Search NASA⌕ Search

SEARCH · Search NASA

Results for “LABORATORY EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Summary of irradiation tests of mixed oxide fuel prepared with weapons-derived plutonium

Mixed oxide (MOX) test capsules prepared with weapons-derived plutonium were irradiated to a burnup of 50 GWd/MT. The MOX fuel was fabricated at Los Alamos National Laboratory by a master-mix process and irradiated in the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL). Previous withdrawals of the same fuel have occurred at 9, 21, 30, and 40 GWd/MT. Oak Ridge National Laboratory managed this test series for the Department of Energy s Fissile Materials Disposition Program (FMDP). This paper describes the preparation of the MOX fuel, the equipment design, and the irradiation history of the test capsules and discussesthe significance of the more important observations of the post-irradiation examinations (PIEs). Fuel performance has been excellent and consistent with code predictions and with existing U.S. and European experience.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Laboratory and Field Testing of Commercially Available Detectors for the Identification of Chemicals of Interest in the Nuclear Fuel Cycle for the Detection of Undeclared Activities

Traditionally, IAEA inspectors have focused on the detection of nuclear indicators as part of infield inspection activities. The ability to rapidly detect and identify chemical as well as nuclear signatures can increase the ability of IAEA inspectors to detect undeclared activities at a site. Identification of chemical indicators have been limited to use in the analysis of environmental samples. Although IAEA analytical laboratories are highly effective, environmental sample processing does not allow for immediate or real-time results to an IAEA inspector at a facility. During a complementary access inspection, under the Additional Protocol, the use of fieldable technologies that can quickly provide accurate information on chemicals that may be indicative of undeclared activities can increase the ability of IAEA to effectively and efficiently complete their mission. The Complementary Access Working Group (CAWG) is a multi-laboratory team with members from Brookhaven National Laboratory, Idaho National Laboratory, Los Alamos National Laboratory, and Sandia National Laboratory. The team identified chemicals at each stage of the nuclear fuel cycle that may provide IAEA inspectors with indications that proliferation activities may be occurring. The group eliminated all indicators related to equipment, technology and training, developing a list of by-products/effluents, non-nuclear materials, nuclear materials, and other observables. These proliferation indicators were prioritized based on detectability from a conduct of operations (CONOPS) perspective of a CA inspection (for example, whether an inspector actually can access the S&O or whether it is in process with no physical access), and the IAEA’s interest in the detection technology in conjunction with radiation detectors. The list was consolidated to general categories (nuclear materials from a chemical detection technique, inorganic chemicals, organic chemicals, halogens, and miscellaneous materials). The team then identified commercial off the shelf (COTS) chemical detectors that may detect the chemicals of interest. Three chemical detectors were selected and tested both in laboratory settings and in field operations settings at Idaho National Laboratory. The instruments selected are: Thermo Scientific TruDefender FT (FTIR), Thermo Scientific FirstDefender RM (Raman), and Bruker Tracer III SD (XRF). Functional specifications, operability, and chemical detectability, selectivity, and limits of detection were determined. Results from the laboratory and field tests will be presented. This work is supported by the Next Generation Safeguards Initiative, Office of Nonproliferation and International Security, National Nuclear Security Administration.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Evaluation of HFC 245ca and HFC 236ea as foam blowing agents

Hydrochlorofluorocarbon (HCFC) 141b has been selected as the interim blowing agent for use in urethane insulations on NASA's Space Shuttle External Tank. Due to the expected limited commercial lifetime of this material, research efforts at the NASA Thermal Protection Systems Materials Research Laboratory at the Marshall Space Flight Center are now being devoted to the identification and development of alternatives with zero ozone depletion potential. Physical blowing agents identified to date have included hydrocarbons, fluorocarbons, hydrofluoroethers, and more predominantly, hydrofluorocarbons (HFCs). The majority of the HFC evaluations in industry have focused on the more readily available, low boiling candidates such as HFC 134a. Higher boiling HFC candidates that could be handled at ambient conditions and use current processing equipment would be more desirable. This paper will describe results from a research program of two such candidate HFC's performed as a cooperative effort between Martin Marietta Manned Space Systems, the U.S. Environmental Protection Agency, and Oak Ridge National Laboratories. The purpose of this effort was to perform a cursory evaluation of the developmental HFC's 245ca and 236ea as blowing agents in urethane based insulations. These two materials were selected from screening tests of 37 C2, C3, and C4 isomers based on physical properties, atmospheric lifetime, flammability, estimated toxicity, difficulty of synthesis, suitability for dual use as a refrigerant, and other factors. Solubility of the two materials in typical foam components was tested, pour foaming trials were performed, and preliminary data were gathered regarding foam insulation performance.

Sharpe, Jon↗

Remote Robotic Equipment for Retrieval of High Level Waste to Support Environmental Closure - 18162

The Idaho Cleanup Project contractor, Fluor Idaho, LLC, is responsible for managing HLW calcine stored in the Calcined Solids Storage Facility at the Idaho Nuclear Technology and Engineering Center. The Idaho Nuclear Technology and Engineering Center is a DOE managed facility located at the INL Site in the remote portions of southeast Idaho. In 2016, DOE directed Fluor Idaho to develop and test a full-scale retrieval system to demonstrate the ability to safely retrieve HLW calcine from the Calcined Solids Storage Facility for future retrieval and processing. Removing HLW calcine from the State of Idaho is required by the 1995 Settlement Agreement, which mandates that DOE have HLW calcine ready to be moved out of Idaho by December 2035. Fluor Idaho is currently testing retrieval and transfer concepts to ensure that the Calcined Solids Storage Facility is placed in a final configuration that is protective of human health and the environment after HLW calcine has been removed to the maximum extent practical. This paper describes the full-scale prototype that will be used to prove retrieval and transfer system design capabilities, verify operating parameters, and establish a basis for calcine retrieval efficacy. Additionally, it describes the retrieval (bulk and residual) and visual monitoring systems that were designed and tested in 2017 and will continue to be tested with the full-scale prototype. Testing (i.e., full-scale mockup, bulk retrieval, residual clean-out, and visualization monitoring) performed by Fluor Idaho will demonstrate the maximum extent practical of HLW calcine removal that is achievable. This is critical to (1) establish criteria for ending calcine removal activities, (2) evaluate cost and benefits associated with performing additional removal, and (3) ensure clean up and closure standards under applicable requirements (e.g., statutes, orders, and agreements) are met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pilot-Scale CFP Commissioning: Creative Problem Solving and Lessons Learned

We have commissioned a pilot-scale, ex-situ catalytic fast pyrolysis (CFP) reactor system in the Thermal and Catalytic Process Development Unit (TCPDU) at the National Renewable Energy Laboratory. The FCC-style CFP system, including a riser and continuous regeneration, was added to the existing half-ton-per-day biomass fast pyrolysis unit and was designed to run a zeolite-type catalyst. The system is unique due to its scale and catalyst flow control scheme. As the design of this system was informed by early data from a bench-scale reactor, several technical scale-up challenges had to be overcome. Additionally, physical constraints and the complexities of biomass vapors required and inspired creative solutions. This talk will discuss the specific challenges we found and addressed, including an oxygen deficiency in the regenerator and plugging in the exit streams. We explored several options for increasing oxygen availability and selected a cyclone-catalyst return design on the exit line so we could increase air flow through the regenerator. We found that hot gas filtration is essential in any exit streams containing water vapor and trace amounts of catalyst; any combination of catalyst and condensate quickly makes mud that plugs equipment and severely limits run time. Duplicate filters are also required to extend run time. Most of the equipment and solutions were designed and installed by our team of engineers and technicians, working closely together in an iterative process to design, install, operate, then redesign. Collaborations with other national laboratories with computational fluid dynamics expertise helped inform designs and identify creative solutions to these scale-up challenges. Ultimately, data from the reactor system will be used to validate a comprehensive kinetic model of CFP that can be used to better design and inform new systems at various scales.

09 BIOMASS FUELS↗

Breast Cancer Detection

NASA's Jet Propulsion Laboratory has come up with a technique to decrease exposure to harmful x-rays in mammographies or breast radiography. Usually, physicians make more than one exposure to arrive at an x-ray film of acceptable density. Now the same solar cells used to convert sunlight into electricity on space satellites can make a single exposure sufficient. When solar cell sensor is positioned directly beneath x-ray film, it can determine exactly when film has received sufficient radiation and has been exposed to optimum density. At that point associated electronic equipment sends signal to cut off x-ray source. Reduction of mammography to single exposures not only reduced x-ray hazard significantly, but doubled the number of patient examinations handled by one machine. The NASA laboratory used this control system at the Huntington Memorial Hospital with overwhelming success.

Source record↗

Progress in Hanford's Double-Shell Tank Integrity Project

The U.S. Department of Energy's Office of River Protection has an extensive integrity assessment program for the Hanford Site Double-Shell Tank System. The DOE Orders and environmental protection regulations provide the guidelines for the activities used to inspect and maintain 28 double-shell tanks (DSTs), the waste evaporator, and ancillary equipment that compose this system. This program has been reviewed by oversight and regulatory bodies and found to comply with the established guidelines. The basis for the DOE Order 435.1-1 for tank integrity comes from the Tank Structural Integrity Panel led by Brookhaven National Laboratory during the late 1990's. These guidelines established criteria for performing Non-Destructive Examination (NDE), for acceptance of the NDE results, for waste chemistry control, and for monitoring the tanks. The environmental regulations mirror these requirements and allow for the tank integrity program to provide compliant storage of the tanks. Both sets of requirements provide additional guidance for the protection of ancillary equipment. CH2M HILL uses two methods of NDE: visual inspection and Ultrasonic Testing (UT). The visual inspection program examines the primary tank and secondary liner of the DST. The primary tank is examined both on the interior surface above the waste in the tank and on the exterior surface facing the annulus of the DST. The interior surface of the tank liner is examined at the same time as the outer surface of the primary tank. The UT program examines representative areas of the primary tank and secondary liner by deploying equipment in the annulus of the tank. Both programs have led to the development of new equipment for remote inspection of the tanks. Compact camera and enhanced lighting systems have been designed and deployed through narrow access ports (called risers) into the tanks. The UT program has designed two generations of crawlers and equipment for deployment through risers into the thermally hot and radioactive environment. Also extensions were developed to allow inspection of the tank's curve upper (haunch) and lower (knuckle) surfaces. CH2M HILL primarily maintains chemistry control of the DST by ensuring that the concentrations of hydroxide and nitrite ions are favorable with respect to the nitrate ion concentration in the waste. This control program is supported by an extensive sampling program that obtains samples from the supernatant and solid layers in the tank to ensure compliance with the chemical specification. At DOE direction, CH2M HILL has embarked on a waste chemistry optimization program to enhance the protection of the tank surface and the understanding of the parameters that affect general and localized corrosion in the tanks. Over the past decade, DOE has deployed Electrochemical Noise corrosion probes in the DST to monitor localized corrosion. From the information gathered as part of the chemistry control, new information has been identified about the parameters requiring control to ensure tank integrity. CH2M HILL is deploying a series of corrosion probes to test and employ these parameters to provide real time corrosion monitoring of the DSTs. (authors)

42 ENGINEERING↗

EVSE Characterization

NextGen Profiles' EVSE characterization efforts explored performance variability in production EVSE through the use of EV emulation equipment and assessed how different operational conditions influence charging behavior. Data were collected at a frequency of 10 Hz from both the EV emulator and EVSE during each charge session and stored in a time-series database for further analysis. As part of the NextGen Profiles project, characterization of high-power EVSE was performed on both conductive and wireless charging infrastructure; however, only conductive charging data are currently included in this repository. This EVSE characterization was performed over a range of DC output currents and voltages, covering both nominal and off-nominal test conditions. This EVSE characterization dataset includes high-power charging data from two types of 350-kW-capable EVSE using liquid-cooled Combined Charging System-1 (CCS1, North American version) cables and connectors. To protect confidentiality, all EVSE metadata are anonymized, and the publicly released datasets are metered at 10-Hz frequency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Sandia National Laboratories Ten-Year Site Plan (Fiscal Year 2016)

During the next 10 years, Sandia’s most critical investments are as follows: 1) Complete the Sandia Silicon Fabrication Revitalization (SSiFR) initiative to replace outdated microelectronics production tools, capital equipment, and processes at the Microsystems and Engineering Sciences Applications (MESA) Complex. 2) Plan, design, and construct the Rad Hard Foundry to sustain the microelectronics-trusted foundry capability in support of critical microsystems science and technology (S&T) for NNSA and SPP. 3) Plan, design, and construct the Weapons Engineering Facility (WEF) to recapitalize core NW capabilities in R&D facilities and excess major buildings that are at the end of their designed service lives. 4) Plan, design, and construct the Emergency Operations and Response Center (EORC) to provide emergency incident management from a modern facility that serves and supports both local and national response teams. 5) Continue to facilitate the deactivation and eventual renovation or demolition of Building 892, a 60-year old facility that is rapidly approaching functional obsolescence.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Completion of Milestone for Receiving Reinstrumentation Equipment from IFE

This set of powerpoint slides demonstrates how milestone "M2CT-21IN0702026: Receive prototype drilling and defueling modules for the re-instrumentation facility procured from the Institute For Energy (Halden, Norway) at the Idaho National Laboratory" was met. It supports an entry in PICS claiming achievement of the milestone. These slides provide a good summary of the purpose and impact of the milestone for our DOE Headquarters colleagues.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Experimental Evaluation of Refrigerant Leak Characteristics for Different HVAC&R Equipment Types–Phase 2

The US Department of Energy (DOE) Building Technology Office (BTO) and the Air-conditioning, Heating & Refrigeration Technology Institute (AHRTI) collaborated to sponsor an experimental study of refrigerant leak characteristics at Oak Ridge National Laboratory (ORNL); AHRTI project 9012. The project has been conducted in two phases with objectives to conduct refrigerant leak tests on several heating, ventilating, air-conditioning and refrigeration (HVAC&R) systems under operating conditions representative of actual applications to document the pressure decay rate and the mass flow rate of leaked refrigerant as a function of time. Phase 1 of the project ran from late 2017 to late 2018 with refrigerant leaks imposed on five systems and the collection of data to meet the project objectives. Systems chosen covered three air-conditioning (AC) applications (packaged terminal AC or PTAC, 3-ton residential split system AC, and 5-ton packaged rooftop AC) and two refrigeration applications (split system unit cooler, and standalone display case). AHRTI members donated the test systems used for the project. The systems were tested at two different leak rates (catastrophic high rate simulating full line break and a lower flow rate), two leak locations (high-pressure side and low-pressure side), and two operating conditions (compressor ON or OFF). Phase 1 results were summarized in a project report by Baxter, et al. (2019)1. The leak rates imposed in Phase 1 led to much more rapid charge releases than the more typical much slower rates seen in practice that would take days, weeks, or months to empty a system of its entire charge. For Phase 2, the project sponsors asked that the “higher” leak rate target a total charge release time of about 4 min. This was intended to represent a “reasonable” worst case release scenario to match the refrigerant leak rate assumption used in the International Electrotechnical Commission (IEC) standard IEC 60335-2-40 (2016 version [IEC 2016]. A charge release time of about 20–40 min (leak release rate 5 to 10 times lower than higher rate) was targeted for the “lower” leak rate. This report provides a summary of the Phase 2 effort. Two additional HVAC systems were selected for testing in this phase. First was a multi-split air-conditioning (MS-AC) system with one outdoor section and two indoor units and a nameplate refrigerant charge of 1.75 kg (3.86 lb.) of R-410A. The MS-AC was tested in cooling only or AC operation. Second was a split system heat pump coupled to two different representative supply duct systems (HP-duct) and a nameplate charge of 3.83 kg (8.44 lb.) of R-410A. This system was tested in both space heating and AC modes. As in Phase 1 of the project, all tests were conducted using R-410A.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Grassroots Network and Community Roadmap for Interconnected Autonomous Science Laboratories for Accelerated Discovery

Scientific discovery is being revolutionized by AI and autonomous systems, yet current autonomous laboratories remain isolated islands unable to collaborate across institutions. We present the Autonomous Interconnected Science Lab Ecosystem (AISLE), a grassroots network transforming fragmented capabilities into a unified system that shorten the path from ideation to innovation to impact and accelerates discovery from decades to months. AISLE addresses five critical dimensions: (1) cross-institutional equipment orchestration, (2) intelligent data management with FAIR compliance, (3) AI-agent driven orchestration grounded in scientific principles, (4) interoperable agent communication interfaces, and (5) AI/ML-integrated scientific education. By connecting autonomous agents across institutional boundaries, autonomous science can unlock research spaces inaccessible to traditional approaches while democratizing cutting-edge technologies. This paradigm shift toward collaborative autonomous science promises breakthroughs in sustainable energy, materials development, and public health.

Ferreira da Silva, Rafael [Oak Ridge National Labo↗

NASA's In-Space Manufacturing Project: A Roadmap for a Multimaterial Fabrication Laboratory in Space

Human space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities (2014-2017), and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The presentation provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. In 2017, the in-space manufacturing project issued a broad agency announcement for this capability. Requirements of the Fabrication Laboratory as stated in the solicitation will be discussed. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business Innovative Research Program (SBIR) is also discussed, as these activities, from development of recyclable packaging for ISS to additive manufacturing capabilities for metals and electronics, could also potentially be infused into future exploration capabilities. Key data from ISM projects to date will also be summarized.

Prater, Tracie↗

NASA's In-Space Manufacturing Project: Toward a Multimaterial Fabrication Laboratory for the International Space Station

uman space exploration to date has been limited to low Earth orbit and the moon. The International Space Station (ISS) provides a unique opportunity for NASA to partner with private industry for development and demonstration of the technologies needed to support exploration initiatives. One challenge that is critical to sustainable and safer exploration is the ability to manufacture and recycle materials in space. This paper provides an overview of NASA's in-space manufacturing (ISM) project, its past and current activities, and how technologies under development will ultimately culminate in a multimaterial fabrication laboratory ("ISM FabLab") to be deployed on the International Space Station in the early 2020s. ISM is a critical capability for the long endurance missions NASA seeks to undertake in the coming decades. An unanticipated failure that can be adapted for in low earth orbit, through a resupply launch or a return to earth, may instead result in a loss of mission while in transit to Mars. To have a suite of functional ISM capabilities that are compatible with NASA's exploration timeline, ISM must be equipped with the resources necessary to develop these technologies and deploy them for testing prior to the scheduled de-orbit of ISS in 2024. The paper provides a broad overview of ISM projects activities culminating with the Fabrication Laboratory for ISS. The FabLab will move NASA and private industry significantly closer to changing historical paradigms for human spaceflight where all materials used in space are launched from earth. While the current ISM FabLab will be tested on ISS, future systems are eventually intended for use in a deep space habitat or transit vehicle. The work of commercial companies funded under NASA's Small Business Innovative Research Program (SBIR) is also discussed, as these activities, from development of recyclable packaging for ISS to additive manufacturing capabilities for metals and electronics, could also potentially be infused into FabLab exploration capabilities as well.

Prater, Tracie↗

Fuel Property Effects on Stochastic Preignition Events During Engine Load Transitions

Stochastic preignition (SPI) is an abnormal combustion phenomenon that can cause catastrophic engine damage. There have been several proposed mechanisms of SPI, where a uniform source is still not certain, however, SPI tendencies have been shown to be influenced by engine operating conditions, oil composition, engine age, and fuel chemical and physical properties. Laboratory research and testing for SPI propensity is challenging given the stochastic nature of events, as well as the potential for significant degradation of the engine platform and measuring equipment over time. Thus, SPI specific experiments are generally conducted under either sustained or cyclic patterning of steady-state operating conditions to avoid the influence of transient engine boundary conditions on test parameters of interest (e.g. oil additive package, fuel properties, engine speed/load, etc.). In this work a cyclically varying SPI test sequence involves a 5 min engine warmup period at a low engine load of around 4 bar gross indicated mean effective pressure (IMEPg), followed by a transition to high load (~20 bar IMEPg) at a constant 2000 rev/min engine speed for a total of 25 min. This individual test sequence load schedule is then sequentially repeated 10 times to generate significant statistical data for analysis. This work examines the influence of fuel chemical and physical properties on SPI tendency during the unsteady portion of the 10-cycle sequence (the first 5 min of the high load operation in each sequence of the loading cycle) which has been discarded from previous analyses due to the uncertainty in engine operating and thermal boundary conditions. Results from this analysis suggest an increasing trend in the ratio of SPI events during the unsteady test period relative to the steady test period with increasing fuel Reid Vapor Pressure (RVP), implying differences in uncontrolled ignition source terms, possibly from, fuel wall interactions and retention during the load transition phase of the test.

Splitter, Derek [ORNL] (ORCID:0000000174044047)↗

Lessons Learned from Particulate Characterization Laboratory Anomalies

The White Sands Test Facility chemistry laboratory provides quality control for cleanroom operations including cleanliness verification of aerospace hardware by particulate counts and non-volatile residue determinations, particulate counts for liquid hypergolic propellants, gaseous helium and nitrogen propellant pressurizing agents used for ground support equipment and flight test article valve actuation, gaseous oxygen primarily used for component testing, and deionized water for refurbished propellant hardware flushing. Cleanliness verification includes particulate counts and non-volatile residue determinations to industry standard, NASA, and program specifications and levels. Particulate counts are typically to customer-specified specifications and levels including JPR 5322.1H (2016) Levels 50 and 100, Orion (MPCV 70156. Revision H (2018)) Level 100, RPTSTD-8070-0001 Revision 3 (2022), and IEST-STD-CC1246E (2013) Levels 50 and 100. The laboratory issues high pressure filter holders containing membrane filters to test operations personnel, who collect samples by flowing the required volumes of fluid through the filter holder, and the filter holder is returned to the lab for counting. A passing particulate count is required before testing may proceed. Rapid data reduction and issuing of reports indicating a pass or fail of the particulate specification are required. Corrective action and resampling invariably occurs if a sample fails. Consequently, the laboratory must maintain the highest degree of reliability to facilitate quality data used to decide if testing may proceed. Experience and continual improvements have enabled reliability. However, anomalies attributed to lab processes and hardware including filter holders, membranes, and Petri dishes have been encountered. This paper presents a summary of problems, solutions, successes, and lessons learned from particle counting experience for over 35 years.

Lessons Learned↗