Numerical and Experimental Investigations on the Ignition Behavior of OME

On the path towards climate-neutral future mobility, the usage of synthetic fuels derived from renewable power sources, so-called e-fuels, will be necessary. Oxygenated e-fuels, which contain oxygen in their chemical structure, not only have the potential to realize a climate-neutral powertrain, but also to burn more cleanly in terms of soot formation. Polyoxymethylene dimethyl ethers (PODE or OMEs) are a frequently discussed representative of such combustibles. However, to operate compression ignition engines with these fuels achieving maximum efficiency and minimum emissions, the physical-chemical behavior of OMEs needs to be understood and quantified. Especially the detailed characterization of physical and chemical properties of the spray is of utmost importance for the optimization of the injection and the mixture formation process. The presented work aimed to develop a comprehensive CFD model to specify the differences between OMEs and dodecane, which served as a reference diesel-like fuel, with regards to spray atomization, mixing and auto-ignition for single- and multi-injection patterns. The simulation results were validated against experimental data from a high-temperature and high-pressure combustion vessel. The sprays’ liquid and vapor phase penetration were measured with Mie-scattering and schlieren-imaging as well as diffuse back illumination and Rayleigh-scattering for both fuels. To characterize the ignition process and the flame propagation, measurements of the OH* chemiluminescence of the flame were carried out. Significant differences in the ignition behavior between OMEs and dodecane could be identified in both experiments and CFD simulations. Liquid penetration as well as flame lift-off length are shown to be consistently longer for OMEs. Zones of high reaction activity differ substantially for the two fuels: Along the spray center axis for OMEs and at the shear boundary layers of fuel and ambient air for dodecane. Additionally, the transient behavior of high temperature reactions for OME is predicted to be much faster.

33 ADVANCED PROPULSION SYSTEMS↗

West Virginia University Industrial Assessment Center (Final Progress Report)

The Industrial Assessment Center at West Virginia University has been successful in workforce development, and in generation of energy savings for manufacturing facilities during the period 2016 to 2021. Graduate and undergraduate students have benefited from energy assessment experience and most of them have found good positions as energy engineers and analysts in the industrial sector. Several peer reviewed research papers in archival journals as well as conference papers on the topic of energy engineering and assessment have been published. The implemented energy savings for manufacturing facilities have been significant in the areas of lighting, compressed air, process heating, steam, HVAC, chillers and cooling towers, and motors. In addition, water use reduction, smart manufacturing applications to save energy, cyber security evaluation, energy management, productivity improvements and waste reduction opportunities that lead to energy intensity reductions have been explored. The students have obtained an opportunity to interact with energy efficiency and productivity improvement professionals at various conferences and workshops and their research has generated important results. In summary, the West Virginia University Industrial Assessment Center (WVU-IAC) has fulfilled its mission in regard to workforce development, energy efficiency for manufacturing facilities, and laid a strong platform enhancing sustainability through reductions in carbon emissions achieved through energy efficiency and energy management initiatives and reductions in water usage and waste reduction. During the project period (2016-2021) the WVU-IAC has made numerous energy efficiency, water use reduction, waste reduction, and productivity improvement recommendations, a significant number of them having been implemented by the manufacturing facilities. The research adds significant understanding to the area of energy efficiency, water and waste reduction, and productivity improvement. The technical effectiveness and economic feasibility of the methods and techniques investigated and demonstrated through this project have been exemplary, resulting in significant recommended and implemented resource savings and reductions in carbon emissions. The project has been of significant benefit to the public owing to replication of results within the industrial sector, thus reducing operating costs for businesses that result in increase of growth and employment, as well as community benefits in terms of reductions in carbon emissions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

CFD modeling of near-wall combustion and unburned methane prediction in natural gas spark ignition engines

Natural gas-powered engines play a critical role in gas drilling, compression, and transmission sectors, but methane (CH 4 ) from engine combustion slip can be significant over their lifespan, contributing to atmospheric pollution and signaling reduced engine efficiency. Here, to address this challenge, computational fluid dynamics (CFD) simulations offer valuable insights into the in-cylinder combustion process, enabling the optimization of combustion strategies and engine designs to minimize unburned CH 4 slip. This study aims to evaluate and improve combustion models for simulating the combustion process and predicting unburned CH 4 concentrations in natural gas spark-ignition (SI) engines, including engines that are part of combined reformer-engine systems. Specifically, the performance of two flamelet-based combustion models—the Extended Coherent Flame Model (ECFM) and the G-equation model—was assessed using experimental engine data collected under varying excess-air ratio (λ) conditions and fuel compositions, including natural gas and syngas blends. In addition, to enhance the predictive capabilities of the G-equation model, a flame-wall interaction (FWI) sub-model was integrated into its framework. The effects of its model parameters, such as quenching and influence distance, on combustion behavior and unburned methane predictions were analyzed in detail. The ECFM tended to predict delayed combustion phasing under diluted mixture conditions, resulting in overprediction of unburned CH 4 concentrations. In contrast, the G-equation model provided reasonable predictions of combustion pressure, while representing higher the CH 4 reduction rate across the operating condition compared to experimental data. Incorporating the FWI sub-model—with the quenching distance calculated based on a pressure-dependent relation (P -0.48 ) and a fixed influence distance of 1.5 mm—further improved the G-equation model’s accuracy in predicting CH 4 reduction rates without compromising its ability to simulate the combustion process.

Combustion model↗

Review of liquid desiccant air dehumidification systems coupled with heat pump: System configurations, component design, and performance

Vapor Compression Systems (VCS) are the most common air conditioning technology. VCS cool the air to its dew point temperature (overcooling) to remove water vapor in the air through condensation and then reheats the air back to the comfort temperature for direct use. The VCS process is inefficient due to overcooling and reheating. Liquid Desiccant Dehumidification (LDD) is a potentially energy-efficient air conditioning. LDD removes water vapor in the process air using liquid desiccant’s high-water affinity. It hybrids with sensible cooling to control temperature and humidity separately. The LD in the LDD becomes weak after dehumidification. The LDD needs additional heating to regenerate the weak Liquid Desiccant (LD) to a high concentration for dehumidification. Earlier versions of the LDD systems use highly concentrated liquid desiccant (large water removal capability) to dehumidify the air by only dealing with latent load. It leads to highly elevated temperatures above 60 °C of heat sources (combustion or electric resistance-based heating) for regeneration. The energy needed for the elevated temperature heat resource significantly reduces or demolishes the benefit of LDD systems. In the recent two decades, researchers have investigated a new configured LDD system that couples an LDD with a heat pump at both dehumidification and regeneration sides for better efficiency. The heat pump provides cooling (from the evaporator) for both dehumidification and sensible cooling and simultaneous heating from the condenser for regeneration. The highly integrated system (HP-LDD) with improved efficiency enables the LDD to operate at lower concentrations and temperatures in dehumidification and regeneration. This paper depicts the working principle behind HP-LDD and its heating and cooling requirements. It reviews the comparison between the HP-LDD systems and the conventional LDD systems regarding system configurations, component design, energy efficiency, and dehumidification performance characteristics. The main findings from the review include the preferred use of packed bed over membrane-based dehumidifiers, the use of internally cooled dehumidifiers enabled by the HP cooling capacity, the high dispersion of HP operation conditions, and the dependence of dehumidification performance on various dehumidifiers. Finally, an outlook for future research on HP-LDD strategies is presented based on the reviewed works and their limitations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cryogenic Carbon Capture™ (CCC) Status Report

The Cryogenic Carbon Capture™ (CCC) process separates CO2 from light gases in essentially any continuous process. CCC cools the gases to the frost or desublimation point of CO2 (-100 to -135 °C), separates and pressurizes the solids, and warms all streams to produce a CO2-depleted stream at ambient pressure and a pure (99+%) pressurized liquid CO2 stream typically to about 150 bar, both at ambient temperature. The process also recovers all gas moisture and most gas impurities less volatile than CO2 (NOx, SOx, Hg, PM, UHC, CCC, etc.) in separable streams. CCC nearly eliminates refrigeration energy for sensible temperature changes through heat integration. CCC does require energy to change the CO2 phase from a mixed vapor to a pressurized fluid, which represents the minimum energy required of any process for this separation. CCC uses additional energy for turbomachinery inefficiencies, heat losses, moisture removal and overall process pressure drop. Aside from these real-world energy demands, CCC operates near the minimum energy required to perform this gas separation by minimizing stream recycling. CCC compresses CO2 as a liquid, which is one of several reasons it costs about about half as much and consumes about half as much energy as an amine process when using flue gases with about 15% CO2. The process also has several major additional advantages, including (a) it is a bolt-on retrofit technology that does not need steam or any modification of existing equipment, (b) it recovers water and nearly all pollutants in addition to CO2 from the flue gas, (c) it enables highly efficient and cost effective energy storage at grid scale and on time scales of minutes, (d) it enables NG storage if the energy storage option is used, and (d) it has a small footprint and is minimally disruptive to existing plants, requiring only electrical power and a gas source to operate. Sustainable Energy Solutions (SES) has scaled this technology through several levels, the largest of which captures nominally 1 tonne of CO2/day and is called the skid system. Skid system field tests include utility-scale power plants, cement plants, heating plants, and other utility or industrial sites that burn natural gas, biomass, coal, shredded tires, municipal waste, and combinations of these fuels. These field tests produced 95-99% CO2 capture with CO2 purities of 99+% and initial CO2 contents that range from 4 to 28%. SES currently seeks to scale the system to merchant scale (10-80 tonnes of CO2 per day). In the process of doing so, SES has demonstrated the potential for CCC to contribute to energy storage and direct air capture in innovative and cost-effective ways. This presentation discusses the overall process and highlights results from field and in-house tests. These include (a) measured CO2 capture rates and operating conditions from in-house and field tests, and (b) predicted utility-scale costs and energy demands. This discussion also includes the application of the CCC technology to energy storage and direct air capture.

20 FOSSIL-FUELED POWER PLANTS↗

Scaleup and Site-Specific Engineering Design for Global Thermostat Direct Air Capture Technology

The overall goal of the project is completion of an initial design of a commercial-scale, Carbon Capture, Utilization, and Storage Direct Air Capture (CCUS-DAC) plant design at three different sites that captures a net of at least 100,000 tonnes per year (TPY) carbon dioxide (CO 2 ) from the atmosphere and considers compression and conditioning of the captured CO 2 for purpose of pipeline transportation to different geological formation sites for deep well injection and underground storage. In addition to the leading system consisting of a scaled-up Global Thermostat DAC unit, overall plant design includes a combined Heat and Power (CHP) unit integrated with a conventional liquid amine-based carbon capture system (90% capture) and compression facilities. These are considered balance of plant (BOP) systems and are required to provide low carbon-intensity steam and power to the DAC process. A second approach involving provision of DAC units modified to directly capture emissions from the CHP unit was initially assessed as an alternative and it was determined to be less mature than considered approach and not included in the scaled-up plant design efforts. Three geographically diverse continental United States locations were selected to better understand the effect of local/regional ambient conditions on scaled-up DAC system performance and project costs: Bucks, Alabama (hot wet climate), Odessa, Texas (dry hot climate), and Goose Creek, Illinois (mid continental climate). The team focused on initial engineering design activities, including the development of project design criteria, initiation of site-specific studies and investigations, completion of DAC system process and equipment design, and definition of balance of plant (BOP) engineering. The purpose of the activities were to develop Technoeconomic Analysis (TEA), Life-Cycle Analysis (LCA), and Environmental, Health, and Safety (EH&S) analysis, and Business Case Analysis (BCA) to validate that the project engineering and scale-up plans of the DAC systems, at each of the three distinct case studies considered, are technically, economically, and environmentally feasible for commercial-scale operation.

20 FOSSIL-FUELED POWER PLANTS↗

Numerical Investigation of High Delta T Sensible Storage Integrated CO2 Heat Pump: Preprint

To assist building heating electrification, this paper numerically investigates a load flexible heat pump system for commercial buildings. The system consists of a CO2 vapor compression cycle, a sensible thermal storage tank, and an air handling unit. The thermal storage medium is inexpensive, non-toxic and stable anti-freeze solution (30% potassium acetate). The air handing unit has an indoor coil and a ventilation coil. The system can be used to manage building electric load. During peak hours, the heat pump is off and the hot solution water is discharged from the tank to heat up the indoor air and ventilation air. During the hour of charge, the heat pump delivers hot solution water to the tank and to the air. The tank can also stand by while the heat pump provides space heating directly. We selected a medium sized office building located in Minnesota as the representative building and used EnergyPlus to obtain its 24 hour load data. We designed three storage tank volumes assuming 50 degrees C, 65 degrees C and 80 degrees C tank temperatures to independently provide the building load for 4 hours in the morning. The higher the tank temperature, the smaller the required volume, and thus higher energy density. The effective energy density is 78 with an 80 degrees C tank, and 40 kWhth/m3 with 50 degrees C. We simulated the tank integrated heat pump performance subjected to the 24-hour building load profile and ambient data. The baseline is the same system without storage tank. There was a trade-off between the storage energy density and the charging COP. The charge hour COP was 2.77 to charge the tank to 80 degrees C, and 3.01 to 50 degrees C. The proposed system could shift building load from the peak hours (8:00 - 12:00) to off-business hour (23:00 - 7:00+1). It eliminated 100% compressor electricity use during the peak hours, and avoided a peak electric power of 34 kW. The 65 degrees C tank saved 9.5 kWhe (4%) considering all day operation, which was the best balance between energy density and the system operation efficiency among the three options.

CO2 heat pump↗

Development of Ti 3 SiC 2 MAX phase tubular structures for solar receiver applications

Solar receiver tubes are key components of concentrating solar-thermal power (CSP) systems that harvest solar energy. For better efficiency, the Gen3 CSP receivers, which collect heat into a heat transfer fluid, require a temperature exceeding 700 °C during operation and need to perform under extreme conditions of high temperature and high thermal stress. Operators are seeking CSP designs using new high-temperature structural materials with high thermal conductivity and high creep resistance to achieve a design life of 30 years and thus help recover the plant capital cost sooner. MAX phase materials, which consist of an early transition metal element, an A-group element, and carbon or nitrogen, are expected to exhibit high creep resistance as well as high fracture toughness. Here, in this paper, we describe fabricating both (1) dense Ti 3 SiC 2 MAX phase disks and (2) short-length tubes using field-assisted sintering technology (FAST). First, the disk samples that we fabricated are fully dense and contain ≈90 % Ti 3 SiC 2 MAX phase materials and ≈10 % TiC phase materials. We determined a flexure strength of 519 ± 32 MPa by conducting a four-point bending test at room temperature with rectangular bar samples of ≈100 % density. The thermal conductivity of the Ti 3 SiC 2 MAX phase samples, measured by light flashing analysis, decreases linearly from a value of 41 W . m -1 . K -1 at room temperature to a value of 36 W . m -1 . K -1 at 650 °C. A solar reflectance measurement of the Ti 3 SiC 2 MAX phase revealed that, temperature increases from 400 to 1400 °C, thermal emittance increases from 0.39 to 0.49, while selectivity decreases from 1.8 to 1.4, respectively. Whereas the surface oxidized MAX phase samples after 100 h exposure to air at 1000 °C exhibit that of SiC. Next, we discuss fabrication of the crack-free Ti 3 SiC 2 MAX phase tubular structures accomplished by using FAST processing in graphite bedding. A Ti 3 SiC 2 MAX phase content of > 95 % with traceable ≈3% remaining TiC phase and ≈15 % porosity were demonstrated after high-temperature annealing. An average fracture strength of ≈250 MPa was determined with Ti 3 SiC 2 MAX phase tubes of ≈85 % density by diametral compression testing at room temperature. Our work demonstrated that using FAST processing to produce Ti 3 SiC 2 MAX phase tubular structures for CSP receiver applications is a viable approach.

14 SOLAR ENERGY↗

Cryogenic Carbon Capture™ Technoeconomic Analysis

The Cryogenic Carbon Capture™ (CCC) process significantly decreases cost and energy demands for CO 2 separation and pressurization to 150 bar compared to alternatives. The process is a post-combustion technology that cools CO 2 -laden flue gas to desublimation temperatures (-100 to -135 °C), separates solid CO 2 —that forms from the flue gas—from the light gases, uses the cold products to cool incoming gases in a recuperative heat exchanger, compresses the solid/liquid CO 2 to final pressures (100–200 bar), and delivers a compressed CO 2 stream separated from an atmospheric pressure light-gas stream. The overall energy and economic costs are about 30-50% lower than most competing processes that involve air separation units (ASUs), solvents, or similar technologies. In addition, the CCC process enjoys several ancillary benefits, including (a) it is a minimally invasive Bolton technology, (b) it provides highly efficient removal of most pollutants (Hg, SOx, NO 2 , HCl, etc.), and (c) possible energy storage capacity. This report outlines the process details and economic and energy comparisons relative to other well-documented alternatives. This paper presents the results of a detailed techno-economic comparison of CCC with amine-based systems. The comparison uses identical financial and economic assumptions similar process assumptions as the detailed analyses published by US DOE in the greenfield analysis. Specifically, the comparison assumes power plants that produce the same net output, one equipped with and a second without carbon capture. Separately, the paper compares similar analyses for retrofitting existing systems using typical plant characteristics in the US (initial capital costs have been paid, high plant utilization), though there are no DOE estimates available for direct comparison. Financial and technical assumptions for all comparisons are maintained as close to the DOE reference studies as possible. The results demonstrate about 30-50% lower costs and energy demands for capture from greenfield coal plants. Natural gas plants produce substantially lower CO 2 concentrations which makes the cost of capturing a ton of CO 2 at the same capture rate as the coal plant higher for all processes while the cost of CO 2 capture per unit of power generation is lower. However, CCC maintains about the same absolute energy and cost advantages for NG as for coal compared to amine systems. Finally, the costs of retrofitting a station are compared to those of building a new station with and without capture. The retrofit costs are comparable to (slightly lower than) new plant costs without capture. In all cases operating and capital cost comparisons show that the CCC process can be retrofitted to a variety of plants to cost effectively reduce CO 2 emissions. Further process integration into the upstream processes and unique process features like water recovery, and integrated energy storage bring the effective cost of carbon capture using the CCC process down further and increase its advantages over alternatives. This technoeconomic analysis shows that the CCC process has the potential to the be lowest cost carbon capture technology under development today.

20 FOSSIL-FUELED POWER PLANTS↗

AN EXPERIMENTAL STUDY OF FUEL SELECTION FOR A GASOLINE MULTI-MODE

In this study of fuels of different reactivities and their performance in a low-temperature combustion (LTC) engine. The engine was a 2.2L CRDI engine code D4HB provided by industry partner Hyundai America Technical Center inc. (HATCI). The engine was instrumented with in-cylinder pressure sensors allowing for monitoring of the combustion process. First, the engine was operated with standard US pump grade gasoline, Research Octane number (RON) 91 E10, to find initial operation conditions as well as control points of stable operation for daily checks on system conditions. Tested were 8 different fuel blends, the four base blends were provided by Phillips 66 (P66) with a RON value ranging from 60 to 91, and three other variations of these fuels were formulated by splash blending alcohols, iso-butanol, and ethanol, with the RON60 fuel and the final blend, was US RON91 E10 pump gasoline. Using these 8 fuels, the low load performance was analyzed allowing a selection of one of the fuels to be made to proceed with experimentation. To study the low load performance of each fuel, the load was decreased until combustion became too unstable to continue. This was done at 1500 rpm with all of the fuels. At 1200 rpm, the same methodology was applied, though all of the fuels were not tested, only the fuels which showed promise at 1500 rpm. Meaning that the lowest targeted load was achieved without any aid to the combustion process other than advancing combustion, increasing intake air temperature (IAT) for example was not done to maintain consistency across all fuels. The same methodology was applied at 800 rpm based upon the 1200 rpm results to see the ability of the engine to idle with the given fuel. It was found that fuel with a RON of 80 showed good low load performance while allowing for high load performance to be maintained. A blend of 25% Iso-Butanol and 75% RON 60 equated to a RON of 80 and showed good low load performance and showed peak indicated thermal efficiency (ITE) numbers of 46% at 17 bar indicated mean effective pressure (IMEP) and 2200 rpm.

02 PETROLEUM↗

Chemical timescale effects on detonation convergence

Numerical simulations of detonation-containing flows have emerged as crucial tools for designing next- generation power and propulsion devices. As these tools mature, it is important for the combustion community to properly understand and isolate grid resolution effects when simulating detonations. To this end, the objective of this work is to provide a comprehensive analysis of the numerical convergence of unsteady detonation simulations, with focus on isolating the impacts of chemical timescale modifications on convergence characteristics in the context of operator splitting. With the aid of an AMReX-based adaptive mesh refinement flow solver-which enables resolutions up to ($\mathcal{O}$ (1000) cells-per-induction length-the convergence analysis is conducted using two kinetics configurations: (1) the simplified three-step Arrhenius-based model mechanism of Short and Quirk (1997), where chemical timescales in the detonation are modified by adjusting activation energies in the initiation and branching reactions, and (2) a detailed hydrogen- air mechanism, where the chemical timescales are adjusted by varying the ambient pressure. The convergence of unsteady self-sustained detonations in one-dimensional channels is then analyzed with reference to steady-state theoretical baseline solutions using these mechanisms. The goal of the analysis is to provide a detailed comparison of the effects of grid resolution on both macroscopic (peak pressures and wave speeds) and microscopic (wave structure) quantities of interest, drawing connections between the deviations from steady-state baselines and minimum chemical timescales. In particular, chemical timescale reductions were found to have minimal impact on the convergence of macroscopic properties. Furthermore, analyses of microscopic convergence trends, particularly in the reaction front location, revealed a key insight: maintaining the induction time while eliminating prohibitive chemical timescales through mechanism simplifications and combustion modeling can significantly enhance detonation convergence properties. Ultimately, this work uncovers resolution-dependent unsteady detonation convergence regimes and highlights the important role played by not only the chemical timescales, but also the ratio between the chemical timescale and induction time on the numerical convergence of the detonation wave structure.

Adaptive mesh refinement↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗