Search NASA⌕ Search

SEARCH · Search NASA

Results for “Upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Upgrade to Fixed and Translating Scintillation-based Loss Detector System in the Fermilab Drift Tube Linac

The closed-off structure of the Fermilab Drift Tube Linac precludes a robust array of instrumentation from directly monitoring the H- beam that is accelerated from 750 keV to 116 MeV. To improve beam tuning and operational assessment of Drift Tube Linac performance, scintillator-based loss monitors were previously installed along the exterior of the first two accelerating cavities to assess low energy beam losses. Here we present a recent upgrade to the loss monitor system, including significant improvements in analog signal processing to address baseline-interfering noise; digitization of the signals to enable regular operational use and tuning; and a new remote operation upgrade of the translating loss monitor with precise positioning of the loss monitor along its nine-foot track. Data from the fixed and translating detectors collected under varying beam conditions validate the utility of the upgrade.

Chen, E. V. [Fermilab]↗

Physics motivation and detector upgrades for the new era of the ATLAS experiment

The ATLAS experiment at CERN’s Large Hadron Collider (LHC) will be upgraded in two stages to prepare first for the Run~3 data-taking campaign, during which the integrated luminosity will roughly double, and then for the High-Luminosity LHC program with an ultimate integrated luminosity of up to 4 ab ^{{-1}} − 1 . These upgrades and high-statistics datasets will allow ATLAS to perform searches and precision measurements to constrain the Standard Model in yet-unexplored phase spaces and in the Higgs sector. This contribution summarizes the ATLAS detector upgrades and selected physics prospects for Run~3 and the HL-LHC.

Nielsen, Jason↗

HERMES 2019 Upgrade Characterization - Quick Look Report (UUR)

Characterizing the electromagnetic environment created by the recently upgraded HERMES III pulser is the primary objective addressed by this report. The pulser upgrade design was intended not only to provide higher electric field and magnetic field illumination amplitudes but also to provide a more collimated beam, focused along the center-line of the courtyard. For high-voltage pulsers to be useful as qualification systems, they must have the requisite peak values and uniform, predictable peak field spatial patterns. To assess the peak electric field values and uniformity of the spatial pattern of the electric fields for the upgraded HERMES system, a 1 6 full-power shot illumination of 9 electric and 9 magnetic field sensors in the courtyard of the HERMES III facility was conducted. The data acquired from this test showed an increase an increase in electric field amplitude, but still an asymmetry in the spatial distributions.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

ACE: Proton beam upgrade plan at Fermilab

aFor Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, ACE-MIRT, is the ACE Main Injector Ramp and Targetry upgrade, which would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, AC-BR, is the ACE Booster Replacement, which would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The implications for the Fermilab neutrino program and future experiments hosted at Fermilab will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Catalytic Upgrading of Renewable Feedstock (Final Technical Report)

The goal of this DOE-funded project was to investigate the fundamental science related to the development of homogeneous (de)hydrogenation catalysts in order to enable energy-relevant transformations of bio-relevant chemical feedstocks including ethanol. The primary focus was to improve the activity of ethanol upgrading catalysts, specifically informed through mechanistic studies, in order to enable rational design optimization strategies. Following in depth mechanistic studies, targeted reaction optimization approaches included ligand redesign to improve catalyst stability, developing new carbon-carbon bond forming reactions using ethanol as a precursor, and examining photochemically-mediated reactions, ultimately to integrate within other reactor designs such as continuous flow reactors. The high modularity of the catalyst components (ligands) has enabled the preparation and analyses of multiple catalyst precursors. These studies uncovered an unexpectedly beneficial substitution pattern of the ligand structure that led to the development of new catalysts that are the best in class for upgrading ethanol to butanol with a turnover number of 155,890 and a turnover frequency of 12,690 h –1 . In addition to upgrading ethanol to butanol, cascade reaction sequences were developed to form new C-C bonds using ethanol as a bio-relevant feedstock, providing access to platform chemicals from renewable sources. As part of the reaction discovery process, new mechanistic details were uncovered that provided insights into: a) catalyst speciation, b) decomposition pathways, c) carbon monoxide releasing pathways, and d) carbon-carbon and carbon hydrogen bond breaking pathways. Most of these outcomes were previously not known; however, they provide important directions for new catalyst design strategies. Finally, use of high throughput and in situ photochemical reaction analyses enabled detailed studies into changes to the catalyst structure upon irradiation. Irradiation was found to improve hydrogen transfer catalysis, by promoting a ligand dissociation event.

09 BIOMASS FUELS↗

End-Use Savings Shapes Upgrade Package Documentation: Wall and Roof Insulation, New Windows, LED Lighting, HP-RTU and ASHP-Boiler

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy’s ResStock™ and ComStock™ models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility enduse load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. “Measures” refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of POTATO for 2S Module Grading for the CMS Phase-2 Outer Tracker Upgrade

Due to the High Luminosity-Large Hadron Collider (HL-LHC) upgrade, several detectors of the Compact Muon Solenoid (CMS) will need to be upgraded, specifically the new Outer Tracker detector that will be composed of 13,200 silicon modules. The Outer Tracker features two types of modules; the PS (pixel-strip) and the 2S (strip-strip) modules. With a large influx of production of modules, extensive testing is required to ensure they fulfill the performance requirements. This research introduces POTATO (Phase-II Outer Tracker Analyzer of Test Outputs), a specialized software developed in C++ to analyze, grade, and store results in a centralized database since module data will be collected from various international production facilities. The implementation of POTATO will facilitate the selection of the best performing modules for the Outer Tracker upgrade. This paper is focused on the implementation of the analysis of 2S Module results within POTATO.

43 PARTICLE ACCELERATORS↗

MaPSA Quality Control and AI-Enhanced Grading For the CMS Phase-II Tracker Upgrade

The Compact Muon Solenoid (CMS) experiment will undergo changes as part of the Large Hadron Collider upgrade. The CMS tracker will be upgraded to cope with the new radiation environment and to provide tracking at the first level trigger. This upgrade features a new type of silicon module called PS Module, which combines a Pixel sensor and a Strip sensor in the same module. The pixel portion of the PS module has a sensor bump bonded to 16 Macro Pixel ASICs (MPA) to form a Macro Pixel Sub Assembly (MaPSA). At Fermilab, MaPSAs are tested for quality control before being assembled with the strip sensors, readout and service electronics to form a PS Module. All of this test data is stored in a centralized database, and is used to grade the final module to determine if it will be installed in the detector. The Phase II Outer Tracker Analyzer of Test Outputs (POTATO) is the software that processes this data and determines the module grades. Using recent technologies, an AI agent is being im plemented into POTATO in order to allow users to more efficiently sort through the large amounts of analysis data and ensure that only the user specified data is being considered. This poster will display the process of testing a MaPSA, how that test data is relevant to module assembly and grading, and how the POTATO grading tool is being improved with the use of an embedded AI agent.

Gzamouranis, Olivia [Purdue U.]↗

Final Technical Report of a Feasibility Investigation of a Hydropower Flexibility Upgrade Kit

The project studied the feasibility of a concept for a flexibility upgrade kit called h-Dynamyk to improve the flexibility of U.S. hydropower plants and assessed its potential impact on the U.S. hydropower industry. This concept addresses the growing need for grid flexibility amid rising renewable energy adoption, such as wind and solar, which often introduce intermittency. The upgrade kit is intended to address challenges posed by aging turbine designs in meeting modern grid demands for flexibility services like frequency response, voltage control, spinning reserve, and black-start capabilities. Key features of the h-Dynamyk kit include siphon turbine assemblies, medium-voltage variable frequency drives (VFDs), and smart controls integrated with plant systems to optimize operations and extend equipment life. This nine-month discovery project successfully achieved its objectives by defining a baseline design and performance metrics for the h-Dynamyk flexibility upgrade kit, analyzing this baseline, and incorporating lessons learned from this analysis into a modified set of metrics and recommendations for future design and testing, which were further guided by field site studies.

13 HYDRO ENERGY↗

Upgrade to Fixed and Translating Scintillation-Based Loss Detector System in the Fermilab Drift Tube Linac

The closed-off structure of the Fermilab Drift Tube Linac precludes a robust array of instrumentation from directly monitoring the H- beam that is accelerated from 750 keV to 116 MeV. To improve beam tuning and op-erational assessment of Drift Tube Linac performance, scintillator-based loss monitors were previously installed along the exterior of the first two accelerating cavities to assess low energy beam losses. Here we present a recent upgrade to the loss monitor system, including significant improvements in analog signal processing to address baseline-interfering noise; digitization of the signals to enable regular operational use and tuning; and a new remote operation upgrade of the translating loss monitor with precise positioning of the loss monitor along its nine-foot track. Data from the fixed and translating de-tectors collected under varying beam conditions validate the utility of the upgrade.

Chen, Erin V. [Fermilab] (ORCID:0000000215467899)↗

Completion document for MRT 8824 - Upgrade NIF’s gaseous radiochemistry diagnostics (RAGS) to support weapons science

This milestone highlights the successful upgrade and deployment of the Radiochemical Analysis of Gaseous Samples (RAGS) system, which delivers high-quality measurements (<20% uncertainty) of activated gaseous species from NIF implosions. These measurements are critical for supporting Stockpile Stewardship Program (SSP) relevant platforms, including LANL’s Double Shell and LLNL’s Pushered Single Shell campaigns. The RAGS diagnostic technique enables analysis of short-range mixing in implosions using high-Z shells, which are otherwise inaccessible to conventional x-ray diagnostic methods. By facilitating the investigation of high-Z material mixing into fusion burn, this system provides essential data for quantifying and interpreting results in high-energy density (HED) experiments. This report details the physics motivation, diagnostic fundamentals, planned and enacted upgrade work, and the quantification of uncertainty for the upgraded system.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

NG-CT Peaker Upgrades with Bottoming Cycle: Preliminary Analysis

The National Energy Technology Laboratory (NETL) has conducted a preliminary analysis exploring a significant opportunity to increase the nation's power grid capacity and reliability. The study focuses on retrofitting under-utilized natural gas combustion turbines (NG-CTs), often called "peaker" plants, with a bottoming cycle to capture waste heat and generate additional electricity. This analysis shows that upgrading these existing assets could add approximately 26,250 MW of new power capacity across the United States. A detailed study of the PJM Interconnection, the nation's largest grid operator, confirmed the benefits of these upgrades. Key findings for the PJM region include: - A median increase in the plants' capacity factor by 17 percentage points. - A projected 36.2% median reduction in the levelized cost of electricity (LCOE) for the upgraded plants, with nearly 88% of them expected to break even. - An average reduction in the regional wholesale price of electricity by approximately 3.0% in the year 2030. - A significant boost to grid reliability, with a 46% reduction in projected Loss of Load Hours (LOLH). These findings suggest that retrofitting peaker plants is a promising and economically viable strategy to enhance grid performance, reduce electricity costs, and meet future demand without the challenges associated with building entirely new facilities.

bottoming cycle↗

The HETDEX Instrumentation: Hobby–Eberly Telescope Wide-field Upgrade and VIRUS

The Hobby–Eberly Telescope (HET) Dark Energy Experiment (HETDEX) is undertaking a blind wide-field low-resolution spectroscopic survey of 540 deg 2 of sky to identify and derive redshifts for a million Ly α -emitting galaxies in the redshift range 1.9 < z < 3.5. The ultimate goal is to measure the expansion rate of the universe at this epoch, to sharply constrain cosmological parameters and thus the nature of dark energy. A major multiyear Wide-Field Upgrade (WFU) of the HET was completed in 2016 that substantially increased the field of view to 22' diameter and the pupil to 10 m, by replacing the optical corrector, tracker, and Prime Focus Instrument Package and by developing a new telescope control system. The new, wide-field HET now feeds the Visible Integral-field Replicable Unit Spectrograph (VIRUS), a new low-resolution integral-field spectrograph (LRS2), and the Habitable Zone Planet Finder, a precision near-infrared radial velocity spectrograph. VIRUS consists of 156 identical spectrographs fed by almost 35,000 fibers in 78 integral-field units arrayed at the focus of the upgraded HET. VIRUS operates in a bandpass of 3500–5500 Å with resolving power R ≃ 800. VIRUS is the first example of large-scale replication applied to instrumentation in optical astronomy to achieve spectroscopic surveys of very large areas of sky. This paper presents technical details of the HET WFU and VIRUS, as flowed down from the HETDEX science requirements, along with experience from commissioning this major telescope upgrade and the innovative instrumentation suite for HETDEX.

79 ASTRONOMY AND ASTROPHYSICS↗

Durability Study of a High-Pressure Common Rail Fuel Injection System Using Lubricity Additive-Dosed Gasoline-Like Fuel—Improved Endurance with Upgraded Hardware

Gasoline compression ignition (GCI) is a promising combustion technology that can help the commercial transportation sector achieve operational flexibility and meet upcoming criteria pollutant regulations. However, high-pressure fuel injection systems (>1000 bar) are needed to enable GCI and fully realize its benefits compared to conventional diesel combustion. This work is a continuation of previous durability studies that identified three key technical risks after running gasoline-like fuel through a heavy-duty, common rail injection system: (i) cavitation damage to the inlet check valve of the high-pressure pump, (ii) loss of injector fueling capacity, (iii) cavitation erosion of the injector nozzle holes. Upgraded hardware solutions were tested on a consistent 400- to 800-hour NATO durability cycle with the same gasoline-like fuel as previous studies. The upgraded pump showed no signs of abnormal wear or cavitation damage to the inlet check valve. In contrast to previous studies, there were no signs of pump performance degradation observed after 400 hours of testing. Material selection and design upgrades were also made to the injector which, only showed a 6.5% loss in fueling capacity after 800 hours of durability testing compared to 49.3% previously. Finally, geometric nozzle hole features such as higher inlet radius of curvature and higher K-factor were found to correlate with reduced cavitation erosion. However, mitigation of eccentric radial needle motion (i.e., wobble) is likely needed to further suppress cavitation. In general, the results from this study indicate there are viable hardware-based solutions for improving the endurance of high-pressure systems when running with gasoline-like fuel.

33 ADVANCED PROPULSION SYSTEMS↗

An evaluation of upgraded boron fibers in epoxy-matrix composites

An initial evaluation of upgraded boron fibers in an epoxy matrix is performed. Data generated on the program show that fiber strength does increase as a consequence of the upgrading treatment. However, the interlaninar shear strength of upgraded fiber composites is lower than that for an untreated fiber composite. In the limited tests performed, the increased fiber strength failed to translate into the composite.

Rhodes, T. C.↗

Performance of the upgraded Orroral laser ranging system

The topics discussed include the following: upgrade arrangements, system prior to 1991, elements of the upgrade, laser performance, timing system performance, pass productivity, system precision, system accuracy, telescope pointing and future upgrades and extensions.

Luck, John M.↗