Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

ASTP experiment support data processing

Activities associated with the generation of ASTP experiment support data in the areas of spacecraft ephemeris and orientation and instrument pointing and field-of-view are documented. It is intended that this document represent a cradle-to-grave chronicle of these activities. To satisfy this intent while facilitating the ready dissemination of information, the document is being published twice. The first publication, scheduled for release prior to ASTP liftoff, includes all preflight phases of the experiment support activity in addition to those appendixes that do not pertain to any mission-specific data. The second publication will provide any required updates to the original documentation and will add all mission-specific data, including documentation of all postflight data processing activities and data archiving information.

Osburn, R. K.↗

Planning and Execution for an Autonomous Aerobot

The Aerial Onboard Autonomous Science Investigation System (AerOASIS) system provides autonomous planning and execution capabilities for aerial vehicles (see figure). The system is capable of generating high-quality operations plans that integrate observation requests from ground planning teams, as well as opportunistic science events detected onboard the vehicle while respecting mission and resource constraints. AerOASIS allows an airborne planetary exploration vehicle to summarize and prioritize the most scientifically relevant data; identify and select high-value science sites for additional investigation; and dynamically plan, schedule, and monitor the various science activities being performed, even during extended communications blackout periods with Earth.

Gaines, Daniel M.↗

Benefits, Consequences, and Uncertainties of Conventional (Exercise) Countermeasure Approaches

This presentation will review the pros, cons, and uncertainties of using exercise countermeasures in hypothetical long duration exploration missions. The use of artificial gravity and exercise will be briefly discussed. One benefit to continued use of exercise is related to our extensive experience with spaceflight exercise hardware and programming. Exercise has been a part of each space mission dating back to the 1960's when simple isometric and bungee exercises were performed in the Gemini capsule. Over the next 50 years, exercise hardware improved cumulating in today's ISS suite of exercise equipment: Cycle Ergometer with Vibration Isolation and Stabilization System (CEVIS), Treadmill (T2) and Advanced Resistive Exercise Device (ARED). Today's exercise equipment is the most robust ever to be flown in space and allows the variety and intensity of exercise that might reasonably be expected to maintain muscle mass and function, bone density and cardiovascular fitness. A second benefit is related to the large body of research literature on exercise training. There is a considerable body of supporting research literature including >40,000 peer reviewed research articles on exercise training in humans. A third benefit of exercise is its effectiveness. With the addition of T2 and ARED to our ISS exercise suite, crew member outcomes on standard medical tests have improved. Additionally exercise has other positive side effects such as stress relief, possible improvement of immune function, improved sleep, etc. Exercise is not without its consequences. The major cons to performance of in‐flight exercise are the time and equipment required. Currently crew are scheduled 2.5 hrs/day for exercise and there is considerable cost to develop, fly and maintain exercise hardware. While no major injuries have been reported on ISS, there is always some risk of injury with any form of exercise There are several uncertainties going forward; these relate mostly to the development of small compact robust effective exercise devices for the next generation of space vehicles. It is becoming increasingly apparent that high intensity exercise is required for maintenance of fitness and functional capability and so future hardware will need to be developed, tested and implemented that allow for a wide variety of exercise, at high intensity while likely involving low mass, volume and power. There are many unanswered issues related to the minimum number and type of exercise devices required for exploration, optimizing exercise prescriptions for these devices, whether a treadmill is absolutely required, and even whether any single countermeasure can adequately protect muscle, bone, cardiovascular and sensorimotor function.

Ploutz-Snyder, Lori↗

Implementation of a Relay Coordination System for the Mars Network

Mars network relay operations involve the coordination of lander and orbiter teams through long-term and short-term planning, tactical changes and post-pass analysis. Much of this coordination is managed through email traffic and point-to-point file data exchanges. It is often difficult to construct a complete and accurate picture of the relay situation at any given moment, as there is no centralized store of correlated relay data. The Mars Relay Operations Service (MaROS) is being implemented to address the problem of relay coordination for current and next-generation relay missions. The service is provided for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These "relay" sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This paper will discuss the relay coordination problem space, overview the architecture and design selected to meet system requirements, and describe the first phase of system implementation

Allard, Daniel A.↗

Soil Moisture Active Passive Mission L4_SM Data Product Assessment (Version 2 Validated Release)

During the post-launch SMAP calibration and validation (Cal/Val) phase there are two objectives for each science data product team: 1) calibrate, verify, and improve the performance of the science algorithm, and 2) validate the accuracy of the science data product as specified in the science requirements and according to the Cal/Val schedule. This report provides an assessment of the SMAP Level 4 Surface and Root Zone Soil Moisture Passive (L4_SM) product specifically for the product's public Version 2 validated release scheduled for 29 April 2016. The assessment of the Version 2 L4_SM data product includes comparisons of SMAP L4_SM soil moisture estimates with in situ soil moisture observations from core validation sites and sparse networks. The assessment further includes a global evaluation of the internal diagnostics from the ensemble-based data assimilation system that is used to generate the L4_SM product. This evaluation focuses on the statistics of the observation-minus-forecast (O-F) residuals and the analysis increments. Together, the core validation site comparisons and the statistics of the assimilation diagnostics are considered primary validation methodologies for the L4_SM product. Comparisons against in situ measurements from regional-scale sparse networks are considered a secondary validation methodology because such in situ measurements are subject to up-scaling errors from the point-scale to the grid cell scale of the data product. Based on the limited set of core validation sites, the wide geographic range of the sparse network sites, and the global assessment of the assimilation diagnostics, the assessment presented here meets the criteria established by the Committee on Earth Observing Satellites for Stage 2 validation and supports the validated release of the data. An analysis of the time average surface and root zone soil moisture shows that the global pattern of arid and humid regions are captured by the L4_SM estimates. Results from the core validation site comparisons indicate that "Version 2" of the L4_SM data product meets the self-imposed L4_SM accuracy requirement, which is formulated in terms of the ubRMSE: the RMSE (Root Mean Square Error) after removal of the long-term mean difference. The overall ubRMSE of the 3-hourly L4_SM surface soil moisture at the 9 km scale is 0.035 cubic meters per cubic meter requirement. The corresponding ubRMSE for L4_SM root zone soil moisture is 0.024 cubic meters per cubic meter requirement. Both of these metrics are comfortably below the 0.04 cubic meters per cubic meter requirement. The L4_SM estimates are an improvement over estimates from a model-only SMAP Nature Run version 4 (NRv4), which demonstrates the beneficial impact of the SMAP brightness temperature data. L4_SM surface soil moisture estimates are consistently more skillful than NRv4 estimates, although not by a statistically significant margin. The lack of statistical significance is not surprising given the limited data record available to date. Root zone soil moisture estimates from L4_SM and NRv4 have similar skill. Results from comparisons of the L4_SM product to in situ measurements from nearly 400 sparse network sites corroborate the core validation site results. The instantaneous soil moisture and soil temperature analysis increments are within a reasonable range and result in spatially smooth soil moisture analyses. The O-F residuals exhibit only small biases on the order of 1-3 degrees Kelvin between the (re-scaled) SMAP brightness temperature observations and the L4_SM model forecast, which indicates that the assimilation system is largely unbiased. The spatially averaged time series standard deviation of the O-F residuals is 5.9 degrees Kelvin, which reduces to 4.0 degrees Kelvin for the observation-minus-analysis (O-A) residuals, reflecting the impact of the SMAP observations on the L4_SM system. Averaged globally, the time series standard deviation of the normalized O-F residuals is close to unity, which would suggest that the magnitude of the modeled errors approximately reflects that of the actual errors. The assessment report also notes several limitations of the "Version 2" L4_SM data product and science algorithm calibration that will be addressed in future releases. Regionally, the time series standard deviation of the normalized O-F residuals deviates considerably from unity, which indicates that the L4_SM assimilation algorithm either over- or under-estimates the actual errors that are present in the system. Planned improvements include revised land model parameters, revised error parameters for the land model and the assimilated SMAP observations, and revised surface meteorological forcing data for the operational period and underlying climatological data. Moreover, a refined analysis of the impact of SMAP observations will be facilitated by the construction of additional variants of the model-only reference data. Nevertheless, the “Version 2” validated release of the L4_SM product is sufficiently mature and of adequate quality for distribution to and use by the larger science and application communities.

SMAP L4_SM↗

An Application of the SSHAC Level 3 Process to the Probabilistic Seismic Hazard Analysis for Nuclear Facilities at the Hanford Site, Eastern Washington, USA

Under the sponsorship of the US Department of Energy (DOE) and the electric utility Energy Northwest, the Pacific Northwest National Laboratory (PNNL) is conducting a probabilistic seismic hazard analysis (PSHA) within the framework of a SSHAC Level 3 procedure (Senior Seismic Hazard Analysis Committee; Budnitz et al., 1997). Specifically, the project is being conducted following the guidelines and requirements specified in NUREG-2117 (USNRC, 2012b) and consistent with approach given in the American Nuclear Standard ANSI/ANS-2.29-2008 Probabilistic Seismic Hazard Analysis. The collaboration between DOE and Energy Northwest is spawned by the needs of both organizations for an accepted PSHA with high levels of regulatory assurance that can be used for the design and safety evaluation of nuclear facilities. DOE committed to this study after performing a ten-year review of the existing PSHA, as required by DOE Order 420.1C. The study will also be used by Energy Northwest as a basis for fulfilling the NRC’s 10CFR50.54(f) requirement that the western US nuclear power plants conduct PSHAs in conformance with SSHAC Level 3 procedures. The study was planned and is being carried out in conjunction with a project Work Plan, which identifies the purpose of the study, the roles and responsibilities of all participants, tasks and their associated schedules, Quality Assurance (QA) requirements, and project deliverables. New data collection and analysis activities are being conducted as a means of reducing the uncertainties in key inputs to the PSHA. It is anticipated that the results of the study will provide inputs to the site response analyses at multiple nuclear facility sites within the Hanford Site and at the Columbia Generating Station.

Nuclear Facilities↗

Planning Tool for Strategic Evaluation of Facility Plans - 13570

Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

54 ENVIRONMENTAL SCIENCES↗

Assessing and improving regulatory communication processes: the case of the WIPP CRA - 15151

This paper will focus on how and why effective communication is useful and meaningful for a multi-organizational project team and the concrete practices through which this team assessed and intervened in its communication. First, the effort generated five recommendations that may be useful in other similar projects. The five primary areas of improvement include the use of an electronic platform for collaboration and document sharing, the continued use of an in-house technical editor, improved direction for authors and technical editors, improved comment resolution process (development of Communication Guidelines) and improved management of the project schedule. These areas for improvement were translated into process changes that were identified and agreed upon by the team. Specific actions were assigned to members of the team with the intent to streamline the complex regulatory process. Second, and more importantly, we demonstrate how the assessment of communication, thinking about our communication practices together (reflexive engagement), and the implementation of insights about communication fit into a larger continuous improvement framework. Third, the experience of the interdisciplinary team provided preliminary evidence about the efficacy of the approach and the need for continuous engagement with communication. The intensified participation in the second assessment encouraged greater ownership and satisfaction with corrective actions. The substance of the recommendations was made more robust as well, focusing on improving communication within the project team. Early anecdotal evidence suggests that improvements in communications continue to enhance the project team's efficiency and efficacy of the planning phase through submittal of the Compliance Re-certification Application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Waste Management Organization for the Whiteshell Laboratories Closure Project - 18317

Whiteshell Laboratories (WL) has been generating and managing radioactive waste for over fifty years in support of a wide variety of research and operational applications. The current mission of the WL site, located in Manitoba, Canada, is to fully decommission the site to an approved end-state criterion and to disposition the waste in compliance with national and provincial regulations. To expedite the decommissioning schedule from over thirty years to nine years, which was a contractual commitment for the site operating company, Canadian Nuclear Laboratories (CNL), it became apparent that a centralized and optimized organization be established to coordinate all waste management activities and to fulfill the mission to process, condition, transport and disposition all radioactive wastes, which include Low-Level Waste (LLW), Intermediate-Level Waste (ILW) and High-Level Waste (HLW). The WL Waste Management Division was effectively established as a two-person operation in 2016 and has rapidly expanded to fulfill the mandate of managing nearly 30,000 cubic meters of LLW, ILW and HLW. This paper outlines the early lessons learned from managing important organizational changes without disrupting ongoing work practices; developing executive-level waste management strategies based on options studies and cost-benefit analysis comparisons; selection of storage vs. disposal disposition strategies; evaluation and selection of transportation methods and packages for LLW, ILW and HLW; and the need to develop an entire suite of programmatic documentation and procedures to support and instill a strong conduct of operations culture. The waste management strategy, which now focuses on transporting the waste to another province (Ontario) in a disposal ready form, represents the first large-scale radioactive waste transportation campaign in Canada that includes all three classes of waste. This paper provides additional insight on the overall waste management strategies for the WL Closure Project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PROSPECT OF STUDYING HARD X- AND GAMMA-RAYS FROM TYPE Ia SUPERNOVAE

We perform multi-dimensional, time-dependent radiation transfer simulations for hard X-ray and {gamma}-ray emissions, following radioactive decays of {sup 56}Ni and {sup 56}Co, for two-dimensional delayed-detonation models of Type Ia supernovae (SNe Ia). The synthetic spectra and light curves are compared with the sensitivities of current and future observatories for an exposure time of 10{sup 6} s. The non-detection of the {gamma}-ray signal from SN 2011fe at 6.4 Mpc by SPI on board INTEGRAL places an upper limit on the mass of {sup 56}Ni of {approx}< 1.0 M {sub Sun }, independently from observations in any other wavelengths. Signals from the newly formed radioactive species have not yet been convincingly measured from any SN Ia, but future X-ray and {gamma}-ray missions are expected to deepen the observable horizon to provide high energy emission data for a significant SN Ia sample. We predict that the hard X-ray detectors on board NuStar (launched in 2012) or ASTRO-H (scheduled for launch in 2014) will reach to SNe Ia at {approx}15 Mpc, i.e., one SN every few years. Furthermore, according to the present results, the soft {gamma}-ray detector on board ASTRO-H will be able to detect the 158 keV line emission up to {approx}25 Mpc, i.e., a few SNe Ia per year. Proposed next-generation {gamma}-ray missions, e.g., GRIPS, could reach to SNe Ia at {approx}20-35 Mpc by MeV observations. Those would provide new diagnostics and strong constraints on explosion models, detecting rather directly the main energy source of supernova light.

79 ASTRONOMY AND ASTROPHYSICS↗

DFSynthesizer: Dataflow-based Synthesis of Spiking Neural Networks to Neuromorphic Hardware

Spiking Neural Networks (SNNs) are an emerging computation model that uses event-driven activation and bio-inspired learning algorithms. SNN-based machine learning programs are typically executed on tile-based neuromorphic hardware platforms, where each tile consists of a computation unit called a crossbar, which maps neurons and synapses of the program. However, synthesizing such programs on an off-the-shelf neuromorphic hardware is challenging. This is because of the inherent resource and latency limitations of the hardware, which impact both model performance, e.g., accuracy, and hardware performance, e.g., throughput. We propose DFSynthesizer, an end-to-end framework for synthesizing SNN-based machine learning programs to neuromorphic hardware. The proposed framework works in four steps. First, it analyzes a machine learning program and generates SNN workload using representative data. Second, it partitions the SNN workload and generates clusters that fit on crossbars of the target neuromorphic hardware. Third, it exploits the rich semantics of the Synchronous Dataflow Graph (SDFG) to represent a clustered SNN program, allowing for performance analysis in terms of key hardware constraints such as number of crossbars, dimension of each crossbar, buffer space on tiles, and tile communication bandwidth. Finally, it uses a novel scheduling algorithm to execute clusters on crossbars of the hardware, guaranteeing hardware performance. We evaluate DFSynthesizer with 10 commonly used machine learning programs. Our results demonstrate that DFSynthesizer provides a much tighter performance guarantee compared to current mapping approaches.

Computer Science↗

Final Report for the Advanced Outage Control Center Dashboard with Predictive Tools

The “Advanced Outage Control Center” (AOCC) pilot project was part of the Light Water Reactor Sustainability (LWRS) program and was a multi-year effort targeted at NPP outage improvement. The primary purpose of this pilot project was to improve management of NPP outages through the development of AOCC features and facilities designed specifically to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. Later stages of the project focused more on tools that utilize technology to improve the outage manager’s understanding of the true outage status. The primary tool that resulted from this research was an innovative outage information dashboard with built-in data analysis and predictive capabilities. In its present form, the dashboard specifically takes advantage of visualization techniques that allow users to view and understand the status of the outage at a glance, without the need to drill down to find detail information. The dashboard also incorporates historical performance data to help evaluate current performance. The key innovation in this dashboard concept is not only its ability to avoid the complexity of raw data presentation, but also to predict the completion of the current outage using data analysis of the current schedule and historical performance of the plant. Through the LWRS program, a relationship between Idaho National Laboratory and Arizona Public Service (APS) was established to investigate the application of specialized techniques to analyze and visualize complex outage information. APS has supported efforts to implement advanced methods to improve the management of outages at the three units of the Palo Verde Nuclear Generating Station (PVNGS). The project has produced the basic principles and methodology for the development of sophisticated outage information analysis and presentation tools.

99 GENERAL AND MISCELLANEOUS↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

An Assessment of Alternate Thermal Protection Systems for the Space Shuttle Orbiter: Executive Summary - Volume 1

Alternate thermal protection system (TPS) concepts to the Space Shuttle Orbiter were assessed. Metallic, ablator, and carbon-carbon concepts which are the result of some previous design, manufacturing and testing effort were considered. Emphasis was placed on improved TPS durability, which could potentially reduce life cycle costs and improve Orbiter operational characteristics. Integrated concept/orbiter point designs were generated and analyzed on the basis of Shuttle design environments and criteria. A merit function evaluation methodology based on mission impact, life cycle costs, and risk was developed to compare the candidate concepts and to identify the best alternate. Voids and deficiencies in the technology were identified, along with recommended activities to overcome them. Finally, programmatic plans, including ROM costs and schedules, were developed for all activities required to bring the selected alternate system up to operational readiness.

Hays, D.↗

The Mission Operations Planning Assistant

The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

Schuetzle, James G.↗

The mission operations planning assistant

The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Prinicpal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZETALISP and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

Schuetzle, James G.↗

Simulation evaluation of TIMER, a time-based, terminal air traffic, flow-management concept

A description of a time-based, extended terminal area ATC concept called Traffic Intelligence for the Management of Efficient Runway scheduling (TIMER) and the results of a fast-time evaluation are presented. The TIMER concept is intended to bridge the gap between today's ATC system and a future automated time-based ATC system. The TIMER concept integrates en route metering, fuel-efficient cruise and profile descents, terminal time-based sequencing and spacing together with computer-generated controller aids, to improve delivery precision for fuller use of runway capacity. Simulation results identify and show the effects and interactions of such key variables as horizon of control location, delivery time error at both the metering fix and runway threshold, aircraft separation requirements, delay discounting, wind, aircraft heading and speed errors, and knowledge of final approach speed.

Credeur, Leonard↗

Operational Implementation of a 2-Hour Prebreathe Protocol for International Space Station

Procedures, equipment, and analytical techniques were developed to implement the ground tested 2-hour protocol in-flight operations. The methods are: 1) The flight protocol incorporates additional safety margin over the ground tested protocol. This includes up to 20 min of additional time on enriched O2 during suit purge and pressure check, increased duration of extravehicular activity (EVA) preparation exercise during O2 prebreathing (up to 90 min vs; the tested 24 min), and reduced rates of depressurization. The ground test observations were combined with model projections of the conservative measures (using statistical models from Duke University and NASA JSQ to bound the risk of Type I and Type II decompression sickness (DCS). 2) An inflight exercise device using the in-flight ergometer and elastic tubes for upper body exercise was developed to replicate the dual cycle exercise in the ground trials. 3) A new in-flight breathing system was developed and man-tested. 4) A process to monitor inflight experience with the protocol, including the use of an in-suit Doppler bubble monitor when available, was developed. The results are: 1) The model projections of the conservative factors of the operational protocol were shown to reduce the risk of DCS to levels consistent with the observations of no DCS to date in the shuttle program. 2) Cross over trials of the dual cycle ergometer used in ground tests and the in-flight exercise system verified that02consumption and the % division of work between upper and lower body was not significantly different at the p= 0.05 level. 3) The in-flight breathing system was demonstrated to support work rates generating 75% O2(max) in 95 percentile subjects. 4) An in-flight monitoring plan with acceptance criteria was put in place for the 2-hour prebreathe protocol. And the conclusions are: The 2-hour protocol has been approved for flight, and all implementation efforts are in place to allow use of the protocol as early as flight ISS 7A, now scheduled in November of 2000.

Waligora, James M.↗