Search NASA⌕ Search

SEARCH · Search NASA

Results for “Autonomous in space assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Behavior-based multi-robot collaboration for autonomous construction tasks

The Robot Construction Crew (RCC) is a heterogeneous multi-robot system for autonomous construction of a structure through assembly of Long components. The two robot team demonstrates component placement into an existing structure in a realistic environment. The task requires component acquisition, cooperative transport, and cooperative precision manipulation. A behavior-based architecture provides adaptability. The RCC approach minimizes computation, power, communication, and sensing for applicability to space-related construction efforts, but the techniques are applicable to terrestrial construction tasks.

autonomous construction↗

Control of free-flying space robot manipulator systems

Control techniques for self-contained, autonomous free-flying space robots are being tested and developed. Free-flying space robots are envisioned as a key element of any successful long term presence in space. These robots must be capable of performing the assembly, maintenance, and inspection, and repair tasks that currently require astronaut extra-vehicular activity (EVA). Use of robots will provide economic savings as well as improved astronaut safety by reducing and in many cases, eliminating the need for human EVA. The focus of the work is to develop and carry out a set of research projects using laboratory models of satellite robots. These devices use air-cushion-vehicle (ACV) technology to simulate in two dimensions the drag-free, zero-g conditions of space. Current work is divided into six major projects or research areas. Fixed-base cooperative manipulation work represents our initial entry into multiple arm cooperation and high-level control with a sophisticated user interface. The floating-base cooperative manipulation project strives to transfer some of the technologies developed in the fixed-base work onto a floating base. The global control and navigation experiment seeks to demonstrate simultaneous control of the robot manipulators and the robot base position so that tasks can be accomplished while the base is undergoing a controlled motion. The multiple-vehicle cooperation project's goal is to demonstrate multiple free-floating robots working in teams to carry out tasks too difficult or complex for a single robot to perform. The Location Enhancement Arm Push-off (LEAP) activity's goal is to provide a viable alternative to expendable gas thrusters for vehicle propulsion wherein the robot uses its manipulators to throw itself from place to place. Because the successful execution of the LEAP technique requires an accurate model of the robot and payload mass properties, it was deemed an attractive testbed for adaptive control technology.

Cannon, Robert H., Jr.↗

A Stigmergic Cooperative Multi-Robot Control Architecture

In nature, there are numerous examples of complex architectures constructed by relatively simple insects, such as termites and wasps, which cooperatively assemble their nests. A prototype cooperative multi-robot control architecture which may be suitable for the eventual construction of large space structures has been developed which emulates this biological model. Actions of each of the autonomous robotic construction agents are only indirectly coordinated, thus mimicking the distributed construction processes of various social insects. The robotic construction agents perform their primary duties stigmergically, i.e., without direct inter-agent communication and without a preprogrammed global blueprint of the final design. Communication and coordination between individual agents occurs indirectly through the sensed modifications that each agent makes to the structure. The global stigmergic building algorithm prototyped during the initial research assumes that the robotic builders only perceive the current state of the structure under construction. Simulation studies have established that an idealized form of the proposed architecture was indeed capable of producing representative large space structures with autonomous robots. This paper will explore the construction simulations in order to illustrate the multi-robot control architecture.

Howsman, Thomas G.↗

Telerobotic assembly of space station truss structure

Discussed are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRNS); (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, Grahme↗

In-Space Transportation for Geo Space Solar Satellites

Space solar power satellites have the potential to provide abundant quantities of electricity for use on Earth. One concept, the Sun Tower, can be assembled in geostationary orbit from pieces transferred from Earth. The cost of transportation from Earth is one of the major hurdles to space solar power. This study found that a two-stage rocket launch vehicle with autonomous solar-electric transfer can provide the transportation at prices close to the goal of $800/kg

Martin, James A.↗

Telerobotic assembly of space station truss structures

Discussed here are methods of assembling the space station's structure utilizing only telerobotic devices, i.e.: (1) an approximately anthropomorphic telerobot with two dextrous arms; (2) the Shuttle Remote Manipulator System (SRMS); and (3) various material handling machines. Timelines and task recommendations for autonomous operations are also included. Also described are some experimental results comparing two manipulator control devices.

Fischer, G.↗

Behavior-Based Multi-Robot Collaboration for Autonomous Construction Tasks

We present a heterogeneous multi-robot system for autonomous construction of a structure through assembly of long components. Placement of a component within an existing structure in a realistic environment is demonstrated on a two-robot team. The task requires component acquisition, cooperative transport, and cooperative precision manipulation. Far adaptability, the system is designed as a behavior-based architecture. Far applicability to space-related construction efforts, computation, power, communication, and sensing are minimized, though the techniques developed are also applicable to terrestrial construction tasks.

autonomous construction↗

Multi-100kW: Planar low cost solar array development

Seven low cost multi-100 kW planar solar array modules were fabricated and tested. Two different designs were used, demonstrating advanced solar array construction practices. Both module types utilized second generation gridded back cells featuring high efficiency and IR transparency. A silicon dioxide AR coating optimized for transmission at gamma = 1.7 microns was applied to the back surface. Two interconnect types, a single sheet printed circuit and a roll type, with alternate approaches to increasing transparency and reducing cost were designed and fabricated. Hinge stress and electrical power optimization were also examined. Two point designs were studied. The first design used a coilage longeron mast and is autonomously deployable. The second design used a Stac Beam for high natural frequency response and required astronaut assistance and assembly on orbit. It was conclusively demonstrated that planar arrays are the most cost effective design for use on the space station or other high power applications.

Source record↗

Robotic technologies of the Flight Telerobotic Servicer (FTS) including fault tolerance

The original FTS concept for Space Station Freedom (SSF) was to provide telerobotic assistance to enhance crew activity and safety and to reduce crew EVA (Extra Vehicular Activity) activity. The first flight of the FTS manipulator systems would demonstrate several candidate tasks and would verify manipulator performance parameters. These first flight tasks included unlocking a SSF Truss Joint, mating/demating a fluid coupling, contact following of a contour board, demonstrating peg-in-hole assembly, and grasping and moving a mass. Future tasks foreseen for the FTS system included ORU (Orbit Replaceable Unit) change-out, Hubble Space Telescope Servicing, Gamma Ray Observatory refueling, and several in-situ SSF servicing and maintenance tasks. Operation of the FTS was planned to evolve from teleoperation to fully autonomous execution of many tasks. This wide range of mission tasks combined with the desire to evolve toward fully autonomy forced several requirements which may seen extremely demanding to the telerobotics community. The FTS requirements appear to have been created to accommodate the open-ended evolution plan such that operational evolution would not be impeded by function limitations. A recommendation arising from the FTS program to remedy the possible impacts from such ambitious requirements is to analyze candidate robotic tasks. Based on these task analyses, operational impacts against development impacts were weighed prior to requirements definition. Many of the FTS requirements discussed in the following sections greatly influenced the development cost and schedule of the FTS manipulator. The FTS manipulator has been assembled at Martin Marietta and is currently in testing. Successful component tests indicate a manipulator which achieves unprecedented performance specifications.

Chladek, John T.↗

Computer vision for real-time orbital operations. Center directors discretionary fund

Machine vision research is examined as it relates to the NASA Space Station program and its associated Orbital Maneuvering Vehicle (OMV). Initial operation of OMV for orbital assembly, docking, and servicing are manually controlled from the ground by means of an on board TV camera. These orbital operations may be accomplished autonomously by machine vision techniques which use the TV camera as a sensing device. Classical machine vision techniques are described. An alternate method is developed and described which employs a syntactic pattern recognition scheme. It has the potential for substantial reduction of computing and data storage requirements in comparison to the Two-Dimensional Fast Fourier Transform (2D FFT) image analysis. The method embodies powerful heuristic pattern recognition capability by identifying image shapes such as elongation, symmetry, number of appendages, and the relative length of appendages.

Vinz, F. L.↗

Modeling Deformable Linear Objects for Autonomous Robotic Outfitting of Lunar Surface Systems

This paper presents structural models of deformable linear objects (DLOs). DLOs are a subclass of deformable objects that encompasses common outfitting elements such as cables and ropes. Models are validated through hardware experiments, and integration in a robotic autonomy architecture for space environments is discussed. A persistent human presence on the lunar surface is one of the next major milestones in space exploration. This requires the development of robust extraplanetary construction technologies including structures and materials modeling and robotic systems. Previous robotic construction technology development has primarily focused on structural assembly, with significantly less focus on robotically performed outfitting tasks to instantiate subsystems providing power, data, life support, etc. These tasks involve manipulation of highly flexible elements, which are difficult to model, such as cable harnesses, ropes, and hoses. Robotic manipulation of DLOs, especially cable harnesses, is an active area of research as cable harnesses are essential for providing power and data to space assets. DLO models that can be used for robot manipulator trajectory generation are necessary for autonomous operation of lunar infrastructure. There are many proposed methods for modeling DLOs, and they primarily fall into three types: 1) discrete model-based, 2) continuum model-based, and 3) Neural Network-based. These types each have pros and cons, and the tradeoff between model accuracy and computational speed informs which type should be used. An understanding of this trade-off is imperative for real-time control of autonomous systems. High computational requirements reduce the speed of the model, making real-time control difficult, while accuracy is critical to preventing collisions. Discrete models, such as a mass-spring multibody representation, require relatively few calculations, and accuracy is directly tied to the step size of the discretization. Continuum models, such as a B-spline representation or a Cosserat rod model (a mix of continuous and discrete), are more informed of the structural properties of the cable and are much more accurate than a rigid body mass-spring model, but at significant computational cost. A Neural Network approach can provide an online solution with very few computational steps, but properly generating training data can be difficult and validation for an in-space application is not trivial. This paper explores the trade-off between different modeling approaches and compares accuracy and computational speed/complexity of the three types mentioned above. Model accuracy is evaluated using a cable in a static configuration. True cable shape is obtained using a depth camera for RGB images and point-cloud segmentation. The purpose of this experiment is to evaluate the trade-offs of different approaches to the DLO modeling problem. Understanding the tradeoffs between different cable modeling techniques paves the way for developing robotic control and planning architectures necessary for real-time manipulation of DLOs for lunar infrastructure outfitting. Real-time control is required for robotic systems to be able to actively manipulate a cable in a harsh environment where model and sensor errors compound, and environmental conditions can cause significant disturbances. Cable routing must be performed in areas with high density of objects/obstacles: through truss structures, near solar panels or mirror arrays, next to bundles of electrical equipment. Understanding the best way to plan and manipulate a cable without disrupting the environment or damaging the cable is imperative to robotic outfitting operations on the lunar surface.

Amy M Quartaro↗

Lunar construction utility vehicle

The lunar construction utility vehicle (LCUV) is an all-purpose construction vehicle which will aid in the robotic assembly of a lunar outpost. The LCUV will have the following capabilities: (1) must be self supporting including repairs; (2) must offload itself from a lunar lander; (3) must be telerobotic and semi-autonomous; (4) must be able to transport one space station common module; (5) must allow for man-rated operation; and (6) must be able to move lunar regolith for site preparation. This study recommends the use of an elastic tracked vehicle. Detailed material analyses of most of the LCUV components were accomplished. The body frame, made of pinned truss elements, was stress analyzed using NASTRAN. A track connection system was developed; however, kinematic and stress analyses are still required. This design recommends the use of hydrogen-oxygen fuel cells for power. Thermal control has proven to be a problem which may be the most challenging technically. A tentative solution has been proposed which utilizes an onboard and towable radiator. Detailed study of the heat dissipation requirements is needed to finalize radiator sizing. Preliminary work on a man-rated cabin has begun; however, this is not required during the first mission phase of the LCUV. Finally, still in the conceptual phases, are the communication, navigation and mechanical arm systems.

Source record↗

Site Selection and Deployment Scenarios for Servicing of Deep-Space Observatories

The deep-space environment and relative transportation accessibility of the Weak Stability Boundary (WSB) region connecting the Earth-Moon and Sun-Earth libration points makes the Sun-Earth L2 an attractive operating location for future observatories. A summary is presented of key characteristics of future observatories designed to operate in this region. The ability to service observatories that operate within the region around the Lagrange points may greatly enhance their reliability, lifetime, and scientific return. The range of servicing missions might begin with initial deployment, assembly, test, and checkout. Post-assembly servicing missions might also include maintenance and repair, critical fluids resupply, and instrument upgrades. We define the range of servicing missions that can be performed with extravehicular activity, with teleoperated robots, and with autonomous robots. We then describe deployment scenarios that affect payload design. A trade study is summarized of the benefits and risks of alternative servicing sites, including at the International Space Station, at other low-Earth-orbit locations, at the Earth-Moon L1 location, and on-site at the Sun-Earth L2 location. Required technology trades and development issues for observatory servicing at each site, and with each level of autonomy, are summarized.

Willenberg, Harvey J.↗

The flight telerobotic servicer and technology transfer

The Flight Telerobotic Servicer (FTS) project at the Goddard Space Flight Center is developing an advanced telerobotic system to assist in and reduce crew extravehicular activity (EVA) for Space Station Freedom (SSF). The FTS will provide a telerobotic capability in the early phases of the SSF program and will be employed for assembly, maintenance, and inspection applications. The current state of space technology and the general nature of the FTS tasks dictate that the FTS be designed with sophisticated teleoperational capabilities for its internal primary operating mode. However, technologies such as advanced computer vision and autonomous planning techniques would greatly enhance the FTS capabilities to perform autonomously in less structured work environments. Another objective of the FTS program is to accelerate technology transfer from research to U.S. industry.

Andary, James F.↗

Robotic Assembly of Truss Structures for Space Systems and Future Research Plans

Many initiatives under study by both the space science and earth science communities require large space systems, i.e. with apertures greater than 15 m or dimensions greater than 20 m. This paper reviews the effort in NASA Langley Research Center's Automated Structural Assembly Laboratory which laid the foundations for robotic construction of these systems. In the Automated Structural Assembly Laboratory reliable autonomous assembly and disassembly of an 8 meter planar structure composed of 102 truss elements covered by 12 panels was demonstrated. The paper reviews the hardware and software design philosophy which led to reliable operation during weeks of near continuous testing. Special attention is given to highlight the features enhancing assembly reliability.

Doggett, William↗

Using multiple sensors for printed circuit board insertion

As more and more activities are performed in space, there will be a greater demand placed on the information handling capacity of people who are to direct and accomplish these tasks. A promising alternative to full-time human involvement is the use of semi-autonomous, intelligent robot systems. To automate tasks such as assembly, disassembly, repair and maintenance, the issues presented by environmental uncertainties need to be addressed. These uncertainties are introduced by variations in the computed position of the robot at different locations in its work envelope, variations in part positioning, and tolerances of part dimensions. As a result, the robot system may not be able to accomplish the desired task without the help of sensor feedback. Measurements on the environment allow real time corrections to be made to the process. A design and implementation of an intelligent robot system which inserts printed circuit boards into a card cage are presented. Intelligent behavior is accomplished by coupling the task execution sequence with information derived from three different sensors: an overhead three-dimensional vision system, a fingertip infrared sensor, and a six degree of freedom wrist-mounted force/torque sensor.

Sood, Deepak↗

Design and implementation of a compliant robot with force feedback and strategy planning software

Force-feedback robotics techniques are being developed for automated precision assembly and servicing of NASA space flight equipment. Design and implementation of a prototype robot which provides compliance and monitors forces is in progress. Computer software to specify assembly steps and makes force feedback adjustments during assembly are coded and tested for three generically different precision mating problems. A model program demonstrates that a suitably autonomous robot can plan its own strategy.

Premack, T.↗

Tall Lunar Towers: Systems Analysis of a Lunar-Surface-Assembled Power, Communication, and Navigation Infrastructure

The National Aeronautics and Space Administration (NASA) intends to develop and maintain a human-lunar presence, requiring infrastructure on the Lunar South Pole. To keep pace with the continued growth in cislunar activity, there is national interest in developing a global lunar infrastructure network for power and Communication, Position, Navigation, and Timing (CPNT). Demonstrating autonomous construction capabilities is an infrastructure-enabling objective. This study explores several architecture trade studies to assess the feasibility of alternative lunar infrastructure concepts. 50 m towers, for instance, enable solar power generation up to 99% of a lunar year in addition to acting as wide-range communication and navigation surface relays. The infrastructure network considered in this study consisted of tower platforms, utilities hosted on the towers, and both crewed and robotic end users. High-level trades were analyzed, such as tower height, location, and distributed vs centralized power grids. Results indicated that even with minimal permanent surface assets (darkness survival power loads on the order of 5 kW or greater), at any of the five locations considered, taller towers resulted in lower infrastructure mass than shorter towers; up to 24% system mass savings were realized by reducing battery mass. Simultaneously, taller towers increased the range of communication coverage; a 50 m tower on the Connecting Ridge had 5 kg more structure and 76% more line-of-sight coverage to a two-meter-tall end user than a 10 m tower with the same location and user height. Leveraging a grid of tall towers for nominal power and communication would not only save up to 2,800 kg in battery mass but would be more maintainable and allow users to take advantage of generational upgrades.

lunar infrastructure↗