DOE OSTI2017
New control rooms in Nuclear Power Plants using digital Distributed Control System (DCS) operated with software displays, are providing thousands of signals to the operating crew. When an event happens, the Flood of information provided to operators could obscure the initiator event increasing the operator response time, work load and complicating the selection of the actions to be performed. There are some initiatives that are trying to minimize the 'avalanche effect' as the alarm engineering filtering and prioritization or diagnostic displays. Likewise, new control rooms are lost the availability to know the plant status just with a quick glance to the panel indicators. Regarding Small Modular Reactors, where in some cases four operators should monitor and control twelve reactors, these problems are even more significant. The challenge is to find a solution, based on current digital systems, that supply information to operators in order to prevent events and take early actions to minimize or avoid any unexpected incident. In order to minimize human errors, Tecnatom has developed a specific set of displays, called 'High Performance Displays' (HPD) based on objectives, work environment limitation, and non-anticipated events. These displays are being design following the HFE standards: applying the NUREG-0711 elements to identify the information that they have to content and the NUREG-0700 to design the interface. The function of these displays is monitoring the plant situation in a way that the operators are able to recognize any potential event at a simple glance but controlling thousands of signals through pattern recognition, symmetries, regular polygons and colors. The objective of the HPD is to provide an integrated function minimizing the tunnel effect and reduce the workload during the diagnosis phase. Moreover, HPD enhance operators to take the right actions to anticipate the response to any event, even avoiding it, if possible This paper analyzes how HPD's have been design as well as presents the results of a preliminary validation of their capabilities. The preliminary validation is a reduce validation in a full scope simulator running two representative scenarios of abnormal and emergency operation. The analysis is focused on the first stage of the event, i.e. the detection phase, HPD's have been installed in a generic full scope simulator of a nuclear power plant, digital controlled. Both scenarios have been performed by two different operator crews. The first operator shift has worked with the conventional human machine interface, that is, displays similar to the ones currently installed in existing nuclear power plant with digital control. The second crew, reproduce the same scenarios but with HPD available. The studio collects preliminary data in order to compare results, draw lesson learned from the experience to improve HPD design, and find solutions in terms of reducing human errors, human workload, and increase the availability of the plant. (authors)
22 GENERAL STUDIES OF NUCLEAR REACTORS↗