Search NASA⌕ Search

SEARCH · Search NASA

Results for “COGENERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Development of a Green Parabolic Trough Collector

This report describes in detail a research project that assesses the potential of a parabolic trough solar collector with a lumber construction to meet ambitious performance, cost, and durability goals. Instead of exploring lumber as a general question for solar collectors, the project focuses on the design optimization, laboratory testing, outdoor testing, and economic modeling of a particular scale of parabolic trough, namely, the 6m aperture and 12m long module that has become the standard in the utility-scale power plant market. As will be appreciated in the report, it is also a scale that matches well the capabilities of lumber as a structural material and the commonly available cross sections. The design and its analysis extend far beyond traditional considerations for wooden structures in the built environment, and includes a computationally efficient coupled structural-optical simulation and the empirical characterization of joint stiffness at small deformations. Laboratory testing is used to characterize cyclic joint behavior, accelerated weathering, and to validate the simulation used as the basis for building a full-scale prototype. The construction and outdoor testing of this prototype is described. A total installed cost model of the collector is presented and the impact of the cost is seen in the context of a full plant techno-economic model. The results of this model in combination with the experience with the first prototype suggest that with improvements to the design and assembly process, this collector type has the potential to lower the levelized cost of heat for industrial solar steam plants used for process heating or cogeneration.

14 SOLAR ENERGY↗

Biochemical Ethanol Plant with Boiler Cogen

Inputs and outputs for ethanol production by a biochemical ethanol plant using cellulosic feedstocks. Electricity is cogenerated with a recovery boiler. Includes addition of denaturant (gasoline) as 5 percent volume of final product. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=82820430-69EA-45E6-949C-83EB3A91CD39

09 BIOMASS FUELS↗

Biochemical Ethanol Plant with Gasifier Cogen

Inputs and outputs for ethanol production by a biochemical ethanol plant using cellulosic feedstocks. Electricity is cogenerated by a gasifier coupled with a gas turbine. Includes denaturant (gasoline) as 5 percent volume of final product. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=EE2AA9E4-0965-4776-BD6B-B8B8B8EFF1B8

09 BIOMASS FUELS↗

Combined Heat and Power in Mexico: Market Opportunity Analysis

Energy reforms in Mexico have emphasized the need for a more diversified energy portfolio to enhance energy security, decrease environmental degradation, and increase Mexico’s economic competitiveness. Starting in 2013, these reforms provide new opportunities for the cogeneration of heat and power (also called combined heat and power, or CHP) in the following ways: (1) they include efficient CHP under clean electricity generation provisions, allowing them to generate Clean Energy Certificates (CEL); and (2) they facilitate investment and competition in natural gas, the primary fuel source of CHP, expanding access to and reducing the price of gas, and increasing the competitive advantage of CHP. Considering the changing regulatory environment in Mexico, and the potential opportunities offered to suppliers of CHP technologies, the U.S. Department of Energy commissioned a report to identify opportunities and challenges facing U.S. suppliers of CHP technology and services within the context of the current regulatory environment in Mexico. This report, prepared by the U.S. Department of Energy Oak Ridge National Laboratory, also provides an overview of the current energy policy environment and the electricity market dynamics related to the CHP sector in Mexico.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AOI2 - Initial Engineering, Testing, and Design of a Commercial-Scale Postcombustion CO 2 Capture System on an Existing Coal-Fired Generating Unit (Project Carbon)

The continued long-term use of North Dakota lignite is likely dependent on creating a business case for carbon capture, utilization, and storage (CCUS) that also addresses society’s desire to reduce carbon emissions. CCUS coupled with enhanced oil recovery appears to be the most feasible option for utilities to sustain and grow the lignite industry. Establishing a market where lignite-powered utilities provide carbon dioxide (CO 2 ) to oil producers depends upon having a cost-effective method to capture CO 2 . The application of CO 2 capture technology to lignite-fired flue gas has challenges in addition to the cost of capture, including the effects of the buildup of heat-stable salts, aerosol formation, degradation of solvents or solid sorbents, or subsequent solvent loss. Lignite, especially North Dakota lignite, presents its own set of challenges that include the combination of high sodium, sulfur, and ash contents; NO x reduction; and footprint limitations. Project Carbon was designed to address these technical barriers and provide pre-FEED (preliminary front-end engineering and design) information necessary for additional commercial demonstrations to move forward. A long-term pilot-scale evaluation of Mitsubishi Heavy Industries’ (MHI’s) KS-1™ solvent at Minnkota Power Cooperative’s lignite-fired Milton R. Young Station Unit 2 (MRY2) was a major objective of the project. The purpose of the test was to demonstrate the technology’s compatibility with MRY2’s flue gas over an extended period of time. During the long-term test, aerosol sampling and measurement were performed, and a pilot-scale baghouse was tested to determine the effect of bag material and operation on aerosol concentrations in the flue gas. Project engineering and design work were performed to support the other major project objective: a pre-FEED study of CO 2 capture at MRY2. Finally, a techno-economic assessment (TEA) of the application of CO 2 capture to MRY2 was performed. This project was performed over a period of 28 months, with a total budget of $12,700,000. The U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory, through the Energy & Environmental Research Center’s (EERC’s) Cooperative Agreement, the North Dakota Industrial Commission, and industry partners ALLETE and Minnkota Power Cooperative, funded the project. The pilot-scale test system at MRY2 performed very well for the continuous test period of 83 days. The CO 2 capture plant achieved stable operation while utilizing MHI’s KS-1™ solvent and the MHI amine emission reduction unit. No major concerns were encountered when capturing CO 2 from lignite-fired flue gas. Challenges were encountered because the cooling water temperature was warmer than needed for the capture system to operate efficiently. This affected the ability of the solvent to capture CO 2 and promoted solvent loss through solvent entrainment caused by high CO 2 gas temperature within a cyclone separator. The KS-1™ solvent and the lignite-derived flue gas were analyzed during the long-term test. Analysis of the solvent indicates that, although some metals and heat-stable salts increased over the course of the long-term test, they were at levels that can be treated with filtration and reclaiming and do not pose a concern for effective solvent operation. Fourier transform infrared (FTIR) spectrometry was successfully used to determine the composition of the lignite-derived flue gas as well as concentrations of select components of the flue gas at various locations within the EERC’s CO 2 capture system. The formation of aerosols during the capture process is of interest, as are approaches for their reduction, especially in a baghouse. Testing of aerosol removal was performed using the EERC’s portable baghouse. It was found that both Ryton and polytetrafluoroethylene (PTFE) membrane bags were effective at reducing the level of aerosols during steady-state operation. During backpulse events, however, the amount of aerosols passing through the bags was an order of magnitude lower for the Ryton bags than the PTFE membrane bags. The testing showed that proper design of the baghouse air-to-cloth ratio as well as minimization of backpulsing can dramatically reduce the amount of aerosols that pass through the bags and remain in the flue gas stream exiting a baghouse system. A technology maturation plan (TMP) was performed to enable successful development of the Kansai Mitsubishi Carbon Dioxide Recovery® (KM CDR®) Process for application to a combustion flue gas for which the process has not yet been demonstrated. In the TMP, new challenges to the MHI CO 2 capture technology during its application to MRY2 were identified. These challenges included capture from lignite-fired (as opposed to subbituminous coal-fired) flue gas, a larger scope than previous applications of the technology, and implementation in a colder climate that could affect process and equipment operability. Because MRY2 is located where stack icing in the winter could be problematic, a rime icing study was performed. Rime icing modeling indicated that, under both 100% and 50% operating loads, there is a potential for many icing events during any given part of the year in which below-freezing weather conditions exist. The models showed that a critical amount of rime ice could be formed at the stack top during two or more events per year. CO 2 capture plant stack height and location will need to be determined in order to minimize the formation of rime ice. It was found that the integration of the MHI CO 2 capture process into the normal operation of the MRY2 steam turbine is a viable alternative to a cogeneration facility to provide steam and power for the carbon capture facility. The research performed under this project showed that CO 2 capture at a lignite-fired power plant can successfully be performed. No known fatal flaws that would prevent the continued development of the MRY2 CO 2 capture facility were identified during the pre-FEED study. A TEA performed following DOE methodology shows that applying capture technology to MRY2 may not only meet but exceed the DOE-recognized state-of-the-art baseline.

20 FOSSIL-FUELED POWER PLANTS↗

Low-Cost Intermediate-Temperature Fuel-Flexible Protonic-Ceramic Fuel Cell and Stack

Large, centralized power plants are currently the most efficient way to convert fuels such as natural gas to electricity. Fuel cells, however, could become highly efficient generators across a range of sizes from tens of watts to megawatts. In particular, fuel cells with an electrical efficiency of 50% could displace small generators of 25 kilowatts (kW) or less in applications such as remote power, telecommunications, and residential cogeneration. Current 25 kW natural gas generators employing internal combustion engines are typically only 25-30% efficient and expensive to maintain. Furthermore, fuel cells could provide valuable services to the grid, such as the ability to ramp power up or down in response to load conditions. While there are different types of fuel cells, each with their strengths and weaknesses, fuel cells generally are very expensive. For example, lower temperature fuel cells can be started up quickly, but require highly pure hydrogen fuel and expensive catalysts. High-temperature fuel cells can operate on a range of fuels, but they have costly system components and can degrade rapidly.

30 DIRECT ENERGY CONVERSION↗

Cooperative Research and Development Agreement among National Energy Technology Laboratory, The Board of Regents of the University System of Georgia by and on behalf of Georgia Institute of Technology, and University of Texas at El Paso [Abstract]

Georgia Institute of Technology (GIT), University of Texas at El Paso (UTEP), and the National Energy Technology Laboratory (NETL) will collaborate and develop cyber-physical systems for advanced power systems. GIT will test virtual models on hybrid power system hardware and cyber physical components. UTEP will test novel actuators on hybrid power system hardware. NETL will access GIT’s expertise in the engineering and real time simulation of power system processes for cyber-physical systems and simulations to control hardware. NETL will establish a relationship to promote UTEP’s capabilities in additive manufacturing and high-temperature piezo-electric devices with the potential for controlling high-temperature flows with a light and inexpensive device at high response rates. This project is the result of an EERE Advanced Manufacturing Office open Multi-Topic awarded proposal led by GIT titled, “Robust Combined Heat and Hybrid Power (CHHP) for High Electrical Efficiency Cogeneration”.

42 ENGINEERING↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Co-production of Clean and Low Cost Hydrogen and Other Commodity Chemicals (CRADA Final Report)

We worked on the production of hydrogen and sulfuric acid electrochemically. We did this by building an electrolyzer and performing techno-economic analysis for which we published a paper (documented above). We also performed many leaching reactions with acid similar to the acid that we would have produced. We found that it was not commercially viable to cogenerate hydrogen and sulfuric acid because the technical problems would take too long to solve under the constraints of venture capital.

08 HYDROGEN↗

Irrigation Modernization Task 4: Accelerating Energy Solutions (FY2022 Final Report)

This report offers insights on energy solutions for irrigation modernization that serve the needs of farmers as well as residents and industry in the local community. Solutions are found in the irrigation districts where local generation from renewable energy sources – solar, hydro, and wind – can be combined with energy storage and customer loads. These combined resources configured in microgrids can lower costs during peak loads and provide resiliency by maintaining electricity supply during outages. The goal of this project, as stated in the FY2022 AOP, is to promote realization of energy solutions that are tailored to physical location, community, infrastructure, and energy value streams. Further, it is to develop examples of how to increase value of, and overcome barriers to, energy solutions in the context of irrigation modernization. In pursuit of that goal, the project looked at options for: 1) Reducing the cost of energy consumed in irrigation systems, 2) Increasing the revenue from surplus power generation, and 3) Deploying new power generation configured as part of a local microgrid. Potential solutions to reducing energy costs and increasing surplus power revenue revolve around addressing regulatory and legal constraints tied to how power is purchased by and sold to the irrigator or irrigation district. Some headway was made in identifying barriers and ways to push utilities to be more accommodating to distributed energy sources; however, for the most part, real progress hinges on changes at the regulatory and legislative level. Deployment of local, renewable generation systems can be implemented provided the economics of the project and the location are favorable. In concert with Famers Conservation Alliance and Energy Trust of Oregon, a number of approaches were studied in the past year, including off-grid solar powered pumps, grid-tied community solar projects, and in-conduit canal hydropower systems. Ultimately three viable projects were identified: 1) North Unit Irrigation District/City of Redmond, Oregon Critical Facility Microgrid – offers combined in-conduit hydro and solar power generation. 2) Wallowa County/Joseph, Oregon Irrigation System Upgrades – centered on upgrades to a non-powered dam that will add a turbine as well as in-conduit power in canal feeders downstream. 3) Medford, Oregon Wastewater Treatment Plant Biogas Cogeneration System – centered on building out biogas storage and grid upgrades to power the plant, sell excess power, and provide emergency backup power (supplanting a diesel generator). Each of these projects has characteristics that broaden the understanding of the value of microgrids employing renewable energy to achieve resiliency and net-zero carbon goals. The first two projects are centered on new hydropower systems. Although the Medford project is only tangentially tied to an irrigation district, it was selected for study analysis as it was the only one mature enough (with sufficient data) to complete an analysis within this project year. Thus, we chose to move forward developing a case study, in concert with the Community Water-Power Resilience project, to demonstrate a method for evaluating such projects. Essentially, this case study serves as a template for studies to be carried out next year that more directly involve irrigation system hydropower, e.g., the project at the Wallowa County/Joseph, Oregon Irrigation System. Lastly, it is recognized that the locations and case studies in this report are all located in Oregon. We recognize this as a limitation. While the intent is not to ignore other states or regions, this result is driven by the fact that we have cultivated a collaboration with non-profit entities in Oregon that focus on these topics – Farmers Conservation Alliance and Energy Trust of Oregon. These partners were central to identifying projects that may be good fits for this program. A goal in the coming year is to establish collaboration with entities in other states/regions that, similarly, can connect us to potential projects in their geographic area. The potential benefits from the WPTO’s support for demonstration projects as energy solutions in irrigation districts include: (1) Alternative power supplies for communities and farms using renewable, carbon-free energy resources, (2) Cost savings for electricity for communities and farms, (3) Resiliency of power supplies for critical loads when electricity from the grid is not available, (4) Resiliency of power supplies for critical infrastructure in the event of catastrophic events, and (5) Demonstration of irrigation modernization projects that provide resilience and a reduced carbon footprint to irrigation districts and nearby communities. These deployments can serve as vanguards/archetypes spurring similar projects in other districts and states.

13 HYDRO ENERGY↗

Creation of Multiple Effect Evaporator and Combined Cycle Modelica Modules, and Optimization of Potable Water Generation from Saltwater Sources (Final Technical Report)

Modelica models for a Heat Recovery Steam Generator (HRSG) and Multiple Effect Evaporator have been developed. These models have been validated against results from literature and from an actual cogeneration system on the campus of NC State University. The models are capable of connecting to other components to create multi-input, multi-output energy systems with storage, also known as integrated energy systems. An existing 35 MW gas turbine model is connected to the HRSG model created for this project to produce 9 bar steam. The high pressure steam feeds a backpressure steam turbine from the library to generate additional electric power. 2 bar steam leaves the turbine to supply an 8 effect MEE to generate water for a community. As part of the effort, three research papers were submitted (two published in ANS Proceedings and one submitted to Applied Energy).

20 FOSSIL-FUELED POWER PLANTS↗

Packaged Combined Heat and Power Technology Overview and Market Profile

Combined heat and power (CHP), sometimes referred to as cogeneration, is an efficient and clean approach to generating electric power and useful thermal energy onsite from a single fuel source, offering reliable and affordable energy services to businesses and institutions. Furthermore, CHP provides a cost effective opportunity to improve the environmental footprint and resilience of industrial and commercial facilities across the United States. CHP equipment can be custom-engineered or installed as a predesigned and assembled package. A packaged CHP system is a standardized, pre-engineered system that includes all equipment, piping, wiring, and ancillary components to deliver electricity and thermal energy to a host facility with minimal onsite engineering and design time. Packaged CHP systems can be shipped as single or multiple modules with standard interconnections (e.g., fuel; electrical; thermal—hot water, steam, and/or chilled water), which simplifies installation and reduces the costs associated with the project. Most containerized or single packaged CHP system offerings range from 10 kW to 3 MW in capacity. Packaged CHP systems are extending the operating, efficiency, and emissions benefits of CHP to nontraditional markets in commercial, institutional, multifamily, light manufacturing, government, and military applications. These markets tend to be served by smaller systems (less than 5 MW) that are conducive to pre-engineered packaging and/or modularization. Many of these sectors have limited CHP experience and technical resources to adequately evaluate, install, and maintain onsite CHP systems. The introduction of packaged CHP offerings from experienced CHP Packagers and Solution Providers has accelerated CHP adoption, lowered energy costs, reduced emissions, and strengthened energy resilience in these sectors. In 2019, the US Department of Energy (DOE) launched the Packaged CHP eCatalog to promote increased acceptance of efficient, cost-effective CHP in these applications. The Packaged CHP eCatalog is a web-based, searchable platform that hosts DOE-recognized packaged CHP systems with features designed to reduce economic and performance risks for designers, developers, owners, and facility operators interested in installing CHP. DOE established the Packaged CHP Accelerator at the same time to help launch and publicize the eCatalog, and to validate project performance, cost, and installation time of CHP packages across a variety of applications. Accelerator efforts documented installed cost reductions and installation time reductions of more than 20% for packaged CHP systems over 100 kW compared with custom-engineered systems. The Packaged CHP Accelerator and eCatalog established a peer-to-peer network connecting public and private sector partners including utilities, state energy offices, and energy efficiency program administrators interested in promoting cost-effective, efficient CHP systems, Packagers, and Solution Providers. Feedback from these partners, along with input from DOE’s CHP Technical Assistance Partnerships (CHP TAPs), was critical in understanding the current market for packaged CHP technologies, stimulating investment in these technologies, and guiding future directions for packaged CHP systems and their applications. This report provides background on packaged CHP systems, an overview of their benefits, a profile of current packaged CHP installations, and a summary of future market trends; this report is intended for facility owners, project developers, engineers, policymakers, and other stakeholders looking to increase the adoption of efficient, flexible, and resilient packaged CHP systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Water Recovery From Cooling Tower Plumes

According to studies by the UN and the US State Department, we are on the path to an extreme freshwater shortage by 2030. The US’s largest water withdrawal source is power plants, which account for 39% of total US freshwater withdrawals, mostly for cooling. Cooling towers are the most common cooling system. To solve these problems and enable efficient water- based cooling – Infinite Cooling’s novel technology uses electric fields to ionize the air, charge the escaping water leaving cooling towers and direct the water toward mesh collectors where it collects and gets recycled for use in the cooling system. This technology was developed at MIT and was reduced to practice on a lab-scale prototype, and a prototype at the MIT Cogeneration Power Plant. This DOE award funded taking this technology from a lab-scale prototype to TRL 5 on an operating cooling tower in the field at the MIT Nuclear Research Laboratory. The funding helped to design and optimize an electrostatic plume collection system and test it in high-fidelity lab setting and in actual field conditions on a cooling tower. Throughout the award, Infinite Cooling investigated the formation of plumes on cooling towers, used that information to optimize the design, material and electrical properties of the collection device and quantified the collection yield via flow rate and water quality.

20 FOSSIL-FUELED POWER PLANTS↗

High-Efficiency Modular SiC-based Power-Converter for Flexible-CHP Systems with Stability-Enhanced Grid-Support Functions

This project seeks to develop a modular, scalable MV power converter featuring stability-enhanced grid-support functions for future grid-interface applications in flexible combined heat and power (F-CHP) cogeneration plants, being fully compliant with the IEEE Standard 1547, category B—for operation in local areas with high aggregated distributed energy resource (DER) penetration, and also with the IEEE standard for the specification of microgrid controllers, namely IEEE Std 2030.7, with the goal to enable F-CHP systems for both microgrid and standalone applications. Further, the proposed converter will use a modular circuit topology, the MMC, which is scalable both in voltage and current by interconnecting power-cell building blocks, thus flexibly suiting the needs of F-CHP systems in the 1–20 MWe range. Furthermore, the use of 10 kV SiC MOSFET devices will minimize the number of power-cells needed to operate in 2–13.8 kV MV distribution systems, but more importantly, they will render feasible a power conversion efficiency > 98 %, and a power density > 10 kW/l. This is highly relevant given that these are two key performance metrics that will further increase the value of F-CHP systems by shortening the time required to recover their investment costs.

14 SOLAR ENERGY↗

Core Model Proposal #386: 2023 Hydrogen Update

This proposal includes several updates to the hydrogen system and transportation technologies that were performed between June 2022 and June 2023: hydrogen combustion turbines for backup electricity; updated medium and heavy-duty truck costs; charging infrastructure costs for BEV LDVs; nuclear-hydrogen production update; revision to industrial energy use's hydrogen cogeneration technology; hydrogen emissions and fugitive emissions. It is a follow-up to Core Model Proposal 359.

08 HYDROGEN↗

Economic Conversion in the Aviation Industry

The use of aviation gas-turbine engines in cogeneration plants is proposed. The application of aviation technology in the power industry may have considerable economic benefits.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Siting Analysis of a Solar-Nuclear-Desalination Integrated Energy System

Nuclear power is typically deployed as a baseload generator. Increased penetration of variable renewables motivates combining nuclear and renewable technologies into Integrated Energy Systems (IES) to improve dispatchability, component synergies and, through cogeneration, address multiple markets. However, combining multiple energy resources heavily depends on the proper selection of each system’s location and design limitations. In this paper, co-siting options for IES that couple nuclear and concentrating solar power (CSP) with thermal desalination are investigated. A comprehensive siting analysis is performed that utilizes global information survey data to determine possible co-siting options for nuclear and solar thermal generation in the United States. Viable co-siting options are distributed across the Southwestern U.S., with the greatest concentration of siting options in the southern Great Plains, although siting with higher solar direct normal irradiance is possible in other states such as Arizona and New Mexico. Brackish water desalination is also attractive across the southwest U.S. due to high water stress, but for brackish water desalination reverse osmosis (an electricity driven process) is most cost- and energy-efficient, which does not require co-siting with the thermal generator. The most attractive state for nuclear and thermal desalination (which is more attractive when using seawater) is Texas, although other areas may become attractive as water stress increases over the coming decades. Co-siting of all CSP and thermal desalination is challenging as attractive CSP sites are not coastal.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗