Spallation Neutron Source Proton Power Upgrade (PPU) Project: Lessons Learned for CD-4

The SNS PPU project goals were to design, build, install and test the equipment necessary to double the accelerator power from 1.4 MW to 2.8 MW and to deliver a 2.0 MW qualified target. PPU also included the provision of a stub-out in the SNS accumulator-ring-to-target tunnel to facilitate a rapid connection to a new proton beamline for the Second Target Station (STS) project. The power capability was doubled by increasing the proton beam energy by 33% and the peak beam current by 50%, relative to pre-PPU accelerator performance. The project also included modifications to some buildings and services. The PPU project accomplished the energy upgrade by fabricating and installing new superconducting radiofrequency (RF) cryomodules, with supporting RF equipment, in the existing linac tunnel and klystron gallery, respectively. The High Voltage Converter Modulators (HVCM) and klystrons for some of the existing installed RF equipment were upgraded to handle the higher beam current. The increased beam power of 2 MW on the First Target Station (FTS) was enabled by the addition of a new high-volume gas injection system for pressure pulse and cavitation mitigation in the mercury target and a redesigned mercury target vessel.

43 PARTICLE ACCELERATORS↗

First Wave of Incentive-Driven CCS Projects in North Dakota

Conference poster presented at American Association of Petroleum Geologists (AAPG) Carbon Capture, Utilization, and Storage (CCUS) Conference, Houston, Texas, March 28–30, 2022. While the central interior of North America offers a tremendous storage resource, optimization will be key to meaningfully reducing the more than 2.6 billion tons of CO 2 emitted annually from large point sources in the United States. These initial projects tend to have the most favorable economics and are often able to take advantage of the best geology, with little to no competition for resource. This initial wave of projects is informing investment in and creating the opportunity for innovation that will enable the next wave of incentive-based CCS projects. Such innovation is critical for reducing costs, enhancing the design and operability of the next wave of CCS projects, and realizing more of the 250 billion tons of storage resource in North Dakota.

01 COAL, LIGNITE, AND PEAT↗

Post-2026 Environmental Impact Statement Rate Analysis for the Colorado River Storage Project

The Glen Canyon Dam (GCD) is a principal power-generating asset within the Colorado River Storage Project (CRSP), accounting for approximately 70–80% of CRSP power production over the past two decades. In June 2023, the U.S. Bureau of Reclamation (Reclamation) issued a Notice of Intent to prepare an Environmental Impact Statement (EIS) outlining operational guidelines and strategies for Colorado River Basin reservoirs after 2026 (Reclamation, 2023). Power generation is among CRSP’s statutory purposes under the Colorado River Storage Project Act of 1956 (U.S. Congress, 1956). Assessing how alternative policy frameworks affect CRSP power production and the resulting electricity rates for U.S. customers is therefore essential to inform decision-making. This report evaluates projected electricity rates and the market value of electricity from the Western Area Power Administration (WAPA) CRSP GCD under multiple post-2026 policy scenarios to support Reclamation’s EIS development. Results from advanced econometric and machine learning models indicate that the Enhanced Coordination alternative (EnhanCoor), Maximum Operational Flexibility alternative (CCA), and Supply Driven - 55 alternative (SD55) alternatives yield more favorable hydropower generation and capacity outcomes, which are objectives outlined in Reclamation’s documentations (Reclamation, 2007; Reclamation, 2016). Specifically, these scenarios are associated with higher electricity production, lower projected rate trajectories, and greater economic value to the U.S. power system from CRSP generation. The remaining five scenarios generally produce lower generation, higher rate trajectories, and reduced long-term market values.

13 HYDRO ENERGY↗

STILGAR End-of-Project Report

The Subsurface Tunnel Imaging LeveraGed by Analysis of Rayleigh wave ellipticity (STILGAR) project demonstrated an integrated geophysical approach for detecting, locating, and characterizing underground structural changes using dense seismic arrays and advanced inversion techniques. Field campaigns were conducted at two operational mines—the Redmond salt mine (Utah) and Graymont Pleasant Gap limestone mine (Pennsylvania)—providing real-world testbeds for monitoring anthropogenic subsurface activity. At the Redmond salt mine, seismic interferometry combined with back-projection inversion successfully identified continuous, low-amplitude signals from mining operations. The approach differentiated stationary from migrating anthropogenic sources, captured daily operational cycles, and validated the potential of passive seismic monitoring for remote detection of underground activity. At the Graymont Pleasant Gap mine, two dense seismic deployments in the spring and fall of 2023 generated over 4 TB of high-resolution data. Key outcomes included the relocation of 199 underground and 8 surface explosions with accuracies within tens of meters and the development of a 3D P-wave velocity model using the triple-difference tomography algorithm (tomoTD) that resolved major structural features such as the mine entrance, low-velocity tunnels, and roof-collapse areas. Ambient noise cross-correlation and back-projection analyses revealed persistent sources linked to ongoing mining activity, whereas horizontal-to-vertical spectral ratio (HVSR) and ellipticity studies confirmed stable site responses across seasons and identified soil thickness trends consistent with regional erosional and depositional processes. Checkerboard and sensitivity tests further validated the robustness of the tomographic results. Overall, the findings emphasize that although significant progress has been made in subsurface imaging, further work is needed to enhance the detection and localization of underground structures. Accurate imaging requires higher frequencies, yet anthropogenic sources tend to dominate the seismic record at those frequencies, and high-frequency surface waves are affected by higher modes that complicate interpretation. The improved detection and localization of human-induced signals enabled detailed temporal and spatial mapping of daily mine operations, demonstrating the feasibility of continuous anthropogenic source monitoring. Sensitivity to signals from nontraditional sources, such as fan operations, highlights the broader applicability of this approach to other industrial environments in which continuous and impulsive signals are present. The field campaigns produced a substantial volume of high-quality seismic data, supporting the development and testing of new methods for seismic source characterization and subsurface imaging. Future deployments should include sensors capable of recording lower frequencies to probe deeper structures, increase bandwidth to enhance resolution and sensitivity to both shallow and deep targets, and collect additional large-scale datasets to refine imaging and source characterization techniques. Moreover, conducting 3D modeling studies of seismic wavefields at higher frequencies will provide a better understanding of wave scattering and cavity–wavefield interactions in complex underground environments. In conclusion, the STILGAR project demonstrated that integrated seismic monitoring can effectively characterize underground operations, capturing both natural and anthropogenic signals. The approaches developed provide a foundation for improved detection, localization, and imaging of subsurface structures and are directly transferable to broader industrial monitoring applications.

58 GEOSCIENCES↗

Meadowview Neighborhood Electrification Project

Awarded a Congressionally Directed Spend (CDS) in 2023, Sacramento Municipal Utility District (SMUD) has successfully executed the Meadowview Neighborhood Electrification Project designed to demonstrate the efficacy of residential energy efficiency and weatherization upgrades for under-resourced communities positively impacting energy use reductions, financial metrics, and indoor air quality. Initially, the project sought to electrify and upgrade 300 homes in Sacramento’s Meadowview neighborhood. However, as interest and momentum grew, the project team proved increasingly efficient and was able to retrofit 374 homes. The project built on SMUD’s years of effort increasing energy efficiency, weatherization, and electrification for low-income residential customers—moving beyond incremental improvements toward full home electrification where it was both feasible and cost-effective.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reese Housing Power Project (Final Technical Report)

The Reese Housing Power Project is located on Tribal trust land in Colusa, CA and expands existing medium-voltage distribution to seven new households with the addition of medium-voltage cabling, step down transformers, smart meters, and street lighting for the new development. The Tribe utilized their existing Co-Generation power plant and micro grid to supply the new homes with highly reliable power with fewer interruptions and at a reduced rate compared with the local utility. The project gives the Tribe greater independence from traditional power sources and provides jobs for the community. The project reduces electric energy costs, increases Tribe self-reliance, and provides highly reliable electric power to seven tribal members’ homes. Construction of the project also provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying Barriers to Solar and Storage Hybrids: Modeled vs. empirical wholesale market value and net-value for co-located solar + storage projects [Slides]

Large-scale (1MW+) co-located solar and battery storage projects are expanding rapidly in the United States, but their realized contribution to the bulk power system remains poorly understood because public project-level operating data are limited. The Lawrence Berkeley National Laboratory estimates the wholesale market value of 280 operational photovoltaic-plus-storage (PV+S) projects across the seven ISOs/RTOs and 19 additional balancing authorities, representing roughly 95% of the U.S. PV+S fleet in 2024. We model optimized hourly dispatch under energy, capacity, and ancillary-service market opportunities and compare the resulting value with standalone PV value, project-specific levelized cost estimates, and empirical operating or revenue data where available.

14 SOLAR ENERGY↗

Aniak Energy Efficiency Retrofit Project

The Native Village of Aniak (NVA) is a remote Yup’ik community in western Alaska. NVA is proposing to install energy efficiency measures in the Tribal Office, Community Center, Association of Village Council Presidents (AVCP) Office, and Duplex. The goal of the project is to reduce the overall energy use of the NVA by implementing energy efficiency measures in four high-use tribal buildings. This project expects to have the following outcomes: projected annual energy savings of approximately $24,238; projected annual reduction in fuel oil of roughly 1,802 gallons and electricity of around 24,537 kWh; and annual reduction in carbon dioxide emissions of approximately 84,594 pounds/year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Muckleshoot Indian Tribe-Energy Deployment (MITED) Project

The Muckleshoot Indian Tribe (MIT) collaborated with our Project Partner, GRID Alternatives (GRID), to install 132 kilowatts of direct current (kW-DC) of rooftop solar on three Tribal facilities. The three facilities are the Tribe’s Youth Drop-In Center, Canoe Shed, and Water Treatment Facility. The solar PV systems were originally anticipated to offset approximately 45% of the aggregate annual electricity usage of the three buildings. A major aspect of the MIT-ED project was providing hands-on paid training to five Muckleshoot Building Maintenance workers in solar PV installations, operations, and maintenance. The scope of work aligns with the Tribe’s goals of building local capacity and providing real world work experience and potential career opportunities in solar PV to its citizens. The Building Maintenance Department committed five of its current FTE employees to the project. GRID provided guidance for the MIT project team on identifying paid trainees as well as end goals of skill development through training, including a long-term Operations and Maintenance (O&M) plan tailored to the Tribe’s goals of local capacity building and stewardship of natural resources.

14 SOLAR ENERGY↗

A Recipe for ABC Multifamily Retrofits: Technologies, Financing, and Project Delivery

This report documents the final technical accomplishments and outcomes of Rocky Mountain Institute’s project under the U.S. Department of Energy (DOE) Award DE-EE0009064. The project aimed to develop, validate, and scale whole building retrofit solutions for multifamily buildings, including two configurations of Integrated Mechanical System Pods (IMSP-C and IMSP-U), in alignment with DOE Advanced Building Construction (ABC) initiative's decarbonization and energy efficiency goals. While the project made significant progress in Budget Period 1 (Phase 1) and throughout Budget Period 2 (Phase 2), activities were discontinued as of March 26, 2025, following a Stop Work Order issued by DOE. As such, this report reflects all completed work through that date. The project did not enter Budget Periods 3 and 4 (Phase 2), and demonstration site implementation, field M&V, and final commercialization execution were not conducted.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Ohio River Valley CO2 Storage Project AEP Mountaineer Plan, West Virginia

This report includes an evaluation of deep rock formations with the objective of providing practical maps, data, and some of the issues considered for carbon dioxide (CO{sub 2}) storage projects in the Ohio River Valley. Injection and storage of CO{sub 2} into deep rock formations represents a feasible option for reducing greenhouse gas emissions from coal-burning power plants concentrated along the Ohio River Valley area. This study is sponsored by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), American Electric Power (AEP), BP, Ohio Coal Development Office, Schlumberger, and Battelle along with its Pacific Northwest Division. An extensive program of drilling, sampling, and testing of a deep well combined with a seismic survey was used to characterize the local and regional geologic features at AEP's 1300-megawatt (MW) Mountaineer Power Plant. Site characterization information has been used as part of a systematic design feasibility assessment for a first-of-a-kind integrated capture and storage facility at an existing coal-fired power plant in the Ohio River Valley region--an area with a large concentration of power plants and other emission sources. Subsurface characterization data have been used for reservoir simulations and to support the review of the issues relating to injection, monitoring, strategy, risk assessment, and regulatory permitting. The high-sulfur coal samples from the region have been tested in a capture test facility to evaluate and optimize basic design for a small-scale capture system and eventually to prepare a detailed design for a capture, local transport, and injection facility. The Ohio River Valley CO{sub 2} Storage Project was conducted in phases with the ultimate objectives of demonstrating both the technical aspects of CO{sub 2} storage and the testing, logistical, regulatory, and outreach issues related to conducting such a project at a large point source under realistic constraints. The site characterization phase was completed, laying the groundwork for moving the project towards a potential injection phase. Feasibility and design assessment activities included an assessment of the CO{sub 2} source options (a slip-stream capture system or transported CO{sub 2}); development of the injection and monitoring system design; preparation of regulatory permits; and continued stakeholder outreach.

01 COAL, LIGNITE, AND PEAT↗

Geologic Sequestration of CO2 in Deep, Unmineable Coalbeds: An Integrated Researdh and Commercial-Scale Field Demonstration Project

The Coal-Seq consortium is a government-industry collaborative consortium with the objective of advancing industry's understanding of complex coalbed methane and gas shale reservoir behavior in the presence of multi-component gases via laboratory experiments, theoretical model development and field validation studies. This will allow primary recovery, enhanced recovery and CO{sub 2} sequestration operations to be commercially enhanced and/or economically deployed. The project was initially launched in 2000 as a U.S. Department of Energy sponsored investigation into CO{sub 2} sequestration in deep, unmineable coalseams. The initial project accomplished a number of important objectives, which mainly revolved around performing baseline experimental studies, documenting and analyzing existing field projects, and establishing a global network for technology exchange. The results from that Phase have been documented in a series of reports which are publicly available. An important outcome of the initial phase was that serious limitations were uncovered in our knowledge of reservoir behavior when CO{sub 2} is injected into coal. To address these limitations, the project was extended in 2005 as a government-industry collaborative consortium. Selected accomplishments from this phase have included the identification and/or development of new models for multi-component sorption and diffusion, laboratory studies of coal geomechanical and permeability behavior with CO{sub 2} injection, additional field validation studies, and continued global technology exchange. Further continuation of the consortium is currently being considered. Some of the topics that have been identified for investigation include further model development/refinement related to multicomponent equations-of-state, sorption and diffusion behavior, geomechanical and permeability studies, technical and economic feasibility studies for major international coal basins, the extension of the work to gas shale reservoirs, and continued global technology exchange.

01 COAL, LIGNITE, AND PEAT↗

This Letter is a Non-Technical Annual Report of Activities on Project 2007-275-00, Impact of American Shad for the Period February 1, 2008 through January 31, 2009.

This letter is a non-technical annual report of activities on Project 2007-275-00, Impact of American Shad for the period February 1, 2008 through January 31, 2009. A non-technical report is appropriate at this time since data collection is ongoing and results are preliminary. This report is intended to highlight accomplishments during this performance period. Progress on administrative work elements in the statement of work has been captured in the periodic status reports provided through Pisces. During this performance period the USGS accomplished the following tasks: (1) Co-chaired a symposium on American shad in the Columbia Basin at the annual meeting of the Western Division, American Fisheries Society. The USGS gave four presentations from work done during this project. Abstracts of the presentations were attached to the 2007 progress report. (2) Continued parameterization of a bioenergetics model for juvenile American shad. We performed a literature review to determine the applicability of the existing adult salmon bioenergetics parameters to juvenile fall Chinook salmon in support of our modeling investigation of diet overlap between juvenile American shad and fall Chinook salmon. We formulated testable hypotheses to investigate using bioenergetics models and conceptually developed model simulations. Held an in-house workshop to obtain feedback on the physiological parameters we selected for the American shad bioenergetics model and to solicit feedback on our modeling approach to address research questions. (3) Received a Section 10 ESA sampling permit based on the application submitted in the 2007 contract period. With the ESA permit in hand, we obtained scientific collection permits from the states of Washington and Oregon that allowed us to use a variety of fisheries sampling techniques to capture juvenile and adult American shad. (4) Conducted field sampling to meet project objectives. Gillnetting efforts to capture adult American shad near Astoria were discontinued in accordance with our ESA permit after encountering a higher-than-expected number of salmonids. Only 30 PIT-tagged adult pre-spawn American shad were released. Another 53 adults were processed for diet and population characterization. Collection objectives for adult pre-spawn fish were met for areas downstream from Bonneville, John Day, and McNary dams. In October we captured 30 post-spawn adult shad from the McNary Dam forebay for diet analysis. Collection objectives for juvenile American shad were met for all four areas. (5) Began laboratory work to enumerate and accomplish dry-weight analysis of prey items from juvenile and adult shad stomachs. (6) Continued to exchange information and develop relations with others interested in American shad research. As an example, at the request of the U.S. Fish and Wildlife Service, Northeast Fishery Center, Lamar, PA, we provided tissue samples from adult Columbia River American shad for use in genetic comparisons with Hudson River fish. Key findings during this contract period: (1) Determined that prevalence of Ichthyophonus infection among adult American shad was the highest level detected in any population of fish throughout the Pacific region. A manuscript describing results is in preparation. (2) Thiaminase specific activity assessed from Columbia River juvenile and adult American shad is higher than that of forage fish of salmonines in the Great Lakes. The consumption of forage fish high in thiaminase can lead to thiamine deficiency in the predator if the diet of the predators contains little other prey. (3) Adult American shad are feeding during their freshwater migration. Plans for next year: (1) Completing laboratory analysis of the gut contents of juvenile and adult American shad collected. (2) Completing bioenergetics model parameterization and testing hypotheses. (3) Describing the age composition of the adult American shad run during the 2008 spawning migration via aging of scales and otoliths. (4) Providing a draft final report describing project tasks and findings.

13 HYDRO ENERGY↗

Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These FY2008 data assessments and others assembled over the years of the CSMEP project can be accessed on the CBFWA public website. The CSMEP web database (http://csmep.streamnet.org/) houses metadata inventories from S&W assessments of Columbia River Basin watersheds that were completed prior to FY2008. These older S&W assessments are maintained by StreamNet, but budget cutbacks prevented us from adding the new FY2008 assessments into the database. Progress was made in FY2008 on CSMEP's goals of collaborative design of improved M&E methods. CSMEP convened two monitoring design workshops in Portland (December 5 and 6, 2007 and February 11 and 12, 2008) to continue exploration of how best to integrate the most robust features of existing M&E programs with new approaches. CSMEP continued to build on this information to develop improved designs and analytical tools for monitoring the status and trends of fish populations and the effectiveness of hatchery and hydrosystem recovery actions within the Columbia River Basin. CSMEP did not do any new work on habitat or harvest effectiveness monitoring designs in FY2008 due to budget cutbacks. CSMEP presented the results of the Snake Basin Pilot Study to the Independent Scientific Review Panel (ISRP) in Portland on December 7, 2008. This study is the finalization of CSMEP's pilot exercise of developing design alternatives across different M&E domains within the Snake River Basin spring/summer Chinook ESU. This work has been summarized in two linked reports (CSMEP 2007a and CSMEP 2007b). CSMEP participants presented many of the analyses developed for the Snake Basin Pilot work at the Western Division American Fisheries Society (AFS) conference in Portland on May 4 to 7, 2008. For the AFS conference CSMEP organized a symposium on regional monitoring and evaluation approaches. A presentation on CSMEP's Cost Integration Database Tool and Salmon Viability Monitoring Simulation Model developed for the Snake Basin Pilot Study was also given to the Pacific Northwest Aquatic monitoring Partnership (PNAMP) steering committee in Portland on August 28, 2008. Further information on CSMEP strengths and weaknesses assessments and monitoring design products for FY2008 is presented in the main text and appendices of this Annual Report as well as being available on CBFWA's public website.

13 HYDRO ENERGY↗

Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.

In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installation of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.

13 HYDRO ENERGY↗

Self-Correcting HVAC Controls Project Final Report

This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Revealing the Hidden Value that the Federal Investment Tax Credit and Treasury Cash Grant Provide To Community Wind Projects

Although the global financial crisis of 2008/2009 has slowed wind power development in general, the crisis has, in several respects, been a blessing in disguise for community wind project development in the United States. For xample, the crisis-induced slowdown in the broader commercial wind market has, for the first time since 2004, created slack in the supply chain, creating an opportunity for shovel-ready community wind projects to finally proceed towards onstruction. Many such projects had been forced to wait on the sidelines as the commercial wind boom of 2005-2008 consumed virtually all available resources needed to complete a wind project (e.g., turbines, cranes, contractors).

17 WIND ENERGY↗

Santa Clara County Planar Solid Oxide Fuel Cell Demonstration Project

The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project demonstrated the technical viability of pre-commercial PSOFC technology at the County 911 Communications headquarters, as well as the input fuel flexibility of the PSOFC. PSOFC operation was demonstrated on natural gas and denatured ethanol. The Santa Clara County Planar Solid Oxide Fuel Cell (PSOFC) project goals were to acquire, site, and demonstrate the technical viability of a pre-commercial PSOFC technology at the County 911 Communications headquarters. Additional goals included educating local permit approval authorities, and other governmental entities about PSOFC technology, existing fuel cell standards and specific code requirements. The project demonstrated the Bloom Energy (BE) PSOFC technology in grid parallel mode, delivering a minimum 15 kW over 8760 operational hours. The PSOFC system demonstrated greater than 81% electricity availability and 41% electrical efficiency (LHV net AC), providing reliable, stable power to a critical, sensitive 911 communications system that serves geographical boundaries of the entire Santa Clara County. The project also demonstrated input fuel flexibility. BE developed and demonstrated the capability to run its prototype PSOFC system on ethanol. BE designed the hardware necessary to deliver ethanol into its existing PSOFC system. Operational parameters were determined for running the system on ethanol, natural gas (NG), and a combination of both. Required modeling was performed to determine viable operational regimes and regimes where coking could occur.

03 NATURAL GAS↗