Search NASA⌕ Search

SEARCH · Search NASA

Results for “structures, systems, and components”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Report from the Light Water Reactor Sustainability Workshop on Advanced Instrumentation, Information, and Control Systems and Human-System Interface Technologies

The Light Water Reactor Sustainability (LWRS) Program is a research and development (R&D) program sponsored by the U.S. Department of Energy (DOE). The program is operated in close collaboration with industry R&D programs to provide the technical foundations for licensing and managing the long-term, safe, and economical operation of Nuclear Power Plants that are currently in operation. The LWRS Program focus is on longer-term and higher-risk/reward research that contributes to the national policy objectives of energy and environmental security. Advanced instruments and control (I&C) technologies are needed to support the safe and reliable production of power from nuclear energy systems during sustained periods of operation up to and beyond their expected licensed lifetime. This requires that new capabilities to achieve process control be developed and eventually implemented in existing nuclear assets. It also requires that approaches be developed and proven to achieve sustainability of I&C systems throughout the period of extended operation. The strategic objective of the LWRS Program Advanced Instrumentation, Information, and Control Systems Technology R&D pathway is to establish a technical basis for new technologies needed to achieve safety and reliability of operating nuclear assets and to implement new technologies in nuclear energy systems. This will be achieved by carrying out a program of R&D to develop scientific knowledge in the areas of: • Sensors, diagnostics, and prognostics to support characterization and prediction of the effects of aging and degradation phenomena effects on critical systems, structures, and components (SSCs) • Online monitoring of SSCs and active components, generation of information, and methods to analyze and employ online monitoring information • New methods for visualization, integration, and information use to enhance state awareness and leverage expertise to achieve safer, more readily available electricity generation. As an initial step in accomplishing this effort, the Light Water Reactor Sustainability Workshop on Advanced Instrumentation, Information, and Control Systems and Human-System Interface Technologies was held March 20–21, 2009, in Columbus, Ohio, to enable industry stakeholders and researchers in identification of the nuclear industry’s needs in the areas of future I&C technologies and corresponding technology gaps and research capabilities. Approaches for collaboration to bridge or fill the technology gaps were presented and R&D activities and priorities recommended. This report documents the presentations and discussions of the workshop and is intended to serve as a basis for the plan under development to achieve the goals of the I&C research pathway.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

MEASURING RISK IMPORTANCE IN A DYNAMIC PRA FRAMEWORK

Risk importance measures are indexes that are used to rank systems, structures and components (SSCs) using risk-informed methods. The most used/known measures are: Risk Reduction Worth (RRW), Risk Achievement Worth (RAW), Birnbaum (B) and Fussell-Vesely (FV). Once obtained from classical Probabilistic Risk Analysis (PRA) analyses, these risk measures can be effectively employed to optimize component testing and maintenance. In contrast to classical PRA methods, Dynamic PRA methods couple stochastic methods with safety analysis codes to determine risk associate to complex systems such as nuclear plants. Compared to classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. The objective of this paper is to present a series of algorithms that can be used to determine classical risk importance measures (RRW, RAW, B and FV) along with newly developed ones from a Dynamic PRA analysis.

97 MATHEMATICS AND COMPUTING↗

Westinghouse Small Modular Reactor balance of plant and supporting systems design

The Westinghouse Small Modular Reactor (SMR) is an 800 MWt (>225 MWe) integral pressurized water reactor (iPWR), in which all of the components typically associated with the nuclear steam supply system (NSSS) of a nuclear power plant are incorporated within a single reactor pressure vessel. This paper is the second in a series of four papers which describe the design and functionality of the Westinghouse SMR. It focuses, in particular, upon the supporting systems and the balance of plant (BOP) designs of the Westinghouse SMR. Several Westinghouse SMR systems are classified as safety, and are critical to the safe operation of the Westinghouse SMR. These include the protection and monitoring system (PMS), the passive core cooling system (PXS), and the spent fuel cooling system (SFS) including pools, valves, and piping. The Westinghouse SMR safety related systems include the instrumentation and controls (I and C) as well as redundant and physically separated safety trains with batteries, electrical systems, and switch gears. Several other incorporated systems are non-safety related, but provide functions for plant operations including defense-in-depth functions. These include the chemical volume control system (CVS), heating, ventilation and cooling (HVAC) systems, component cooling water system (CCS), normal residual heat removal system (RNS) and service water system (SWS). The integrated performance of the safety-related and non-safety related systems ensures the safe and efficient operation of the Westinghouse SMR through various conditions and transients. The turbine island consists of the turbine, electric generator, feedwater and steam systems, moisture separation systems, and the condensers. The BOP is designed to minimize assembly time, shipping challenges, and on-site testing requirements for all structures, systems, and components. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hazard consistent structural demands and in-structure design response spectra

Current analysis methodology for the Soil Structure Interaction (SSI) analysis of nuclear facilities is specified in ASCE Standard 4. This methodology is based on the use of deterministic procedures with the intention that enough conservatism is included in the specified procedures to achieve an 80% probability of non-exceedance in the computed response of a Structure, System. or Component for given a mean seismic design input. Recently developed standards are aimed at achieving performance-based, risk consistent seismic designs that meet specified target performance goals. These design approaches rely upon accurately characterizing the probability (hazard) level of system demands due to seismic loads consistent with Probabilistic Seismic Hazard Analyses. This paper examines the adequacy of the deterministic SSI procedures described in ASCE 4-98 to achieve an 80th percentile of Non-Exceedance Probability (NEP) in structural demand, given a mean seismic input motion. The study demonstrates that the deterministic procedures provide computed in-structure response spectra that are near or greater than the target 80th percentile NEP for site profiles other than those resulting in high levels of radiation damping. The deterministic procedures do not appear to be as robust in predicting peak accelerations, which correlate to structural demands within the structure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

IS Process Hydrogen Production Test for Components and System Made of Industrial Structural Material - (I) - Bunsen and HI Concentration Section - 18628

Japan Atomic Energy Agency (JAEA) has been conducting research and development on a hydrogen production system as one of the heat applications of High Temperature Gas-Cooled Reactor. The iodine-sulfur (IS) process is one of the most promising thermochemical methods because of its potential for large-scale CO{sub 2} free hydrogen production. In the IS process, hydrogen is produced through three chemical reactions: Bunsen reaction, hydriodic acid (HI) decomposition and sulfuric acid (H{sub 2}SO{sub 4}) decomposition. High corrosion resistance is required of the component materials in the IS process because the high-temperature strong acids flow in this process. JAEA has fabricated a 30 NL/h - H{sub 2}-scale apparatus made of glass and Teflon which boast corrosion-resistance for the acids, and has succeeded a continuous operation for a week. However, for practical use on a larger scale, the components have to be made of industrial corrosion-resistance materials. As a next step, we have fabricated the new test-facility which can produce H{sub 2} of 100 NL/h-scale for the demonstration of the continuous operation by using the industrial materials. In advance of the continuous operation, we investigated the performance of the components in each section of the IS process. In this presentation, the test results of Bunsen and HI concentration sections will mainly be discussed. (authors)

08 HYDROGEN↗

Preliminary Nuclear Containment Vessel Modeling for Multi-Hazard Probabilistic Risk Assessment under Seismic Hazards and Concrete Degradation

The current practice for natural phenomena hazards (NPH) risk assessment of nuclear facilities is to compute the risk for each hazard independently and then compound the total risk as a combination of single hazard risks. This state of practice does not consider correlations between hazards and the cascading impacts to structures, systems, and components (SSCs), and could thus underestimate the NPH risk or overestimate the nuclear facility safety. Events such as the Fukushima Daiichi accident have highlighted the importance of multi-hazard risk considerations to nuclear power plants (NPPs) that quantify the cascading damage effects to SSCs in the risk models. Moreover, the current fleet of NPPs in the United States is aging; these NPPs are now expected to operate well beyond their initially planned design life. Aging-related deterioration can potentially decrease the capacity of critical structures such as containment vessels to withstand NPH. Such aging considerations may not be adequately accounted for by the current NPH risk assessment guidelines. This paper presents a preliminary modeling and simulation of a representative reinforced concrete containment vessel subjected to seismic mainshock and aftershock considering concrete degradation due to alkali silica reaction. The broader aim is to develop multi-hazard time-dependent fragility functions that could be subsequently used in the probabilistic risk assessment (PRA) model. The multi-hazard component comes into play due to the consideration of damage to the containment vessel under seismic loads and concrete degradation. Consideration of concrete degradation also brings into play the time-dependent nature of the containment vessel response. The response of the containment vessel under varying degrees of concrete degradation to seismic loads is investigated. The results presented are simulated using the Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) software for seismic analysis and the Blackbear software for concrete degradation and damage modeling. Both software are open source and developed within the Multiphysics Object-Oriented Simulation Environment (MOOSE).

42 ENGINEERING↗

State of Electrical Cable Aging in U.S. Nuclear Power Plants

Nuclear energy has supplied one fifth of the electricity generation in the United States for the last thirty years, but headwinds for continued contribution of nuclear to the US energy mix include the aging state of existing plants and the challenge of remaining cost competitive with energy alternative such as natural gas. As an integral component of the power, control and safety operations of a nuclear power plant, electrical cables are a significant factor in both long term and resource-efficient plant operation. The cost and practical challenge of wholesale replacement of the thousands of miles of cables in each reactor make effective management of the existing cable inventory increasingly important as the cables age in service. Total generation costs for US nuclear reactors have increased in the last decade, due in part to safety and security upgrades. Passive, long-lived structures, systems and components may be subject to aging-related degradation, necessitating increase frequency of inspection and repair/replace decisions. Costs associated with cable aging management in long-term operation can be reduced with effective cable condition monitoring technology and sufficient understanding of material aging behavior. Technical basis for confidence in cable status can reduce the frequency of cable system inspections and align cable replacement decisions with physical need. Knowledge of cable remaining useful life can allow longer term cable maintenance planning and fewer unplanned outages. As methods for relating measurable key indicators of aging with cable status develop, industry has begun to demonstrate how informed cable aging management can help to minimize costs necessary for safe, long-term operation.

light water reactors, electrical cables, nuclear p↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Probabilistic structural analysis methods for space propulsion system components

The development of a three-dimensional inelastic analysis methodology for the Space Shuttle main engine (SSME) structural components is described. The methodology is composed of: (1) composite load spectra, (2) probabilistic structural analysis methods, (3) the probabilistic finite element theory, and (4) probabilistic structural analysis. The methodology has led to significant technical progress in several important aspects of probabilistic structural analysis. The program and accomplishments to date are summarized.

Chamis, C. C.↗

Probabilistic structural analysis methods for space propulsion system components

The development of a three-dimensional inelastic analysis methodology for the Space Shuttle main engine (SSME) structural components is described. The methodology is composed of: (1) composite load spectra, (2) probabilistic structural analysis methods, (3) the probabilistic finite element theory, and (4) probabilistic structural analysis. The methodology has led to significant technical progress in several important aspects of probabilistic structural analysis. The program and accomplishments to date are summarized.

Chamis, Christos C.↗

Recent developments in deployment analysis simulation using a multi-body computer code

Deployment is a candidate mode for construction of structural space systems components. By its very nature, deployment is a dynamic event, often involving large angle unfolding of flexible beam members. Validation of proposed designs and conceptual deployment mechanisms is enhanced through analysis. Analysis may be used to determine member loads thus helping to establish deployment rates and deployment control requirements for a given concept. Futhermore, member flexibility, joint free-play, manufacturing tolerances, and imperfections can affect the reliability of deployment. Analyses which include these effects can aid in reducing risks associated with a particular concept. Ground tests which can play a similar role to that of analyses are difficult and expensive to perform. Suspension systems just for vibration ground tests of large space structures in a 1 g environment present many challenges. Suspension of a structure which spatially expands is even more challenging. Analysis validation through experimental confirmation on relatively small simple models would permit analytical extrapolation to larger more complex space structures.

Housner, Jerrold M.↗

Relating Measured Component Damage to Assessed Component Reliability in Reliability Integrity Management (RIM)

There is currently no widely agreed detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. It may be possible to develop an approach to licensing such a plant that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev.0, endorses, with conditions, the subject portion of the ASME Code. But that portion of the ASME code is written at a very high level, and there are fundamental technical challenges associated with applying it literally to licensing a real plant. In the RIM approach, applicants need to do the following (among other things): • Allocate target reliabilities to structures, systems, and components (SSCs) that collectively support the top-level plant safety and availability objectives; • Understand failure modes of those SSCs, and the degradation mechanisms that could lead to those failure modes; • Develop and propose a program of surveillances that will identify degradation prior to failure of SSCs; • Provide a means of reporting results, taking actions for anomalous or undesirable conditions, and give the regulator assurance of continued safe operations. Applying RIM in a specific case will call for advances in the state of practice of relating physical observables to functional reliability of certain component types. Except where a given level of damage corresponds to a failed (or nearly failed) state, it is not practical to establish a precise quantitative relationship between physical observables and reliability. This paper focuses on managing risk of passive component failures based on observable damage parameters. A simple approach to cumulative damage modeling will be illustrated with a view to possible use in RIM applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0. NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs. The NEI guidance document provides one acceptable means for addressing the aforementioned topics as part of demonstrating a specific design provides reasonable assurance of adequate radiological protection. This report provides the framework and associated methodology guidelines and discussion for establishing, then evaluating, confirming, and documenting the adequacy of defense-in-depth (DID) for advanced non-light-water reactor technologies. It was developed as part of the Licensing Modernization Project led by Southern Company and cost-shared by the United States Department of Energy and has benefited from considerable NRC formal reviews and public workshops. The methodology converts the DID philosophy into a structured process that is implementable, embraces existing United States and international definitions and philosophies of DID that set the foundation for the process. It builds on the DID framework developed in the Department of Energy Next Generation Nuclear Plant Project and earlier works on this subject. The approach to establishing DID adequacy involves the incorporation of DID attributes into the plant capabilities and programmatic elements of DID. The integrated evaluation of DID adequacy includes both quantitative elements to incorporate risk-informed and performance-based (RIPB) considerations and qualitative elements that address uncertainties and limitations in the quantitative models and supporting data. Demonstration of DID adequacy ensures that there are multiple layers of defense for risk-significant challenges to the design and that the plant capabilities and programs that support each layer are provided in a manner that minimizes dependencies among these layers. The focus of this report is assurance of DID adequacy with respect to protection of the public from radiological exposures resulting from accidental releases of radioactive material. While other hazards are not specifically addressed, this methodology is expected to be beneficial for determining DID adequacy for them as well. Risk-informed evaluation of DID considers the integrated performance of all plant SSCs and associated programs to manage daily operational activities, transients, and accidents, including the evaluation of strategies for accident prevention and mitigation. The RIPB LBE scenario methodology used in this evaluation defines the challenges to the plant safety features included in the plant design basis and beyond, and the scope of all deterministic and probabilistic safety evaluations. By examining event sequences across the whole spectrum of LBEs, a systematic assessment of DID can be accomplished.

42 ENGINEERING↗

Development and Validation of a Lifecycle-based Prognostics Architecture with Test Bed Validation

On-line monitoring and tracking of nuclear plant system and component degradation is being investigated as a method for improving the safety, reliability, and maintainability of aging nuclear power plants. Accurate prediction of the current degradation state of system components and structures is important for accurate estimates of their remaining useful life (RUL). The correct quantification and propagation of both the measurement uncertainty and model uncertainty is necessary for quantifying the uncertainty of the RUL prediction. This research project developed and validated methods to perform RUL estimation throughout the lifecycle of plant components. Prognostic methods should seamlessly operate from beginning of component life (BOL) to end of component life (EOL). We term this "Lifecycle Prognostics." When a component is put into use, the only information available may be past failure times of similar components used in similar conditions, and the predicted failure distribution can be estimated with reliability methods such as Weibull Analysis (Type I Prognostics). As the component operates, it begins to degrade and consume its available life. This life consumption may be a function of system stresses, and the failure distribution should be updated to account for the system operational stress levels (Type II Prognostics). When degradation becomes apparent, this information can be used to again improve the RUL estimate (Type III Prognostics). This research focused on developing prognostics algorithms for the three types of prognostics, developing uncertainty quantification methods for each of the algorithms, and, most importantly, developing a framework using Bayesian methods to transition between prognostic model types and update failure distribution estimates as new information becomes available. The developed methods were then validated on a range of accelerated degradation test beds. The ultimate goal of prognostics is to provide an accurate assessment for RUL predictions, with as little uncertainty as possible. From a reliability and maintenance standpoint, there would be improved safety by avoiding all failures. Calculated risk would decrease, saving money by avoiding unnecessary maintenance. One major bottleneck for data-driven prognostics is the availability of run-to-failure degradation data. Without enough degradation data leading to failure, prognostic models can yield RUL distributions with large uncertainty or mathematically unsound predictions. To address these issues a "Lifecycle Prognostics" method was developed to create RUL distributions from Beginning of Life (BOL) to End of Life (EOL). This employs established Type I, II, and III prognostic methods, and Bayesian transitioning between each Type. Bayesian methods, as opposed to classical frequency statistics, show how an expected value, a priori, changes with new data to form a posterior distribution. For example, when you purchase a component you have a prior belief, or estimation, of how long it will operate before failing. As you operate it, you may collect information related to its condition that will allow you to update your estimated failure time. Bayesian methods are best used when limited data are available. The use of a prior also means that information is conserved when new data are available. The weightings of the prior belief and information contained in the sampled data are dependent on the variance (uncertainty) of the prior, the variance (uncertainty) of the data, and the amount of measured data (number of samples). If the variance of the prior is small compared to the uncertainty of the data, the prior will be weighed more heavily. However, as more data are collected, the data will be weighted more heavily and will eventually swamp out the prior in calculating the posterior distribution of model parameters. Fundamentally Bayesian analysis updates a prior belief with new data to get a posterior belief. The general approach to applying the Bayesian method to lifecycle prognostics consisted of identifying the prior, which is the RUL estimate and uncertainty from the previous prognostics type, and combining it with observational data related to the newer prognostics type. The resulting lifecycle prognostics algorithm uses all available information throughout the component lifecycle.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel. In general, the internal control weaknesses we discovered could have permitted, without detection, the procurement and installation of safety critical components that did not meet quality assurance standards. In a worst case scenario, undetected, nonconforming components could fail and injure workers or the public. In certain instances, the Department took steps to ensure that the prime contractors at Savannah River began action to remediate nonconforming components and to strengthen policies and procedures. Additionally, the Department took actions to ensure that critical components necessary for projects worked as designed by requiring that the prime contractor place personnel at manufacturers' locations. Further, the Department had suspended work with certain other manufacturers due to quality assurance problems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Prioritization and Implementation Plan for Collaborative Case Study on RPV Steels During Extended Service

Nuclear power currently provides a significant fraction of the United States non-carbon emitting power generation. In future years, nuclear power must continue to generate a significant portion of the nation's electricity to meet the growing electricity demand, clean energy goals, and ensure energy independence. New reactors will be an essential part of the expansion of nuclear power. However, given limits on new builds imposed by economics and industrial capacity, the extended service of the existing fleet will also be required. Ensuring public safety and environmental protection is a prerequisite to all nuclear power plant operating and licensing decisions at all stages of reactor life. This includes the original license period of 40 years, the first license extension to 60 years, and certainly for any consideration of life beyond 60 years. For extended operating periods, it must be shown that adequate aging management programs are present or planned and that appropriate safety margins exist throughout the subsequent license renewal periods. Materials degradation can impact reactor reliability, availability, and potentially, safe operation. Components within a reactor must tolerate the harsh environment of high temperature water, stress, vibration, and/or an intense neutron field. Degradation of materials in this environment can lead to reduced performance, and in some cases, sudden failure. Clearly, understanding materials degradation and accounting for the effects of a reactor environment in operating and regulatory limits is essential. The Light Water Reactor Sustainability (LWRS) Program is designed to support the long-term operation (LTO) of existing domestic nuclear power generation with targeted collaborative research programs into areas beyond current short-term optimization opportunities. Within the LWRS program, two pathways have been initiated to perform research essential to informing relicensing decisions. The Materials Aging and Degradation Pathway is designed to help develop the scientific basis for understanding and predicting long-term environmental degradation behavior of materials in nuclear power plants and to provide data and methods to assess performance of systems, structures, and components essential to safe and sustained operation. The Risk-Informed Safety Margins Characterization Pathway (RISMC) seeks to merge fundamental scientific understanding of critical phenomenological conditions and deterministic predictions of nuclear power plant performance with risk-informed characterization tools. This will provide an integrated characterization of public safety margins in an optimization of nuclear safety, plant performance, and long-term asset management. Clearly, these two pathways have many synergies in goals and outcomes. The data and mechanisms generated in the Materials Pathway may feed into and mold efforts within the RISMC Pathway. In addition, insights from the characterization tools developed in RISMC tasks may inform materials testing needs and experiments. To demonstrate this potentially powerful interaction, a joint case study has been proposed and initiated. This document describes the initial planning for a coordinated study between the Materials and the RISMC Pathways. A brief description of each Pathway is presented along with a more detailed description of the needs and requirements of this collaborative task. A list of criteria for any case-study candidate are then listed, along with the rationale for choosing pressurized thermal shock as the prime candidate an inter-pathway collaboration. A proposed timeline and organization of future interactions on this subject area is also presented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Technology status of a fluorine-hydrazine propulsion system for planetary spacecraft

The basic technology exists and a system integration program is well underway to allow incorporation of a fluorine-hydrazine propulsion system into future spacecraft required for unmanned planetary missions. These spacecraft would be inserted in earth orbit using the Space Transportation System Shuttle and given its initial sendoff by the Inertial Upper Stage (IUS). The design of a typical propulsion system, assessment of thermal and structural impacts on a selected spacecraft and comparative studies with conventional propulsion systems have been completed. A major part of the current JPL Program involves assembly of a 3650 N thrust demonstration system using titanium tanks, flight weight components and structure. This system will be used to demonstrate the state-of-the-art throughout a representative flight system's qualification.

Bond, D. L.↗

NDT System for Metal Components in Concrete Structures (Final Report)

Steel reinforcements embedded within concrete can corrode and crack, leading to weakening of the structures, and existing NDT (non-destructive testing) techniques do not provide the full picture. Condition assessment is critical in evaluating these structures in order to ensure safe, long-term operation of the nuclear power plants. Improved NDT techniques are needed as the nation’s generating stations age and require action based on increasingly critical inspection data. The power industry uses eddy current test (ECT) during in-service inspections to detect and monitor defects such as cracks and corrosion in metals, particularly metal pipes. However, the detection of defects in the reinforcing steel embedded in concrete is far more challenging for numerous reasons. Primary among them is the concrete layer’s thickness, which prevents the ability to have a close proximity between sensor and metallic sample. One solution to this problem is to create a higher sensitivity technique which can inspect at depth, with good spatial resolution and excellent directional sensitivity, to isolate the metal buried deep in the concrete and characterize defects in the metal. The goal of the phase II research program was to study and develop a new reinforced concrete NDT technology based on anisotropic magnetoresistive (AMR) sensors designed specifically for ECT of steel reinforcements in concrete. The first technical objective was to demonstrate the capability of inspecting steel reinforcement structures, including metal rebar and tensioning cable at or below 6” of depth embedded in concrete. Another objective was to be able to confidently identify multiple layers of reinforcements at varying depths. In addition, the technique needed to be able to provide condition assessment of the metal, providing data on the structure and positioning of the steel members, material loss, and detection of the presence of breaks. An important part of the research and development was aimed at achieving superior performance compared to existing technology. The ability to detect corrosion breaks in unbonded multi-wire and multi-strand tendons was another important objective. The final objective that led to a successful program was to build a complete prototype portable scanning system capable of demonstrating the probe performance in the field. All of these objectives were met, which provided data for the system development work going forward. RMD worked with the engineering firm Simpson Gumpertz & Heger to develop a detailed problem definition for concrete structures and the necessary sensor specifications. In addition, we developed finite element simulation models for the eddy current based NDT system through the analysis of the electromagnetic (EM) properties of sample materials and the orientation of the transmitter, sensor array (receivers), metal, and intervening materials like concrete and air. Based on the modeling and specifications, we designed and fabricated prototype sensor modules. We then acquired and fabricated test samples to characterize and optimize the sensors. Finally, we built a complete prototype for testing on actual concrete structures. This new NDT technology has high promise for greatly improving capabilities in the inspection of steel reinforcements within concrete structures, such as rebar, liners, anchors, and prestressing cables. This method could be valuable in the maintenance of nuclear power plants, and many other structures critical to our nation’s infrastructure.

42 ENGINEERING↗