodology created by Kent Beck. Seeing the benefits of Test Driven Development, other Trick components were refactored to make them more testable and tests were designed and implemented for them.

Penn, John M.↗

Human Exploration Missions - Maturing Technologies to Sustain Crews

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. Providing crews with the essentials of life such as clean air and potable water means recycling human metabolic wastes back to useful products. Individual technologies are under development for such things as CO2 scrubbing, recovery of O2 from CO2, turning waste water into potable water, and so on. But in order to fully evaluate and mature technologies fully they must be tested in a relevant, high-functionality environment; a systems environment where technologies are challenged with real human metabolic wastes. It is for this purpose that an integrated systems ground testing capability at the Johnson Space Center is being readied for testing. The relevant environment will include deep space habitat human accommodations, sealed atmosphere of 8 psi total pressure and 32% oxygen concentration, life support systems (food, air, water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth ]Moon L2 or L1, the moon, and Mars). This type of integrated testing is needed not only for research and technology development but later during the mission design, development, test, and evaluation phases of preparing for the mission.

Mukai, Chiaki↗

Mars aqueous chemistry experiment

The Mars Aqueous Chemistry Experiment (MACE) is designed to conduct a variety of measurements on regolith samples, encompassing mineral phase analyses, chemical interactions with H2O, and physical properties determinations. From these data, much can be learned or inferred regarding the past weathering environment, the contemporaneous soil micro-environments, and the general chemical and physical state of the Martian regolith. By analyzing both soil and duricrust samples, the nature of the latter may become more apparent. Sites may be characterized for comparative purposes and criteria could be set for selection of high priority materials on future sample return missions. Progress for the first year MACE PIDDP is reported in two major areas of effort: (1) fluids handling concepts, definition, and breadboard fabrication and (2) aqueous chemistry ion sensing technology and test facility integration. A fluids handling breadboard was designed, fabricated, and tested at Mars ambient pressure. The breadboard allows fluid manipulation scenarios to be tested under the reduced pressure conditions expected in the Martian atmosphere in order to validate valve operations, orchestrate analysis sequences, investigate sealing integrity, and to demonstrate efficacy of the fluid handling concept. Additional fluid manipulation concepts have also been developed based on updated MESUR spacecraft definition. The Mars Aqueous Chemistry Experiment Ion Selective Electrode (ISE) facility was designed as a test bed to develop a multifunction interface for measurements of chemical ion concentrations in aqueous solution. The interface allows acquisition of real time data concerning the kinetics and heats of salt dissolution, and transient response to calibration and solubility events. An array of ion selective electrodes has been interfaced and preliminary calibration studies performed.

Clark, Benton C.↗

Solid Secondary Waste Form Testing Activities for the Integrated Disposal Facility Performance Assessment Support - 17567

Solid secondary waste (SSW) that will be generated at the Waste Treatment and Immobilization Plant (WTP) and from other activities at the Hanford site is destined for disposal at the Integrated Disposal Facility (IDF). Construction of the IDF was undertaken based on a Performance Assessment (PA) performed in 2001. In 2016, a SSW data package was prepared to support the development of an updated PA (2017 IDF PA). There are many inputs required to support the IDF PA. Data needs were identified based on experience from the previous PAs and from the development of conceptual models and modeling approaches to be applied for the 2017 PA. Interactions with the IDF PA team and the inventory data package developer helped to focus detailed efforts on a few key waste streams, contaminants of concern, and disposal configurations that are expected to be the primary contributors to the dose resulting from SSW disposed at the IDF. The key waste streams include: High Efficiency Particulate Air (HEPA) filters, ion exchange resins, granular activated carbon, and Ag-mordenite. The key parameters addressed in the 2016 data package include: saturated hydraulic conductivity, moisture characteristic curves, effective diffusion coefficient, distribution coefficient and porosity. The IDF PA team also identified a set of key contaminants that are expected to be the primary concern for the PA calculations (Tc-99, I-129, Cs-137, Sr-90, uranium isotopes (and total uranium), chromium, mercury and nitrate). These contaminants were the focus of the SSW data package. Specific formulations had not been identified for cementitious materials that will be used to encapsulate or stabilize SSW, and no IDF-specific experiments had been conducted to obtain the data for the PA. Thus, for the 2016 SSW data package, recommended property values were provided for a range of representative candidate materials based on a review of existing literature. However, starting in FY17, IDF-specific experiments will be performed for Hanford SSW expected to contribute most significantly to the dose for the IDF. This paper will summarize the information obtained for the 2016 data package and the plans for further testing to refine key inputs for the IDF PA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating nuclear fuel development and qualification: Modeling and simulation integrated with separate-effects testing

In this work, an approach to transform and accelerate nuclear fuel development and qualification is outlined. The approach exploits advanced modeling and simulation at the outset to inform constituent and system selection and to enable integral fuel performance analyses. Analyses using these tools identify and prioritize the most important fuel performance parameters and phenomena for subsequent targeted characterization with separate-effects tests. Separate-effects testing spans out-of-pile and in-pile tests and is meant to iterate with and inform engineering-scale integral fuel performance analyses throughout the development process. Exercising this cycle in an agile fashion will increase confidence in the integral fuel performance predictions while reducing uncertainties. This process sets the stage for executing a much more limited set of well-defined integral irradiation tests designed to validate engineering-scale fuel performance codes and to confirm the performance and safety of the fuel system under prototypic conditions. This approach will reduce the time for development and qualification of a new fuel system, and it will also reduce associated costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Numerical discretization of completely integrable nonlinear Hamiltonian systems

Completely integrable nonlinear Hamiltonian systems offer attractive models for novel accelerator systems that are being developed to push the frontiers of high intensity and high power beam applications. However, all known numerical methods used to discretize and simulate these systems spoil the integrability property of the original, time-continuous, theoretically integrable system. Since the hallmark of integrability is the existence of sufficiently many functionally independent first integrals in involution, we investigated several methods’ performance in terms of invariant preservation over longer timescales. We conclude that, while novel structure preserving integrators would be ideal, symplectic methods under mild restrictions offer adequate invariant preservation. We especially highlight the very good performance of the Stormer-Verlet method at low accuracy and a modified Lobatto method at high accuracy for the Integrable Optics Test Accelerator (IOTA). However, we show that symplectic integrators are limited by numerically induced resonances, which make interpretation of some simulation results challenging. These limitations and workarounds are discussed.

43 PARTICLE ACCELERATORS↗

CIVET: Continuous Integration, Verification, Enhancement, and Testing

A Git server (GitHub, GitLab, BitBucket) sends event notifications to the Civet server. These are either a " Pull Request" or a "Push" notification. Civet then checks the database to determine what tests need to be run and marks them as ready to run. Civet clients, running on dedicated machines, query the server for available jobs that are ready to run. When a client gets a job it executes the scripts attached to the job and report back to the server the output and exit status. When the client updates the server, the server will also update the Git server with the result of the job, as well as updating the main web page.

Alger, Brian↗

In-cell Re-fabrication and Loss-of-coolant Accident (LOCA) Testing of High Burnup Commercial Spent Fuel

A high burnup commercial spent fuel segment was re-fabricated into a pressurized test train for fuel safety testing in the Irradiated Fuels and Examination Laboratory (IFEL) hot cell facility at Oak Ridge National Laboratory. Descriptions of the in-cell re-fabrication capabilities and assembly of the loss-of-coolant-accident (LOCA) test train are provided. An in-cell integral LOCA test was performed in the Severe Accident Test Station (SATS) by subjecting the fuel segment to a steam environment, internal pressure, temperatures up to 1200 ºC, and water quench.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Processing Package for Cyclic Integrated Reversible Bending Fatigue Testing

A data processing software package has been introduced. The package was developed using MATLAB with the aid of the Curve Fitting Toolbox. The package is made up of four modules: pre-processing, data processing for static testing, data processing for monitoring, and data processing for measurements. CIRFT data are structured with multiple levels of architecture involving group, specimen, session, and scan/block. The degree of complexity of the data structure depends on whether a test is static or cyclic.The test results are presented in figures, scatter plots, and tables. For static testing, the output in tables provides bending mechanical properties and characteristic points of moment–curvature relation: flexural rigidities in linear segments of loading and unloading stages, intersection points between characteristic segments of the curve, and equivalent stress and strain quantities. For cyclic testing, the table output lists control and fatigue life and responsive/dependent quantities including moment, curvature, flexural rigidity, flexural hysteresis, rigidity phase angle, and equivalent stresses and strains. In addition, derivatives such as half-gage length and sensor spacing correction are included. The output also provides standard deviations of the reported quantities when they are applicable or available. The data processing package can serve as a fundamental characterization tool in mechanical study of materials. The package is intended primarily for data processing for the CIRFT process and can also be used in applications for which similar testing requirements exist.

36 MATERIALS SCIENCE↗