Search NASA⌕ Search

SEARCH · Search NASA

Results for “TECHNICAL DETAILS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

NRC Consultation and Monitoring at the Savannah River Site: Focusing Reviews of Two Different Disposal Actions - 12181

Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2011, the NRC staff reviewed DOE performance assessments for tank closure at the F-Tank Farm (FTF) Facility and salt waste disposal at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) as part of consultation and monitoring, respectively. Differences in inventories, waste forms, and key barriers led to different areas of focus in the NRC reviews of these two activities at the SRS. Because of the key role of chemically reducing grouts in both applications, the evaluation of chemical barriers was significant to both reviews. However, radionuclide solubility in precipitated metal oxides is expected to play a significant role in FTF performance whereas release of several key radionuclides from the SDF is controlled by sorption or precipitation within the cementitious wasteform itself. Similarly, both reviews included an evaluation of physical barriers to flow, but differences in the physical configurations of the waste led to differences in the reviews. For example, NRC's review of the FTF focused on the modeled degradation of carbon steel tank liners while the staff's review of the SDF performance included a detailed evaluation of the physical degradation of the saltstone wasteform and infiltration-limiting closure cap. Because of the long time periods considered (i.e., tens of thousands of years), the NRC reviews of both facilities included detailed evaluation of the engineered chemical and physical barriers. The NRC staff reviews of residual waste disposal in the FTF and salt waste disposal in the SDF focused on physical barriers to flow and chemical barriers to radionuclide release from the waste. Because the waste inventory and concentration at both sites is sufficient to generate unacceptable doses to an off-site member of the public or inadvertent intruder in the absence of engineered barriers, the NRC staff review focused on the engineering features DOE plans to put in place to limit radionuclide release. At the FTF, DOE expects that peak doses are delayed beyond a 10,000 year performance period by a combination of (1) the flow-limiting effect of the steel tank liner and (2) chemical conditions created by the stabilizing grout overlying the waste that limit the solubility of key radionuclides for tens of thousands of years. At the SDF, DOE expects that flow will be significantly limited by water shedding along the closure cap lower drainage layer and that radionuclide release will be further limited by radionuclide precipitation or sorption within the high pH, chemically reducing conditions created within the saltstone waste form. Because the performance of both facilities depends on the performance of engineered barriers for thousands of years, the reviews included a detailed evaluation of the expected long-term behavior of these barriers. As previously discussed, NRC staff reviews of DOE waste determinations during consultation are designed to evaluate the three NDAA criteria, whereas the review of an updated PA during monitoring only addresses whether the NRC staff has reasonable assurance that the planned disposal action will meet the performance objectives of 10 CFR Part 61. The NRC staff review of the Waste Determination for the FTF did not include conclusions about whether the planned disposal of residual waste at the FTF would meet the NDAA criteria because of the substantial uncertainties in the degree of waste removal DOE would achieve and other technical uncertainties. The main product of the NRC staff review of the planned FTF disposal action is the recommendation that DOE should conduct waste release experiments to increase support for key modeling assumptions related to: (1) the evolution of pH and Eh in the grouted tank system over time; (2) identification of HRR association with solid phases comprising the residual wastes; and (3) expected solubility of HRRs under a range of environmental or service conditions that the residual wastes in the contaminated zone are expected to be exposed to over time. Implementation of this recommendation is deemed crucial for NRC staff to have reasonable assurance that the performance objectives in 10 CFR Part 61, Subpart C can be met. Given the risk-significance of Tank 18 to the overall PA and the short timeline for closure of this tank, the NRC staff recommended that DOE should initiate discussions with NRC staff regarding implementation of this recommendation for Tank 18 as soon as practical. The NRC staff also recommended that experiments to address this recommendation should be conducted prior to final closure of Tank 18. Results of the Tank 18 residual waste experiments, if conducted, will be evaluated by NRC staff to determine the need for additional data collection, experiments, and modeling for Tank 18, as well as other FTF tanks. Additional information regarding the NRC staff's recommendations in this area, including details on the suggested implementation of other recommendations will be provided in the NRC staff's plan for monitoring the FTF later in FY 2012, after DOE makes a final decision on the waste determination. The NRC staff's review of waste disposal at the SDF is ongoing. When complete, the SDF TER will indicate whether the NRC staff continues to have reasonable assurance that waste disposal at the SDF will meet the performance objectives of 10 CFR Part 61 (NDAA Criterion 3). The TER also will include risk insights that will form the basis of the NRC staff's revised monitoring plan for the SDF. The NRC staff will publish an updated monitoring plan for the SDF later in FY 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expected Performance of the ATLAS Experiment - Detector, Trigger and Physics

The Large Hadron Collider (LHC) at CERN promises a major step forward in the understanding of the fundamental nature of matter. The ATLAS experiment is a general-purpose detector for the LHC, whose design was guided by the need to accommodate the wide spectrum of possible physics signatures. The major remit of the ATLAS experiment is the exploration of the TeV mass scale where groundbreaking discoveries are expected. In the focus are the investigation of the electroweak symmetry breaking and linked to this the search for the Higgs boson as well as the search for Physics beyond the Standard Model. In this report a detailed examination of the expected performance of the ATLAS detector is provided, with a major aim being to investigate the experimental sensitivity to a wide range of measurements and potential observations of new physical processes. An earlier summary of the expected capabilities of ATLAS was compiled in 1999 [1]. A survey of physics capabilities of the CMS detector was published in [2]. The design of the ATLAS detector has now been finalised, and its construction and installation have been completed [3]. An extensive test-beam programme was undertaken. Furthermore, the simulation and reconstruction software code and frameworks have been completely rewritten. Revisions incorporated reflect improved detector modelling as well as major technical changes to the software technology. Greatly improved understanding of calibration and alignment techniques, and their practical impact on performance, is now in place. The studies reported here are based on full simulations of the ATLAS detector response. A variety of event generators were employed. The simulation and reconstruction of these large event samples thus provided an important operational test of the new ATLAS software system. In addition, the processing was distributed world-wide over the ATLAS Grid facilities and hence provided an important test of the ATLAS computing system - this is the origin of the expression 'CSC studies' ('computing system commissioning'), which is occasionally referred to in these volumes. The work reported does generally assume that the detector is fully operational, and in this sense represents an idealised detector: establishing the best performance of the ATLAS detector with LHC proton-proton collisions is a challenging task for the future. The results summarised here therefore represent the best estimate of ATLAS capabilities before real operational experience of the full detector with beam. Unless otherwise stated, simulations also do not include the effect of additional interactions in the same or other bunch-crossings, and the effect of neutron background is neglected. Thus simulations correspond to the low-luminosity performance of the ATLAS detector. This report is broadly divided into two parts: firstly the performance for identification of physics objects is examined in detail, followed by a detailed assessment of the performance of the trigger system. This part is subdivided into chapters surveying the capabilities for charged particle tracking, each of electron/photon, muon and tau identification, jet and missing transverse energy reconstruction, b-tagging algorithms and performance, and finally the trigger system performance. In each chapter of the report, there is a further subdivision into shorter notes describing different aspects studied. The second major subdivision of the report addresses physics measurement capabilities, and new physics search sensitivities. Individual chapters in this part discuss ATLAS physics capabilities in Standard Model QCD and electroweak processes, in the top quark sector, in b-physics, in searches for Higgs bosons, supersymmetry searches, and finally searches for other new particles predicted in more exotic models.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Envelope-driven comfort risk in residential demand response

Residential demand response (DR) is a valuable resource for grid reliability, but remains challenging because the highly heterogeneous residential building stock leads to widely varying and hard-to-predict load and comfort responses during DR events. Although prior research has estimated the technical potential of DR-capable technologies for achieving energy demand savings, little is known about how they affect thermal comfort. In particular, it remains unclear how indoor thermal conditions due to DR depend on the thermal envelope characteristics of the housing stock. To address this gap, this study provides a systematic, location-specific assessment of indoor thermal performance during DR-events across the US housing stock using both typical DR weather data and detailed building metadata. We evaluate how envelope characteristics influence indoor temperatures during realistic simulated summer and winter DR events across 37 US locations, applying both temperature threshold and rate of temperature change criteria to estimate region-level probabilities of discomfort. Additionally, we show the impact of distinct weather patterns that intensify or abate thermal stress on comfort outcomes. Results show a near-universal overheating risk in summer DR events, where comfort outcomes are strongly influenced by rapid risk of comfort violations. In contrast, overall winter DR discomfort risk is lower, risk escalation is more gradual and shows greater sensitivity to event duration. These findings offer a data-driven quantification of comfort risk across diverse climates and building envelopes, demonstrating the need for region-specific DR scheduling and discomfort mitigation strategies tailored to local weather patterns and the performance of existing residential buildings.

Demand response↗

Development of a specific methodology to assess suitable sites to receive a repository for L/ILW waste in the Portuguese territory

Portugal does not have nuclear power plants but records an increasing production of radioactive waste from medical, industrial and research applications of radioactive materials in the form of sealed and unsealed sources; the country totals include also the spent fuel of one nuclear reactor for research purposes. Since radioactive waste management policies and practices in Portugal will have to comply with the Council Directive 2011/70/Euratom and the IAEA Joint Convention, the search for scientific and technological solutions to deal with radioactive wastes produced in the country started some years ago. The research carried out recently under the scope of a national funded project (KADRWaste, PTDC/CTEGEX/ 82678/2006) represents a firm step in this commitment. Indeed, the transfer of methodologies tested and validated in this project allowed for improvement to a procedure to assess suitable sites to receive a near-surface repository for 'Low and Intermediate Level Waste, Short Live and Long Live' (LILWSL, LL) wastes in Portugal mainland. Although the main stages of the procedure can be of universal usage, details were designed according to the intrinsic geological, geomorphic and meteorological features of previously selected target-areas. All the requirements exhaustively listed in many reports of the IAEA were fulfilled and, in addition, the application of mineralogical, geochemical and textural criteria is strongly advised. The proposed procedure is based on a 5 key-steps approach preceded by clarification of the boundary conditions to be imposed, which are crucial to the inventory of various compulsory technical requirements. This analysis requires the adoption of stringent criteria, many of them of multidisciplinary nature, including tests of vulnerability and assessment of uncertainty, besides the environmental impact risk. As a result, priority targets that are not excluded will integrate different classes and, depending on the existing knowledge, it will be possible to select locations suitable for the repository installation, taking into account also the political, social and administrative dimensions behind this decision. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Examination of an optical transmittance test for photovoltaic encapsulation materials

The optical transmittance of encapsulation materials is a key characteristic for their use in photovoltaic (PV) modules. Changes in transmittance with time in the field affect module performance, which may impact product warranties. Transmittance is important in product development, module manufacturing, and field power production (both immediate and long-term). Therefore, an international standard (IEC 62788-1-4) has recently been proposed by the Encapsulation Task-Group within the Working Group 2 (WG2) of the International Electrotechnical Commission (IEC) Technical Committee 82 (TC82) for the quantification of the optical performance of PV encapsulation materials. Existing standards, such as ASTM E903, are general and more appropriately applied to concentrated solar power than to PV. Starting from the optical transmittance measurement, the solar-weighted transmittance of photon irradiance, yellowness index (which may be used in aging studies to assess durability), and ultraviolet (UV) cut-off wavelength may all be determined using the proposed standard. The details of the proposed test are described. The results of a round-robin experiment (for five materials) conducted at seven laboratories to validate the test procedure using representative materials are also presented. For example, the Encapsulation Group actively explored the measurement requirements (wavelength range and resolution), the requirements for the spectrophotometer (including the integrating sphere and instrument accessories, such as a depolarizer), specimen requirements (choice of glass-superstrate and -substrate), and data analysis (relative to the light that may be used in the PV application). The round-robin experiment identified both intra- and inter-laboratory instrument precision and bias for five encapsulation materials (encompassing a range of transmittance and haze-formation characteristics).

14 SOLAR ENERGY↗

PINS Spectrum Identification Guide

The Portable Isotopic Neutron Spectroscopy—PINS, for short—system identifies the chemicals inside munitions and containers without opening them, a decided safety advantage if the fill chemical is a hazardous substance like a chemical warfare agent or an explosive. The PINS Spectrum Identification Guide is intended as a reference for technical professionals responsible for the interpretation of PINS gamma-ray spectra. The guide is divided into two parts. The three chapters that constitute Part I cover the science and technology of PINS. Neutron activation analysis is the focus of Chapter 1. Chapter 2 explores PINS hardware, software, and related operational issues. Gamma-ray spectral analysis basics are introduced in Chapter 3. The six chapters of Part II cover the identification of PINS spectra in detail. Like the PINS decision tree logic, these chapters are organized by chemical element: phosphorus-based chemicals, chlorine-based chemicals, etc. These descriptions of hazardous, toxic, and/or explosive chemicals conclude with a chapter on the identification of the inert chemicals, e.g. sand, used to fill practice munitions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Data request for Majiata DCL plant site characterization for geological sequestration - explanation of purpose and need

Detailed and accurate geological assessment of the proposed CO2 pilot injection and commercial project associated with Shenhua’s DCL plant is central to project success and US-China collaboration. The best result requires access to multiple data types and in the highest abundance available for the site and region. Insufficient data access will result in inaccurate simulations, poor drilling recommendations, high uncertainty in understanding new data from the site, and would increase the chance of technical failure or poor outcome. Examples from prior successful project discussed here are provided to demonstrate the need for full access to individual data types, access to multiple data types, and ability to correlate and integrate between these data sets.

58 GEOSCIENCES↗

Design of a modified Halbach magnet for the CBETA Project

A modified Halbach magnet has been designed to be installed in the splitter/merger section of the CBETA project which is under construction at Cornell University. The splitter/merger of the CBETA consists of 4 beam lines and is shown in Fig. 1. Two of the functions of the splitter/merger lines are; first to match the beam parameters at the exit of the Energy Recovery Linac (ERL) to those at the entrance of the Fixed Field Alternating Gradient (FFAG) arc, and second to place the trajectories of the reference particles of the beam bunches at the entrance of the FFAG arc on specified trajectories as they determined by the beam optics of the FFAG arc. In this technical note we present results from the 2D and 3D electromagnetic analysis of the S4.BEN01 magnet which is one of the dipole magnets of the 150 MeV line of the splitter/merger. The present design of the S4.BEN01 magnet, is based on a modified Halbach-type permanent magnet. To justify our suggestion of using a Halbach type of magnet instead of an electromagnet for the S4.BEN01 magnet we devote an APPENDIX A in which we provide details on the design of an electromagnet for the S4.BEN01 magnet and in the section under conclusion will list the pros and cons of the two designs.

43 PARTICLE ACCELERATORS↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Examination of an Optical Transmittance Test for Photovoltaic Encapsulation Materials (Presentation)

The optical transmittance of encapsulation materials is a key characteristic for their use in photovoltaic (PV) modules. Changes in transmittance with time in the field affect module performance, which may impact product warranties. Transmittance is important in product development, module manufacturing, and field power production (both immediate and long-term). Therefore, an international standard (IEC 62788-1-4) has recently been proposed by the Encapsulation Task-Group within the Working Group 2 (WG2) of the International Electrotechnical Commission (IEC) Technical Committee 82 (TC82) for the quantification of the optical performance of PV encapsulation materials. Existing standards, such as ASTM E903, are general and more appropriately applied to concentrated solar power than to PV. Starting from the optical transmittance measurement, the solar-weighted transmittance of photon irradiance, yellowness index (which may be used in aging studies to assess durability), and ultraviolet (UV) cut-off wavelength may all be determined using the proposed standard. The details of the proposed test are described. The results of a round-robin experiment (for five materials) conducted at seven laboratories to validate the test procedure using representative materials are also presented. For example, the Encapsulation Group actively explored the measurement requirements (wavelength range and resolution), the requirements for the spectrophotometer (including the integrating sphere and instrument accessories, such as a depolarizer), specimen requirements (choice of glass-superstrate and -substrate), and data analysis (relative to the light that may be used in the PV application). The round-robin experiment identified both intra- and inter-laboratory instrument precision and bias for five encapsulation materials (encompassing a range of transmittance and haze-formation characteristics).

14 SOLAR ENERGY↗

Exploring New Physics Beyond the Standard Model: Final Technical Report

This grant in 2015 to 2016 was for support in the area of theoretical High Energy Physics. The research supported focused mainly on the energy frontier, but it also has connections to both the cosmic and intensity frontiers. Lian-Tao Wang (PI) focused mainly on signal of new physics at colliders. The year 2015 - 2016, covered by this grant, has been an exciting period of digesting the influx of LHC data, understanding its meaning, and using it to refine strategies for deeper exploration. The PI proposed new methods of searching for new physics at the LHC, such as for the compressed stops. He also investigated in detail the signal of composite Higgs models, focusing on spin-1 composite resonances in the di-boson channel. He has also considered di-photon as a probe for such models. He has also made contributions in formulating search strategies of dark matter at the LHC, resulting in two documents with recommendations. The PI has also been active in studying the physics potential of future colliders, including Higgs factories and 100 TeV pp colliders. He has given comprehensive overview of the physics potential of the high energy proton collider, and outline its luminosity targets. He has also studied the use of lepton colliders to probe fermionic Higgs portal and bottom quark couplings to the Z boson.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Devascularization of Head and Neck Paragangliomas by Direct Percutaneous Embolization

Preoperative transarterial embolization of head and neck paragangliomas using particulate agents has proven beneficial for decreasing intraoperative blood loss. However, the procedure is often incomplete owing to extensive vascular structure and arteriovenous shunts. We report our experience with embolization of these lesions by means of direct puncture and intratumoral injection of n-butyl cyanoacrylate (NBCA) or Onyx. Ten patients aged 32-82 years who were referred for preoperative embolization of seven carotid body tumors and three jugular paragangliomas were retrospectively analyzed. Intratumoral injections were primarily performed in four cases with multiple small-caliber arterial feeders and adjunctive to transarterial embolization in six cases with incomplete devascularization. Punctures were performed under ultrasound and injections were performed under roadmap fluoroscopic guidance. Detailed angiographies were performed before and after embolization procedures. Control angiograms showed complete or near-complete devascularization in all tumors. Three tumors with multiple small-caliber arterial feeders were treated with primary NBCA injections. One tumor necessitated transarterial embolization after primary injection of Onyx. Six tumors showed regional vascularization from the vasa vasorum or small-caliber branches of the external carotid artery following the transarterial approach. These regions were embolized with NBCA injections. No technical or clinical complications related to embolization procedures occurred. All except one of the tumors were surgically removed following embolization. In conclusion, preoperative devascularization with percutaneous direct injection of NBCA or Onyx is feasible, safe, and effective in head and neck paragangliomas with multiple small-caliber arterial feeders and in cases of incomplete devascularization following transarterial embolization.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Safeguards-by-Design: Guidance for High Temperature Gas Reactors (HTGRs) With Pebble Fuel

The following is a guidance document from a series prepared for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), under the Next Generation Safeguards Initiative (NGSI), to assist facility designers and operators in implementing international Safeguards-by-Design (SBD). SBD has two main objectives: (1) to avoid costly and time consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) to make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save industry and the International Atomic Energy Agency (IAEA) time, money, and resources and be mutually beneficial. This particular safeguards guidance document focuses on pebble fuel high temperature gas reactors (HTGR). The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards; safeguards rights and obligations in safeguards agreements and additional protocols; and technical measures implemented pursuant to those agreements. Of foremost importance is the international safeguards agreement between the country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). According to a 1992 IAEA Board of Governors decision, countries must: notify the IAEA of a decision to construct a new nuclear facility as soon as such decision is taken; provide design information on such facilities as the designs develop; and provide detailed design information based on construction plans at least 180 days prior to the start of construction, and on "as-built" designs at least 180 days before the first receipt of nuclear material. Ultimately, the design information will be captured in an IAEA Design Information Questionnaire (DIQ), prepared by the facility operator, typically with the support of the facility designer. The IAEA will verify design information over the life of the project. This design information is an important IAEA safeguards tool. Since the main interlocutor with the IAEA in each country is the State Regulatory Authority/SSAC (or Regional Regulatory Authority, e.g. EURATOM), the responsibility for conveying this design information to the IAEA falls to the State Regulatory Authority/SSAC.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Corrective Action Decision Document for Corrective Action Unit 568. Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada Revision 0

The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of corrective action alternatives (CAAs) for the 14 CASs within CAU 568. Corrective action investigation (CAI) activities were performed from April 2014 through May 2015, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites, Nevada National Security Site, Nevada; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. The purpose of the CAI was to fulfill data needs as defined during the DQO process. The CAU 568 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated that the dataset is complete and acceptable for use in fulfilling the DQO data needs. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 14 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 568: • No further action is the preferred corrective action for CASs 03-23-17, 03-23-22, 03-23-26. • Closure in place is the preferred corrective action for CAS 03-23-19; 03-45-01; the SE DCBs at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; and the Pascal-BHCA at CAS 03-23-31. • Clean closure is the preferred corrective action for CASs 03-08-04, 03-23-30, and 03-26-04; and the four well head covers at CASs 03-23-20, 03-23-23, 03-23-31, and 03-23-33.

54 ENVIRONMENTAL SCIENCES↗

Repairing polycrystalline IN 100 using additive manufacturing (CRADA NFE-17-06791 Final Report)

The overall goal of this Manufacturing Demonstration Facility (MDF) technical collaboration project is to extend the use of the laser blown powder additive manufacturing process to enable the repair of polycrystalline high γ' Ni base super alloys, and to qualify the repaired parts for end use. The goal of phase 1 of this project was to evaluate the cracking susceptibility of Inconel 100 samples, and to identify parameters that would yield crack free repair deposits on representative geometries using a surrogate material as a substrate. A detailed design of experiments was performed in conjunction with thermomechanical modeling to determine processing conditions. A set of process parameters were identified which yielded minimal cracking. Further modeling was used to identify the preheat condition necessary to obtain crack free deposits. Following identification of the preheat, a furnace was integrated within the chamber of the blown powder Direct Energy Deposition (DED) system, and deposits were fabricated with on a preheated furnace. The results show that crack free deposits with dimensions 35x15x0.5 mm 3 can be fabricated. With this success obtained in phase 1 the goal of phase 2, if awarded, would be to fabricate the deposit on the actual IN 100 substrates develop heat treatment procedures and qualify the repair procedures.

36 MATERIALS SCIENCE↗

Draft Geologic Disposal Requirements Basis for STAD Specification

This document provides supporting technical rationale in draft form as input for: STAD Performance Specification Requirements Rationale (planned to be issued as FCRD-NFST-2015- 000106). The supporting rationale addresses those parts of the storage, transportation and disposal (STAD) canister performance specification that pertain to geologic disposal. These parts include service lifetime, repository thermal performance, postclosure criticality, and materials selection. Each draft performance specification is presented, and those pertaining to geologic disposal are elaborated with brief sections labeled Rationale. More detail is provided in appendices that address: long-term performance of borated stainless steel, use of borated stainless steel in existing designs, recommendations for additional corrosion studies, stress corrosion cracking of canister shell materials, and a generic postclosure safety case for STAD canisters.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program

The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energy’s (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 “Quality Assurance Program” under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as “not applicable” to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented the QA program and completed individual research project activities. PIs were also responsible for developing implementing procedures, conducting technical training, assuring that the QA program training was acquired by all task personnel, and participating in monitoring the QA program control for each individual research project activity. This project activity, which was an essential part of the program to enhance the collaborative ongoing research between the NSHE and ORD, was intended to support all quality-affecting activities funded during the five-year period of the cooperative agreement. However, the cooperative agreement was down-graded to non quality-affecting after 4 years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguards-by-Design:Guidance for High Temperature Gas Reactors (HTGRs) With Prismatic Fuel

Introduction and Purpose The following is a guidance document from a series prepared for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), under the Next Generation Safeguards Initiative (NGSI), to assist facility designers and operators in implementing international Safeguards-by-Design (SBD). SBD has two main objectives: (1) to avoid costly and time consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) to make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save industry and the International Atomic Energy Agency (IAEA) time, money, and resources and be mutually beneficial. This particular safeguards guidance document focuses on prismatic fuel high temperature gas reactors (HTGR). The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards; safeguards rights and obligations in safeguards agreements and additional protocols; and technical measures implemented pursuant to those agreements. Of foremost importance is the international safeguards agreement between the country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). According to a 1992 IAEA Board of Governors decision, countries must: notify the IAEA of a decision to construct a new nuclear facility as soon as such decision is taken; provide design information on such facilities as the designs develop; and provide detailed design information based on construction plans at least 180 days prior to the start of construction, and on "as-built" designs at least 180 days before the first receipt of nuclear material. Ultimately, the design information will be captured in an IAEA Design Information Questionnaire (DIQ), prepared by the facility operator, typically with the support of the facility designer. The IAEA will verify design information over the life of the project. This design information is an important IAEA safeguards tool. Since the main interlocutor with the IAEA in each country is the State Regulatory Authority/SSAC (or Regional Regulatory Authority, e.g. EURATOM), the responsibility for conveying this design information to the IAEA falls to the State Regulatory Authority/SSAC. For the nuclear industry to reap the benefits of SBD (i.e. avoid cost overruns and construction schedule slippages), nuclear facility designers and operators should work closely with the State Regulatory Authority and IAEA as soon as a decision is taken to build a new nuclear facility. Ideally, this interaction should begin during the conceptual design phase and continue throughout construction and start-up of a nuclear facility. Such early coordination and planning could influence decisions on the design of the nuclear material processing flow-sheet, material storage and handling arrangements, and facility layout (including safeguards equipment), etc.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗