Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electric power reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Component Modeling, Co-Optimization, and Trade-Space Evaluation (FY2021 Annual Progress Report)

This project is intended to support the development of new traction drive systems that meet the targets of 100 kW/L for power electronics and 50 kW/L for electric machines with reliable operation to 300,000 miles. To meet these goals, new designs must be identified that make use of state-of-the-art and next-generation electronic materials and design methods. Designs must exploit synergies between components, for example converters designed for high-frequency switching using wide band gap devices and ceramic capacitors. This project includes: (1) a survey of available technologies; (2) the development of design tools that consider the converter volume and performance; (3) exercising the design software to evaluate performance gaps and predict the impact of certain technologies and design approaches, i.e. GaN semiconductors, ceramic capacitors, and select topologies; and (4) building and testing hardware prototypes to validate models and concepts. Early instantiations of the design tools enable co-optimization of the power module and passive elements and provide some design guidance; later instantiations will enable the co-optimization of inverter and machine. Prototype testing begins with evaluation of simpler conversion topologies (i.e. the half-bridge boost converter) and progresses with fabrication of prototype inverter drives.

33 ADVANCED PROPULSION SYSTEMS↗

Evaluating the Impact of Managed EV Charging for Reliable Operation of Bulk Power Systems with High Non-Dispatchable Generation

The growth of electric vehicles (EVs) and variable-generation (VG) sources introduces new challenges for power-system operations. This study introduces a modeling framework and evaluates five EV charging strategies under projected 2040 grid conditions in the Evergy service territory with high non-dispatchable generation. Using realistic EV behavior and generation models, their impacts on system peak demand, ramp rate, and reserve capacity are evaluated. Results show that only the peak-avoidance strategy effectively reduces system peak demand, while decentralized strategies-particularly cost based dynamic charging-can exacerbate peaks due to synchronized user behavior. However, ramp-rate minimization strategy significantly reduce the stress on dispatchable generation achieving the lowest maximum absolute ramp rate (MARR) (56.81 MW) and lowest reserve requirement (2.39 GW). In contrast, unmanaged and TOU random strategies increase the stress on dispatchable generation sources with increased MARR and reserve requirements. These findings highlight the importance of coordinated, system-aware managed charging strategies to ensure reliable and affordable grid operation in the presence of EVs and VG sources.

14 - SOLAR ENERGY↗

A Framework to Evaluate the Grid Impacts of EV Fleet Charging Solutions

Growing Electric vehicle (EV) adoption in residential and commercial applications is driving the need for the charging infrastructures required to fulfill the charging needs. The resulting increase in demand for electric power will add a significant load to the electric grid, which could negatively impact the grid operation. EVs are power electronic loads and draw harmonic currents which can lead to a host of power quality issues. Therefore, it is crucial to assess the grid impacts and management of EV charging loads to ensure the reliable operation of the electric grid. In this paper, we develop a framework to help determine power-quality impacts given an EV charging schedule on the system. We compare the performance of unmanaged and managed charging solutions on factors like voltage drop, flicker, harmonic distortion and the peak site load - based on the EV depot in Hazelwood school district. The results allow insights into operation and site design of EV depots.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Current Practices in Distribution Utility Resilience Planning for Winter Storms

This report is part of a series of hazard-focused case studies examining common practices in electric utility resilience planning. We use standard terminology defining resilience as the ability to anticipate, withstand, absorb, and recover from hazards that cause long duration outages. We distinguish between reliability and resilience using Institute of Electrical and Electronics Engineers (IEEE) 1366-2022, which defines major events as an event that exceeds reasonable design and/or operational limits of the electric power system. Resilience planning is focused on major event days and reliability planning is focused on nonmajor event days. Utility resilience plans are assessed according to common resilience components identified in existing resilience frameworks. The focus of this report is on winter storms in which the primary hazards are heavy snowfall, freezing rain, ice, extreme cold, severe wind, and flooding. These hazards can also contribute to generation shortages, resulting in bulk power system impacts that have consequences for the distribution system, such as load shedding. Stand-alone reports focusing on wildfires and nonwinter storms have been published in parallel with this report. This report can be used as a starting point for understanding potential investment prioritization processes and investment options. This report is intended to improve utility resilience planning by supporting constructive dialogue among utilities, regulators, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hybrid Resources: Challenges, Implications, Opportunities, and Innovation

The electric power system has historically been designed to provide reliable energy to loads by using a relatively small number of well-understood generators. The distinction between load, generation, and transmission resources has been quite clear. Most of the responsibility for planning and operating a system - building a highly reliable network from less reliable parts - has been with the system manager, whether that be a utility, a regional market operator, or some similar entity. Given this historical context, many experts were initially perplexed by the rapidly growing popularity of hybrid resources, which combine multiple technologies into a single entity. Rather than depending on a system operator to provide instructions to individual technologies, hybrid resources intentionally take on more operational responsibility by optimizing and scheduling their combined functions. Interconnection queues in many regions reveal a large and growing interest in hybrids, suggesting that project developers and investors see them as providing advantages.

generators↗

Digitalization mapping and assessment process supporting ION strategic transformation activities

The existing fleet of commercial nuclear power plants (NPPs) are an important asset in the nation’s portfolio of electrical generating resources. Their continued safe and reliable operation are critical to providing a large source of carbon-free electricity to power the nation’s economy. The United States Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops the scientific bases, methods, and tools, for the continued safe and economical operation of the nation's commercial NPPs. The Plant Modernization Pathway within LWRS Program focuses on providing guidance to industry on the full-scale implementation of modernization solutions for NPPs that significantly reduce the technical and financial risks associated with modernization. This research is focused on helping the nuclear industry understand how to digitize and digitalize their NPPs so that they can design their modernization solutions to be scalable, sustainable, and integrated both laterally and horizontally within their organization. That is, this research creates a digital transformation in NPPs by reshaping cultural mindsets and by identifying business efficiencies. In partnership with industry, and using four previously established guiding principles for digitalization, this research supported NPP modernization through assessing readiness for digitalization as a means to achieve integrated operations for nuclear. Specifically, this research created an assessment to review an entire organization’s work processes to gather information about the digitalization health of the plant. The assessment tools were administered to plant employees, and the results were used to develop a digitalization plan. The survey assessment identified the optimal candidate processes that would most benefit from a digitalization initiative which were revealed through analytical frameworks. One analysis calculated mean digitalization health indicator scores for all endorsed activities which allowed the researchers to rank and color code the results for easy identification. Individual health indicator scores are also provided, should our industry partner wish to understand these findings according to their own organizational priorities, business considerations and desired end-state. The results were also analyzed from the perspective that organizations are comprised of different types of innovators (e.g., generators, optimizers, conceptualizers, and implementers), which differentially affects the organization’s ability to comprehend and adapt to change (i.e., opportunities to innovate). Understanding the relative composition of innovator types at an NPP allows them to gather insights into the strengths and weaknesses they have in innovating how work is performed. For the utility that partnered with this research team, the results showed that implementers make up the largest portion of respondents and conceptualizers the smallest portion. Knowing the proportion of innovator types gave this organization insights on how they can effectively implement their innovation solutions. Additionally, the results were analyzed from a technical, economic, and risk perspective to identify and quantify work reduction opportunities (WROs). Recognizing that not all cost-saving opportunities are the same, a Technical, Economic and Risk Assessment (TERA) was performed to evaluate WROs to identify areas of greatest potential and lowest risk. The key results from TERA included a digitalization opportunity score for each activity, and a calculation of potential cost savings. These two outputs formed the bases for calculating a priority index and rank for the activities/processes assessed. From the prioritization calculations, TERA can then help the utility 1) decide what digitalization priorities to invest money in implementing and then 2) calculates how much should be invested in the digitalization initiatives selected to achieve cost savings and/or an acceptable return on investment. Last, onsite interviews revealed several inefficiencies in the standard work processes that occur cross-departmentally that are due to the absence of digitized and digitalized processes. Examples of these include time spent scanning paper documents and then uploading the documents electronically, obtaining signatures, and searching for desired information. This represents a digital but not digitalized process. Over 15 opportunities to improve work processes were identified through this multi-method digitalization assessment. The various analytical assessments used (e.g., TERA, digitalization health indicator scores), as well as discussions with the utility partner, corroborated that all the opportunities identified had a strong potential to make work processes more efficient and to improve overall performance of the NPP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Time-Domain Protection Approach for AC Transmission Systems With Grid-Forming Resources

Ac transmission protection must reliably detect, classify, and locate short-circuit faults from voltage and current measurements. At present, these functionalities, which have been classically engineered using phasors approaches, are being challenged by the dynamic behavior and fault-current limits of converter-based generation. This paper tackles these challenges by engineering a time-domain protection approach that leverages the classical Bergeron model in a new manner. Low- and high-impedance faults are detected and classified by ascertaining how well line voltage and current measurements match the Bergeron equations. Faults are located by posing a novel one-variable optimization problem, whereas voltage and current waveforms at the fault location are estimated by unveiling rigorous relationships. The proposed elements are secure against external faults, measurement errors, and variation of line parameters and sampling time. Furthermore, these advances are tested via electromagnetic transient simulations and are significant to satisfy IEEE and North American Electric Reliability Corporation requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar-Plus-Storage Program Design: Frameworks and Examples [Slides]

The Columbia River Treaty Tribes in the Pacific Northwest - the Nez Perce, Umatilla, Warm Springs, and Yakama - hold treaty-reserved fishing rights for the Columbia River, the largest river in North America flowing into the Pacific Ocean. The four Tribes, through the Columbia River Inter-Tribal Fish Commission (CRITFC), prepared a vision for a more harmonized energy and water system in their 2022 Energy Vision for the Columbia River Basin. In it, the four Tribes envision a future where the Columbia Basin electric power system supports healthy and harvestable fish and wildlife populations, protects Tribal treaty and cultural resources, and provides clean, reliable, and affordable electricity. To help realize the Energy Vision, CRITFC received technical assistance from the National Renewable Energy Laboratory (NREL) through the Communities Local Energy Action Program (LEAP) pilot with the goal of ensuring that the Tribes are fully informed and prepared to integrate their interests into regional power system planning. This resource aims to provide an overview of program and policy design frameworks for behind-the-meter (BTM) energy storage and solar-plus-storage programs and examples from across the United States. This information is intended to build CRITFC's understanding of potential policies and program designs that could support the deployment of solar photovoltaics (PV) and energy storage in the Pacific Northwest.

14 SOLAR ENERGY↗

Development of Human and Technology Integration Guidance for Work Optimization and Effective Use of Information

Existing nuclear power contributes to roughly 20% of the total electricity generation, and consistently provides the highest capacity factor of any other electricity generating resource in the United States. Despite these advantages, the existing nuclear power plant fleet in the United States has been enduring significant challenges in providing electricity in a cost-competitive manner, which has ultimately threatened the long-term economic viability of these plants. A major contributor to these increased operating and maintenance costs has been the continued reliance of a large workforce who perform their work under an operating model that has largely remained unchanged since the commissioning of these nuclear power plants. Unfortunately, while this operating model has provided safe and reliable electricity, other industries have already began transforming their workforce through the use of advanced digital technology and automation that has reduced their operating and maintenance cost significantly. In order for the United States nuclear industry to remain economically viable, a similar transformation must be considered in which digital technologies and automation capabilities are brought in to support key plant functions across all work functions across plant operation, maintenance, and support. To effectively integrate digital technology and automation in the existing nuclear power plant operating model, a multidisciplinary approach is needed that addresses technological and sociotechnical (i.e., human and technology integration) considerations. This report describes an extension to the human and technology integration methodology, herein referred to as Human Integration and Technology Task Force for Work Management Optimization (HITT), to support the safe, reliable, and efficient use of proposed innovations with the intended users in their intended environment to perform their intended tasks. By effectively incorporating human and technology integration into a plant modernization effort by using HITT, we believe that a utility can significantly improve work performance and overall workforce quality of life. For instance, if HITT is performed to optimize work management, scheduling performance and scope stability can be improved by up to 10%. HITT enables these benefits through developing a rich understanding of the work being performed, the utility’s vision, and the opportunities that provide greatest value to optimize performance through a 10-step process illustrated below as a quick guide. The quick guide contains links in the righthand side of each step that allows for navigation to the detailed section (Section 4) of HITT in this technical report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimal strategies for a cost-effective and reliable 100% renewable electric grid

This paper explores cost-optimal pathways to 100% renewable power systems for the U.S. building stock. We show that long-duration misalignments of supply and demand, spanning from multi-day to seasonal timescales, present a dominant challenge that must be addressed to meet real-time 100% renewable targets. While long-duration misalignments can be addressed through energy storage, we show that alternative and readily available solutions that are more cost-effective should be considered first. Through a techno-economic analysis, we identify cost-optimal, region-dependent, supply-side, and demand-side strategies that reduce, and in some U.S. regions eliminate, the otherwise substantial capacities and associated costs of long-duration energy storage. Investigated supply-side strategies include optimal mixes of renewable portfolios and oversized generation capacities. Considered demand-side strategies include building load flexibility and building energy efficiency investments. Our results reveal that building energy efficiency measures can reduce long-duration storage requirements at minimum total investment costs. In addition, oversizing and diversifying renewable generation can play a critical role in reducing storage requirements, remaining cost effective even when accounting for curtailed generation. We identify regionally dependent storage cost targets and show that for emerging long-duration energy storage innovations to achieve broad adoption, their costs will need to compete with the decreasing cost of renewables. The findings of this research are particularly important given that most long-duration storage technologies are currently either uneconomical, geologically constrained, or still underdeveloped.

100% renewable↗

Strengthening Resilience: Florida Resident Voices on Resource Needs During Power Outages

Extreme weather events related to climate change, and an aging electricity infrastructure are disrupting reliable electricity services to a greater degree. Further, previous research has found that more socially vulnerable populations are more likely to live in areas with a higher probability of power outages. Here, this study examines the issues that people face during power outages and the resources that help individuals maintain resilience during power outages caused by extreme weather events in socially vulnerable communities. Using qualitative data from focus groups with 56 individuals in Central and North Florida, the research highlights lived experiences during outages and difficulties using and accessing resources during these conditions. Based on a qualitative review of the focus group discussions, this paper explores the solutions and support systems residents believe would improve their ability to cope. The findings offer insights to guide policy and strategic planning, with the goal of strengthening personal preparedness and response by focusing on the resources people consider most helpful for enduring frequent and severe outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Developing a Reduced 240-Bus WECC Dynamic Model for Frequency Response Study of High Renewable Integration

The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.

dynamic simulation↗

Cyber Attack Sequences Generation for Electric Power Grid

Security assessment of cyber-physical energy systems (CPESs) such as the electric power grid is a critical operation to maintain availability, reliability, and quality of service in the presence of persistent threats from malicious cyber actors. Existing security assessment approaches such as penetration testing and red teaming rely on subject matter expert experience and forensic cyber analysis of historical events to perform realistic, threat-informed assessments of CPES defense. CPESs have a large attack surface because of the heterogeneity and complexity of underlying topology, devices, measurements, and vulnerabilities. The aforementioned approaches lead to partial coverage of the attack surface with a large set of unknown but possible exploits. There is a need to automate the CPES attack surface discovery and contextualize it for relevant, highly probable, real-world attack scenarios. We propose a methodology and framework to facilitate the discovery of the CPES attack surface. We present a multilayer attack graph with ranked attack sequences to describe CPES failure scenarios. We present a work-in-progress framework that lists key components to automate the attack modeling and sequence generation. We demonstrate the published National Electric Sector Cybersecurity Organization Resource CPES failure scenario to highlight the trustworthiness of generated attack sequences.

Dutta, Ashutosh↗

How the U.S. Power Grid Kept the Lights on in Summer 2024

Maintaining the reliability of the bulk power system, which supplies and transmits electricity, is a critical priority of electric grid planners, operators, and regulators. As demand for electricity increases and the U.S. resource mix changes, how grid operators meet peak demand is changing. In summer 2024, grid operators in all regions maintained enough capacity to keep the lights and air conditioners on during periods of peak demand, even as older generators have been retired. And, an increasing number of regions used more solar and storage to meet peak demand. In this publication, we describe grid operations on the highest demand day in ERCOT and a few other regions and how solar and storage in particular worked together to help meet peak demand.

14 SOLAR ENERGY↗

Power System Event Classification and Localization Using a Convolutional Neural Network

Detection and timely identification of power system disturbances are essential for situation awareness and reliable electricity grid operation. Because records of actual events in the system are limited, ensemble simulation-based events are needed to provide adequate data for building event-detection models through deep learning; e.g., a convolutional neural network (CNN). An ensemble numerical simulation-based training data set have been generated through dynamic simulations performed on the Polish system with various types of faults in different locations. Such data augmentation is proven to be able to provide adequate data for deep learning. The synchronous generators’ frequency signals are used and encoded into images for developing and evaluating CNN models for classification of fault types and locations. With a time-domain stacked image set as the benchmark, two different time-series encoding approaches, i.e., wavelet decomposition-based frequency-domain stacking and polar coordinate system-based Gramian Angular Field (GAF) stacking, are also adopted to evaluate and compare the CNN model performance and applicability. The various encoding approaches are suitable for different fault types and spatial zonation. With optimized settings of the developed CNN models, the classification and localization accuracies can go beyond 84 and 91%, respectively.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating power grid model hydropower feasibility with a river operations model

Production cost models (PCMs) simulate dispatch of generators across a large power grid and are used widely by planners to study the reliability of electricity supply. As energy systems transition away from the thermoelectric technologies that have traditionally balanced electricity supply and demand, hydropower and its representation in PCMs is of increasing importance. A limitation of PCMs applied to continental power grids with diverse generation portfolios is that hydropower generation is simulated without full consideration of complex river dynamics, leading to possible misrepresentation of grid flexibility and performance. In addition, data used in PCMs may reflect outdated operating policies. In this paper we propose a hydropower generation feasibility test for PCMs. The approach uses a detailed hydropower model to determine whether the hourly hydropower schedule from a PCM with simplified monthly parameterization can be attained after accounting for realistic river dynamics and operating policies, such as spill requirements and general water movement and balance through a cascade reservoir system. We perform this hydropower generation test for the ‘Big 10’ hydropower system on the Columbia River (part of the Western Interconnect of the United States), revealing 9% overestimation of available hydropower generation in a PCM solution in an average hydrologic year. Our evaluation provides insight on the cost and opportunities for better representing hydropower in PCMs.

54 ENVIRONMENTAL SCIENCES↗

A Cable Condition Monitoring Strategy for Safe and Reliable Plant Operation

Electrical cables provide essential functions, such as delivery of power or instrumentation signals for monitoring systems. Most cables installed in industrial applications are constructed with organic polymer insulations that can become brittle, crack, or degrade over time from exposure to harsh environmental conditions, such as elevated temperatures, moisture, vibration, mechanical shock, and radiation. This paper describes an overall strategy for assessing the health and managing the aging of cables during the operating life of an industrial facility. This strategy involves performing condition assessments and monitoring of electrical cables using both in situ and laboratory testing techniques. It includes in situ testing to identify anomalies in the circuits, such as degraded terminations, splices, connections, and degraded sections of cable insulation, as well as as-found evaluations to determine the current condition of installed cables. Furthermore, these cable condition evaluations provide important information about the current state of the cable circuits. Moreover, the test results can be used to trend/monitor age-related degradation and estimate the remaining useful life of installed cables.

36 MATERIALS SCIENCE↗