Search NASA⌕ Search

SEARCH · Search NASA

Results for “Utility and Grid Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Adoption of AI in the Utility T&D Sector: Use Cases, Consequence, Assessment and Benefits

Digital transformation and utilization of artificial intelligence (AI) in the electric grid are fundamentally changing the industry’s approach to common problems and enabling a broader paradigm shift in grid planning and operations. The change in approach is circularly both enabling and driving modernization, with load growth and reliable management of data center and AI infrastructure shifting away from planning approaches with relatively predictable behaviors and toward a mix of consumer and industrial choices that surpass human cognitive abilities to process. This movement has potential to condition humans to not understand the system on which the AI depends, while requiring it for development of the necessary infrastructure. Approaches which would address most likely grid conditions and events, such as faults, aging of equipment, and weather, now must also account for large loads which shift not based upon weather or time of day, but the computational load. Quantifying computational load is independent of the traditional grid forecasting variables, where a data center’s aggregate load is determined by user and AI system behavior and decoupled from normal grid planning and operations. AI is both the cause and solution for these challenges, with new grid planning tools integrating massive amounts of decisions into frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity for the Operational Technology Environment (CyOTE) (Final Technical Report)

Electric grids have historically been susceptible to both physical attacks and environmental hazards but the implementation of smart grids, remote management, and self-healing networks, has now made the grid vulnerable to cyber attacks. To address risks introduced by routable connectivity, utilities must establish dynamic solutions to identify, protect, detect, respond to, and recover from cyber security threats and vulnerabilities. In response to the evolving threat landscape U.S. Department of Energy-Office of Cybersecurity, Energy Security, and Emergency Response (DOE CESER) initiated the Cybersecurity for the OT Environment (CyOTE) pilot program, a U.S. Department of Energy (DOE) effort designed to leverage U.S. intelligence capabilities to prevent, detect, or mitigate a cyber attack on utility operational technology (OT) networks. As part of the CyOTE pilot, The Southern Company (Southern Company or Southern) researched, evaluated and deployed emerging Commercial off the Shelf (COTS) technologies and cyber security monitoring architectures to provide previously unrealized network visibility and situational awareness through deep packet inspection and data analytics. This Final Scientific/Technical Report documents the objectives, methodology, lessons learned, and results of Southern Company’s participation in the CyOTE pilot from December 2018 to September 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Facets of hydro power and future trends in a Nordic Context

Hydropower technologies bolster high penetration of variable renewable energies (VREs) in the net zero emissions scenarios. Nevertheless, there are various challenges to meeting the ambitious goal, such as stability, reliability, resiliency, security, lack of reactive power, voltage support and inertia, large-scale storage deployment and coordination, interconnectedness, demand-side response, higher thermal cycles with increased start/stops, and inadequate Levelized Cost of Energy (LCOE) for system-wise VRE integration and profitability. This survey conducts a bottom-up analysis to unveil the opportunities to utilize hydropower facilities and disentangle the nested problem for intertwining design features, control algorithms, operation, optimization approaches, incentives, services, and market mechanisms using a three-pillar framework perspective: grid owners, power producers, and machine designers. The survey identified emerging trends in real-time and capacity markets, flexible power systems, and enhanced grid capabilities, including advanced voltage support and updated grid codes. These developments present significant opportunities for hydropower, such as achieving super-flexibility through hybridization, expanded reactive power capabilities, and advanced operational modes like a synchronous condenser and power adequator functionalities. These opportunities require novel design philosophies — including new winding, stator, and rotor configurations, optimized ventilation, and active cooling systems — to enhance performance under stressed grid and climate conditions. Finally, integrating climate and energy models for multi-basin optimization with finer spatial and temporal granularity enhances the planning accuracy for water management of hydropower while addressing environmental challenges. The review delivers helpful prospective suggestions and tools that would serve researchers, power engineers, and stakeholders in making decisions about hydropower technologies and services in 2050 and beyond.

13 HYDRO ENERGY↗

Grid Parameters and Voltage Estimation Approach Integrating Data-Driven Converter Model

With Measurements of grid voltage and current are essential for the optimal operation of the grid protection and control (P&C) systems. Grid parameters vary through time during the faults and especially in the converter interfaced resources (CIRs) rich power grid, and thus accurate estimation is critical to avoid the mis-operation of the P&C systems. In this paper, a moving horizon estimation (MHE) as an observer is devised and applied to estimate the grid line parameters and grid voltages for protection enhancement. Due to the proprietary and confidentiality of CIRs, the proposed approach uses the black-box model to represent their dynamics. Leveraging the easily accessible measurements of output current from the black-box model of CIR and voltage at the point of common coupling, the proposed method estimates the grid impedance and grid voltage during normal and faulty operating conditions. The performance shows that the optimization-based observer was able to closely observe the accurate states and parameters, which can be utilized by the P&C systems.

Subedi, Sunil↗

ARPA-E Grid Optimization (GO) Competition Challenge 1

The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each dataset consisted of a collection of power system network models of different sizes with associated operating scenarios (snapshots in time defining instantaneous power demand, renewable generation, generator and line availability, etc.). The datasets were of two types: Real-Time, which included starting-point information, and Online, which did not. Week-Ahead data is also provided for some cases but was not used in the Competition. Although most datasets were synthetic and generated by GRIDDATA, a few came from industry and were only used in the Final Event. All synthetic Input Data and Team Results for the GO Competition Challenge 1 for the Sandbox, Trial Events 1 to 3, and the Final Event along with problem, format, scoring and rules descriptions are available here. Data for industry scenarios will not be made public. Challenge 1, a minimization problem, required two computational steps. Solver 1 or Code 1 solved the base SCOPF problem under a strict wall clock time limit, as would be the case in industry, and reported the base case operating point as output, which was used to compute the Objective Function value that was used as the scenario score. The feasibility of the solution was provided by the Solver 2 or Code 2, which solves the power flow problem for all contingencies based on the results from Solver 1. This is not normally done in industry, so the time limits were relaxed. In fact, there were no time limits for Trial Event 1. This proved to be a mistake, with some codes running for more than 90 hours, and a time limit of 2 seconds per contingency was imposed for all other events. Entrants were free to use their own Solver 2 or use an open-source version provided by the Competition. Containers, such as Docker, were considered to improve the portability of codes, but none that could reliably support a multi-node parallel computing environment, e.g., MPI, could be found. For more information on the competition and challenge see the "GO Competition Challenge 1 Information" and "GO Competition Challenge 1 Additional Information" resources below.

ACOPF↗

Grid Value Analysis of Geothermal Systems for End-Use Applications

Fuel based end-uses for residential, commercial, and industrial consumers require a technology change to achieve economy-wide decarbonization. Space heating accounts for 42% of residential and 32% of commercial energy demand, much of which is currently met through carbon emitting fuels. Industrial energy use is heavily fuel based with electricity currently representing 13% of energy demand. Geothermal heat pumps (GHPs) and geothermal direct use can eliminate the need for CO2 emitting and simultaneously allow for more efficient electrification of end uses. Past work has assessed the impact on total energy costs and generation investments but did not identify specific grid services benefited. Energy usage in residential and commercial structures was assessed by leveraging data from ComStock and ResStock models. These models utilize housing attributes, occupancy patterns, weather data, and sophisticated energy simulations to generate hourly load profiles for individual buildings identified by unique IDs associated with their locations. Industrial sector energy use was evaluated using information from the Manufacturing Energy Consumption Survey (MECS) as well as plant utilization data from the US Census to estimate hourly plant operations. The change in end-use demand for electricity, natural gas, and other fuels was calculated for different technologies that could meet this need. Using the ReEDS capacity expansion model, we produce regional price profiles that capture the grid benefit associated with the amount and timing of energy shifts in the power system from the adoption of geothermal systems relative to other technologies that could meet space heating, space cooling, and process heat requirements. We find that geothermal systems for meeting end-use demand add value to the energy system. In buildings where geothermal systems increase grid costs, these values are offset by reduced fuel costs and benefits to externalities, including emissions and health impacts.

decarbonization↗

Unalakleet Microgrid Optimization for Tribal Community Resilience

The Unalakleet Microgrid Optimization Project aimed to strengthen the reliability and efficiency of the isolated electric power system that serves the Tribal community of Unalakleet, Alaska. The community relies entirely on a local wind-diesel microgrid, consisting of four 475 kW diesel generators and six 100 kW wind turbines, to provide electricity to approximately 745 residents and Tribal facilities. Because Unalakleet is not on a road system and is located nearly 400 miles from the nearest major power grid, maintaining a resilient and efficient local energy system is critical. The scope of this project included upgrading a portion of the transmission line between the wind farm and the power plant to increase voltage and reduce line losses, along with modernizing the Supervisory Control and Data Acquisition (SCADA) system to improve monitoring, control, and data management of the power system. These upgrades were designed to increase wind energy utilization, reduce diesel fuel consumption by tens of thousands of gallons annually, and improve overall grid stability. By allowing more of the community’s electricity to be supplied by local renewable wind resources, the project was designed to lower operating costs, reduce dependence on imported fuel, and strengthen the long-term resilience of the power system. These improvements represent an important step toward the community’s long-term energy vision of expanding renewable generation, incorporating energy storage, and eventually achieving “diesels-off” operation, where essential Tribal loads are powered primarily by local renewable resources.

17 WIND ENERGY↗

Moving Beyond Direct Load Control: A Maturity Model for Realizing the Promise of Demand Flexibility

This report discusses a new maturity model that regulators and utilities can use to guide and expand demand flexibility programs and enable the resources to provide more grid services. The model has six demand flexibility categories: planning and design; customer engagement; program operations; evaluation, measurement and verification; distributed energy resource orchestration; and data infrastructure. Within each category, capabilities are identified and described on a maturity scale that ranges from performing below expectations to improving on best practices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Techno-Economic Assessment of Data Center Load Demand Powered by Small Modular Reactors and Distributed Energy Resources

The rapid increase in data center energy demand, driven by AI and large-scale data processing, poses significant challenges to global energy infrastructure. Data centers require substantial and reliable energy for continuous operations and high-performance computing. Current electrical grids face issues such as transmission bottlenecks and aging infrastructure, making it difficult to meet these demands. Integrating inverter-based-resources (IBRs) like solar and wind presents both opportunities and challenges due to their intermittent nature. Small Modular Reactors (SMRs) offer a promising solution with their enhanced safety, modularity, reliability, and scalability, providing consistent base load power ideal for data center operations. This study presents a comprehensive techno-economic assessment of powering data center load demand using a combination of SMRs and IBRs with grid-connected and islanded mode. This study utilized Idaho National Laboratory’s (INL) HPC data center hourly load profiles and Xendee microgrid optimization platform to conduct the analysis. In this configuration, SMRs serves as the primary base load power source, consistently providing a steady supply of electricity necessary to meet the minimum load demand of the data center with support from the IBRs. Key performance indicators such as Levelized Cost of Electricity (LCOE), Net Present Value (NPV) has been calculated to assess the economic feasibility. The findings from this research will underscore the strategic benefits of integrating SMR plant with DERs – particularly for critical infrastructure load such as data centers.

14 - SOLAR ENERGY↗

V2XConnect: Harmonizing the Landscape of Bidirectional Charging Codes, Standards, and Communication Protocols

The utility grid is constantly evolving with new generation sources and diverse loads from backup generators, backup batteries, rooftop photovoltaics (PV), and flexible charging loads. Each of these technologies presents consumers with an opportunity to work with their local utility to promote grid stability, reliability, and affordability. Through a wide range of programs, utilities are incentivizing the use of these resources to benefit the grid. However, especially for devices with inverters that supply power back to the grid, it is important that these assets comply with local grid codes to ensure human safety, power quality, and grid reliability. One of the most promising of these new technologies is the bidirectional electric vehicle (EV) coupled with bidirectional electric vehicle supply equipment (EVSE). This report introduces the technologies that enable bidirectional charging and how these systems operate. It then outlines the necessary interconnection codes and industry standards that govern the operations of grid-tied inverters, including those in bidirectional charging. A key challenge is then outlined from the complex landscape of communication protocols and proprietary systems designed to coordinate these grid assets. Finally, a single gateway solution is proposed to harmonize communications between all assets across an entire site for a cohesive response to grid codes and utility programs that is flexible enough to support a range of market options.

33 ADVANCED PROPULSION SYSTEMS↗

Enhancing Grid Resilience with HIVE: Decentralized V2G Coordination for Black Starts

This paper proposes the HIVE (Harmonized Integration of Vehicle Energy for Grid Support) model, a novel game-theoretic framework for decentralized coordination of electrified vehicles to enable black start and load restoration during grid outages. In the absence of a central controller, HIVE employs a cooperative game to model vehicle interactions, allowing autonomous decision-making while admitting to a Nash equilibrium for grid restoration. The framework addresses the heterogeneity of vehicles and their operational constraints, selecting a lead vehicle for grid-forming and coordinating grid-following vehicles to support prioritized loads. Applied to a hospital blackout scenario, HIVE demonstrates robust performance in forming an islanded microgrid and sustaining critical loads under varying vehicle availability, state of charge, and power constraints. Simulation results highlight the model’s effectiveness in ensuring decentralized coordination of energy allocation and prioritizing loads, offering a scalable solution for resilient grid operations.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Demonstration of Electrolyzer Operation at a Nuclear Plant to Allow for Dynamic Participation in an Organized Electricity Market and In-House Hydrogen Supply

This document details the execution of Cooperative Agreement DE-EE0008849, “demonstration of electrolyzer operation at a nuclear plant to allow for dynamic participation in an organized electricity market and in-house hydrogen supply” during the performance period of 10/1/2019 – 9/30/2024. The project was funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). Constellation Energy Generation, LLC (formerly Exelon Generation Company, LLC) is the prime recipient of the award. Other members of the project team are INL, NREL, ANL and Nel Hydrogen. The main project objective was to demonstrate an end-to-end integrated grid-scale carbon-free H 2 production, storage and utilization pilot plant at a nuclear generating facility. The project also aimed to evaluate market opportunities and regulatory requirements related to the participation of integrated hydrogen production and nuclear plant facilities in organized power markets, by demonstrating dynamic control and operation of the electrolyzer and assessing the economics of dynamic participation combined with the revenue streams from hydrogen production. On March 7th , 2023 Constellation started hydrogen production at it’s Nine Mile Point Nuclear Plant in Oswego, New York. The PEM electrolyzer operating at Nine Mile Point uses 1.25 megawatt of nuclear electricity to produce 560 kilograms of clean hydrogen per day, more than enough to meet the plant’s operational hydrogen use. It will also help set the stage for possible large-scale deployments at other clean energy centers in Constellation’s fleet that would couple clean hydrogen production with storage and other on-site uses. Employing the lessons learned from the 1.25 MW demonstration-scale, nuclear-powered clean hydrogen production facility at Nine Mile Point, Constellation was a major participant in the MachH2 hydrogen hub recently selected for up to $\$$1 billion by the Department of Energy (DOE) as part of the bipartisan Infrastructure Investment and Jobs Act. Constellation will use a portion of the hub funding to build the world’s largest nuclear-powered clean hydrogen production facility at its LaSalle Clean Energy Center in Illinois. The project was featured in a number of news articles and press releases and received 2 awards. At the 2023 DOE HFTO’s Annual Merit Review meeting, the P.I. Dr. Uuganbayar Otgonbaatar and project manager Robert Beaumont were recognized for “outstanding achievements in the development and demonstration of a first-of-a-kind clean hydrogen production facility, powered by carbon-free nuclear energy, at the Nine Mile Point Nuclear Station in Oswego, New York.” The project was also awarded 2023 Nuclear Energy Institute’s Top Innovative Practice award.

08 HYDROGEN↗

Electrification Options for Multi-Family Water Heating in Cold Climates - Final Report

In multi-family buildings, large water storage tanks in centralized domestic hot water (DHW) systems can serve as thermal energy storage (TES) batteries to mitigate grid impact. These systems offer demand shift and efficiency benefits, significantly reducing peak power consumption, particularly in cold climates. This study evaluates the load-shifting benefits of a centralized heat pump water heater (HPWH) system equipped with a CO2 heat pump in multi-family buildings through simulation. The heat pump system and water storage tank are sized using design-day sizing. A finite-element-based stratified tank model and CO2 heat pump performance map from a commercial DHW product are used. Annual simulations are conducted to assess the benefits of the centralized DHW system for energy efficiency improvements, load shifting, and emission reductions. These simulations incorporate utility tariffs and marginal grid emission data from Los Angeles and Chicago. In Los Angeles, using a water tank as a thermal battery achieves 7.4% utility cost savings and 10.2% emission reduction. In Chicago, compared to HPWH conventional operation without preheating, TES-enabled central HPWH provides 15% utility cost savings and 13% emission reduction. The case study demonstrates that the demand reduction potential of central CO2 HPWHs is significant in cold climate regions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen Carriers for Renewable Microgrid System Applications

Utility-scale energy storage can help improve grid reliability, reduce costs, and promote faster adoption of intermittent sources such as solar and wind. This paper analyzes the technical aspects and economics of standalone microgrids operating on intermittent power combined with hydrogen energy storage. It explores the feasibility of using dibenzyltoluene (DBT) as a liquid organic hydrogen carrier to absorb excess energy during periods of high supply and polymer electrolyte fuel cells to generate electrical energy during periods of low supply. A comparative analysis is conducted on three power demand scenarios (industrial, residential, and office), in conjunction with three alternative energy sources: solar, wind and wind–solar mix. A mixed system of solar and wind energy can maintain an annual average efficiency above 70%, except for residential power demand, which lowered the efficiency to 67%. A balanced combination of wind and solar power was the most cost-effective option. The current levelized cost of electricity (LCOE) for industrial power demand was estimated to 15 ¢/kWh, and it is projected to decrease to 9 ¢/kWh in the future. For residential power demand, the LCOE was 45% higher due to the demand profile. In comparison, battery storage is significantly more expensive than hydrogen storage, even with future cost projections, increasing the LCOE between 60 and 120 ¢/kWh.

PEM electrolysis↗

Advance Distribution Management System (ADMS)

This presentation explores the transition from traditional distribution management systems to Advanced Distribution Management Systems (ADMS) as a foundation for smart grid development. It highlights the key benefits of ADMS, including enhanced reliability, improved operational efficiency, and increased situational awareness. The presentation also addresses common implementation challenges such as system integration, data management, and organizational readiness. It concludes with a forward-looking perspective on the evolving role of ADMS and essential takeaways for utilities and stakeholders.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Valuing the Future Electric Grid: A Bid-Based Approach

Energy storage resources (ESRs) and other zero marginal cost (ZMC) resources have unique characteristics that are not fully captured in today’s electricity planning and operations modeling tools. Because the modeling assumptions used in these tools are simplified approximations of how operations and investment decisions occur in the real-world, accurately representing cost and operational characteristics are key for determining how these resources impact price formation. Questions such as—Where should we build new transmission? Will a small modular reactor earn enough revenue to participate in the future electric grid? Is retrofitting a coal plant with carbon capture technology economically feasible?—all require accurate electricity prices, which aren’t available from today’s electricity planning and operations modeling tools. As an example, production cost models (PCMs) are heavily utilized tools that determine the cost and reliability of the electric system. However, as PCMs were developed to help thermal generators manage their fuel inventories, production cost modeling is largely based on fuel prices. Because ESRs do not incur fuel costs, they are often modeled as ZMC resources. In reality, ESRs incur opportunity costs as well as technology-specific (degradation) costs that are non-trivial to calculate but are important for price formation. In this research, we identify options to incorporate more realistic opportunity and degradation costs in ESR bidding algorithms. Expanding available bidding assumptions allows energy system modelers to develop more accurate economic valuations for ESRs, leading to more accurate price formation from leading energy system modeling tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗