Guidance and Recommendations for Streamlining Reporting for Federal Energy and Water Efficiency Projects

Federal agencies are required to report on their progress in meeting various energy and water management requirements. These reporting requirements encompass energy and water projects at federal facilities, including projects that are alternatively financed, e.g., conducted through energy savings performance contracts (ESPCs) or utility energy service contracts (UESCs). The purpose of this guidance is to provide recommendations to streamline federal agency reporting. The guidance recommends the use of eProject Builder (ePB), a project development and archiving tool for energy projects. ePB carries additional value in its simplification of federal agency reporting by dovetailing with the Federal Energy Management Program’s (FEMP’s) EISA 432 Compliance Tracking System (CTS).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

2009 National Biodiesel Foundation Biodiesel Infrastructure Project [Final Report]

The National Biodiesel Foundation (NBF) worked with industry partners to displace nearly 10 millions of gallons of petroleum-based diesel with biodiesel by installing or modifying terminals throughout the United States (US). The original grant was to install seven terminals, but with DOE’s approval and using existing grant funds, the project provided funds for an additional terminal. The primary goal of this project was to displace 86 million gallons of petroleum based diesel with biodiesel by installing seven terminals. Although the project installed eight terminals, it only resulted in displacing approximately 9.7 million gallon. However, the project (through the Harms Oil installation) enabled the state of Minnesota to increase its biodiesel mandate from 5% to 10%, increase biodiesel demand at other MN terminals by an addition 25 million. Further, this state mandate will grow demand to 120 million gallons annually by 2018, if the state’s biodiesel mandate is fully enforced. None of this would have been possible without the Harm’s Oil terminal funded under this grant.

09 BIOMASS FUELS↗

Reduction of CO 2 Emissions Through Lightweight Body Panels (Project Final Report)

Lightweight construction is an integral part of Volkswagen’s overall strategy of reducing CO 2 emissions. Due to its low cost, steel is the most commonly used material for automotive exterior body panels today. Unfortunately, steel has a high density, resulting in a relatively low specific strength. Glass fiber based sheet molding compounds (SMC) provide high properties in combination with lower density. The high specific strength of SMC offers an enormous lightweight potential. To unlock the full potential of SMC materials in combination with cutting edge manufacturing processes, Volkswagen Group of America worked together with IACMI (Institute for Advanced Composites Manufacturing Innovation) and the academic partners: University of Tennessee Knoxville, Purdue University and Michigan State University; as well as the industry partners: Ashland, IDI, Owens Corning and Continental Structural Plastics. Leveraging the expertise of all project partners, reaching over the entire supply chain the project demonstrated the potential of these materials. This report will highlight the major steps in the development process on the way to technology readiness for SMC using the example of the Volkswagen Atlas Liftgate. Over the 36-month period of the project, the work focused on three R&D areas: material development, design and simulation, and development of the manufacturing process. Material selection included alternative fibers and resin systems, and accounted for material availability, properties, and cost-efficiency. The work undertaken in the field of design and simulation has pushed the envelope of short fiber reinforced thermoset molding compound process simulation. Design iterations were virtually tested, while the final design was used to validate the simulation software against physical parts. Manufacturing development used cutting-edge technology, while experts along the supply chain were working together to ensure the best possible results. In the final stage of the project, liftgates were molded, trimmed, bonded, painted and assembled before exhaustive testing. The result is an e-coat (electrophoretic dip coating) capable Class-A SMC liftgate, which is ready for high-volume production, and can be used as a technology demonstrator. The prototypes manufactured in the scope of this work have exhibited a mass reduction for the Volkswagen Atlas liftgate of up to 35% compared to the series production steel version, without a degradation of the functionalities.

36 MATERIALS SCIENCE↗

Amended Stormwater Pollution Prevention Plan: Water Line Project-Northern Portion

This Storm Water Pollution Prevention Plan (SWPPP) has been prepared for the Sandia National Laboratories Water Line Project – Northern Portion, in Livermore, CA. The project, located at 7011 East Avenue, and will entail the portion of the site north of the Arroyo Section. The project is comprised of 19,584 linear feet of water line improvements totaling approximately 9.0 acres. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC with this project being developed by NTESS for Sandia National Laboratories.

54 ENVIRONMENTAL SCIENCES↗

Assess and Benchmark Magneto-Inertial Fusion (MIF) Scaling. Final Technical Report for the SNL/Rochester ALPHA Follow-on Project

This project was a follow-on to the Sandia National Laboratories (SNL) and the Laboratory for Laser Energetics (LLE) ARPA-E ALPHA project entitled “Demonstrating Fuel Magnetization and Laser Heating Tools for Low-Cost Fusion Energy”. The primary purpose of this follow-on project was to obtain additional data at the OMEGA facility to help better understand how MagLIF, a platform that has already demonstrated the scientific viability of magneto-inertial fusion, scales across a factor of 1000 in driver energy. A secondary aspect of this project was to extend simulations and analysis at SNL to cover a wider magneto-inertial fusion (MIF) parameter space and test scaling of those models across this wide range of input energies and conditions of the target. This work was successful in improving understanding of how key physics elements of MIF scales and improves confidence in setting requirements for fusion gain with larger drivers. The OMEGA experiments at the smaller scale verified the hypothesis that preheating the fuel plays a significant role in introducing wall contaminants that mix into the fuel and significantly degrade fusion performance. This contamination not only impacts target performance but the optimal input conditions for the target. However, analysis at the Z-scale showed that target performance at high preheat levels is limited by the Nernst effect, which advects magnetic flux from the hot spot, reducing magnetic insulation and consequently reduces the temperature of the fuel. The combination of MagLIF experiments at the disparate scales of OMEGA and Z along with a multiscale 3D simulation analysis has led to new insight into the physical mechanisms responsible for limiting target performance and provides important benchmarks to assess target scaling more generally for MIF schemes. Finally, in addition to the MagLIF related work, a semi-analytic model of liner driven Field Reversed Configuration (FRC) was developed that predicts the fusion gain for such systems. This model was also validated with 2D radiation magneto-hydrodynamic simulations and predicts that fusion gains of near unity could be driven by the Z machine.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Southeast Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test at Citronelle Field, Mobile Co., AL: Project Assessment Report

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest CO 2 capture and transportation, injection, storage and monitoring project using CO 2 derived from a coal-fired power station. The project represents a U.S. Department of Energy research and development initiative designed to demonstrate deep underground injection and containment of 100,000 tonnes or more of anthropogenic-source CO 2 . This report provides an assessment of the CO 2 injection at the Citronelle Anthropogenic Test site for the period August 23, 2012 to August 31, 2013. The purpose of the project assessment is to re-evaluate the AoR for the injection well. The AoR is defined as the region surrounding the geological sequestration project that may be impacted by the injection activity. The AoR is further defined as the farthest reach of the tangible CO 2 plume and/or the region of ‘significant’ reservoir pressure increase. An updated geologic model of the injection zones and storage reservoir sandstones incorporates geologic data obtained from the injection well and characterization wells drilled at the Phase III Anthropogenic Test site. The numerical modeling of the injection was conducted using the updated geologic model, plus the monitoring results obtained to August 31, 2013. The simulation demonstrates effective containment of CO 2 by the reservoir architecture of the upper Paluxy Formation, consisting of multiple, stacked, highly porous and permeable sandstones, separated by low permeability flow barriers. The CO 2 containment demonstrated in this report requires an AoR with a radius of 440 ft from the injection well. This revision reduces the radius of the AoR from the preinjection determination of 1,700 ft. With the revised AoR, the only well within the AoR is the injection well itself, the D 9-7 #2. The nearest well to the injector is the D 9-8 #2. The surface location is 870 ft away from the D 9-7 #2, placing the D 9-8 #2 outside the revised AoR.

01 COAL, LIGNITE, AND PEAT↗

Project Management, Including Data Management Best Practices Framework (Best Management Practice; Work Product 12.3.b)

The Project Management documentation includes: (1) background on the RCSP Initiative and its best practices development process; (2) a historical perspective of best practices for project management; (3) a comparison of the roles of project managers, functional managers, and operations managers; (4) an overview of project management practices for field activities; and discussions of (5) managing change, (6) managing data, and (7) managing knowledge and information.

01 COAL, LIGNITE, AND PEAT↗

Report of the Atmosphere to Electrons Land-Based Mesoscale-to-Microscale Coupling Project (FY2020)

The overall goal of the Mesoscale-to-Microscale Coupling (MMC) project is to improve coupling between mesoscale and microscale simulations via improved guidance and new strategies for setting up simulations and for the development of new tools that can be used across the community. Including the mesoscale forcing is critical to modeling the full energy transfer across scales in the atmosphere. The project-specific objectives include: 1) To apply rigorous verification and validation (V&V) techniques to the new modeling tools that are developed as part of the project to ensure the accuracy of our codes and results and to develop estimates of the relative uncertainty. 2) To improve computational performance of the coupled MMC models through the development of methods that can be used to reduce turbulence spin-up time and hence the size of computational domains. 3) To improve representation of the surface layer in microscale models to enhance simulations of hub-height wind speed. 4) To develop guidance for the community describing the best ways to couple mesoscale and microscale models, including specific spatial scales at which the handoff to the microscale model should occur. 5) To prepare documentation and a suite of software tools that can be used across the community. And 6) To transition MMC research to the offshore environment. Major progress was made in each of these areas during FY20. The land-based portion of the project is reported herein, while the offshore portion will be reported separately. The team continued to advance the MMC tools and methodologies as well as to document their performance in journal papers and conference presentations, although several planned conferences were cancelled due to the COVID-19 pandemic.

54 ENVIRONMENTAL SCIENCES↗

Tailoring EVMS Tools for Projects under $50M

The Earned Value Management System (EVMS) Tailoring Guide for Projects Under $\$$50M is designed for U.S. Department of Energy (DOE) cost-reimbursed projects less than $50M where full EVMS is not required per DOE Order 413.3B but is applicable to all projects below a mandated compliant EVMS requirement. The guide provides an inventory of tools and rules typically used as part of a fully compliant EVMS. The ranking employed in this guide identifies key foundational tools, as well as identifying opportunities for tailoring based upon project size or risk. The goal is to provide guidance for companies to establish enterprise level tools that provide meaningful performance data as efficiently as possible.

99 GENERAL AND MISCELLANEOUS↗

Ute Mountain Ute Tribe Community-Scale Solar Project (Final Technical Report)

Deployment of Community-Scale solar power has been a goal of the Ute Mountain Ute Tribe (Tribe) for several years. The 1 MW AC photovoltaic power facility was built to power Tribal facilities in a manner that would allow the Tribe to credit residents’ electric bills and Tribal government electric bills with the dollar equivalent of the power generated. Other accomplished project objectives, in addition to learning the intricacies of such an endeavor, included strengthening the relationship with the local electric cooperative and their primary power provider, analysis of the generation and operations and maintenance during a one-year test phase, workforce development and training, and using the project to plan and drive future community scale solar projects. The Tribe’s vision of a net-zero electrical independence for its communities became a clearer reality with this project.

14 SOLAR ENERGY↗

Project Risk Assessment and Monitoring for CarbonSAFE Illinois - Macon County (Task 2)

A risk evaluation performed for CarbonSAFE Macon County included performing a risk assessment for the overall project and the identification of technical project risks. These tasks were accomplished through a combination of risk assessment meetings, workshops, expert solicitation, and identifying and implementing risk mitigation or prevention activities. Information from previous carbon storage projects and from the execution of the project (including drilling a test well and conducting 2D seismic survey) were assessed to identify future risks towards the development of a storage complex.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Geologic Modeling and Simulation Report for the Aquistore Project

The Plains CO 2 Reduction (PCOR) Partnership, through the Energy & Environmental Research Center (EERC), has been supporting, and continues to support, the Petroleum Technology Research Centre (PTRC) Aquistore project. This support has been in the form of geologic characterization, involvement in the Science and Engineering Research Committee (SERC), involvement in public outreach, developing geologic models and running predictive simulations on the expected injection program at the site. The Aquistore project is part of the world’s first commercial postcombustion carbon capture, utilization, and storage project from a coal-fired power-generating facility, the SaskPower Boundary Dam, located in Saskatchewan, Canada, and will be acting as a storage site for a portion of the captured CO 2 from the Boundary Dam power plant. The Aquistore site includes one injection well and a 152-meter offset observation well. Both wells were drilled and completed in the Deadwood and Black Island Formations. At the time of this report, injection at the Aquistore site is anticipated to begin in late 2014. To better understand the storage implications of injecting carbon dioxide (CO 2 ) at the Aquistore site, the EERC has constructed P10, P50, and P90 geologic model realizations and run three new predictive simulation scenarios on each realization. These models and simulations were constructed to better understand both operational and geologic uncertainties that may exist at the Aquistore site. The geologic model realizations and simulations are an update to those completed in the original report entitled “Geologic Modeling and Simulation Report for the Aquistore Project,” Deliverable D93, approved in March 2014. In this update, the same fine-scale model extent of the 34-square-kilometer PTRC 3-D seismic survey area, with higher structural resolution, was continually used for the uncertainty analysis. A low (P10), mid (P50), and high volumetric (P90) case for the amount of pore volume accessible to store the potential injected CO 2 was ranked based on certain deviation variations of model-building parameters, including effective porosity and net-to-gross reservoir, in six sand units of the study area. Three cases with various injection rate and period schemes were simulated based on uncertainty models P10, P50, and P90.

54 ENVIRONMENTAL SCIENCES↗

Coastal Acoustic Buoy for Offshore Wind: Project Synthesis

The population of North Atlantic right whales is critically endangered and their habitat overlaps with offshore windfarm leases. It is therefore imperative that effective mitigation strategies be used to avoid impacts on right whales during the construction of offshore windfarms. The Department of Energy issued FOA Number DE-FOA-0001924 to encourage the development of technology that could monitor large exclusion zones for right whales in order to mitigate potential impact of construction noise on right whales. This report summarizes the past two years of the development and evaluation of the Coastal Acoustic Buoy for Offshore Wind (CABOW) project which aimed to develop technology to monitor large exclusion zones for North Atlantic right whales. Over the course of the project SMRU Consulting have implemented a rigorous design process including comparison of different approaches (e.g., single sensor vs multiple sensors), as well as consideration of placement and timing of acoustic monitoring. We have evaluated critical components of the CABOW system including, reliability, detection range, and bearing accuracy in areas adjacent to offshore windfarm leases in Maryland by conducting 3,536 playbacks of simulated right whale upcalls. The maximum call detection range was 7.5 km when noise was 99 dB re 1µPa rms (50-225 Hz), but this reduced to < 1 km when ambient noise levels were high. Our detection probability in the field was measured as a function of range as well as the source-to-noise level ratio allowing us to build a model to predict the probability of detection under various scenarios (sample size: 3,536 calls x 5 buoys = 17,680). The median bearing error was -0.25° but this is likely an underestimate of error due to experimental design. Using the published recall and precision of the two detectors we implemented in the CABOW system, we estimate that at a recall of 80%, our precision was > 80%, within the range of what we were aiming for in this project. To estimate our exclusion zone false negative and false positive rates, we built a simulation model using the empirical data from our field trial. We modelled three to nine CABOW units placed on the 10 km exclusion zone and estimated our false negative rate to be 1% or less (which was our project goal) and our false positive rate to be between seven and nine percent, slightly above our goal of 5%. However, we also modelled an equivalent PAM system that does not have bearing capabilities and found the false positive rates for that system to be six to eight times higher than the CABOW rate. This higher false positive rate of PAM systems with low spatial information could have significant cost repercussions for offshore wind developers by adding work shutdowns or delays without providing additional protection for right whales. The model we built allows us to explore the placement of PAM systems under various scenarios and will thus help facilitate planning of PAM mitigation systems to meet NOAA Incidental Harassment Authorizations for specific windfarms. We achieved an average system uptime of 98.3%, just below our goal of 99%. The issues that caused these short losses of data have been identified and fixed. Right whale detections and audio clips were typically transferred via radio from the buoys to the base station in two to four seconds. We therefore believe we have developed a highly robust real-time PAM system. Based on the above, we feel we have achieved the stated funding goal of developing a cost-effective and robust real-time PAM system that enables the monitoring of large exclusion zones for right whales during the constructions of offshore windfarms. This should lead to decreased costs and risks for the offshore wind sector while providing robust mitigation for right whales. It is important to state that PAM mitigation will need to be implemented with other mitigation strategies (e.g., visual observers) to provide a complete mitigation strategy to ensure that any effects on right whales from offshore windfarm construction is minimized.

17 WIND ENERGY↗

Tempus Project (Final Report)

This final technical report tracks the accomplishments of the Tempus Project to the statement of project objectives and resulting deliverables. The objective of the Tempus project was to develop and demonstrate the capabilities of a secure, modular, and customizable time synchronization platform that provides layers of protection from GPS spoofing attacks and other vulnerabilities. These vulnerabilities present a challenge to power system operators utilizing GPS-based time synchronization, as time synchronization increasingly plays a critical role in the efficient and reliable operation of power systems. The Tempus project addressed these concerns through the development of a secure, customizable time synchronization platform. The Tempus platform applies a layered approach to time security that protects from manipulation of timing systems used by power utilities. The Tempus platform consists of a component framework utilizing modularized time sources and customizable manipulation detection algorithms. With multiple time sources, and comparisons between sources and tracking sudden or subtle changes to the timing phase and time information, the Tempus system can detect and mitigate compromised timing sources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measurement Acceptance Region (MAR) Assessment Results Based on Confirmation Sample Sludge Batch 10 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the 0.65 Weight Percent Sulfate Solubility Limit for Sludge Batch 10 Based on November 2022 Projections

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, 26F, 40H (heel only), and Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System glass property models and their associated Measurement Acceptance Region constraints. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In October 2022, SRMC System Planning provided an updated SB10 Tank 40H blend baseline projection based on the Tank 51 confirmation sample results. Due to the reduced Na concentration relative to previous SB10 projections, two additional projections based on the addition of 7,000 gallons of caustic were provided in November 2022.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site 300 Small Firearms Training Facility Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is planning to execute a construction project at the Small Firearms Training Facility within LLNL's Experimental Test Site, Site 300 (S300). The proposed project will include extensive dirt work from a removal of a berm, the installation of a cinder block wall, and the replacement of a canopy and a fence with an access gate. This Sampling and Analysis Plan (SAP) outlines the procedures to collect environmental samples for the management and/or disposition of excess soil generated from the project site and geotechnical samples for building pad and pavement designs. This SAP has been prepared and is organized to be consistent with LLNL's Soil Screening and Management Plan (SSMP) (LLNL, 2021), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

Improving Subsurface Stress Characterization for Carbon Dioxide Storage Projects by Incorporating Machine Learning Techniques

The overall objective of this project is to develop a framework for reliable characterization and prediction of the state of stress in the overburden and underburden (including the basement) in CO 2 storage reservoirs using machine learning and integrated geomechanics and geophysical methods. Specifically, we propose to develop workflow encompassing of technologies and/or methods to predict stress and pressure changes due to CO 2 injection in an active tertiary recovery site and their impacts on subtle fault activation, fractures and occurrence of microseismic events and compare responses to field observations. In this project, we anticipate using dataset from the Farnsworth field Unit (FWU) which is operated by Purdure Petroleum. A novel elastic-waveform VSP inversion technique will be used to estimate high-resolution spatial and temporal changes of elastic moduli in CO 2 storage reservoirs, which will be combined with velocity-stress relationship derived from laboratory tests to obtain subsurface pressure and stress. Clustered microseismic data will be jointly inverted for improved focal mechanisms. Least-squares reverse-time migration of microseismic waveform data will be performed to directly image fracture/fault zones. Additionally, a deep neural network machine learning technique with convolutional and recurrent layers will be used for learning the spectro-temporal structures in microseismic waveforms. The results of this geotechnical data analysis will be integrated to develop a high-resolution 3D mechanical earth model extending from the overburden sealing formations to the underburden including the basement. Mechanical properties will be derived through integration of mechanical logs, tests, available results from chemo-mechanical laboratory tests, and elastic inversion of seismic data using a combination of Bayesian and stochastic methods as well as machine learning technique. Failure features (faults/fractures) will be represented and/or modeled based on seismic and core data analysis. A transient hydrodynamic-geomechanical model will be developed through coupling with the calibrated FWU reservoir simulation model. The full physics coupled model will be used to train a reduced order proxy model using machine learning algorithm for estimating stress which will then be used with appropriate constitutive relationships and forward seismological models to simulate pressure changes and induced microseismicity. An advanced optimization framework will be developed to perform a history match to minimize error between field observations and simulated. The history matched proxy model will be verified against the full-physics equivalent. The field observations that will be used in the coupled model calibration process include pressure/stress inverted from VSP, moment magnitude from microseismic analysis, real time downhole pressure measurements, production and injection data. Parameter sensitivity and uncertainty analysis will be performed to characterize the impact of model parameter uncertainty on stress estimates. The proposed project will have significant impact on future field implementation of the proposed technology. Because the project field site is an ongoing CO 2 EOR development, the value of the new technology will be demonstrated in an operational context and evaluated as a viable risk mitigation strategy. Cost/benefit will be evaluated together with the various commercial incentives for CO 2 sequestration available to oil and gas operators. The extensive available dataset and ongoing data acquisition under the SWP Phase III work plan provides flexibility for investigation of multiple approaches and reduces technical risk.

58 GEOSCIENCES↗