Search NASASearch

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Macro-micro multiscale modeling to assist the design of HPDC Al castings microstructure and alloys for EV super-large body structures (Phase 1)

Implementation of High Pressure Die Casting (HPDC) Aluminum (Al) body structures for high volume electrified vehicles (EV) to improve electric efficiency remains a key strategy within many original equipment manufacturer (OEM)s. In addition to high strength for safety requirements, superior Self-Piercing Riveting (SPR) performance is demanded for HPDC Al alloys to be compatible with high volume SPR joining. In this work, it is proposed to extend and validate an existing Contractor finite element multiscale macro-micro modeling approach to quantify the influence of the microstructure of HPDC alloys on the fracture strain/displacement under 3-point bend and clinch testing. The success of this work will allow to replace solution treatment stage with low energy consumption heat treatment (HT) processes, or to design new non heat treatable (NHT) HPDC Al alloys to eliminate HT requirements. Ultimately, this project will facilitate the application of HPDC Al alloys for super-large vehicle structures to significantly reduce vehicle weight, and thus improving energy efficiency. The purpose of this project is to extend and validate an existing finite element code, which is based on the Contractor developed macro-micro multi-scale modeling approach, to numerically simulate the three-point bending and clinch test and study the influences of material microstructural characteristics and phase properties on the rivetability. The macro-micro modeling approach begins with a sample scale model and identify the location, which is mostly prone to failure, the deformation history of the boundaries of that location calculated will be used to drive a microstructure-based sub-models where the material microstructure and microscale properties are considered. Using this approach, the wrap-bending failure for two Al alloys are correctly predicted for the first time. This will start with phase I effort of building a framework of macro-micro three point bending test and clinch test of Al10SiMgMn HPDC alloy in the as-cast and T7 heat treated conditions. Those results will then be validated with experimental test results. The phase II effort will involve the utilization of the knowledge learned in phase I to establish the quantitative correlation between the microstructure characteristics and the riveting performance, which will be further used to guide the optimization of HPDC Al alloy microstructure using heat treatment process to achieve sufficient rivetability to join large thin-wall HPDC alloys.

36 MATERIALS SCIENCE

Automated segmentation and analysis of point clouds of pier foundations using Pier Inspection and Evaluation Report (PIER)

Pier foundations are commonly used in locations with unstable soil or where other types of foundations are unsuitable or cost prohibitive. A pier foundation consists of vertical columns to support the structure and elevate it above the ground. Common materials for pier foundations include masonry, concrete, timber, and steel. The methods for accurate placement of pier foundations have remained relatively unchanged for decades. For simple installations, construction chalk lines are used to layout the locations of piers to ensure accurate placement and elevation. For more complex installations, surveying instruments operated by trained professionals are employed to accurately locate piers and assess correct elevation before construction. After installation, another survey may need to be performed to assess the quality of the as-built foundation. However, with the advent of terrestrial laser scanners (TLS), the means now exist for contractors to conduct their own assessments of as-built foundations. The major barrier preventing contractors from performing their own assessments of as-built foundation quality is the segmentation and analysis of point cloud data, a skill that often requires a trained user. The objective of this research is to develop a software tool (PIER: Pier Inspection and Evaluation Report) to enable automated segmentation and analysis of point clouds of pier foundations. In this paper, the automated segmentation and analysis algorithms are detailed. A mockup lay out of pier foundations was built using concrete masonry units, and the algorithms were tested to evaluate performance. Limitations of the current algorithms and future research direction are discussed.

Turki, Amine [ORNL]

Next Generation Multi-Use Heavy-Duty High-Flow Direct-Fill Hydrogen Refueling Station with Standardized Design (CRADA Final Report)

The Contractor will build a liquid hydrogen (LH2) fueling station model that is capable of simulating the amount of hydrogen transferred from the liquid storage tank to the vehicle, depending on the station’s design and control scheme. This modeling work will allow the Parties to seek the design and control scheme of an LH2 station that can fill a targeted number of vehicles while meeting a time-average flow rate of 10 kg/min for each fill. While evaluating a high dispensing performance station design and control scheme, the Contractor will analyze the design and control scheme are economically viable.

08 HYDROGEN

Proceedings of the Nimbus Program Review

The Nimbus program review was conducted at the George Washington Motor Lodge and at General Electric Missiles and Space Division, Valley Forge, Pennsylvania, on November 14, 15, and 16, 1962. The purpose of the review was twofold: first, to present to top management of the Goddard Space Flight Center (GSFC), National Aeronautics and Space Administration (NASA) Headquarters, other NASA elements, Joint Meteorological Satellite Advisory Committee (_MSAC), Weather Bureau, subsystem contractors, and others, a clear picture of the Nimbus program, its organization, its past accomplishments, current status, and remaining work, emphasizing the continuing need and opportunity for major contributions by the industrial community; second, to bring together project and contractor technical personnel responsible for the planning, execution, and support of the integration and test of the spacecraft to be initiated at General Electric shortly. This book is a compilation of the papers presented during the review and also contains a list of those attending.

SYSTEMS ANALYSIS

Report from Mars - Mariner IV, 1964-1965

The successful mission of Mariner IV is a most gratifying conclusion to the first generation of lunar and planetary exploration, which has been based on lightweight automatic unmanned spacecraft in constant communication with Earth, designed for lunar impact or planetary encounter. The flight of this first Mars probe is noteworthy not only for the outstanding quantity and quality of scientific data but also as the verification of large and useful advances in a number of technological areas. The Mariner Mars Project of 1964-1965 was conducted for the National Aeronautics and Space Administration by the Jet Propulsion Laboratory; it was made possible by the valued assistance and support of many government agencies, scientific institutions, and industrial concerns. Among these are NASA's Lewis Research Center (Launch Vehicle Systems Manager) and their prime contractors, Lockheed Missiles and Space Corporation and General Dynamics/Convair; Goddard Space Flight Center (Launch Operations) and other agencies at Cape Kennedy; the agencies of the Australian, South African, and Spanish governments which operate overseas tracking stations; many hundreds of American industrial contractors and vendors; and a number of scientists in various fields of endeavor. The Project was established in late 1962 with the objective of conducting scientific observations near the planet Mars and returning the data to Earth for study and analysis; secondary objectives were to develop and study the equipment and techniques involved and to make certain scientific measurements of the interplanetary environment on the way to Mars. Successful accomplishment of these objectives under the severe constraints which were a part of the mission is a tribute to every single individual who shared in the preparation and execution of the Mariner Mars Project.

MARINER IV SPACE PROBE

Apollo Program Management, Kennedy Space Center, Florida

The evolution of the Kennedy Space Center as the launch organization for Apollo/ Saturn V involved the concurrent solution of numerous complex problems. A significant increase in manpower was involved. Large and complex checkout and launch facilities were to be designed and constructed. Expansion of operational capabilities required the establishment and integration of a Government-Contractor operational team. From an initial cadre of approximately 200 civil service personnel of the Army Ballistic Missile Agency, transferred to NASA in 1960 following its establishment, expansion to the present civil service level of 2,900 occurred in the last seven years. Established within NASA as a directorate of the Marshall Space Flight Center, KSC achieved center status in 1962. With its designation as a Center, KSC accomplished the development and staffing of an organization that could perform procurement, resources, financial, and other management requirements formerly provided by the parent organization. In addition to continuing launch operations for established programs, KSC undertook the design and construction of large, new, and unique launch facilities for Apollo/Saturn V. With the expansion of the civil service work force, KSC integrated contractor organizations employing 23,000 personnel at the Center to perform specific operational and support missions under the technical supervision and observation of the Government team. The management techniques, organizational concepts, and continuing efforts utilized to meet the Apollo goals and challenges are discussed in this document.

Source record

Proposed preliminary criteria for space shuttle access equipment at the operational site

A comparison was made between the methods of access utilized, or proposed, by the military, commercial airlines, and the space shuttle Phase B contractors. The methodology was subjected to consideration for space shuttle use and similarity to current space shuttle access concepts. The Phase B contractor concepts were in turn examined for degree of use of the state-of-the-art and progressive extension of new cost-effective ideas. This comparison disclosed a need for better definition of the criteria/requirements for space shuttle access equipment. Preliminary criteria, needed prior to initiation of the detail design (Phase C/D effort) of ground hardware for the operational site, are presented.

Beck, P. E.

Fuel cell technology program contract summary report

A fuel cell technology program which was established to advance the state-of-the-art of hydrogen-oxygen fuel cells using the P and WA PC8B technology as the base is reported. The major tasks of this program consisted of (1) fuel cell system studies of a space shuttle powerplant conceptual design (designated engineering model -1, EM-1) supported by liaison with the space shuttle prime contractors; (2) component and subsystem technology advancement and; (3) a demonstrator powerplant test. Fuel cell system studies, with the EM-1 as the focal point of design activities, included determination of voltage regulation, specific reactant consumption, weight, voltage level and performance characteristics. These studies provided the basis for coordination activities with the space shuttle vehicle prime contractor. Interface information, on-board checkout and in-flight monitoring requirements, and development cost data were also provided as part of this activity. Even though the two vehicles primes had different voltage requirements (115 volts in one case and 28 volts in the other), it was concluded that either option could be provided in the fuel cell power system by the electrical hook-up of the cells in the stack.

Source record

NASA's management concept for the Space Shuttle Program.

An overview of the Shuttle Program organization and management concepts suggests the necessity of careful measurements of contractor schedules, cost and technical performance, and program modification control to keep both the development and operating cost of the Program at the lowest possible level. Maximum use of the contractors' own management systems and the utilization of new technologies, procedures and materials during space operations are also envisaged as contributors to the reduction of costs per flight to acceptable limits.

Myers, D. D.

Solid rocket motor cost model

A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.

Harney, A. G.

Government-Industry Data Exchange Program (GIDEP)

The Government-Industry Data Exchange Program (GIDEP) was originated in 1959 by the Army, Navy, and Air Force Ballistic Missile Agencies. Known at that time as IDEP--Interservice Data Exchange Program--its intent was to eliminate duplicate testing of parts and components by disseminating pertinent test data among Department of Defense contractors and various government agencies. In 1966 both the National Aeronautics and Space Administration and the Canadian Military Electronics Standards Agency (CAMESA) recognized the value of the data provided by the program and became participants. Today, GIDEP provides the interchange of specialized technical data to all the military services, participating government contractors and numerous government agencies such as the Atomic Energy Commission, Federal Aviation Administration, Defense Supply Agency, and the Small Business Administration.

Richards, E. T.

Earth Observatory Satellite system definition study. Report 2: Instrument constraints and interfaces

The instrument constraints and interface specifications for the Earth Observatory Satellite (EOS) are discussed. The Land Use Classification Mission using a 7 band Thematic Mapper and a 4 band High Resolution Pointable Imager is stressed. The mission and performance of the instruments were reviewed and expanded to reflect the instrument as a part of the total remote sensing system. A preliminary EOS interface handbook is provided to describe the mission and system, to specify the spacecraft interfaces to potential instrument contractors, and to describe the instrument interface data required by the system integration contractor.

Source record

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record

Ames Research Center Publications, July 1971 through December 1973

A bibliography of the publications of Ames Research Center authors and contractors which appeared as formal NASA publications, journal articles, books, chapters of books, patents, and contractor reports is presented. Years covered are July 1971 through December 1973.

Source record

Ames Research Center publications, 1974

A bibliography is presented of the publications of Ames Research Center authors and contractors which appeared in formal NASA publications, journal articles, books, chapters of books, patents, and contractor reports.

Source record

Ames research center publications, 1975

This bibliography cites 851 documents by Ames Research Center personnel and contractors which appeared in formal NASA publications, journals, books, patents, and contractor reports in 1975, or not included in previous annual bibliographies. An author index is provided.

Sherwood, B. R.

Bibliography of Lewis Research Center technical contributions announced in 1976

Abstracts of Lewis authored publications and publications resulting from Lewis managed contracts which were announced in the 1976 issues of STAR (Scientific and Technical Aerospace Reports) and IAA (International Aerospace Abstracts) are presented. Research reports, journal articles, conference presentations, patents and patent applications, and these are included. The arrangement is by NASA subject category. Citations indicate report literature (identified by their N-numbers) and the journal and conference presentations (identified by their A-numbers). A grouping of indexes helps locate specific publications by author (including contractor authors), contractor organization, contract number, and report number.

Source record

Institutional environmental impact statement, Michoud Assembly Facility, New Orleans, Louisiana

A description and analysis of Michoud Assembly Facility as an operational base for both NASA and NASA-related programs and various government tenant-agencies and their contractors is given. Tenant-agencies are governmental agencies or governmental agency contractors which are not involved in a NASA program, but utilize office or manufacturing space at the Michoud Assembly Facility. The statements represent the full description of the likely environmental effects of the facility and are used in the process of making program and project decisions.

Source record