Search NASA⌕ Search

SEARCH · Search NASA

Results for “In Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Space Station assembly sequence planning - An engineering and operational challenge

This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

Kaidy, James T.↗

Modeling and Control of Robot-Structure Coupling During In-Space Structure Assembly

This paper considers the problem of robot-structure coupling dynamics during in-space robotic assembly of large flexible structures. A two-legged walking robot is used as a construction agent, whose primary goal is to stably walking on the flexible structure while carrying a substructure component to a designated location. The reaction forces inserted by the structure to the walking robot are treated as bounded disturbance inputs, and a trajectory tracking robotic controller is proposed that combines the standard full state feedback motion controller and an adaptive controller to account for the disturbance inputs. In this study, a reduced-order Euler-Bernoulli beam structure model is adapted, and a finite number of co-located sensors and actuators are distributed along the span of the beam structure. The robot-structure coupling forces are treated as a bounded external forcing function to the structure, and hence an output covariance constraint problem can be formulated, in terms of linear matrix inequality, for optimal structure control by utilizing the direct output feedback controllers. The numerical simulations show the effectiveness of the proposed robot-structure modeling and control methodology.

Swei, Sean↗

Hazard Analysis for the Mark III Space Suit Assembly (SSA) Used in One-g Operations

This Hazard Analysis document encompasses the Mark III Space Suit Assembly (SSA) and associated ancillary equipment. It has been prepared using JSC17773, "Preparing Hazard Analyses for JSC Ground Operation", as a guide. The purpose of this document is to present the potential hazards involved in ground (23 % maximum O2, One-g) operations of the Mark III and associated ancillary support equipment system. The hazards listed in this document are specific to suit operations only; each supporting facility (Bldg. 9, etc.) is responsible for test specific Hazard Analyses. A "hazard" is defined as any condition that has the potential for harming personnel or equipment. This analysis was performed to document the safety aspects associated with manned use of the Mark III for pressurized and unpressurized ambient, ground-based, One-g human testing. The hazards identified herein represent generic hazards inherent to all standard JSC test venues for nominal ground test configurations. Non-standard test venues or test specific configurations may warrant consideration of additional hazards analysis prior to test. The cognizant suit engineer is responsible for the safety of the astronaut/test subject, space suit, and suit support personnel. The test requester, for the test supported by the suit test engineer and suited subject, is responsible for overall safety and any necessary Test Readiness Reviews (TRR).

Mitchell, Kate↗

Knowledge-based decision support for Space Station assembly sequence planning

A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

Source record↗

Results of a Manned Over Pressurization Event in the Extravehicular Mobility Unit Space Suit Assembly

The Neutral Buoyancy Laboratory (NBL) is a 102 x 202 x 40-foot-deep tank holding over 6 million gallons of water used to simulate weightlessness for Astronaut training. The maxim "Train Like You Fly" refers to the desire to have the suit perform, during training, as close as possible to how it performs during an Extra-Vehicular Activity (EVA), particularly with respect to mobility. Therefore, the Space Suit Assembly (SSA) used in the NBL is a downgraded hardware version of the flight SSA; it is not designed for the NBL environment or operations. A classification system defines the flight Space Suit Assembly hardware as Class I, and the NBL training hardware SSA as Class IIIW. On July 20, 2017, during a manned training event in the NBL, the SSA was inadvertently over-pressurized to 22 psid; normal operating pressure being 4.3 psid. The suit subject was removed from the suit with no injury. The event was investigated by a NASA Mishap Team. The Team investigated common causes and differences between the Class I and Class IIIW Extra-vehicular Mobility Unit (EMU). The investigation determined that the event was limited to Class IIIW hardware and its external flow-controlled open loop ventilation systems. The flight EMU is a pressure regulated closed loop ventilation system. This paper will examine the differences between the Class I and Class IIIW SSA hardware and provide details of the Mishap Investigation. Corrective actions taken to mitigate risk with hardware, operations, and hazard documentation will be discussed.

Spacesuit↗

Design of a welded joint for robotic, on-orbit assembly of space trusses

A preliminary design for a weldable truss joint for on-orbit assembly of large space structures is described. The joint was designed for ease of assembly, for structural efficiency, and to allow passage of fluid (for active cooling or other purposes) along the member through the joint. The truss members were assumed to consist of graphite/epoxy tubes to which were bonded 2219-T87 aluminum alloy end fittings for welding on-orbit to truss nodes of the same alloy. A modified form of gas tungsten arc welding was assumed to be the welding process. The joint was designed to withstand the thermal and structural loading associated with a 120-ft diameter tetrahedral truss intended as an aerobrake for a mission to Mars.

Rule, W. K.↗

Robot path planning for space-truss assembly

Construction, repair, and maintenance of space-based structures will require extensive planning of operations in order to effectively carry out these tasks. The path planning algorithm described here is a general approach to generating paths that guarantee collision avoidance for a single chain nonredundant or redundant robot. The algorithm uses a graph search of feasible points in position space, followed by a local potential field method that guarantees collision avoidance among objects, structures, and the robot arm as well as conformance to joint limit constraints. This algorithm is novel in its computation of goal attractive potential fields in Cartesian space, and computation of obstacle repulsive fields in robot joint space. These effects are combined to generate robot motion. Computation is efficiently implemented through the computation of the robot arm Jacobian and not the full inverse arm kinematics. These planning algorithms have been implemented and evaluated using existing space-truss designs, and are being integrated into the RPI-CIRSSE Testbed environment.

Muenger, Rolf↗

In-space Servicing, Assembly, and Manufacturing (ISAM) State of Play 2022 Edition

The future of spaceflight will yield increasingly more ambitious missions to support civil, national security, and commercial space sectors. Achieving these ambitious missions is not feasible using the traditional paradigm of launching an integrated, fully functioning system on a single launch vehicle. For example, science and human exploration missions will desire payloads that are larger than any foreseeable launch vehicle fairing, national security missions will require persistent assets that are mobile and resilient, and commercial space missions will require cost-effective ways to update to the latest technology on orbit. In-space Servicing, Assembly, and Manufacturing (ISAM) can vastly expand the performance, availability, and lifetime of space systems compared to the traditional paradigm of launching an asset with no intent to ever touch it again. ISAM capabilities foster an ecosystem that changes the space operations paradigm, creating the foundation for sustainable exploration and serving as a multiplier for other capabilities like space logistics, power generation, and reusability. Previous achievements in ISAM have enabled ambitious human and robotic space missions. NASA’s International Space Station (ISS) operations and maintenance, servicing missions of the Hubble Space Telescope (HST), and Northrop Grumman’s Mission Extension Vehicle (MEV) demonstrate the dramatic operational missions that can be achieved using ISAM capabilities. Many current and upcoming flight demonstrations are advancing areas that will enable the next generation of civil, national security, and commercial space missions. This document describes the current state of ISAM missions, capabilities, and developments. Compiling and organizing the available ISAM capabilities will help mission designers incorporate ISAM technologies into their concepts, create the starting point for technology development plans and roadmaps, and provide technologists a survey of the field they are developing. This document divides the ISAM capabilities into 11 capability areas that describe the functions or activities that would be performed in space using ISAM. This version of the ISAM State of Play is part of a continuing journey to encourage the use of ISAM capabilities in space. Compiling and organizing the current state of ISAM provides a simple resource for those working in the ISAM ecosystem to ensure that the advancements being made build upon the investments of the past. The state of play is ever changing as new capabilities are developed, and this document will be periodically updated to ensure that it is relevant to those who need it in the future.

ISAM↗

Robotic Specialization in Autonomous Robotic Structural Assembly

Robotic in-space assembly of large space structures is a long-term NASA goal to reduce launch costs and enable larger scale missions. Recently, researchers have proposed using discrete lattice building blocks and co-designed robots to build high-performance, scalable primary structure for various on-orbit and surface applications. These robots would locomote on the lattice and work in teams to build and reconfigure building-blocks into functional structure. However, the most reliable and efficient robotic system architecture, characterized by the number of different robotic 'species' and the allocation of functionality between species, is an open question. To address this problem, we decompose the robotic building-block assembly task into functional primitives and, in simulation, study the performance of the the variety of possible resulting architectures. For a set consisting of five process types (move self, move block, move friend, align bock, fasten block), we describe a method of feature space exploration and ranking based on energy and reliability cost functions. The solution space is enumerated, filtered for unique solutions, and evaluated against energy and reliability cost functions for various simulated build sizes. We find that a 2 species system, dividing the five mentioned process types between one unit cell transport robot and one fastening robot, results in the lowest energy cost system, at some cost to reliability. This system enables fastening functionality to occupy the build front while reducing the need for that functional mass to travel back and forth from a feed station. Because the details of a robot design affect the weighting and final allocation of functionality, a sensitivity analysis was conducted to evaluate the effect of changing mass allocations on architecture performance. Future systems with additional functionalities such as repair, inspection, and others may use this process to analyze and determine alternative robot architectures.

Bernus, Borbala↗

HgCdTe Avalanche Photodiode Array Detectors with Single Photon Sensitivity and Integrated Detector Cooler Assemblies for Space Lidar Applications

A HgCdTe avalanche photodiode (APD) focal plane array assembly with linear mode photon-counting capability has been developed for space lidar applications. An integrated detector cooler assembly (IDCA) has been built using a miniature Stirling cooler. A microlens array has been included to improve the fill factor. The HgCdTe APD has a spectral response from 0.9- to 4.3-μm wavelengths, a photon detection efficiency as high as 70%, and a dark count rate of <250 kHz at 110 K. The mass of the IDCA is 0.8 kg and the total electrical power consumption is about 7 W. The HgCdTe APD arrays have been characterized at NASA Goddard Space Flight Center. A series of environmental tests have been conducted for the IDCAs, including vibration, thermal cycling, and thermal vacuum tests. A description of the device and the test results at NASA are given in this paper.

Sun, Xiaoli↗

Design of a welded joint for robotic, on-orbit assembly of space trusses

In the future, some spacecraft will be so large that they must be assembled on-orbit. These spacecraft will be used for such tasks as manned missions to Mars or used as orbiting platforms for monitoring the Earth or observing the universe. Some large spacecraft will probably consist of planar truss structures to which will be attached special purpose, self-contained modules. The modules will most likely be taken to orbit fully outfitted and ready for use in heavy-lift launch vehicles. The truss members will also similarly be taken to orbit, but most unassembled. The truss structures will need to be assembled robotically because of the high costs and risks of extra-vehicular activities. Some missions will involve very large loads. To date, very few structures of any kind have been constructed in space. Two relatively simple trusses were assembled in the Space Shuttle bay in late 1985. Here the development of a design of a welded joint for on-orbit, robotic truss assembly is described. Mechanical joints for this application have been considered previously. Welded joints have the advantage of allowing the truss members to carry fluids for active cooling or other purposes. In addition, welded joints can be made more efficient structurally than mechanical joints. Also, welded joints require little maintenance (will not shake loose), and have no slop which would cause the structure to shudder under load reversal. The disadvantages of welded joints are that a more sophisticated assembly robot is required, weld flaws may be difficult to detect on-orbit, the welding process is hazardous, and welding introduces contamination to the environment. In addition, welded joints provide less structural damping than do mechanical joints. Welding on-orbit was first investigated aboard a Soyuz-6 mission in 1969 and then during a Skylab electron beam welding experiment in 1973. A hand held electron beam welding apparatus is currently being prepared for use on the MIR space station. Presently, Marshall Space Flight Center is evaluating processes appropriate for on-orbit welding. A low gravity environment has been found to have very minor effects on the welding processes appropriate for this application. This is based on tests run on-orbit as well as low gravity environments achieved by flying aircraft in parabolic trajectories. It appears that a modified form of gas tungsten arc welding (GTAW) will be most appropriate for welding together structures on-oribt. The process has been modified to work in a vacuum by providing gas to the arc zone by means of a hollow tungsten electrode with special shielding. A commercial tube welding head has been successfully modified for use on-orbit with a gas leakage rate of approximately 2.5 liters/min. To develop as realistic a joint as possible, a specific truss structure was selected on which to base the design. The structure considered was based on the 120 foot diameter aerobrake tetrahedral truss structure. The truss members were assumed to consist of graphite/epoxy tubes. Also, it was assumed that the nodes were constructed of 2219-T87 aluminum alloy. The magnitude of the member load assumed for design purposes was 100 kips.

Rule, William K.↗

Characterization of the Twelve Channel 100/140 Micron Optical Fiber, Ribbon Cable and MTP Array Connector Assembly for Space Flight Environments

Presented here is the second set of testing conducted by the Technology Validation Laboratory for Photonics at NASA Goddard Space Flight Center on the 12 optical fiber ribbon cable with MTP array connector for space flight environments. In the first set of testing the commercial 62.5/125 cable assembly was characterized using space flight parameters. The testing showed that the cable assembly would survive a typical space flight mission with the exception of a vacuum environment. Two enhancements were conducted to the existing technology to better suit the vacuum environment as well as the existing optoelectronics and increase the reliability of the assembly during vibration. The MTP assembly characterized here has a 100/140 optical commercial fiber and non outgassing connector and cable components. The characterization for this enhanced fiber optic cable assembly involved vibration, thermal and radiation testing. The data and results of this characterization study are presented which include optical in-situ testing.

Ott, Melanie N.↗

TriTruss Packaging and Deployment Trade Study

A trade study was conducted that evaluated viable concepts of operation for the packaging and deployment (P&D) of novel deployable modular truss modules, called TriTruss modules, that can be assembled to form a large aperture In-Space Assembled Telescopes (iSAT). In this first phase of an ongoing more comprehensive trade study, concepts were proposed and then evaluated based on initial metrics representing features of an ideal P&D concept. The ideal TriTruss P&D concept is defined as one that: allows for efficient packaging, has sufficient geometric versatility to be launch vehicle independent, provides a stiff and lightweight structure, has low mechanical complexity, and has component modularity. The P&D concept should allow for prelaunch subsystem or utility integration if required. The concept should be kinematically simple and be robotically deployed using a minimum number of specialized tools. The P&D concepts evaluated are categorized as: core collapse, face collapse, and erectable structures. Sub-scale models were constructed to help understand the kinematics and mechanical complexity required to enable P&D. Based on a weighting scale, the most promising candidate P&D concepts have been selected and will undergo more rigorous structural design, analysis, and testing in the study’s next phase. The ultimate goal of the comprehensive trade study will be to recommend a single TriTruss design and associated P&D concept that will be built and evaluated at NASA Langley Research Center’s In-Space Assembly Laboratory.

in-space assembly (ISA)↗

The International Space Station Assembly on Schedule

As engineers continue to prepare the International Space Station (ISS) for in-orbit assembly in the year 2002, ANSYS software has proven instrumental in resolving a structural problem in the project's two primary station modules -- Nodes 1 and 2. Proof pressure tests performed in May revealed "low temperature, post-yield creep" in some of the Nodes' gussets, which were designed to reinforce ports for loads from station keeping and reboost motion of the entire space station. An extensive effort was undertaken to characterize the creep behavior of the 2219-T851 aluminum forging material from which the gussets were made. Engineers at Sverdrup Technology, Inc. (Huntsville, AL) were responsible for conducting a combined elastic-plastic-creep analysis of the gussets to determine the amount of residual compressive stress which existed in the gussets following the proof pressure tests, and to determine the stress-strain history in the gussets while on-orbit. Boeing, NASA's Space Station prime contractor, supplied the Finite Element Analysis (FEA) model geometry and developed the creep equations from the experimental data taken by NASA's Marshall Space Flight Center and Langley Research Center. The goal of this effort was to implement the uniaxial creep equations into a three dimensional finite element program, and to determine analytically whether or not the creep was something that the space station program could live with. The objective was to show analytically that either the creep rate was at an acceptable level, or that the node module had to be modified to lower the stress levels to where creep did not occur. The elastic-plastic-creep analysis was performed using the ANSYS finite element program of ANSYS, Inc. (Houston, PA). The analysis revealed that the gussets encountered a compressive stress of approximately 30,000 pounds per square inch (psi) when unloaded. This compressive residual stress significantly lowered the maximum tension stress in the gussets which decreased the creep strain rate. The analysis also showed that the gussets would not experience a great deal of creep from future pressure tests if braces or struts proposed by Boeing were installed to redistribute stress away from them. Subsequent analysis of on-orbit station keeping and reboost loads convinced Boeing that the gussets should be removed altogether.

Source record↗

Telerobotics test bed for space structure assembly

A cooperative research on super long distance space telerobotics is now in progress both in Japan and USA. In this program. several key features will be tested, which can be applicable to the control of space robots as well as to terrestrial robots. Local (control) and remote (work) sites will be shared between Electrotechnical Lab (ETL) of MITI in Japan and Jet Propulsion Lab (JPL) in USA. The details of a test bed for this international program are discussed in this report.

Kitami, M.↗

Metrics for in-space telescope assembly techniques

Reliable metrics are not yet available for choosing among human and robotic assets for space-based construction and servicing of large space telescopes. Using FAIR-DART as a reference design, we generated example event sequences for telescope assembly scenarios in enough detail to identify infrastructure assumptions and technology requirements. A systems trade among human and robotic techniques (human EVA, on-site telerobotic, ground-in-the- loop robotic, commanded or sequenced robotic, and autonomous/decision-making robotic) helped us to define key metrics in the human-robotic trade space, including quality, time, cost, and risk. Our methodology included examining representative end-member scenarios. Case A treated each step in the assembly sequence as if all other steps have no on-site human involvement, and Case B treated each step as if human EVA is already involved in all other steps. With this trade, we identified key enabling technologies and infrastructure for space-based assembly and servicing of large space telescopes.

space telescopes human and robotic in-space assemb↗