Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECT PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrating Commercial Ready Autonomous Robotic Platforms to Enhance Worker Safety and Efficiency - 20053

This paper will explore the challenges and triumphs of implementing advanced robotic systems and the supporting technology for the waste management industry. Deployment-ready solutions for autonomous robotic platforms are new to the radioactive waste management industry and have been slow to implement across the complex. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground-based autonomous robotic platforms to enhance workforce safety and efficiency. The first objective of the project is to demonstrate safe operation of autonomous instrumented robots, followed by a scaling up of capabilities for the platform to meet any additional requests of internal stakeholders. Autonomous robotics platforms offer a fantastic range of capabilities that will aid in decreasing long-term liability of radioactive waste management industry by enhancing clean-up efforts and worker safety. Over the past five years, deployment-ready solutions for autonomous robotic platforms have come a long way. Autonomous robotic platforms are increasingly available to purchase from many vendors, often for prices under $100,000. Additionally, the vendors who produce these products are efficient in accommodating customized solutions to unique challenges, such as those often found in the radioactive waste management industry. However, the newness of this technology to the radioactive waste management industry and has resulted in a slow implementation across the complex. This paper will explore the challenges and triumphs of implementing advanced robotic systems and supporting technology for the waste management industry. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground based autonomous robotic platforms to enhance workforce safety and efficiency. While the company has utilized robots in many parts of the tank farms mission, this was first attempted in the deployment of an autonomous platform that required no operator with only minor maintenance and created challenges not yet encountered. These challenges included stakeholder buy-in, operational safety, procurement uncertainties, adaption of 'off the shelf products, overcoming the 'Fukushima complexity' perception, security concerns, and the initial criteria down select. Hanford Tank Operations Contractor's management identified the need for a workforce protecting low cost robotics solution in the fall of 2017. The project scope generated was part of the response to the Tank Vapor Assessment Team recommendation to enhance the safety of the workforce by utilizing new technology. Since the projects inception, it has been incorporated into the Tank Stewardship Plan. This project was unique to Hanford Tank Operations Contractor, as the company does not frequently incorporate advanced technology for field deployment quickly. The project was also progressive to the Hanford Tank Operations Contractor as it functions as a partnership project with a local university. The first objective of the project is to demonstrate safe operations of autonomous instrumented robotics, monitoring and collecting data, and the wireless transmission of data to a central computing system. Following the completion of this first objective, the project will scale up capabilities of the platform to meet the requests of additional internal stakeholders throughout the tank farms - including completion of specific in-field tasks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fermilab's controls development with virtual accelerator

Control Systems development is often the last thing considered when designing and building new equipment, e.g. a new detector or superconducting RF LINAC; however when the new equipment is installed, it is the first thing desired to be operational for testing. Due to frequent delays in building new equipment and project deadlines, control system development and testing is often curtailed. A way to alleviate this problem is to simulate the control system, though this will be challenging for complex systems.The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC for the remainder of the existing accelerator complex. The new LINAC consists of a warm front end (WFE), 23 superconducting RF cryomodules (of 5 types), and a beam transfer line (BTL) to the existing complex.The accelerator physics group has a parallel project to create a digital twin (DT) of the PIP-II accelerator. We have coupled the EPICS controls to this DT and are developing both the DT and EPICS software in parallel. This will allow us to develop the EPICS software framework, the HMIs, sequences, high level physics applications, and other services for use in a fully functional control system.This presentation will detail the work that we have performed to date and show demonstrations of controlling and monitoring the status of the accelerator, as well as future plans for this work.

Hanlet, Pierrick [Fermilab]↗

E2C Cohorts: Implementation Funding Projects - Impact Summary [Slides]

From August 2024 to October 2025, 11 Clean Cities and Communities coalitions supported projects to advance transportation goals by gathering input from local stakeholders, and using the resulting insights to develop new plans and programs for local partners. This effort leveraged information and best practices shared during the 2024 E2C Cohort on Integrating Community Priorities into Electric Vehicle Plans and Projects. These coalitions supported partners across the country to develop plans for electric vehicle integration through one-on-one technical assistance and tailored local engagement. This deck summarizes the individual projects completed by coalitions, and the overall reach and impact of all of this program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Continuous Electron Beam Accelerator Facility at 12 GeV

This review paper describes the energy-upgraded Continuous Electron Beam Accelerator Facility (CEBAF) accelerator. This superconducting linac has achieved 12 GeV beam energy by adding 11 new high-performance cryomodules containing 88 superconducting cavities that have operated cw at an average accelerating gradient of 20 MV / m . After reviewing the attributes and performance of the previous 6 GeV CEBAF accelerator, we discuss the upgraded CEBAF accelerator system in detail with particular attention paid to the new beam acceleration systems. In addition to doubling the acceleration in each linac, the upgrade included improving the beam recirculation magnets, adding more helium cooling capacity to allow the newly installed modules to run cold, adding a new experimental hall, and improving numerous other accelerator components. We review several of the techniques deployed to operate and analyze the accelerator performance and document system operating experience and performance. In the final portion of the document, we present much of the current planning regarding projects to improve accelerator performance and enhance operating margins, and our plans for ensuring CEBAF operates reliably into the future. For the benefit of potential users of CEBAF, the performance and quality measures for the beam delivered to each of the experimental halls are summarized in the Appendix. Published by the American Physical Society 2024

43 PARTICLE ACCELERATORS↗

Monitoring Avian Productivity and Survivorship at the Sandia Wetlands at Los Alamos National Laboratory (2014-2019)

Biologists at Los Alamos National Laboratory completed six years (2014–2019) of demographic monitoring of passerines (songbirds) during the breeding season in Los Alamos, New Mexico. We captured songbirds at a mist netting station located in the Sandia Wetlands in Sandia Canyon (Technical Areas 60 and 61). We identified, measured, and then banded captured birds with federal migratory bird bands. Banding operations took place between May and August of each year, with 10 mist netting sessions annually. We conducted this project as part of the implementation of the Biological Resources Management Plan. The project complies with the 2013 Memorandum of Understanding between the United States Fish and Wildlife Service (USFWS) and the United States Department of Energy regarding the implementation of Executive Order 13186. The overall number of birds and species captured was variable, and we saw no decreases over the course of six years in bird species diversity, abundance, or the percentage of breeding birds. Our results indicate that the Sandia Wetlands support numerous species of breeding birds, including species of conservation concern. We did not see a declining trend for the top 10 most-captured species or for any of the species of conservation concern over time; however, we need more years of data to make robust conclusions about population trends through time. Our results indicated that adult recapture rates at the Sandia Wetlands are at least twice as low when compared with estimated adult survival in migratory passerines from peer-reviewed literature. We also did not recapture any birds that were banded as juveniles in subsequent years throughout the entire six-year period. Low recapture rates for adults and the non-existent recapture rates for juveniles should be explored further. To accurately assess individual species survival rates for adults and juveniles using mark-recapture models, we need a longer dataset, which would allow for a more robust analysis.

59 BASIC BIOLOGICAL SCIENCES↗

Site 200 #1400 Block Area New Trailers Project, Soil Sampling and Analysis Plan/Quality Assurance Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is proposing to install a series of modular trailers and install associated underground utilities in the 1400 Block at the Livermore Site. This Sampling and Analysis Plan (SAP) outlines the processes and procedures to collect environmental and geotechnical soil samples from the project area and to send the samples to the appropriate laboratory or laboratories for analysis or testing. The resulting environmental laboratory data will determine whether excavated soils can be reused on the project, or which type of landfill or landfills the soils may be sent for disposal. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2019), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗

Staffing Analyses Tool

The Staffing Analyses Tool is an interactive resource planning tool used for visualizing programmatic staffing financial information. This dashboard provides historical and current staff charging data under organizations’ and/or programs’ views. This tool is used to manage staffing cost and inform outyear planning. It was developed in collaboration with Associate Laboratory Directorate for Infrastructure and Capital Projects (ALDICP) Planning Office.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Stakeholder-guided holistic, Adaptive Framework for enhancing community Energy Resilience (SAFER) (Final Technical Report)

The Stakeholder-guided holistic, Adaptive Framework for enhancing community Energy Resilience (SAFER) project advances resilience science and engineering by addressing challenges in rural Kansas communities where aging infrastructure, extreme weather, and socioeconomic disparities heighten vulnerability to energy disruptions. Traditional approaches often focus on technical performance while overlooking community concerns and priorities. SAFER responds by integrating community perspectives with advanced analytical frameworks to create a holistic model for measuring and improving resilience. Project objectives included developing novel resilience metrics, advancing modeling frameworks that capture interdependencies across infrastructures, and embedding community-centric indicators directly into planning processes for distributed energy resources. The key technical innovations included the creation of self-organizing map (SOM)-based indices for objective resilience quantification, hetero-functional graph theory (HFGT) models linking power, water, transportation, and community assets, and graph neural network (GNN) tools for identifying critical nodes in complex systems. Community-centric energy planning was demonstrated through optimal siting and sizing of (photovoltaic) PV and battery storage, ensuring resilience enhancements also addressed energy burden and energy insecurity. SAFER engaged community partners in Dodge City and Ford County through surveys, focus groups, and workshops, generating more than 600 responses that established baseline measures of energy burden, financial insecurity, and willingness-to-pay to avoid outages. This data, organized in terms of a community capitals framework, informed the development of weighted reliability indices that better reflect community costs than traditional utility metrics. SAFER’s GNN-based critical node identification framework identified expert-labelled critical nodes with over 99% accuracy, while also uncovering additional functionalities essential for proactive resilience planning. The project’s models demonstrated that optimal PV and storage deployment could improve resilience indices by over 11 percent, with dispatch strategies further enhancing outcomes, confirming both the technical effectiveness and economic feasibility of these approaches. Through its combined emphasis on rigorous modeling, community-focused planning, and community engagement, SAFER advances the state of resilience research while delivering direct benefits to rural communities. The project provides tools, guidelines, and resilience heatmaps that help utilities, local governments, and residents better anticipate disruptions, prioritize investments, and strengthen the capacity to withstand and recover from energy-related hazards. Furthermore, the developed HFG and GNN frameworks are designed for transferability, allowing them to be adapted for resilience planning in other communities with minimal retraining. This inductive learning capability provides a scalable pathway to extend the SAFER project’s impact. Thus, creating a foundation for a nationally applicable model of infrastructure resilience. Additionally, the HFG can also be extended to include other FEMA community lifelines.

14 SOLAR ENERGY↗

New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications (Final Technical Report)

Being able to refill a cars gas tank when low on fuel is incredibly convenient and is a lacking feature for battery elective vehicles. New High-Energy & Safe Battery Technology with Extreme Fast Charging Capability for Automotive Applications was a research project designed to help correct this lacking feature by developing automotive sized Li-ion battery cells and demonstrating their ability to charge in under 10-minutes. To address the technical challenges Microvast, a cell manufacturer, was joined by Argonne National Labs, battery technology innovator, and BMW, a renown OEM, worked together to define and validate materials and cells for this project. By projects end, Microvast had successfully built and demonstrated a 240 Wh/kg, 35 Ah pouch cell that was capable of over 800 10-minute charge, full discharge cycles. From the outset of the project the plan was to use large amp-hour cells (ie automotive relevant sizes) to ensure the project findings and outcomes were most relevant for electric vehicle applications. The manufacture of cells was done using test manufacturing lines at Microvast and BMW that closely resemble the procedures of a Li-ion battery cell factory.

25 ENERGY STORAGE↗

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

Midwest EVOLVE (Midwest Electric Vehicle Opportunities: Learning, eVents, Experience)

The Midwest Electric Vehicle Opportunities: Learning, eVents, Experience (Midwest EVOLVE) project was a 45 month, seven-state effort to introduce electric vehicles to the public, workplaces, corporate fleets and auto dealership staff. Midwest EVOLVE projects were planned and completed in the following states: Illinois, Indiana, Michigan, Minnesota, North Dakota, Ohio, and Wisconsin. The project was coordinated by the American Lung Association of the Upper Midwest (ALAUM), dba Twin Cities Clean Cities Coalition (TC4).

33 ADVANCED PROPULSION SYSTEMS↗

Building 151 NNMA Clean Laboratory Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 151 NNMA Clean Laboratory Project (project) located immediately south of Building 154. The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL, 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA, 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO. In addition to environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection of geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY↗