Performance Evaluation of Distributed Energy Resource Management Algorithm in Large Distribution Networks

Abstract

This paper presents performance evaluation of hierarchical optimization and control for distributed energy resource management system (DERMS) in large distribution networks via an advanced hardware-in-the-loop (HIL) platform. The HIL platform provides realistic testing in a laboratory environment, including the accurate modeling of a full-scale distribution system of 11,000 nodes, the DERMS software controller, and 90 power hardware photovoltaics (PVs) and battery inverters. The applied DERMS algorithm is designed based on a realtime optimal power flow algorithm and implemented with acceleration design that performs fast dispatch of simulated PVs and real physical hardware DER devices every 4 seconds.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Wang, Jing, Huang, Jianqiao, Zhou, Xinyang. 2021-12-20. Performance Evaluation of Distributed Energy Resource Management Algorithm in Large Distribution Networks. https://doi.org/10.1109/pesgm46819.2021.9637893

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

An Introduction to the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FAST-DERMS): Preprint

Deployment and capability of distributed energy resources (DER) in power systems is growing rapidly. These resources present an opportunity for low-cost provision of energy and grid services. The Federal Energy Regulatory Commission recently provided rulings to enable market participation of these distribution-connected resources, but the prevailing strategies for their management may not scale well to meet future needs. This paper introduces the Federated Architecture for Secure and Transactive Distributed Energy Management Solutions (FASTDERMS) which was designed to address this need. In it we describe the architectural features of the approach, and a reference controls implementation employing a hierarchical coordination that includes stochastic optimization, model predictive control, and a simple real-time management scheme. Sample results from simulation show firm transmission-level service provision measured at the distribution substation.

DERMS↗

Advanced Power-Hardware-in-the-Loop Evaluation of Inverter-Based Resources (IBRs)

Power-hardware-in-the-loop evaluation of IBRs has become more and more important as it provides reliable testing results to investigate the real responses of inverters with interconnected systems. A successful laboratory PHIL testing gives confidence of the hardware system to be deployed and de-risk technology integration prior to field deployment. So far, there are two important applications for PHIL evaluation: (1) test stability and functionality of large utility inverters into the system when it interconnects to the distribution systems/microgrids; and (2) test the collective grid service that inverters can provide to the grid. For the first application, the PHIL evaluation has high requirements for the stability and accuracy of the PHIL interface as the close-loop in digital real time simulator (DRTS) should replicate the actual current and voltage dynamics in the inverter. This is challenging because of the delays, sensing errors, nonlinearities of inverters, and hardware bandwidth limitations of the elements in the HIL loop. For the second application, multiple inverters will be tested resulting in multiple PCCs, which naturally causes competing dynamics and oscillations among hardware inverters if traditional PHIL interface is used. Therefore, new PHIL interface should be developed to compromise between stability and accuracy and represent the dispatched grid services for the hardware inverters. In this presentation, we will share our latest work in developing PHIL interface in these two applications to address the two key challenges.

DERMS↗