Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,513 records · Page 84

EVALUATION OF ORGANIC RANKINE CYCLES IN AN AIR-BRAYTON COMBINED CYCLE FOR MICROREACTOR APPLICATIONS

Microreactors can be used to provide electrical power up to 10 MWe for emergency situations, remote areas, or military applications. Combined cycles comprised of an air Brayton topping cycle and an Organic Rankine bottoming cycle were evaluated in HYSYS using different working fluids in the bottoming cycle and in different ambient environments. The results suggest that a bottoming ORC can increase the thermal efficiency of the air Brayton cycle up to 40.22%. Exergy analysis was also performed on the combined cycle along with a simple validation of HYSYS on the bottoming cycle. The exergy analysis shows that of available work, most is lost at the reactor or turned into work at the topping cycle. A rudimentary capital cost estimate showed that adding a bottoming cycle is not prohibitively expensive.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

10 Megawatts Electric Coal Direct Chemical Looping Large Pilot Plant - Pre-Front End Engineering and Design Study

The Peer Review presentation covered the following items: Perform pilot studies to obtain design information. Perform a pre-FEED study of a modular 10 MWeCDCL pilot plant. Provide Functional specifications for integration with host site. Provide risk assessment, schedule and cost estimate for fabrication, construction and testing. Update commercial 550 MWeCDCL plant design and economic analysis

20 FOSSIL-FUELED POWER PLANTS↗

Update on Design of 10 MWe Iron-Based Coal Direct Chemical Looping Demonstration Plant

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗

LBNF CMGC Delivery Method: ICE Process

The Construction Manager/General Contractor (CM/GC) delivery method is intended to benefit the design process, value engineering, risk mitigation, and schedule optimization while promoting construction and design innovation. This delivery method is particularly suited for complex projects that require significant consideration of contractor means and methods. Fermilab’s Far Site Conventional Facilities proceeded with a CM/GC delivery method to account for the unique conditions of excavating over 300,000 cubic yards of rock in tunnels and caverns that will be constructed approximately 5000-ft deep in the repurposed Homestake Mine in Lead, SD. The experiences of the Independent Cost Estimating (ICE) process are presented.

Pelletier, Douglas↗

Implementing Zero Energy Design with the U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high performance buildings that push the boundaries of the industry. In the 2020 competition, DOE is piloting Design Partners, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Challenge, Design Partners receive a zero energy alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment and provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. Attendees will leave understanding the “perfect storm” of policy, technology, health, and economic trends that make zero energy buildings desirable and feasible and the value of the U.S. DOE Solar Decathlon to industry. They will also get a sneak peek at innovative solutions 2020 Design Partner pilot projects are bringing to the building industry and how becoming a Design Partner in 2021 could benefit their organization.

30 DIRECT ENERGY CONVERSION↗

U.S. Department of Energy Solar Decathlon

The U.S. Department of Energy (DOE) Solar Decathlon® Design Challenge is a collegiate competition that challenges student teams to design high-performance buildings that push the boundaries of the industry. In the 2020 Design Challenge, DOE piloted the Design Partners Program, a low-risk opportunity for builders and building owners to harness student innovation and explore zero energy design for current or upcoming projects. Design Partners provide a student team of architects and engineers with project requirements. By the end of the Design Challenge, Design Partners receive a zero-energy design alternative and cost estimate for their project. The collaboration allows Design Partners to incorporate innovative concepts such as grid-interactivity, resilience, and low embodied carbon in a low-risk environment. It also provides the future generation of engineers and architects with invaluable experience designing a building for a client under real-world circumstances. This article summarizes the current policy, technology, health, and economic trends that make zero energy buildings desirable and feasible, and presents the value of the Solar Decathlon to industry. We highlight innovative solutions 2020 Design Partner pilot projects are bringing to the building industry.

30 DIRECT ENERGY CONVERSION↗

Development and Performance Evaluation of of Active Insulation Systems using Solid-State Thermal Switches

Traditional building envelopes have passive insulation systems that cannot respond to dynamic changes in the environment. An Active Insulation System (AIS) consists of Active Insulation Materials (AIMs), which dynamically vary the thermal conductivity of the insulation system. Several researchers have evaluated the impact of AIS on building thermal and energy performance by using simulation tools. Up to 70% savings in annual heating and cooling energy and significant reductions in peak demand have been predicted for some climates with wall systems employing AIS. Sensitivity studies have provided requirements for the AIS properties and control schemes that can lead to those savings. However, materials and assembly development have not yet achieved a cost-effective product that achieves the required performance. In this study, we present the process to develop an AIS that we will install in a test hut for their performance evaluation. Minimum performance criteria of the AIS system are developed based on Rmin/Rmax ratio, required time and efficiency to switch states and cost estimate. The next step carried out during this study is creating the concept to meet the requirements, predicting the performance by simulations, developing the experimental setup for bench-scale testing, and finally, constructing a full-scale wall assembly and monitoring the performance when exposed to natural weather conditions. The selected approach uses off-the-shelf products to create a materials system that can switch R-value between R~=1 ft2·°F·h/BTU (0.18 m2·K/W) and R~=7 ft2·°F·h/BTU (1.23 m2·K/W and have a switching time of less than one minute between R-high and R-low.

Iffa, Emishaw↗

International Research Reactor Decommissioning Project

Many research reactors have been or will be shut down and are candidates for decommissioning. Most of the respective countries neither have a decommissioning policy nor the required expertise and funds to effectively implement a decommissioning project. The IAEA established the Research Reactor Decommissioning Demonstration Project (R{sup 2}D{sup 2}P) to help answer this need. It was agreed to involve the Philippine Research Reactor (PRR-1) as model reactor to demonstrate 'hands-on' experience as it is just starting the decommissioning process. Other facilities may be included in the project as they fit into the scope of R{sup 2}D{sup 2}P and complement to the PRR-1 decommissioning activities. The key outcome of the R{sup 2}D{sup 2}P will be the decommissioning of the PRR-1 reactor. On the way to this final goal the preparation of safety related documents (i.e., decommissioning plan, environmental impact assessment, safety analysis report, health and safety plan, cost estimate, etc.) and the licensing process as well as the actual dismantling activities could provide a model to other countries involved in the project. It is expected that the R{sup 2}D{sup 2}P would initiate activities related to planning and funding of decommissioning activities in the participating countries if that has not yet been done.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flexible Gasification of Coal and Biomass to Generate Carbon Free Electric Power and Hydrogen

This paper describes the development of a coal and biomass-fed plant concept to co-produce electric power and hydrogen with net-negative CO2 emissions under the aegis of the 21st Century Power Plant initiative of the U.S. Department of Energy (DOE), whose goal is to advance innovative power plant concepts that are capable of flexible, net-zero carbon emission operations while producing cost-effective “blue” hydrogen to support economy-wide decarbonization goals. The proposed standalone plant will be in Nebraska, USA. The specified design feedstock is a hybrid blend of Powder River Basin (PRB) subbituminous coal from Wyoming and local Nebraska biomass (corn stover), 50 wt.% each (dry basis). Other potential feedstocks, including woody biomass (eastern red cedar) and waste plastic (auto shredder residue) were evaluated or reviewed as alternates. The proposed process block comprises a high-pressure, oxygen-blown fluidized bed gasifier (GTI Energy U-GAS® process) coupled with water gas shift, the Selexol process for acid gas (H2S and CO2) removal, and pressure-swing adsorption (PSA) to yield 8,500 kg/h of high-purity hydrogen. The off gas from the PSA unit is used in the power block (gas turbine combined cycle) to generate electric power to support the gasification process, hydrogen production, and 50 MWe net electric power to the grid. All major plant equipment including the gasifier, gas cleanup system, and power generation are commercially available and proven in other applications and considered at TRL 8-9. However, gasification of corn stover biomass is considered at TRL 6. Overall thermal efficiency of the plant is 50% (net HHV) with net atmospheric CO2 removal at a rate of 250-300,000 tpa. Design activities necessary to provide input to a FEED study (Phase II of the project), including the development of the Environmental Information Volume (EIV) for the host site, and an investment case, based on a pro-forma pre-FEED level cost estimate, have been completed and are described in detail in this paper.

Gülen, S. Can↗

Successful Characterization Strategies for the Active High Risk Y-12 National Security Complex 9201-5 (Alpha-5) Facility, Oak Ridge, TN - 12164

Building 9201-5 (Alpha 5) was completed in May 1944 and served as a production facility for National Nuclear Security Administration (NNSA) Y-12 Weapons Plant. During the Manhattan Project, it functioned as a uranium enrichment facility. The facility was renovated and altered over the years, converting the calutrons to support other missions. Alpha 5 consists of 4 floors and a basement measuring approximately 600,000 square feet. The facility contains various pieces of equipment remaining from legacy operations. A significant amount (approximately 200,000 kgs) of mercury (Hg) has been spilled in the facility over the operational history of the building. To further complicate matters, beryllium (Be) contamination in 9201-5 is found throughout approximately sixty percent of the facility. Concentrations varying from very low (< 0.2 micrograms (μg)/100 cm{sup 2}) to areas where concentrations are relatively high, approximately 600 μg/100 cm{sup 2}, in regulated beryllium areas. The primary site related contaminants (SRCs) for the waste in this facility are enriched uranium, depleted uranium, beryllium and mercury. This facility represents the highest environmental risk for DOE-ORO EM and NNSA at Y-12 and must be quickly addressed to minimize impacts to future Y-12 missions, as well as human health and the environment. As part of the American Recovery and Reinvestment Act (ARRA), approximately 700,000 cubic feet of legacy material was removed in 2010 and 2011. In addition, characterization of the 9201-5 facility was scheduled in the winter and spring of 2011. This activity was initiated in January 2011 and was completed in July 2011. Heavy schedule pressure was further complicated by the fact that this building has active utility, security and process systems. Given these complex variables, a unique, out of the box characterization strategy was forged in an effort to bound radiological and chemical contaminants, as well as providing the appropriate level of quality to ensure that this data could be used to develop waste profiles when deactivation, decontamination and demolition (D and D) activities are authorized at a future date. The characterization strategy involved a hybrid model of statistically-based and biased sampling events. To achieve the desired results, traditional intrusive sampling and laboratory analysis, as well as a number of field-based characterization methodologies (e.g., X-ray Fluorescence [XRF], Lumex and Non-Destructive Assay [NDA]) were utilized. Results were captured and synthesized into meaningful, usable conclusions in a facility characterization report that will more accurately aid D and D cost estimates for future remedial actions. This massive characterization campaign involved over 1,200 separate sample locations using 4 separate characterization methods and was successfully completed to meet a performance-based milestone within 8 months of initiation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Efficiencies in the Environmental Restoration Operations at Sandia National Laboratories, New Mexico - 12198

The mission of the Environmental Restoration Operations at Sandia National Laboratories - New Mexico is to complete all necessary corrective actions at 268 legacy release soil sites and three groundwater Areas of Concern. Additional scope impacted the anticipated 2009 completion of corrective action at the remaining 32 soil sites and the three groundwater Areas of Concern. This additional scope is base-lined to require 10 years (2011-2020) at an estimated cost of $34 M to $39 M. Efficiencies been proposed to reduce the impact of this recently realized additional corrective action scope: (1) Perform activities concurrently when possible to help reduce the length of the overall schedule; (2) Implement a 'high-performance, one-pass' concept based on an early resolution of deficiencies in draft documents and attempt to avoid multi-submission cycles with long turnaround review times, and (3) Assess the appropriateness of progressing 'at risk' from groundwater characterization to groundwater remediation using existing data, conceptual models and potential remedies. The ongoing promotion and implementation of these ideas with the New Mexico Environment Department will produce scope and cost saving -- without any reduction in the protection of public health and the environment. DOE/SSO developed and presented to the NMED three areas where efficiencies in ER Operations may be realized. The NMED has not formally responded to these proposals, but in discussions with NMED in the fall of 2011 the NMED is conceptually supportive of these proposals. NMED cannot commit to an outcome (such as no NOD), but NMED is very willing to seek efficiencies that will reduce the overall scope, while achieving regulatory compliance and considering public input. The challenge of finding efficiencies to reduce the new schedule and cost has become even more of a necessity due to shrinking budgets. A prioritization of remaining activities has been discussed with the regulatory authority. Efficiencies in the ER Operations at SNL have been proposed to reduce the impact of recently realized regulatory delays and additional corrective action scope. The ongoing promotion and implementation of these ideas with the NMED will produce scope and cost saving, without any reduction in the protection of public health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structure and Process of Managing the UO2 Dry In-Pile Fracture Test Irradiation Experiment

The management and structure of a novel research and development (R&D) project can be hard to navigate. This is especially true when it involves nuclear fuel. Familiarity with institutional safety and procedural requirements, a well defined scope, and accurate cost estimates can all help ensure successful project management from start to finish. The Dry In-Pile Fracture Test (DRIFT) experiments performed at the Transient Test Reactor Facility are an excellent example of managing an R&D project within its scope and budget constraints. The objective of the DRIFT test was to develop fracture propagation data in a manner consistent with light-water reactors to validate and improve the fracture propagation models of uranium oxide fuels in the MOOSE (Multiphysics Object-Oriented Simulation Environment)-BISON-Marmot code framework [1].

99 GENERAL AND MISCELLANEOUS↗

System Analysis Support of Consent-Based Siting Efforts - 23400

To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the Integrated Waste Management (IWM) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate things like the implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed system operation start dates. Some example system analysis results have been published previously. With the passage of the consolidated appropriations acts for fiscal years 2021 and 2022, Congress provided funding and direction for the DOE to move forward with interim storage to support near-term action in managing the nation’s SNF as an important component of an IWMS. Consent-based siting is a phased, adaptive, and collaborative approach to siting facilities that focuses on the needs and concerns of people and communities. Communities participate in the siting process by working carefully through a series of phases and steps with the DOE (as the implementing organization). Each step and phase helps a community determine whether and how hosting a facility to manage SNF is aligned to the community’s goals. By its nature, a consent-based siting process must be transparent, flexible, adaptive, and responsive to community concerns. Thus, the phases and steps are intended to serve as a guide, not a prescriptive set of instructions. System analysis research analysts interface with DOE’s consent-based siting for a federal interim storage program and can perform preliminary system analyses as requested to support various aspects of the consent-based siting team’s work. This paper provides an overview of IWM program’s system analysis activities that support the ongoing consent-based siting process. The questions that decision-makers, planners, communities, and stakeholders might have during the consent-based siting process are similar to questions that have been explored by system analysts previously. Specifically, this paper discusses work that will inform consent-based siting efforts in the areas of community impacts, cost estimates, various SNF acceptance rates by potential facilities, potential consolidated interim storage facility (CISF) capacities and configurations, and the implications of a CISF on the overall waste management system. It is expected that system analysis will continue to be performed to support the consent-based siting process in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Laboratory testing options for FUSRAP projects - 15462

Remediation projects within the Formerly Used Sites Remedial Action Program (FUSRAP) have many options to consider when evaluating their analytical testing needs. Factors that should be considered in determination of a project's analytical testing needs include which parameter results are considered time-critical, the potential savings in reduction of construction-related delays when time-critical samples are analyzed onsite (including screening) instead of offsite, control of data quality for onsite versus offsite data, and the value of additional knowledge gained by programs such as FUSRAP by employing onsite laboratories. The most important factor turned out to be reduction in construction-related delays. We considered development of an optimum combination of onsite lab/offsite lab capability. This depends on: i. Time critical parameters and the methods required; ii. Estimated Cost for onsite lab construction or facility rental, maintenance, labor, chemicals (reagents and standards), and certification (if desired and deemed necessary) iii. Ability, flexibility, and cost of offsite lab sample testing using project-desired TATs and methods that will meet project action levels iv. Willingness of stakeholders, in particular regulators, in accepting some combination of onsite and offsite testing (for example, onsite screening followed by offsite confirmatory testing for certain parameters) Due to the significant costs in construction of an onsite lab and development of sample testing capability and all which that entails, the recommendations made in this paper will aid other FUSRAP projects in finding an acceptable combination of onsite and offsite testing that is acceptable to all stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conducting Gamma Radiation Surveys on Municipal Roadways in Support of the Port Hope Area Initiative - 16602

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope, Ontario. The project aims to remediate approximately 1.7 million cubic metres LLRW through the consolidation of waste within two Long-term Waste Management facilities to be constructed within the municipalities of Port Hope and Clarington. Within the Town of Port Hope, surveys are being conducted at approximately 5000 individual properties to confirm the presence of LLRW, delineate its extent and develop cost estimates for remediation. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and sampling for four signature contaminants. Of the 5000 properties, a number are municipal rights of way, largely municipal roads, that may have been impacted through spillage of LLRW when it was historically transported through the community for disposal and/or through its use as construction backfill. This paper describes the completion of gamma radiation surveys on these municipal rights of way and the challenges that needed to be addressed working on travelled roadways in an active community. To maximize efficiency and minimize inconvenience to motorists the gamma surveys are conducted using a mobile platform that provides high resolution spectral gamma logging coupled to GPS for geo-spatial referencing. The system employs large volume, spectroscopy grade, sodium iodide detectors that permit the collection radiological spectra allowing for effective discrimination of gamma radiation signals emitted from naturally occurring background sources (e.g. potassium 40) from the gamma emissions associated with the specific contaminants of concern (e.g. Ra-226). The system can be deployed on any platform including a backpack. For the majority of the roadways surveyed a small, self-contained, road-legal trailer attached to a motorized tow vehicle (e.g. side-by-side UTV or small pick-up truck) is used as the survey platform. This accommodates the mounting of multiple detectors and allows the surveys to be conducted without the need for closing traffic lanes thus improving productivity and safety while minimizing inconvenience to motorists. Data quality objectives are readily achieved through the use of multiple passes over the same target area providing a geo-spatially rich dataset for post-processing and imaging. Topics covered in the paper include: the logistics of completing high quality gamma surveys on travelled roadways; health, safety and traffic considerations; community outreach and response; and a comparison of isotopically-speciated data vs total gamma readings evaluating the influence of background sources. The lessons learned will be applicable to anyone planning on conducting similar surveys in urban settings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Training to Promote Successful Environmental Remediation Projects - 18636

The International Atomic Energy Agency (IAEA) supports the efforts of its Member States to manage their nuclear and radiological liabilities, including radioactive waste management, decommissioning of facilities, and remediation of contaminated sites. As part of a project addressing Constraints in Decommissioning and Environmental Remediation (the CIDER Project), the IAEA is developing initiatives to further support capacity development specifically to promote implementation of safe, appropriate, and cost-effective environmental remediation (ER) projects. The IAEA sponsors numerous initiatives to provide its Member States training on important topics related to ER. It has become clear in recent years, however, that the existing training should be augmented with more in-depth training to provide for the development of the critical expertise needed to address significant ER challenges. ER projects typically are very complex, requiring the integration of numerous scientific and engineering disciplines, along with effective project planning and management. There are many examples of ER projects where considerable work has been completed, qualified technical staff are available, and adequate funding has been obtained, yet actual progress towards a final solution has been limited. In such cases, it appears that a key barrier is the lack of capacity to develop strategies, make fully informed decisions, plan for and manage activities, and implement successful ER actions. In light of the above, the IAEA has placed a priority on capacity development across the broad spectrum of ER project implementation. Efforts are underway to develop a new training program to develop capacity at the institutional and individual levels to equip course graduates to effectively integrate all areas of expertise in the planning and execution of ER projects. The target audience includes decision-makers; project managers, planners, and implementers; and academics. The core capabilities to be developed via this program include knowledge and skills related to: (1) radiation issues and radionuclide behavior; (2) health and safety protection principles and requirements; (3) identification, evaluation, and selection of ER technologies and approaches; (4) ongoing, constructive dialogue with stakeholders; (5) project planning, management, and communication; (6) cost estimation and funding development; and (7) implementation of appropriate site monitoring activities. The IAEA is collaborating with multiple organizations to develop and implement this training program, to leverage existing training programs and materials, and to coordinate on the development of sustainable training solutions. This paper will present the status of this initiative and work accomplished thus far. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗