Operations automation

This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

Boreham, Charles Thomas↗

Flight test experience with an adaptive control system using a maximum likelihood parameter estimation technique

The flight test performance of an adaptive control system for the F-8 DFBW aircraft is summarized. The adaptive system is based on explicit identification of surface effectiveness parameters which are used for gain scheduling in a command augmentation system. Performance of this control law under various design parameter variations is presented. These include variations in test signal level, sample rate, and identification channel structure. Flight performance closely matches analysis and simulation predictions from previous references.

Hartmann, G.↗

Johnson Space Center CFD overview

Recent applications and development of CFD technology have focused on flow problems that are critically important to the operation and design of space flight vehicles. The main effort is spent on the Space Shuttle in order to provide an understanding of the cryogenic fluid in the duct connecting the External Tank and the Main Engines, the subsonic flow surrounding the Orbiter during crew egress maneuvers, the transonic aerodynamic forces on the Orbiter fuselage and wing, the high angle-of-attack abort flight, and the aerodynamic heating during entry. To provide in-depth analyses for such diverse problems within a timely schedule, matured panel codes and a state-of-the-art incompressible turbulent flow code were adapted. Collaboration with Ames Research Center has resulted in a Shuttle ascent aerodynamic code; and a viscous chemical nonequilibrium code is being developed for predicting Orbiter real-gas aerodynamics and finite-catalytic heating. The remaining activities are devoted to the prediction of the flow environment around the Aeroassist Flight Experiment vehicle at hypersonic speeds and high altitudes. A thermochemical nonequilibrium Navier-Stokes code has been developed on the basis of two- temperature and 11-species models for solving both the shock layer and near wake. After validating the code against wind-tunnel aerodynamic, pressure and heating data, the code is being used to supplement the ground test facilities in predicting a more realistic flight environment. CFD technology is being relied upon by other programs as well in the consideration of candidate configurations.

Li, Chien P.↗

Automation of Hubble Space Telescope Mission Operations

On June 13, 2011, after more than 21 years, 115 thousand orbits, and nearly 1 million exposures taken, the operation of the Hubble Space Telescope successfully transitioned from 24x7x365 staffing to 815 staffing. This required the automation of routine mission operations including telemetry and forward link acquisition, data dumping and solid-state recorder management, stored command loading, and health and safety monitoring of both the observatory and the HST Ground System. These changes were driven by budget reductions, and required ground system and onboard spacecraft enhancements across the entire operations spectrum, from planning and scheduling systems to payload flight software. Changes in personnel and staffing were required in order to adapt to the new roles and responsibilities required in the new automated operations era. This paper will provide a high level overview of the obstacles to automating nominal HST mission operations, both technical and cultural, and how those obstacles were overcome.

Burley, Richard↗

Evaluating the Stability of NASA's Space Launch System with Adaptive Augmenting Control

NASA's baseline Space Launch System (SLS) flight control system (FCS) design includes an adaptive augmenting control (AAC) component that modifies the attitude control system response to provide the classical gain-scheduled control architecture with additional performance and robustness. The NASA Engineering and Safety Center (NESC) teamed with the Space Launch System (SLS) Program to perform a comprehensive assessment of the stability and robustness of the FCS with AAC. This paper provides an overview of the approach, specific analysis techniques, and outcomes that were particularly relevant for the SLS Program. Multiple analysis techniques that specifically target the nonlinear AAC were commissioned as part of this assessment, which was completed outside of the Program's standard design analysis cycle. The following analyses were included, with each technique adding its own valuable insights: Lyapunov-based stability analysis, classical stability analysis with static AAC gain variations, circle criterion-based analysis of the FCS with a time-varying element, time-domain stability margin assessment, Monte Carlo simulations with expanded dispersions, and an extensive set of stressing cases. Several of the completed analyses focused on determining whether the inclusion of AAC introduced risk to the FCS, while others quantified the benefits of the adaptive augmentation.

Tannen S Vanzwieten↗

Assessing Individual Differences in Adaptation to Extreme Environments: A 36-Hour Sleep Deprivation Study

In space, astronauts may experience effects of cumulative sleep loss due to demanding work schedules that can result in cognitive performance impairments, mood state deteriorations, and sleep-wake cycle disruption. Individuals who experience sleep deprivation of six hours beyond normal sleep times experience detrimental changes in their mood and performance states. Hence, the potential for life threatening errors increases exponentially with sleep deprivation. We explored the effects of 36-hours of sleep deprivation on cognitive performance, mood states, and physiological responses to identify which metrics may best predict fatigue induced performance decrements of individuals.

Martinez, Jacqueline↗

CRiSPPy: An advanced hydropower scheduling tool for the Colorado River Storage Project

The Western Area Power Administration (WAPA) plays a vital role in delivering reliable and cost-effective hydroelectric power to millions of customers across the western United States. The Colorado River Storage Project (CRSP) carries out WAPA’s mission in Arizona, Utah, Colorado, New Mexico, Nevada, Wyoming and Texas. Achieving this mission requires effective management of the Colorado River system, and depends on the use of advanced analytical tools and modeling methodologies. For many years, CRSP has relied on the Generation and Transmission Maximization Superlite (GTMax SL) model for its mid-term and long-term hydroscheduling needs. However, the evolving energy market, power system operations, environmental rules, and hydrology conditions, coupled with advancements in computational capabilities, have necessitated the development of a more modern and robust solution. This report introduces the Colorado River Storage Project Python-based (CRiSPPy) model, a new, advanced hydropower scheduling tool developed to address CRSP ever-evolving challenges. CRiSPPy represents a significant leap forward in our ability to model and optimize the operation of the Colorado River system. It incorporates state-of-the-art optimization algorithms, enhanced data management capabilities, and an advanced graphical user interface, providing WAPA CRSP personnel with unprecedented insights and decision-making support. This document details the development, capabilities, and implementation of CRiSPPy. It is intended to serve as a comprehensive resource for WAPA staff, stakeholders, and anyone interested in the future of hydropower scheduling in the Colorado River Basin. We are confident that CRiSPPy will enhance WAPA's mission while adapting to the challenges of a dynamic and increasingly complex environment. The version of CRiSPPy described in this report is the version 2.3. New versions of CRiSPPy will be developed as the tool keeps evolving to address CRSP challenges.

13 HYDRO ENERGY↗

The Skylab orbital laboratory.

The Skylab orbital laboratory is described in terms of spacecraft design features, the experiment programs, and the schedule of planned missions. Attention is given to flight and crew operations, rescue measures, the Multiple Docking Adapter, the Airlock Module, the Workshop, the Apollo Telescope Mount, Saturn V booster, Command and Service Modules, the life support system, thermal and environmental control, electrical power, attitude and pointing control, instrumentation and communications, crew equipment, provisions, and stowage.

Schneider, W. C.↗

Atmosphere, Magnetosphere and Plasmas in Space (AMPS). Spacelab payload definition study. Volume 7, book 2: AMPS phase C/D analysis and planning document

The results are presented of the AMPS Phase C/D (Design, Development, and Operations) program analysis and planning effort. Cost and schedule estimates are included. Although the AMPS program has been specifically addressed, these task descriptions are basically adaptable to a broader-based program incorporating additional or different Spacelab/orbiter payloads.

Source record↗

A Hybrid Traveling Salesman Problem - Squeaky Wheel Optimization Planner for Earth Observational Scheduling

We outline a hybrid planner for scheduling Observa- tion Requests on an Earth observing satellite, subject to a variety of constraints for the ASPEN (Chien et al. 2000) Eagle Eye adaptation (Knight, Donnellan, and Green 2013) that combines Squeaky Wheel Optimiza- tion (Joslin and Clements 1999) with sliding observa- tion planning (Aldinger et al. 2013). The Earth Ob- serving Satellite (EOS) planning problem (Globus et al. 2004) is reformulated as time-varying travel time TSP with interval constraints (Ichoua, Gendreau, and Potvin 2003). The replanning/ ll stage of the hybrid scheduler marginally improves schedule quality for all bus agilities examined, but has more impact on lower agility observers. The squeaky wheel stage primarily a ects overall schedule quality by satisfying high pri- ority requests, while the replanner reduces starvation of lower value requests.

Trowbridge, Michael↗

Space Flight LiDARs, Navigation & Science Instrument Implementations: Lasers, Optoelectronics, Integrated Photonics, Fiber Optic Subsystems and Components

For the past 25 years, the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center's Photonics Group in the Engineering Directorate has been substantially contributing to the flight design, development, production, testing and integration of many science and navigational instruments. The Moon to Mars initiative will rely heavily upon utilizing commercial technologies for instrumentation with aggressive schedule deadlines. The group has an extensive background in screening, qualifying, development and integration of commercial components for spaceflight applications. By remaining adaptable and employing a rigorous approach to component and instrument development, they have forged and fostered relationships with industry partners. They have been willing to communicate lessons learned in packaging, part construction, materials selection, testing, and other facets of the design and production process critical to implementation for high-reliability systems. As a result, this successful collaboration with industry vendors and component suppliers has enabled a history of mission success from the Moon to Mars (and beyond) while balancing cost, schedule, and risk postures. In cases where no commercial components exist, the group works closely with other teams at Goddard Space Flight Center and other NASA field centers to fabricate and produce flight hardware for science, remote sensing, and navigation applications. Summarized here is the last ten years of instrumentation development lessons learned and data collected from the subsystems down to the optoelectronic component level.

Detectors↗

Decision-Theoretic Control of Planetary Rovers

Planetary rovers are small unmanned vehicles equipped with cameras and a variety of sensors used for scientific experiments. They must operate under tight constraints over such resources as operation time, power, storage capacity, and communication bandwidth. Moreover, the limited computational resources of the rover limit the complexity of on-line planning and scheduling. We describe two decision-theoretic approaches to maximize the productivity of planetary rovers: one based on adaptive planning and the other on hierarchical reinforcement learning. Both approaches map the problem into a Markov decision problem and attempt to solve a large part of the problem off-line, exploiting the structure of the plan and independence between plan components. We examine the advantages and limitations of these techniques and their scalability.

Zilberstein, Shlomo↗

Activity Planning for the Mars Exploration Rovers

Operating the Mars Exploration Rovers is a challenging, time-pressured task. Each day, the operations team must generate a new plan describing the rover activities for the next day. These plans must abide by resource limitations, safety rules, and temporal constraints. The objective is to achieve as much science as possible, choosing from a set of observation requests that oversubscribe rover resources. In order to accomplish this objective, given the short amount of planning time available, the MAPGEN (Mixed-initiative Activity Plan GENerator) system was made a mission-critical part of the ground operations system. MAPGEN is a mixed-initiative system that employs automated constraint-based planning, scheduling, and temporal reasoning to assist operations staff in generating the daily activity plans. This paper describes the adaptation of constraint-based planning and temporal reasoning to a mixed-initiative setting and the key technical solutions developed for the mission deployment of MAPGEN.

Bresina, John L.↗

SAGE III on ISS Lessons Learned on Thermal Interface Design

The Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument - the fifth in a series of instruments developed for monitoring vertical distribution of aerosols, ozone, and other trace gases in the Earth's stratosphere and troposphere - is currently scheduled for delivery to the International Space Station (ISS) via the SpaceX Dragon vehicle in 2016. The Instrument Adapter Module (IAM), one of many SAGE III subsystems, continuously dissipates a considerable amount of thermal energy during mission operations. Although a portion of this energy is transferred via its large radiator surface area, the majority must be conductively transferred to the ExPRESS Payload Adapter (ExPA) to satisfy thermal mitigation requirements. The baseline IAM-ExPA mechanical interface did not afford the thermal conductance necessary to prevent the IAM from overheating in hot on-orbit cases, and high interfacial conductance was difficult to achieve given the large span between mechanical fasteners, less than stringent flatness specifications, and material usage constraints due to strict contamination requirements. This paper will examine the evolution of the IAM-ExPA thermal interface over the course of three design iterations and will include discussion on design challenges, material selection, testing successes and failures, and lessons learned.

Davis, Warren↗

Effects of Centrifuge Diameter and Operation on Rodent Adaptation to Chronic Centrifugation

This study examined the responses of rats to centrifugation in a constant acceleration field (1.5 G). Centrifuge diameter (1.8m, 2.5m or 6.0m) and schedule of operation (Daily or weekly stop) varied between groups. Body mass, food consumption, water consumption and neurovestibular function were measured weekly. Body temperature and activity were continuously monitored using telemetry. A subset of subjects were videotaped (50 minutes per day) to allow for movement analysis. Exposure to a hyperdynamic field of this magnitude did cause the expected depression in the physiological variables monitored. Recovery was accomplished within a relatively rapid time frame; all variables returned to precentrifugation levels. In general, the magnitudes of the changes and the rate of recovery were similar at different centrifuge diameters and stopping frequency. There were cases, however, in which the magnitude of the response and/or the rate of recovery to a new steady-state were altered as a result of centrifuge diameter. In summary, these results indicate that stopping frequency has little, if any, effect on adaptation to chronic centrifugation. However, the angular velocity (omega), and therefore centrifuge diameter is an important consideration in the adaptation of an organism to chronic centrifugation.

Fuller, Charles A.↗

Effects of Centrifuge Diameter and Operation on Rodent Adaptation to Chronic Centrifugation

This study examined the responses of rats to centrifugation in a constant acceleration field (1.5 G). Centrifuge diameter (1.8m, 2.5m or 6.0m) and schedule of operation (Daily or weekly stop) varied between groups. Body mass, food consumption, water consumption and neurovestibular function were measured weekly. Body temperature and activity were continuously monitored using telemetry. A subset of subjects were videotaped (50 minutes per day) to allow for movement analysis. Exposure to a hyperdynamic field of this magnitude did cause the expected depression in the physiological variables monitored. Recovery was accomplished within a relatively rapid time frame; all variables returned to precentrifugation levels. In general, the magnitudes of the changes and the rate of recovery were similar at different centrifuge diameters and stopping frequency. There were cases, however, in which the magnitude of the response and/or the rate of recovery to a new steady-state were altered as a result of centrifuge diameter. In summary, these results indicate that stopping frequency has little, if any, effect on adaptation to chronic centrifugation. However, the angular velocity (omega), and therefore centrifuge diameter is an important consideration in the adaptation of an organism to chronic centrifugation.

Fuller, Charles A.↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgement, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs its high-data-rate return link for harvesting payload science. In the coming months, it will double that data rate and is forecast to fully utilize that capability. Already there is talk of an upgrade that quadruples the current data rate allocated to ISS payload science before the end of its mission and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗