Search NASA⌕ Search

SEARCH · Search NASA

Results for “Systems Integration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

HDU Pressurized Excursion Module (PEM) Prototype Systems Integration

The Habitat Demonstration Unit (HDU) project team constructed an analog prototype lunar surface laboratory called the Pressurized Excursion Module (PEM). The prototype unit subsystems were integrated in a short amount of time, utilizing a skunk-works approach that brought together over 20 habitation-related technologies from a variety of NASA centers. This paper describes the system integration strategies and lessons learned, that allowed the PEM to be brought from paper design to working field prototype using a multi-center team. The system integration process included establishment of design standards, negotiation of interfaces between subsystems, and scheduling fit checks and installation activities. A major tool used in integration was a coordinated effort to accurately model all the subsystems using CAD, so that conflicts were identified before physical components came together. Some of the major conclusions showed that up-front modularity that emerged as an artifact of construction, such as the eight 45 degree "pie slices" making up the module whose steel rib edges defined structural mounting and loading points, dictated much of the configurational interfaces between the major subsystems and workstations. Therefore, 'one of the lessons learned included the need to use modularity as a tool for organization in advance, and to work harder to prevent non-critical aspects of the platform from dictating the modularity that may eventually inform the fight system.

Gill, Tracy R.↗

The Habitat Demonstration Unit System Integration

The Lunar Surface System Habitat Demonstration Unit (HDU) will require a project team to integrate a variety of contributions from National Aeronautics and Space Administration (NASA) centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the first version of the HDU, the Pressurized Excursion Module (PEM), from conception in June 2009 to rollout for operations in July 2010, the HDU project team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of PEM and to the payloads, such as the Geology Laboratory, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a habitat avionics test bed prior to equipment installation into HDU PEM are planned to facilitate the integration process. A coordinated effort to establish simplified Computer Aided Design (CAD) standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU design to maximize the efficiency of both integration and field operations.

Gill, Tracy R.↗

The Habitat Demonstration Unit System Integration

The Lunar Surface System Habitat Demonstration Unit (HDU) will require the project team to integrate a variety of contributions from NASA centers and potential outside collaborators and poses a challenge in integrating these disparate efforts into a cohesive architecture. To accomplish the development of the HDU from conception in June 2009 to rollout for operations in July 2010, the HDU team is using several strategies to mitigate risks and bring the separate efforts together. First, a set of design standards is being developed to define the interfaces between the various systems of HDU and to the payloads, such as the Geology Lab, that those systems will support. Scheduled activities such as early fit-checks and the utilization of a Habitat avionics test bed prior to equipment installation into HDU. A coordinated effort to establish simplified Computer Aided Design standards and the utilization of a modeling and simulation systems will aid in design and integration concept development. Finally, decision processes on the shell development including the assembly sequence and the transportation have been fleshed out early on HDU to maximize the efficiency of both integration and field operations.

Kennedy, Kriss J.↗

Integrated System Health Management: Foundational Concepts, Approach, and Implementation

Implementation of integrated system health management (ISHM) capability is fundamentally linked to the management of data, information, and knowledge (DIaK) with the purposeful objective of determining the health of a system. It is akin to having a team of experts who are all individually and collectively observing and analyzing a complex system, and communicating effectively with each other in order to arrive to an accurate and reliable assessment of its health. This paper presents concepts, procedures, and a specific approach as a foundation for implementing a credible ISHM capability. The capability stresses integration of DIaK from all elements of a subsystem. The intent is also to make possible implementation of on-board ISHM capability, in contrast to a remote capability. The information presented is the result of many years of research, development, and maturation of technologies, and of prototype implementations in operational systems (rocket engine test facilities). The paper will address the following topics: ISHM Model of a system; detection of anomaly indicators; determination and confirmation of anomalies; diagnostic of causes and determination of effects; consistency checking cycle; sharing of health information; sharing of display information; storage and retrieval of health information; and example implementation.

Figueroa, Fernando↗

NASA Human Systems Integration Handbook

This handbook is intended to provide general guidance and information on Human Systems Integration (HSI) for the NASA community and the applicability of HSI to NASA programs and projects. The primary goals are to increase awareness and consistency across the Agency, advance the practice and implementation of HSI principles, and provide invaluable information and guidance to HSI practitioners in the performance of their duties. Specific aims of this handbook are to define HSI, illustrate the value of HSI in programmatic decisions, demonstrate how HSI fits into the NASA project life cycle process, describe how HSI applies across all three NASA Technical Authorities, provide guidance on HSI processes and products, and provide helpful information on HSI resources within the NASA community. Largely within the engineering community, a system is thought of as the integration or assemblance of hardware and software that together perform a function. HSI considers a system to be the integration of hardware, software, humans, data, and processes, where the human in HSI refers to all personnel involved with a given system, including system owners, users/customers, operators, maintainers, assemblers, support personnel, logistics suppliers, training personnel, test personnel, and others. This handbook should be used as a companion for implementing NPR 7123.1, Systems Engineering Processes and Requirements, the NASA Systems Engineering Handbook, NASA directives, and any Center-specific handbooks and directives developed for implementing programs and projects. As of 2021, both NPR 7123.1 and NPR 7120.5 require HSI to be implemented within NASA technical efforts.

Lisa O Rippy↗

Alpha: A real-time decentralized operating system for mission-oriented system integration and operation

Alpha is a new kind of operating system that is unique in two highly significant ways. First, it is decentralized transparently providing reliable resource management across physically dispersed nodes, so that distributed applications programming can be done largely as though it were centralized. And second, it provides comprehensive, high technology support for real-time system integration and operation, an application area which consists predominately of aperiodic activities having critical time constraints such as deadlines. Alpha is extremely adaptable so that it can be easily optimized for a wide range of problem-specific functionality, performance, and cost. Alpha is the first systems effort of the Archons Project, and the prototype was created at Carnegie-Mellon University directly on modified Sun multiprocessor workstation hardware. It has been demonstrated with a real-time C(sup 2) application. Continuing research is leading to a series of enhanced follow-ons to Alpha; these are portable but initially hosted on Concurrent's MASSCOMP line of multiprocessor products.

Jensen, E. Douglas↗

Implementation of Human Systems Integration Technical and Management Process for the Lunar Gateway Program

NASA recognizes Human Systems Integration (HSI) as part of the overall systems engineering and acquisition strategy for space systems. The Lunar Gateway Program is implementing HSI technical and management process across the lifecycle of the mission, as required by NPR 7123.1C NASA Systems Engineering Processes and Requirements, and led by the Gateway HSI team as required by NPR 8705.2C Human-Rating Requirements for Space Systems, now HEOMD-003 Crewed Deep Space Systems Human Rating Certification Requirements and Standards for NASA Missions. NASA has been using HSI principles for many years and has applied them to many of its previous human spaceflight Programs. As NASA returns to the Moon in a more sustainable manner, the Gateway Program is maturing the application of HSI by implementing it more visibly as part of Artemis, with guidance from the NASA/SP-20210010952 NASA HSI Handbook. This paper discusses how HSI is being implemented in the Gateway Program, challenges faced with its implementation during the development phase, and strategies/approaches used to overcome those. The paper also covers HSI implementation for flight systems, vehicle processing, and interfaces across the six identified NASA HSI Domains: human factors engineering, operations, safety, training, maintainability and supportability, habitability and environment. The goal is to provide an overview of the implementation process of HSI in the Gateway Program as an example for other Programs/Projects/Missionsthat are looking to implement HSI.

Jackelynne Silva-Martinez↗

System integration of marketable subsystems

Progress is reported in the following areas: systems integration of marketable subsystems; development, design, and building of site data acquisition subsystems; development and operation of the central data processing system; operation of the MSFC Solar Test Facility; and systems analysis.

Source record↗

Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

NASA Glenn Research Center (GRC) developed a non-nuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASC), a Dual Convertor Controller (DCC) EM (engineering model) 2 & 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University/Applied Physics Laboratory (JHU/APL) to actively control a pair of Advanced Stirling Convertors (ASC). The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS) which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASC's in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and supercapacitor. A load profile, created based on data from several missions, tested the RPS and RSIL ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 V or exceeded 36 V. Once operation was verified with the DASCS, the tests were repeated with actual operating ASC's. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

systems integration↗

Step 1: Human System Integration Simulation and Flight Test Progress Report

The Access 5 Human Systems Integration Work Package produced simulation and flight demonstration planning products for use throughout the program. These included: Test Objectives for Command, Control, Communications; Pilot Questionnaire for Command, Control, Communications; Air Traffic Controller Questionnaire for Command, Control, Communications; Test Objectives for Collision Avoidance; Pilot Questionnaire for Collision Avoidance; Plans for Unmanned Aircraft Systems Control Station Simulations Flight Requirements for the Airspace Operations Demonstration

Source record↗

Grand challenges in mass storage: A systems integrators perspective

Within today's much ballyhooed supercomputing environment, with its CFLOPS of CPU power, and Gigabit networks, there exists a major roadblock to computing success; that of Mass Storage. The solution to this mass storage problem is considered to be one of the 'Grand Challenges' facing the computer industry today, as well as long into the future. It has become obvious to us, as well as many others in the industry, that there is no clear single solution in sight. The Systems Integrator today is faced with a myriad of quandaries in approaching this challenge. He must first be innovative in approach, second choose hardware solutions that are volumetric efficient; high in signal bandwidth; available from multiple sources; competitively priced, and have forward growth extendibility. In addition he must also comply with a variety of mandated, and often conflicting software standards (GOSIP, POSIX, IEEE, MSRM 4.0, and others), and finally he must deliver a systems solution with the 'most bang for the buck' in terms of cost vs. performance factors. These quandaries challenge the Systems Integrator to 'push the envelope' in terms of his or her ingenuity and innovation on an almost daily basis. This dynamic is explored further, and an attempt to acquaint the audience with rational approaches to this 'Grand Challenge' is made.

Lee, Richard R.↗

Unifying Human Centered Design and Systems Engineering for Human Systems Integration

Despite the holistic approach of systems engineering (SE), systems still fail, and sometimes spectacularly. Requirements, solutions and the world constantly evolve and are very difficult to keep current. SE requires more flexibility and new approaches to SE have to be developed to include creativity as an integral part and where the functions of people and technology are appropriately allocated within our highly interconnected complex organizations. Instead of disregarding complexity because it is too difficult to handle, we should take advantage of it, discovering behavioral attractors and the emerging properties that it generates. Human-centered design (HCD) provides the creativity factor that SE lacks. It promotes modeling and simulation from the early stages of design and throughout the life cycle of a product. Unifying HCD and SE will shape appropriate human-systems integration (HSI) and produce successful systems.

Boy, Guy A.↗

System-Integrated Finite Element Analysis of a Full-Scale Helicopter Crash Test with Deployable Energy Absorbers

A full-scale crash test of an MD-500 helicopter was conducted in December 2009 at NASA Langley's Landing and Impact Research facility (LandIR). The MD-500 helicopter was fitted with a composite honeycomb Deployable Energy Absorber (DEA) and tested under vertical and horizontal impact velocities of 26-ft/sec and 40-ft/sec, respectively. The objectives of the test were to evaluate the performance of the DEA concept under realistic crash conditions and to generate test data for validation of a system integrated finite element model. In preparation for the full-scale crash test, a series of sub-scale and MD-500 mass simulator tests was conducted to evaluate the impact performances of various components, including a new crush tube and the DEA blocks. Parameters defined within the system integrated finite element model were determined from these tests. The objective of this paper is to summarize the finite element models developed and analyses performed, beginning with pre-test predictions and continuing through post-test validation.

Annett, Martin S.↗

A new simulation model building process for use in dynamic systems integration research

A framework to build simulation models for aircraft dynamic systems integration is described. The objective of the framework is increased simulation model fidelity and reduced time required to develop and modify these models. The equations of motion for an elastic aircraft and their impact on the framework are discussed in broad terms. A software tool which automatically generates FORTRAN routines for tabular data lookups, the language used to develop a simulation model, and the structures for passing information into a simulation are discussed. A simulation variable nomenclature is presented. The framework has been applied to build an open-loop F/A-18 simulation model. This example model is used to illustrate model reduction issues. Current deficiencies in the framework are identified as areas for future research.

Arbuckle, P. Douglas↗

Mach 6 Integrated Systems Tests of Lewis' Hypersonic Tunnel Facility

A series of 15 integrated systems tests were conducted at the NASA Lewis Research Center's Hypersonic Tunnel Facility (HTF) with test conditions simulating flight up to Mach 6. Facility stagnation conditions up to 3050 R and 1050 psia were obtained with typical test times of 20 to 45 sec.

Source record↗

Shared visions: Partnership of Rockwell International and NASA Cost Effectiveness Enhancements (CEE) for the space shuttle system integration program

As a result of limited resources and tight fiscal constraints over the past several years, the defense and aerospace industries have experienced a downturn in business activity. The impact of fewer contracts being awarded has placed a greater emphasis for effectiveness and efficiency on industry contractors. It is clear that a reallocation of resources is required for America to continue to lead the world in space and technology. The key to technological and economic survival is the transforming of existing programs, such as the Space Shuttle Program, into more cost efficient programs so as to divert the savings to other NASA programs. The partnership between Rockwell International and NASA and their joint improvement efforts that resulted in significant streamlining and cost reduction measures to Rockwell International Space System Division's work on the Space Shuttle System Integration Contract is described. This work was a result of an established Cost Effectiveness Enhancement (CEE) Team formed initially in Fiscal Year 1991, and more recently expanded to a larger scale CEE Initiative in 1992. By working closely with the customer in agreeing to contract content, obtaining management endorsement and commitment, and involving the employees in total quality management (TQM) and continuous improvement 'teams,' the initial annual cost reduction target was exceeded significantly. The CEE Initiative helped reduce the cost of the Shuttle Systems Integration contract while establishing a stronger program based upon customer needs, teamwork, quality enhancements, and cost effectiveness. This was accomplished by systematically analyzing, challenging, and changing the established processes, practices, and systems. This examination, in nature, was work intensive due to the depth and breadth of the activity. The CEE Initiative has provided opportunities to make a difference in the way Rockwell and NASA work together - to update the methods and processes of the organizations. The future success of NASA space programs and Rockwell hinges upon the ability to adopt new, more efficient and effective work processes. Efficiency, proficiency, cost effectiveness, and teamwork are a necessity for economic survival. Continuous improvement initiatives like the CEE are, and will continue to be, vehicles by which the road can be traveled with a vision to the future.

Bejmuk, Bohdan I.↗

The Build System - Integration and management of large software avionic systems

The Build System comprises the software tools and procedures creating the flight memory load for the Space Shuttle Backup Flight System. The system has six functions: (1) configuration management, which insures that the memory load contains the proper modules, all clearly marked; (2) source translation, which translates the source code into a relocatable machine code; (3) module integration, which combines and assigns memory locations to all the object modules produced in source translation; (4) static code analysis, which verifies the integration process; (5) deliverables generation, which yields release documentation and deliverable items; and (6) release maintenance, which controls all system patches subsequent to release. Further developments will include more automation in the producing of patches from source-code updates and system requirements for tracking.

Mayer, J. T. B.↗