Search NASA⌕ Search

SEARCH · Search NASA

Results for “Site Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enzymatic Nitrogen Insertion into Unactivated C–H Bonds

Selective functionalization of aliphatic C–H bonds, ubiquitous in molecular structures, could allow ready access to diverse chemical products. While enzymatic oxygenation of C–H bonds is well established, the analogous enzymatic nitrogen functionalization is still unknown; nature is reliant on pre-oxidized compounds for nitrogen incorporation. Likewise, synthetic methods for selective nitrogen derivatization of unbiased C–H bonds remain elusive. In this work, new-to-nature heme-containing nitrene transferases were used as starting points for the directed evolution of enzymes to selectively aminate and amidate unactivated C(sp3)–H sites. The desymmetrization of methyl- and ethylcyclohexane with divergent site selectivity is offered as demonstration. The evolved enzymes in these lineages are highly promiscuous and show activity towards a wide array of substrates, providing a foundation for further evolution of nitrene transferase function. Computational studies and kinetic isotope effects (KIEs) are consistent with a stepwise radical pathway involving an irreversible, enantiodetermining hydrogen atom transfer (HAT), followed by a lower-barrier diastereoselectivity determining radical rebound step. In-enzyme molecular dynamics (MD) simulations reveal a predominantly hydrophobic pocket with favorable dispersion interactions with the substrate. Here, by offering a direct path from saturated precursors, these enzymes present a new biochemical logic for accessing nitrogen-containing compounds.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Development of Robotic Inspection Systems for In-situ Characterisation Prior to Decommissioning - 20306

The University of Bristol's South West Nuclear Hub is part of two large UK academic research collaborations aiming to reduce the costs of nuclear power by trialing innovative solutions to major decommissioning challenges. Robotics and Artificial Intelligence in Nuclear (RAIN) and the National Centre for Nuclear Robotics (NCNR) are the two collaborations tasked by the UK research councils to coordinate this activity, for the benefit of the nuclear industry. This paper presents a summary of Bristol's research aimed at generating and demonstrating a series of technologies ready for commercialization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Distributed Edge Data Centers and Use of Building Loads to Support Large Interconnections

The rapid expansion of artificial intelligence (AI) and machine learning is driving unprecedented electricity demand from data centers. It is predicted that by 2030, 90% of AI workloads will be inference-based, requiring interconnection of multiple low-latency edge data centers (<20 MW) sited closer to end users - often on already constrained distribution feeders. Although individually small, these loads can aggregate to large loads per feeder, straining infrastructure, creating multi-year interconnection delays, and driving up customer costs. This paper proposes a data center-focused grid-integration framework that combines feeder hosting capacity analysis with building energy efficiency, building load flexibility, and waste heat reuse to expand effective feeder and substation headroom. Such approaches can reduce interconnection delays, lower costs for ratepayers, and accelerate AI-ready infrastructure deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants

The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.

20 FOSSIL-FUELED POWER PLANTS↗

Sand Thermal Energy Storage Pilot Design (Final Report)

This report summarizes work done on developing a 10-MWhe pilot of the sand-based thermal energy storage (SandTES) technology at Alabama Power’s Plant Gaston Unit 5, an operating, supercritical coal power unit. The system will be integrated to the unit, obtaining steam to heat the sand through an air-blown fluidized-bed heat exchanger, then storing the water to be reused during discharging to produce steam that will then be vented. An electrical particle heater will also be included to provide part of the heat to the sand to provide data and learnings for commercial systems that will be fully electrically heated. Hot sand is contained in one bunker, while cold sand is housed in the other bunker, and standard solids handling equipment moves the sand around. This pilot would advance the SandTES technology to Technology Readiness Level 6 and position it for commercial readiness by 2030. This work was done in two phases: Phase I performed a conceptual study that provided Association for the Advancement of Cost Engineering (AACE) Class 5 costs and estimated performance, and then Phase II, which also involved a design update, performed a more detailed pre-front-end engineering and design study that elicited AACE Class 4 costs. Work was also done to provide estimated costs for commercial applications of the technology, assess its gaps, create its technology maturation and commercialization plans, and finally perform an Environmental Information Volume for the pilot site as a first step in the National Environmental Policy Act process.

20 FOSSIL-FUELED POWER PLANTS↗

Hydrogen Education for a Decarbonized Global Economy (H 2 EDGE) (Final Technical Report)

The energy sector is undergoing rapid growth and transformation, creating urgent demand for a skilled workforce to support emerging technologies and resilient systems. Hydrogen is an emerging solution for “hard to abate” sectors, including heavy industry and transportation that also provides optionality for the electric system and enables long‑duration energy storage. As hydrogen scales from traditional industrial uses to new applications, success depends on knowledgeable engineers, technicians, planners, and operators safely deploying hydrogen technologies across the full value chain: production, delivery, storage, and end use. The H 2 EDGE initiative, funded by the U.S. Department of Energy’s Hydrogen and Fuel Cell Technologies Office from 2020 to 2025, was launched to prepare people for careers hydrogen and related technologies. Through its interactive approach, H 2 EDGE equipped stakeholders with knowledge and tools to build a reliable and sustainable energy future together. H 2 EDGE built a national network of academic and industry partners to deliver modular training, share open-access curricula, and engage diverse talent pipelines. The program leveraged EPRI’s extensive industry membership and expanded on the train-the-trainer model of the GridEd program to connect educators, employers, and community organizations across all regions of the U.S. New methods were introduced to more systematically map hydrogen competencies and assess curricula using traditional and AI-assisted approaches. Outcomes included delivery of professional short courses, developing university curriculum, sponsoring faculty and student projects, and engaging stakeholders through workshops, site tours, and webinars.

08 HYDROGEN↗

Plowing Through the Cost Barrier: Zero Energy K-12 Schools for Less: Preprint

There is a perception that zero energy K–12 schools cost more than conventional schools. Zero energy schools provide a number of unique benefits to school districts, students and staff, and communities. Among other things, a zero energy school requires far less energy to operate than a conventional school and uses on-site renewable energy systems to offset that reduced energy load. The money saved on energy can often be used to enhance educational programs. But does the extra value come at a premium? Research findings indicate that not only can zero energy schools be designed and built on conventional school budgets, they can cost less. In an integrated design and construction process, the cost of zero energy measures can be offset by, for example, downsizing heating, ventilating, and air-conditioning systems, reducing both life cycle and first costs. These findings are based on an examination of 88 zero energy or zero energy ready schools across the United States built during the last 15 years. The data collected on these schools include capital costs and the experiences of owners and design teams. The goal was to understand the perceived cost barrier, given that each building was built with a predetermined budget. The results will help future school stakeholders, program administrators, and design teams counter the perceived cost barriers. Successful strategies for achieving zero energy at no initial cost are presented. The lessons learned from existing zero energy schools can help transform the market such that all new schools can be zero energy.

30 DIRECT ENERGY CONVERSION↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS): Task 6.0 Deliverable – CarbonSAFE Phase III Readiness

The OASIS CarbonSAFE Phase II Project OASIS (Optimizing Alabama’s CO 2 Storage in Shelby County) is a geologic and reservoir characterization study designed to evaluate deep saline formations for potential long-term carbon dioxide (CO 2 ) storage in central Alabama near the National Carbon Capture Center (NCCC) and Alabama Power’s Plant Gaston. The project centers on understanding the potential of the Cambro-Ordovician Knox Group and underlying strata such as the Conasauga and Rome Formations for geologic storage of CO 2 . These formations were investigated as part of SECARB-USA (DE-FE0031830) and Project OASIS through the drilling of two stratigraphic test wells to obtain electronic well logs, core, and sidewall core plugs. These data provide direct measurements of porosity, permeability, and lithologic variability critical for reservoir characterization. Complementing the well program, a limited 2D seismic survey was conducted to help select the site for Westover #2 as part of SECARB-USA (DE-FE0031830), and a more regional Seismic Exchange (SEI) seismic survey was licensed and interpreted to define structural and stratigraphic frameworks in a new Static Earth Model (SEM), map reservoir continuity, and to identify potential sealing intervals. Integrated with geologic and reservoir modeling, these datasets form the basis for evaluating storage capacity, injectivity, and containment. While this document endeavors to provide readers with a high-level overview of Project OASIS activities and its suitability for subsequent CarbonSAFE Phases, such as a Phase III effort. Other project deliverables and milestones will provide more details on individual subjects.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced Structured Adsorbent Architectures for Transformative Carbon Dioxide Capture Performance (Final Report)

Svante is a world leader at using solid sorbents for low-cost Carbon Dioxide (CO 2 ) capture, a technology which is recognized as critical in meeting the dual mandates of energy security/reliability and the mitigation of man-made CO 2 emissions. Svante has been developing proprietary adsorbent material compositions, forming them into structured laminates, developing and optimizing process cycles, and system design for efficient capture of CO 2 from post-combustion flue gases of thermal power plants and industrial facilities. The deployment of first-generation CO 2 capture technology has been significantly hampered by high costs and energy penalties, among other barriers. Second generation CO 2 capture technologies (including the Mark I variant of Svante’s Veloxotherm™ adsorption-based technology), utilizing single adsorbent architecture, show promise for reducing the barriers to deploying CO 2 capture plants in commercially meaningful numbers. The objective of this project was to evaluate the Recipient’s transformational (Mark-II) VeloxoTherm™ Technology via the development and bench-scale testing of an advanced structured adsorbent, including novel Bi-layer, laminated adsorbent structures and segmented beds. Svante selected, synthesized, and characterized tailored solid adsorbents for computational modeling, advanced structured adsorbent development, process simulations, and dynamic bench scale (~1-10 kg/day CO 2 captured) testing using an existing single-bed VeloxoTherm™ Station (VTS) coupled with a natural gas-fired boiler. Segmented beds used the in-house, multi-bed Process Demonstration Unit (PDU) to demonstrate key performance indicators (KPIs), such as recovery, product purity, regeneration energy, and the integrated system's productivity in lifetime analysis. Segmented beds were used at a 1 tonne per day (TPD) unit at an industrial site to provide bench-scale validation of performance in an industrial setting. Svante was developing and optimizing the post-combustion CO 2 adsorption technology architectures, including the Bi-layer and segmented laminated adsorbent structure design, integrated rapid cycle temperature swing adsorption (RC-TSA) cycle, flow path architecture, and adsorbent bed construction and packaging (including gas porting) to progress towards achievement of DOE’s Transformational CO 2 Capture goals of 95% CO 2 purity and a cost of electricity at least 30% lower than a supercritical Pulverized Coal (PC) power plant with CO 2 capture, or approximately $30 per tonne of CO 2 captured ready for demonstration by 2030. The main requirements to reach the DOE target cost of carbon capture below $30/MT using Rapid-Cycling Temperature Swing Adsorption (RC-TSA) are as follows: (1) Increased capacity at different CO 2 concentrations, (2) Increased sorbents cycle life, (3) Increased O 2 resistance, and (4) Decreased steam requirement to extract 1 kg of CO 2 .

20 FOSSIL-FUELED POWER PLANTS↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Progress in the Verification and Validation Efforts for START: A Spent Fuel Routing Tool

The U.S. Department of Energy’s (DOE) Office of Nuclear Energy (DOE-NE) is planning for an integrated waste management approach to transport, store, and dispose of spent nuclear fuel (SNF) and other high-level radioactive waste (HLW) as part of the Integrated Waste Management (IWM) program [1]. In support of this effort, the Stakeholder Tool for Assessing Radioactive Transportation (START) is being developed within the IWM program [2, 3]. This is a web-based decision support tool that can be used to analyze geospatial data related to the transportation of SNF and HLW. START is designed as a web-based application using an ArcGIS server through which the user can select the origin and destination of the route [4]. This is followed by selection of the mode of transportation of choice based on user preference. Some of the modes available to the user include rail, heavy haul truck, and barge. The option of utilizing more than one mode of transportation (intermodal transportation) is also implemented in START. A few examples of intermodal transportation include barge to rail, and heavy haul truck to rail. It must be noted that some routes might not have access to all modes of transportation, depending on the infrastructure availability at the origin and destination sites. Users can also select any stops or barriers they would like to introduce in the routes. This is followed by selection of the routing criteria of interest. Three primary routing options available to the user include minimum population, minimum distance, and minimum time. Apart from that, a few other options include accounting for a weighted average of the three aforementioned routing options. The next step involves the selection of the buffer distance of interest which includes the two choices available of 800 m and 2500 m, respectively. Finally, an option to select any prohibited rail carriers that the user does not wish to use is available. After making these selections, a route is ready to be created.

Gadey, Harish Reddy↗

Enhancing Lifetime and Reducing Costs for Fish Diversion Netting Structures (Abstract)

This effort will focus on technology transfer and commercialization of antifouling coatings with an enthusiastic and engaged industrial team. Environmental requirements and operational demands call for a nontoxic coating/paint to prevent fouling on fish passage guidance netting at hydropower facilities. For example, one netting customer estimated the capital cost for compliance at $\$12$ million to $\$15$ million. This project will build partnerships between PNNL and private companies to optimize, demonstrate, mature, and commercialize a novel PNNL-developed technology that addresses this critical coating need of the hydropower industry. This effort will support modification of existing coatings for application to flexible netting structures. Industrial partners include commercial coating development specialist (Lorama), hydrophobic material manufacturer and paint developer (Dry Surface Technologies), aquatic applications specialists (Prometheus Innovations and River Connectivity Systems), and hydropower netting producer (Pacific Netting Products). Engagement with the U.S. Army Corps of Engineers (USACE) and Bureau of Reclamation (BOR), two hydropower operators, throughout the project will provide expertise and field test sites that will provide crucial proof of real-world performance data (additional details provided in Teaming section). Taylor Shellfish Farms will provide organisms and fouling expertise as well as a perspective of potential broader impacts for the blue economy. Sample netting will demonstrate performance in a range of environments for key hydropower applications. PNNL will work with industrial partners to overcome commercialization barriers as well as resolving any manufacturing or regulatory issues. This Phase 1 effort is focused on technology optimization for application to fish passage guidance netting and technology validation as verified by independent testing (through USACE, BOR, Taylor Shellfish and Prometheus Innovations). Through this effort, SLIC will be demonstrated for netting applications at technology readiness level (TRL) 5. The field test data will allow optimization of SLIC formulation and performance which is key to enabling technology transfer of a mature proven technology to industry and production of a viable commercial product specifically focused for hydropower needs.

13 HYDRO ENERGY↗

Model-ready benchmarks for NPP, ANPP, litter fluxes, and recruitment into the 1 cm dbh size class

The intended use of this dataset is to serve as an observational benchmark to evaluate model predictions of NPP, ANPP, litter fluxes, and recruitment at Barro Colorado Island, Panama. This dataset contains four CSV files and one text file. “Benchmarks-NPP-ANPP-R-L.csv” provides estimates of annual ecosystem-level reproductive litter flux (R), leaf litter flux (L), aboveground net primary productivity (ANPP), and net primary productivity (NPP) for 61 field plots throughout tropical, temperate, and boreal forest biomes. An additional 499 plots (n = 550) include estimates of just R, L, and R/L. Each row reports a distinct set of estimates for one sampling interval at one plot. “Metadata-Benchmarks-NPP-ANPP-R-L.csv” contains field descriptions for all data fields in “Benchmarks-NPP-ANPP-R-L.csv”. “References-Benchmarks-NPP-ANPP-R-L.txt” contains full references to the original studies used to produce the observations at each plot included in the data. “Benchmarks-Recruitment.csv” provides estimates of species-level recruitment rates into the 1 cm dbh size class at four CTFS-ForestGeo sites using methods that account for unobserved mortality of new recruits between census intervals (Kohyama et al., 2018). “Metadata-Benchmarks-Recruitment.csv” contains field descriptions for all data fields in “Benchmarks-Recruitment.csv”.

54 ENVIRONMENTAL SCIENCES↗

The Fast Modular Reactor (FMR) - Development Plan of a New 50 MWe Gas-cooled Fast Reactor

General Atomics Electromagnetic Systems (GA-EMS) will be developing a new 50-megawatt electric (MWe) fast modular reactor (FMR), under the Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), Advanced Reactor Concepts 2020 (ARC-20) development pathway, that provides safe, carbon free electricity, capable of incremental capacity additions. A modular design allows it to be factory-built and assembled on-site to keep the cost of capital low, while the dry-cooling facilitates siting to complement renewables in nearly any location. GA-EMS is committed to commercialization of the proposed reactor, with a demonstration by 2030, and deployment by the mid-2030s. The ultimate goal of the design is to develop flexible and dispatchable carbon-free power source for the 2035 US electricity market. The GAEMS- led team will verify that simplified characteristics (e.g., inert helium gas coolant, pellet-loaded fuel rod, installation-free of heat sink requirements, small and passive heat removal systems) of the FMR will result in a safe, maintainable, cost-effective, distributed, nuclear energygenerating station. Three key specific project objectives for the next three years include: Development of the conceptual design of the 50- MWe FMR plant, Achievement of Technology Readiness Level (TRL) 4 for key system and component technologies through in-pile tests, out-of-pile tests, and numerical experiments; and Development of robust techno-economic analysis (TEA) and pre-application licensing approach necessary for timely demonstration and eventual commercialization.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Coalition for Community-Supported Affordable Geothermal Energy Systems (C2SAGES)

The C2SAGES project evaluated the feasibility of a community geothermal system for the planned Windy Ridge affordable housing development in Hinesburg, Vermont. Led by GTI Energy with Vermont Gas Systems, LN Consulting, NREL, and Frontier Energy, the work assessed technical design, energy performance, costs, business models, community engagement, maintenance, workforce development, and permitting. The proposed system was designed to serve 100% of the development’s heating, cooling, and domestic hot water loads. Compared with a baseline using air-source heat pumps and natural gas water heating, the geothermal system was estimated to reduce HVAC and domestic hot water energy use by about 45% to 48%, lower operating and maintenance costs, and reduce 30-year life-cycle costs by 37% for Phase 1 and 10% for Phase 2. Technical testing and modeling indicated that the Windy Ridge site is suitable for a community-scale geothermal system. The project also developed borehole field layouts, piping concepts, pump house designs, controls, maintenance plans, and supporting engineering drawings. The business model analysis found that first cost, ownership structure, and customer affordability remain major deployment challenges. Utility-led maintenance and operation were viewed favorably, but traditional utility cost-recovery models may require subsidy or revised financing structures to be practical for affordable housing. Community engagement highlighted the need for clear public education, transparent financing, reliable long-term maintenance, trained technicians, and the potential to pair geothermal systems with weatherization. Overall, the report concludes that community geothermal is technically feasible and offers meaningful energy, emissions, and life-cycle cost benefits, but broader deployment will depend on workable financing models and workforce readiness.

15 GEOTHERMAL ENERGY↗

Advancement of Commercial Intumescent Expanding Foams for Deactivation and Decommissioning in the Nuclear Sector - 20198

Florida International University (FIU), in collaboration with The Department of Energy's Office of Environmental Management (DOE-EM), Savannah River National Laboratory (SRNL), and sites across the Savannah River complex, have identified an operational requirement for a fixative technology that is intended to immobilize and/or isolate residual contamination within a 3-dimensional space. Fixation of radiological contamination can reduce worker risk and mitigate potentially hazardous conditions, however nearly every marketed contamination fixative has been found to be flammable; a significant concern in radiological facilities. Coupled with this, industry fixatives are normally used as a thin coating which can present problems when attempting to stabilize irregular geometry or areas that are difficult to access whilst ensuring full coverage. The technical evaluation and advancement of commercial-off-the-shelf (COTS) polyurethane foams has yielded a down-selected candidate that shows potential in meeting the requirements to support deactivation and decommissioning activities. Several performance criteria have been established and tested to progress the technology readiness level towards an active field demonstration (TRL-7). Such criteria include: mechanical failure limits, adhesive and cohesive properties, thermal/fire resilience, determining thermal behavior, ability to immobilize contamination, and a means of non-destructive evaluation of applications. The test scenario examined was targeted towards an application for decommissioning nuclear pipework, in which the down-selected polyurethane foam would act as a barrier to segregate pipework and mitigate the potential for release during cutting, packaging, and storage operations. Testing carried out at SRNL included: mechanical evaluation of tensile, compressive, and adhesion strength by dynamic mechanical analysis (DMA), as well as thermogravimetric analysis (TGA). FIU examined the foam's fixative properties by utilizing phosphorescent europium-dysprosium doped strontium aluminate powder to investigating the extent to which contamination can be immobilized. FIU has also exploited previous successes in the field of intumescent technologies to assess the down-selected foam's tolerance to an extreme fire scenario, while maintaining the ability to effectively mitigate a contamination release. Parallel to this, extensive thermal investigations were carried out to determine the upper boundary of anticipated heat generation during the curing process as heat generation has the potential to compromise rubber parts of contaminated enclosures. These investigations subsequently yielded a promising method for a non-destructive application evaluation by means of infrared thermography. Utilizing the high sensitivity of modern IR cameras, coupled with the heat generated during the curing process of the polyurethane foam, FIU has been exploring the concept of monitoring the external pipe surface for indications of an irregular or abnormal application, thus informing operational decision making. The testing carried out utilized several current 'best fit' ASTM standards, which serve as helpful guidelines for testing, however, a precise definition of the operational parameters and requirements is still necessary. With continued collaboration with SRNL, FIU aims refine said definitions and develop new standards by which this, and other decommissioning technologies, can be accredited by relevant standards based testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗