Search NASA⌕ Search

SEARCH · Search NASA

Results for “automated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Software Verification and Validation Plan Activities, 2011 – SAPHIRE 8 Quality Assurance

SV&V Updates through FY11 An official update was released in February 2011. This update was to add a new automated test, to revise the SV&V wording to indicate the operational life cycle that SAPHIRE 8 has entered, and to provide design documentation for Inspection Planning Reports (which evolved into the Plant Risk Information e-Book (PRIB)) and Analysis Speed Improvements. Another update to the SV&V will be released in conjunction with this report in September 2011 to include the following: two new automated tests, the inclusion of metrics into the testing regime and references to the addition of the Preliminary Design Review and Critical Design Review processes.

42 ENGINEERING↗

Application of quantitative methods for reliability testing of a nuclear power plant digital rod position indication diagnostic system - 391

Obsolescence, aging, reliability, and performance issues are driving nuclear facilities to replace conventional analog Instrumentation and Control (I and C) systems with digital technologies. In addition, the designs of the next generation of nuclear reactors, including Small Modular Reactors (SMRs), will incorporate digital I and C for most, if not all, of their safety and non-safety related functions. As part of an on-going research and development (R and D) effort under the auspices of the U.S. Department of Energy (DOE), Analysis and Measurement Services Corporation (AMS) is developing a platform to provide automated testing of digital I and C systems and create a standard method of evaluation for reliability assessments. This hands-on R and D effort has produced a Software Reliability Tester (SRT), which is a set of software and hardware tools designed to automate the testing of digital I and C systems to measure and quantify how well the systems perform under normal operating conditions and in the presence of faults. Furthermore, the SRT provides the foundation for a practical tool to automate verification and validation (V and V) activities and reduce the amount of testing time of digital I and C systems. When combined with its capabilities of integrating both reliability and fault tolerance quantification, the SRT can be used to ensure that digital I and C implementations are both safe and cost-effective for the nuclear industry. This paper describes the application of the SRT to perform V and V of a new Digital Rod Position Indication (DRPI) diagnostic system. The DRPI diagnostic system is a digital system that monitors the rod address and rod position data bus voltages of typical DRPI systems in nuclear power plants to detect and diagnose faults. For this application, the SRT was configured to exercise the inputs of the DRPI diagnostic system, and test cases were generated for common system faults such as address and data bit errors, bus voltage, and timing problems. These test cases were applied by the SRT hardware as voltage inputs to the DRPI diagnostic system and the outputs were compared to expected values generated by a model of the DRPI diagnostic system. Included in the paper is a description of the overall design of the SRT including the hardware and software architectures. Methodologies for automating test cases are also described. V and V using the SRT demonstrates the benefits of automated testing and qualification to provide a quantitative assessment of reliability and cost effective implementation of digital I and C in existing and next generation nuclear power plants. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Automated flight test maneuvers - The development of a new technique

A new flight test technique using a maneuver autopilot is being applied at the Dryden Flight Research Facility of the NASA Ames Research Center. The flight test maneuver autopilot (FTMAP) is designed to provide precise, repeatable control of an aircraft during certain prescribed maneuvers so that a large quantity of high quality test data can be obtained with a minimum of flight time. This paper discusses the control algorithms, the flight test application, and the preliminary flight demonstration results of the FTMAP.

Duke, E. L.↗

Computer control for automated flight test maneuvering

The application of an experimental flight test maneuver autopilot test technique for collecting aerodynamic and structural flight research data on a highly maneuverable aircraft is described in this paper. This technique, which was developed to increase the quality and quantity of data obtained during flight test, was applied to the highly maneuverable aircraft technology (HiMAT) vehicle. A primary flight experiment was to verify the design techniques used to develop the HiMAT aerodynamics and structures. This required the performance of maneuvers for collection of large quantities of high-quality pressure distribution, loads, and wing and canard deflection data. Flight data obtained while executing these research maneuvers are presented to demonstrate the effectiveness of this new technique.

Duke, E. L.↗

Automated System Tests Ferroelectric Capacitors

Polarization-switching parameters measured under computer control. Ferroelectric-capacitor-testing system applies voltage pulses and measures responses of ferroelectric capacitor to determine write; "time dependence of polarization," polarization-retention and fatigue characteristics of capacitor. Highly integrated setup quite flexible, versatile, and interactive, and allows convenient computer storage and analysis of data.

Lakata, Mark↗

Automated System Tests High-Power MOSFET's

Computer-controlled system tests metal-oxide/semiconductor field-effect transistors (MOSFET's) at high voltages and currents. Measures seven parameters characterizing performance of MOSFET, with view toward obtaining early indication MOSFET defective. Use of test system prior to installation of power MOSFET in high-power circuit saves time and money.

Huston, Steven W.↗

Tools Automate Spacecraft Testing, Operation

"NASA began the Small Explorer (SMEX) program to develop spacecraft to advance astrophysics and space physics. As one of the entities supporting software development at Goddard Space Flight Center, the Hammers Company Inc. (tHC Inc.), of Greenbelt, Maryland, developed the Integrated Test and Operations System to support SMEX. Later, the company received additional Small Business Innovation Research (SBIR) funding from Goddard for a tool to facilitate the development of flight software called VirtualSat. NASA uses the tools to support 15 satellites, and the aerospace industry is using them to develop science instruments, spacecraft computer systems, and navigation and control software."

Source record↗

A Description of the Development, Capabilities, and Operational Status of the Test SLATE Data Acquisition System at the National Transonic Facility

The paper will present a brief background of the previous data acquisition system at the National Transonic Facility (NTF) and the reasoning and goals behind the upgrade to the current Test SLATE (Test Software Laboratory and Automated Testing Environments) data acquisition system. The components, performance characteristics, and layout of the Test SLATE system within the NTF control room will be discussed. The development, testing, and integration of Test SLATE within NTF operations will be detailed. The operational capabilities of the system will be outlined including: test setup, instrumentation calibration, automatic test sequencer setup, data recording, communication between data and facility control systems, real time display monitoring, and data reduction. The current operational status of the Test SLATE system and its performance during recent NTF testing will be highlighted including high-speed, frame-by-frame data acquisition with conditional sampling post-processing applied. The paper concludes with current development work on the system including the capability for real-time conditional sampling during data acquisition and further efficiency enhancements to the wind tunnel testing process.

Cramer, Christopher J.↗

From an automated flight-test management system to a flight-test engineer's workstation

Described here are the capabilities and evolution of a flight-test engineer's workstation (called TEST PLAN) from an automated flight-test management system. The concept and capabilities of the automated flight-test management system are explored and discussed to illustrate the value of advanced system prototyping and evolutionary software development.

Duke, E. L.↗

Cryogenic Fuel Valve Testbed Development

The goal for this project is to update the cryogenic valve testbed program in LabVIEW to schedule and automate tests and experiments. By using an automated system, tens or hundreds of tests may be performed. This will ensure that accurate data is being collected for testing of the remaining useful life and end of life predictions. From the data obtained, new diagnostic and prognostic methods will be developed to manage or predict potential leaks which may occur in the future. The Cryogenic valve testbed injects controlled faults into the cryogenic fuel valve system in order to accurately determine failure behavior.

Prognostics↗