Search NASA⌕ Search

SEARCH · Search NASA

Results for “power hardware in the loop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Interoperable, Inverter-Based Distributed Energy Resources (DERs) Enable 100% Renewable and Resilient Utility Microgrids

Project overcomes frequency stability and system control issues when operating distribution microgrids in a low inertia, high PV penetration environment without fossil fuel generators. The team implemented a grid-forming inverter and advanced control features at SDG&E's Borrego Springs Microgrid to demonstrate islanding and blackstart using renewable resources. Simulation and emulation in advance of deployment de-risks field operations.

battery energy storage systems↗

Performance Evaluation of Distributed Energy Resource Management Algorithm in Large Distribution Networks

This paper presents performance evaluation of hierarchical optimization and control for distributed energy resource management system (DERMS) in large distribution networks via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale distribution system of 11,000 nodes, the DERMS software controller, and 90 power hardware photovoltaics (PVs) and battery inverters. The applied DERMS algorithm is designed based on a realtime optimal power flow algorithm and implemented with acceleration design that performs fast dispatch of simulated PVs and real physical hardware DER devices every 4 seconds.

DERMS↗

Networked HIL Simulation System for Modeling Large-scale Power Systems

This paper presents a network hardware-in-the-loop (HIL) simulation system for modeling large-scale power systems. Researchers have developed many HIL test systems for power systems in recent years. Those test systems can model both microsecond-level dynamic responses of power electronic systems and millisecond-level transients of transmission and distribution grids. By integrating individual HIL test systems into a network of HIL test systems, we can create large-scale power grid digital twins with flexible structures at required modeling resolution that fits for a wide range of system operating conditions. This will not only significantly reduce the need for field tests when developing new technologies but also greatly shorten the model development cycle. In this paper, we present a networked OPAL-RT based HIL test system for developing transmission-distribution coordinative Volt-VAR regulation technologies as an example to illustrate system setups, communication requirements among different HIL test systems, and connection mechanisms. Impacts of communication delays, information exchange cycles, and computing delays are illustrated. Simulation results show that the performance of a networked HIL test system is satisfactory.

digital twin, distribution system, co-simulation, ↗

Performance Evaluation of Distributed Energy Resource Management Systems Using Software- and Hardware-in-the-Loop

Distributed energy resource management systems (DERMS) are an important emerging technology for coordinating distributed energy resources (DERs) integrated in power distribution networks. These solutions implement a software platform to monitor, control, and coordinate DERs in real time to provide aggregate grid services to the electric utility or distribution system operator. To move DERMS technology forward, research and performance validation in a laboratory environment are needed to ensure proper function of DERMS prior to field deployment. This presentation presents a generic hardware-in-the-loop (HIL) platform to evaluate performance of DERMS using software-in-the-loop (SIL) and power HIL. The platform provides realistic testing in a laboratory environment, including accurate modeling of full-scale distribution systems, DERMS software controllers, and at-power distributed energy resources (DERs), such as solar and battery inverters. Two case studies are presented to demonstrate how the platform can be used independently as an integrated development and validation approach for different projects. Laboratory testing results are included to showcase the voltage regulation performance of each study and the benefits of implementing such a platform for DERMS evaluation.

DERMS↗

Performance Evaluation of Distributed Energy Resource Management Algorithm in Large Distribution Networks

This paper presents performance evaluation of hierarchical optimization and control for distributed energy resource management system (DERMS) in large distribution networks via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory envi-ronment, including the accurate modeling of a full-scale dis-tribution system of 11,000 nodes, the DERMS software con-troller, and 90 power hardware photovoltaics (PVs) and bat-tery inverters. The applied DERMS algorithm is designed based on a real-time optimal power flow algorithm and im-plemented with acceleration design that performs fast dis-patch of simulated PVs and real physical hardware DER devices every 4 seconds.

distributed energy management system (DERMS)↗

Optimize Topology, Component Sizes, and Operating Strategy of Participant's Protype: Cooperative Research and Development Final Report

The purpose of the project was to complete testing of Shine Technologies LLC’s prototype power system called “Juicebox 3.0.” Testing of the prototype using NREL’s hardware-in-the-loop capabilities, including a DC power supply programmed to simulate PV module output and provide the JuiceBox 3.0 at the specified power level and with a load bank of sufficient capacity to mimic DC and AC loads connected to the outlets of the Juicebox 3.0. The unit is provided with SAE wire connectors. A photo of a JuiceBox 3.0 unit is shown in Figure 1 below.

14 SOLAR ENERGY↗

Evaluation of Centralized Model Based FLISR in a Lab Setup

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗

Local Power-Voltage Sensitivity and Thevenin Impedance Estimation from Phasor Measurements

This paper describes how to use voltage phasor measurements to produce a sensitivity matrix that describes how real and reactive power injections at a node on a distribution network affect the local voltage magnitude and angle. Rather than estimating the sensitivity directly, the voltage phasor measurements and power commands/measurements are used to estimate the unbalanced, three-phase Thevenin impedance. The Thevenin impedance estimation is conducted using recursive least squares on temporal difference measurements. The Thevenin impedance and voltage phasor measurement are then used to build the local power-voltage sensitivity matrix with the closed form expression for the Jacobian of the power flow manifold. Hardware-in-the-loop simulations with phasor measurement units providing real phasor measurements are used to evaluate the recursive temporal difference Thevenin impedance estimation and Thevenin-based power-voltage sensitivity methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Understanding Line Losses and Transformer Losses in Rural Isolated Distribution Systems: Preprint

Rural, isolated power systems in the mainland U.S. and in states like Alaska and Hawaii are powered by assets like diesel generators. These rural, isolated power systems also cannot operate at the higher band of medium voltage (like 69kV). They are primarily in the 12 to 14 kV range to keep the cost of the distribution investments lower. Because of this mid-band medium voltage range, the line losses and distribution transformers losses consume significant diesel consumption (almost 10 percent of the peak load). This work considers one such power system powering an isolated system and presents key findings online losses, and transformer losses. Understanding and documenting the impacts is critical for these communities operating their power systems and take actions to reduce expensive diesel consumption. In this paper, we will present one such typical grid and model it in electromagnetic transients (EMT) domain. We used the tower structure, under ground cabling installation to develop high fidelity models of lines. We also used high fidelity models of distribution transformers to present the no-load losses and full load loses. We will also present technical solutions available commercially off-the-shelf to reduce these losses and reduce diesel consumption. This work will be a primer for communities to understand the technical challenges and to understand the possible solution available to solve such challenges for rural, isolated power system operators.

blackstart↗

Real-Time Optimization and Control of Next-Generation Distribution Infrastructure

This presentation highlights the key developments of the ARAP-e NODES project, including the innovative real-time optimal power flow (RT-OPF) algorithm for distributed energy resource (DER) management, trip planning for T+D coordination, and extensive validation of the RT-OPF algorithm in NREL ESIF laboratory with 100+ physical hardware devices, controller-hardware-in-the-loop test at Southern California Edison (SCE), and two field demonstrations.

hardware-in-the-loop↗

Demonstrating Distribution System Resiliency through Grid-Edge Microgrids, on a Multi-Site Networked Hardware-in-Loop Platform

With the increasing penetration of Distributed Energy Resources (DERs) at the grid-edge, power systems include more energy storage, remote switches, relays, voltage regulators, and other intelligent electronic devices (IED). Effective control of these grid-edge devices by using Advanced Distribution Management Systems (ADMS) can yield substantial improvements to the resiliency and power quality of distribution systems. In this paper, improvements to the resiliency of a distribution system are demonstrated using a multi-site evaluation environment consisting of a real-time Hardware-in-Loop (HIL) setup in which DERs and other IEDs are modeled; and an ADMS which monitors and is able to control the distribution system assets. The HIL model and the ADMS are located 2400 km away, with communication between the sites enabled by a data manager using Distributed Network Protocol 3 (DNP3), demonstrating the system's capabilities even over long distances. After a simulated transmission system failure in the HIL demonstration setup, DERs and other devices are operated to restore critical loads and node voltage profile (to within the 'nominal +/-5%' band) in the distribution system.

ADMS↗

Interoperable, Inverter - Based Distributed Energy Resources Enable 100% Renewable and Resilient Utility Microgrids

As microgrids transition away from use of conventional generating resources and increasingly rely on renewable resources towards decarbonization goals, it is crucial to evaluate the capability inverter-based resources to provide microgrid stability and resilience. Particularly, microgrids with a high contribution of intermittent solar photo voltaic generation and higher load variability present unique challenges requiring fast voltage and frequency support. At the San Diego Gas & Electric Company(R) (SDG&E(R)) Borrego Springs Microgrid, a battery inverter was upgraded with grid-forming (GFM) capability to serve as island leader, transitioning responsibility away from diesel generators. An interoperable microgrid control scheme was developed, coordinating GFM and grid-following (GFL) inverters. Hardware-in-the-loop (HIL) simulations using relevant power and controller HIL interfaces between real-time simulators and field equipment are being conducted to de-risk field deployment.

battery energy storage↗

Performance Evaluation of Next-Generation Grid Automation and Controls with High PV Penetration

This paper presents a hardware-in-the-loop (BIL) simulation to evaluate the performance of an advanced grid automation architecture, referred to as data-enhanced hierarchical control (DEHC), in achieving voltage regulation and conservation voltage reduction (CVR) in distribution networks with very high photovoltaic (PV) generation. This architecture comprises an advanced distribution management system (ADMS), a distributed energy resource management system (DERMS), and grid-edge devices working synergistically to provide the grid benefits. The HIL setup used for the evaluation includes ADMS, DERMS, and grid-edge devices. The DEHC performance is evaluated in two representative scenarios considering loose and tight constraints of the power factor at the substation. The results show that the DEHC architecture is effective in achieving voltage regulation and CVR and thus enables the grid integration of high levels of PV generation.

ADMS↗

Evaluation of Centralized Model-Based FLISR in a Lab Setup: Preprint

Utilities are installing advanced distribution management systems (ADMS) around the globe to improve the sensing and control of distribution systems. ADMS is becoming a critical component to improve the resiliency and reliability of distribution systems. These management systems host a multitude of applications that can be used to sense, control, and operate distribution systems. Fault location, isolation, and service restoration (FLISR) is one of the ADMS applications that is critical to improving resilience during fault conditions. FLISR applications use smart, controllable devices that are installed in the distribution system for FLISR operation. These controllable devices include distributed energy resources (DER) and reclosers. Evaluating such ADMS applications before installation in the field can help de-risk the field implementation and avoid costly failures in the field. This paper presents a background on experimental setup that are typically used to evaluate ADMS applications. This is followed by briefly presenting the setup used to evaluate the FLISR application in an off-the-shelf ADMS tool. Finally, results from the evaluation experiments are presented.

94 GMLC - Grid Modernization Laboratory Consortium↗

Situational Awareness of Grid Anomalies (SAGA)

The modern power industry becomes more vulnerable to cyber events due to the growing interconnectivity, interdependence, and complexity of the electric power grid. High-fidelity modeling and simulation tools that support the preventative risk analysis on potential cyber-relevant events is essential for ensuring the situational awareness of the system operator as it provides an inexpensive and risk-free environment to test the system responses under various cyber-relevant events and hereby can support research on cyber anomaly detection, optimal protective resource allocation, and mitigation measures. In this webinar, we will share NREL's cybersecurity research capabilities by highlighting the development of a scalable cyber-physical event test bed and demonstration with real hardware in the loop. The developed cyber-physical event test bed is backboned by an integrated transmission, distribution, and communication dynamic co-simulation framework and a plug-and-play cyber event generation module. It is designed to be modular and compatible with parallel computing, and thereby supports large-scale system simulations at an affordable computation cost. The test bed can capture millisecond-to-minutes dynamic frequency and voltage responses under cyber events from the bulk transmission system to the active distribution systems and distributed energy resources at the grid edge.

co-simulation↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Understanding Line Losses and Transformer Losses in Rural Isolated Distribution Systems

Rural, isolated power systems in the mainland U.S. and in states like Alaska and Hawaii are powered by assets like diesel generators. These rural, isolated power systems also cannot operate at the higher band of medium voltage (like 69kV). They are primarily in the 12 to 14 kV range to keep the cost of the distribution investments lower. Because of this mid-band medium voltage range, the line losses and distribution transformers losses consume significant diesel consumption (almost 10 percent of the peak load). This work considers one such power system powering an isolated system and presents key findings online losses, and transformer losses. Understanding and documenting the impacts is critical for these communities operating their power systems and take actions to reduce expensive diesel consumption. In this paper, we will present one such typical grid and model it in electromagnetic transients (EMT) domain. We used the tower structure, under ground cabling installation to develop high fidelity models of lines. We also used high fidelity models of distribution transformers to present the no-load losses and full load loses. We will also present technical solutions available commercially off-the-shelf to reduce these losses and reduce diesel consumption. This work will be a primer for communities to understand the technical challenges and to understand the possible solution available to solve such challenges for rural, isolated power system operators.

blackstart↗