Search NASA⌕ Search

SEARCH · Search NASA

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Zero Emission Cargo Transport (ZECT) II Demonstration: South Coast Air Quality Management District (Final Report)

The South Coast Air Quality Management District (South Coast AQMD), California Air Resources Board (CARB) and Southern California Association of Governments (SCAG) — the agencies responsible for preparing the State Implementation Plan required under the federal Clean Air Act — have agreed that attainment of federal air quality standards for the region will require a transition to the broad use of zero and near-zero emission energy sources in cars, trucks and other equipment. Accordingly, the 2012 South Coast AQMD Air Quality Management Plan, the SCAG 2012 Regional Transportation Plan, and the “Vision for Clean Air: A Framework for Air Quality and Climate Control Planning” all identify the need to immediately enact a phasing in of zero and near-zero emission technologies to meet air quality goals. In 2014, South Coast AQMD was awarded grant funding under the US Department of Energy Zero Emission Cargo Transport (ZECT) II Demonstration program to develop and demonstrate zero-emission drayage trucks for goods movement operations between the Port of Los Angeles (POLA) and Port of Long Beach (POLB) near dock rail yards and warehouses: 1) development and demonstration of zero-emission fuel cell range extended electric drayage trucks and 2) development and demonstration of hybrid electric drayage trucks. The purpose of this project was to accelerate deployment of zero emission cargo transport technologies to reduce harmful diesel emissions, petroleum consumption and greenhouse gases in the surrounding communities along the goods movement corridors that are impacted by heavy diesel traffic and the associated air pollution. Between 2014 – 2024, six ZECT II zero-emission fuel cell drayage truck platforms, including fuel cell range extended and CNG hybrid trucks, were successfully designed, developed, integrated, built, tested, and demonstrated with drayage fleet operators in transportation corridors within areas of the South Coast AQMD jurisdiction in Southern California such as in and around POLA and POLB. Portable hydrogen refueling was deployed to support the fuel cell vehicles. The project had real-time improvement with on-going debugging and optimizations while the vehicles were under demonstration. All platforms demonstrated sufficient or excess power, torque, and energy to support 82,000lbs Gross Vehicle Weight Rating and gradeability to perform their daily duty cycles. Collectively, the trucks drove over 23,000 miles during their respective demonstration phases. The ZECT II project was the first of its kind to demonstrate the commercial viability that supported the additional technology breakthroughs for Class 8 zero emission trucks and validations as well as the regulatory basis for all the zero-emission regulation that we know today, such as the Innovative Clean Transit regulation, Advanced Clean Trucks and Clean Fleet regulations.

08 HYDROGEN↗

MeVPrtl: An Event Generator for Dark Sector Particles in the Short-Baseline Neutrino Program

MeVPrtl is a modular event generator of beyond the Standard Model (BSM) physics particles developed for use in the Short-Baseline Neutrino (SBN) Program. A large class of BSM physics models predict that new particles could be produced in the intense Booster Neutrino Beam (BNB) and Neutrinos at the Main Injector (NuMI) beams at Fermilab, travel to the SBN Program detectors, and decay into Standard Model (SM) particles. These new physics models are motivated by dark matter, the neutrino mass scale, and a solution to the strong CP problem. MeVPrtl provides an interface to implement the overlapping phenomenology of these models, and to connect them with meson flux inputs and object outputs used by the SBN Program's LArSoft-based detector simulation. Implementations for the Higgs portal, heavy neutral lepton, and heavy QCD axion models exist within MeVPrtl. In this paper these implementations and their validation, as well as details of the MeVPrtl interface, are specified.

Abratenko Ao, P.↗

Storage Field Development Plan: One Earth Energy

This Storage Field Development plan presents the Storage Complex characterization results, construction, monitoring, and operational plans, and costs associated with the proposed One Earth Sequestration Carbon Capture and Storage (OES-CCS) site in McLean County, Illinois, near Gibson City. The proposed storage complex, known as the Mt. Simon Storage Complex, comprises the Cambrian Mt. Simon Sandstone reservoir and the primary seal, the Cambrian Eau Claire Formation. The lowermost Underground Source of Drinking Water (USDW) identified for the site is the Ordovician St. Peter Sandstone. Geologic characterization of the Mt. Simon Storage Complex at the OES-CCS site was performed by the Illinois Storage Corridor CarbonSAFE Phase III project, which also prepared and submitted three UIC Class VI applications to construct three injection wells; the permit applications were submitted and are in the federal EPA review process. A characterization well, OEE #1, was drilled to collect site-specific data. These data were analyzed and used to develop the UIC Class VI applications. The OEE #1 well will be converted to an in-zone monitoring (IZM) well for the injection phase. The proposed buildout for the OES-CCS site includes (1) three injection wells (OES #1, OES #2, and OES #3), (2) two IZM wells, (3) two above confining zone (ACZ) monitoring wells, one of which will be used to monitor the lowermost USDW, (4) capture and compression facilities, and (5) transportation facilities, i.e., pipelines. A pre-operational testing program was proposed in the Class VI permit application and will be employed at the site pending approval. Additional pre-injection (baseline), syn-injection, and post-injection monitoring and site care procedures will be followed by OES to ensure that injection activities are protective of human health and the environment. Injection is scheduled to begin in 2025, distributed across the three injection wells in accordance with the permit operating conditions. One Earth Sequestration intends to inject up to 90 million tonnes of CO 2 over a period of approximately 20 years. Injection will begin at approximately 0.5 million tonnes of CO 2 annually and ramp up to a maximum of 4.5 million tonnes annually. Daily injection rates are expected to range from 1,400 to 1,500 tonnes per day initially and reach a maximum of approximately 4,225 tonnes per day, depending on site geology and injectivity at each injection well location, and CO 2 availability. The costs associated with the OES-CCS project include pre-operational costs (e. g. additional seismic data acquisition and well drilling), capture and transportation facility and equipment costs, predicted field operating expenditures (OpEx), and decommissioning and post-injection site care (PISC) costs. The risks associated with project activities, such as site construction, injection operations, and verification of secure storage were evaluated, and mitigation strategies proposed to alleviate those risks.

09 BIOMASS FUELS↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

Inaugural Symposium of the Institute for Sustainable Energy and Environment, Virginia Commonwealth University

The Inaugural Symposium of the Institute for Sustainable Energy and Environment (ISEE) was held in Virginia Commonwealth University, Richmond, Virginia during April 26 – 28, 2023. The symposium addressed issues and challenges in energy and environment and highlighted the use of clean renewable energy to mitigate the adverse effects of fossil fuels and the greenhouse gases it produces. These issues are complex as the involve educating the public that the climate change is real, it is caused by the use of fossil fuels, it requires scientists and engineers to understand the fundamental science in the production and storage of renewable energy, it requires industries to manufacture and distribute the equipment necessary for commercial application of these technologies, it requires policy makers to put together policies and guidelines to make the transition from fossil fuels to renewable energies efficient, and it requires social scientists and educators to address environmental justice issues and create a workforce to sustain the transition. The symposium considered all the above issues with a diverse list of speakers from the federal and state government, industrial partners, and experts from science and technology to social sciences and public policy. Speakers from the White House Office of Science and Technology Policy, Department of Energy, universities, and non-governmental agencies discussed the challenges and solutions in Plenary as well as Panel sessions. The talks were recorded with permission from the speakers and the panelists and were put in the ISEE website. The participants included students, postdoctoral fellows, and professors from Virginia Commonwealth University and local area Historically Black College and Universities (HBCU) such as Virginia State University and Norfolk State University. The $5000 fund awarded by the Department of Energy were used to support the participation of students, postdoctoral fellows, and faculty from the HBCU institutions. The technical program the list of participants is provided later in the document.

08 HYDROGEN↗

2023 Peer Review Final Report

The U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy requires each of its programs to conduct periodic peer reviews to enhance EERE program planning. May 16–18, 2023, the Advanced Materials and Manufacturing Technologies Office (AMMTO) held an in-person peer review of its program activities in which an independent panel of experts provided AMMTO with feedback on how well the new office’s programs align with its overarching goals and mission statement, identified possible course correction, and shared information. This review marks AMMTO’s first in-person peer review since the Advanced Manufacturing Office evolved into AMMTO and the Industrial Decarbonization and Efficiency Office. A detailed summary of observations, findings, impact, and recommendations is contained in the following report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

University Data Management Pilot Utilizing the Nuclear Research Data System

Background In 2022, the Office of Science and Technology Policy (OSTP) issued a memo that significantly reshaped the landscape of access to federally funded research. The memo mandated that all taxpayer-funded research be made available to the public without delay upon publication, without an embargo period, superseding the 2013 OSTP public access policy. This public access policy promotes transparency and the democratization of knowledge, ensuring that the fruits of scientific endeavors funded by federal agencies could be immediately accessed and built upon by scientists, educators, students, and the public at large. To implement the requirements of the OSTP guidance and DOE Public Access Plan, the Office of Nuclear Energy (NE) has implemented public access plan guidance and has identified several areas where better data management practices would further expand public access to important nuclear energy related scientific data, reports, and other technical products. Significant NE supported efforts are already underway for data management and public access to important nuclear energy related data.1 2 To address gaps in data management practices, and improve retention and accessibility of data, NE is actively exploring enhanced data management options utilizing its high-performance computing resources administered by its Nuclear Scientific User Facility Program. A newly piloted system, the Nuclear Research Data System (NRDS) acts as a portal for data collection and dissemination. Nuclear Energy University Program Research and Development Portfolio According to Web of Science, NEUP has produced 2,345 journal publication that have been cited more than 61,000 times3 and countless conference proceedings. These publications are publicly available through OSTI.gov and in the open literature. Additional scientific and technical products including project milestones that are not publications and NEUP project final reports are vetted through OSTI.gov and released once reviewed and approved by DOE. Since 2009, NEUP has awarded close to 1,000 different R&D projects in technical areas across the NE research programs. As of June 2023, 512 NEUP reports are publicly available on OSTI. The underlying data for projects is still held at universities, and data transfer, co-location, and dissemination has not occurred in a systematic way. NEUP data is currently accessible through myriad university-based data repositories, or through direct requests to PIs. The program identified this patchwork of repositories, or often lack of publicly available data, as a significant barrier to an organized, accessible, and comprehensive solution to sharing data with the larger nuclear energy community. Approach The goal of this pilot project is to establish a pathway to a consolidated long-term repository for NEUP project data. To accomplish this goal, the pilot strives to accomplish the following objectives: Establish data collection standards, including a standard set of required supplementary information to contextualize and support raw data files. Work with the HPC group collect and upload information and to modify the NRDS system, as needed, to support a standardized approach. Resolve potential barriers to successful roll out of an expanded data collection strategy, including modifying data management plan guidelines and establishing a document and data release process that accounts for potential intellectual property and/or export control concerns. Results Overall, the pilot was successful in collecting 8,982 raw and processes data files, 220 reports, 56 calibration files, and 5,931 other supplementary documents. Supplementary documents included experimental plans, methods, journal publications and conference proceedings, milestone reports, and final reports. Figure 2 shows the number of data sets and supplementary project information provided by each project. Projects has significantly different input, depending on experimental data produced and completeness of the datasets provided.

Data collection↗

Countering Weapons of Mass Destruction (CWMD) Device Cybersecurity Characterization Process and Profile

Countering Weapons of Mass Destruction (CWMD) recognizes that threats in the cyberspace domain continue to grow, which requires CWMD devices and supporting systems to be both cybersecure (ability to protect or defend from cyber-attacks) and resilient (ability to maintain required capability in the face of adversity) to cyber threats. The CWMD cybersecurity characterization approach in this document supports existing cyber resilience activities within the Acquisition Lifecycle Framework. Similarly, this process supports existing Department of Homeland Security Cyber Resilience Test and Evaluation activities, which consist of iterative processes, starting at the initiation of system acquisition and continuing throughout the entire device and system life cycle. Cyber resilience is the ability of an information system to continue to operate while under attack, even if in a degraded or debilitated state,1 and to rapidly recover operational capabilities for essential functions after a successful attack.2 The goal of the security characterization task for CWMD is to support the development of a CBRN device-dependent profile that aligns with device network capabilities and maps to recommended security controls to create a characterization security profile impact levels. The impact levels for CWMD devices should be characterized as Low (L), Moderate (M), High (H) to align with the low, moderate, high control baselines. To estimate the impact levels, the device’s security-related attributes are translated into the security objectives: Confidentiality (C), Integrity (I), and Availability (A), known as the CIA triad. The potential impact for each device can be L, M, H, for devices that connect and transmit different types of data and may have different impact levels. National Institute of Standards and Technology Federal Information Processing Standards Publication 199 states, “the potential impact values assigned to the respective security objectives shall be the highest value from among those security categories that have been determined for each type of information resident on the information system.”3 As CWMD is determining the cybersecurity impact levels of CBRN devices based on network connections and data transfers, the impact levels are aligned with the associated attributes of network connections and communications. For example, if the device system is connected to a wireless network and transmits different data types based on the confidentiality of the data, the highest impact value for each security objective should represent the device’s CIA impact level. This document is intended to be used by test managers, test team, and program managers.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Open Energy Data Initiative (OEDI) FY22-24 (Final Technical Report)

Final technical report for the Open Energy Data Initiative (OEDI) project covering fiscal years FY22 through FY24. The DOE Open Energy Data Initiative (OEDI) is a partnership between the National Renewable Energy Laboratory (NREL), the U.S. Department of Energy (DOE), and major cloud providers including Amazon, Microsoft, and Google to provide universal access to big data in the cloud. At the heart of OEDI is a centralized repository of high-value energy research datasets aggregated from the U.S. Department of Energy's Program Offices, National Laboratories and other collaborators. It aggregates smaller, domain-specific repositories, allows direct data submissions, and includes support for big data through its energy data lakes. OEDI's data lakes make high-value data universally accessible and help researchers, collaborators and the general public overcome many of the obstacles to accessing and using big data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Findings on subtask 3.3 – applicability of automated brine chemistry determinations for treatment and recovery processes through facility automation/modularization: engineering design study

Under the Energy & Environmental Research Center’s (EERC’s) ~$\$$22 million Phase II Brine Extraction and Storage Test (BEST) Program, a multimillion-dollar brine treatment technology test bed facility was established in western North Dakota to provide a platform for evaluating developing technologies and approaches for brine treatment and volume reduction. The initial facility, and associated research effort, was funded by the U.S. Department of Energy (DOE), with in-kind contributions provided by several industry participants and the state of North Dakota. Since its opening, the Brine Technology Test Facility (BTTF) has supported performance evaluations of desalination technologies capable of treating high-salinity produced water (PW) and enabled data collection for multiple approaches of PW management and critical material recovery. As part of the decommissioning process for the original project, facility ownership and liability were transferred to Select Water, which is providing the EERC with a continuing site access option for state or federal research and/or commercial technology development. This report documents the findings from a design study conducted by the EERC and the engineering firm that was originally contracted to design and construct the facility (Advanced Engineering and Environmental Services, LLC [AE2S]) that evaluated the current status of BTTF and its systems and developed a retrofit design to increase the facility’s capabilities through automation and modularization of its PW treatment infrastructure. The proposed retrofit will provide DOE and industry with an expanded range of conditioned PW that can be produced at the facility for evaluating fit-for-purpose water treatment technologies, online instrumentation for brine chemistry determination, and systems that recover critical materials like lithium and magnesium. The current facility consists of an 9600-square-foot facility that includes a 40-foot by 65-foot Class 1, Division 2-rated demonstration area and associated control rooms and lab-ready space capable of sourcing oil and gas PW and wastewater from industrial sources or tailoring brine compositions up to 300,000 mg/L total dissolved solids (TDS) and supplying them at rates up to 25 gpm for extended-duration technology demonstrations. The colocation of the facility with Select Water’s water management facilities allows for access and unloading of more than 10,000 bbl/day of trucked water delivered to site and associated access to on-site Class I and Class II brine disposal wells and nearby hazardous waste landfills operated and/or contracted by Select Water to dispose of concentrate and/or effluents associated with the testing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Congestion Management Solutions for Enhanced Distribution System Operations with Aggregated Distribution Grid Resources Providing Grid Services and Market Participation

Microgrids and other aggregations of distribution grid resources (DGRs) are poised to actively participate in electricity markets and provide essential grid services in the coming years. In fact, DGRs already play such a role through behind-the-meter (BTM) demand response programs and small-scale BTM dispatchable generation initiatives. At the same time, the rapid growth of artificial intelligence (AI) and cryptocurrency datacenters imposes significant, often unpredictable, demands on the power distribution system. Aggregated DGRs can serve as flexible resources that help mitigate these pressures by using available transmission and distribution capacity more efficiently, supporting resource adequacy and other reliability services, and providing bridge strategies while long-term transmission infrastructure is being developed. The impacts this activity will have on distribution networks are not fully understood and could present significant challenges for distribution utilities due to capacity constraints and the need for congestion management. Technical issues include reverse power flow, variability and possible degradation of equipment integrity, voltage violations, and customer power quality concerns. These issues will likely intensify as electricity market operators across the United States implement Federal Energy Regulatory Commission Order 2222 over the next few years.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Measurement of exclusive 𝜋 + -argon interactions using ProtoDUNE-SP

We present the measurement of 𝜋 + -argon inelastic cross sections using the ProtoDUNE single-phase liquid argon time projection chamber in the incident 𝜋 + kinetic energy range of 500–800 MeV in multiple exclusive channels (absorption, charge exchange, and the remaining inelastic interactions). The results of this analysis are important inputs to simulations of liquid argon neutrino experiments such as the Deep Underground Neutrino Experiment and the Short Baseline Neutrino program at Fermi National Accelerator Laboratory. They will be employed to improve the modeling of final state interactions within neutrino event generators used by these experiments, as well as the modeling of 𝜋 + -argon secondary interactions within the liquid argon. This is the first measurement of 𝜋 + -argon absorption at this kinetic energy range as well as the first ever measurement of 𝜋 + -argon charge exchange.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

A Look Towards the Execution of the Low-Temperature TEX Experimental Campaign

To address the mounting need for below roomtemperature nuclear data validation, the Low-Temperature Thermal Epithermal eXperiments (LT-TEX) have been designed. Validation of low-temperature neutron cross sections is necessary to verify any operation at temperatures below room temperature which is typically observed in environments far from the equator. For example, a fissile material transportation truck may routinely observe ambient temperatures down to -40°C, which is the lower temperature bound of the normal conditions of transportation defined in the United States Title 10 Code of Federal Regulations §71.71c2. Additionally, sub-room temperature benchmarks can validate newly produced cross sections, that include novel thermal scattering laws, from North Carolina State University.

LT-TEX↗

OptiMX

OptiMX is a GUI-oriented program with principal aim to be an easy to use, yet comprehensive, interactive accelerator optics design and analysis tool. It was originally developed starting in the 1990s as an MS Windows centric application using the commercial Borland OWL framework. In the spring of 2014, a decision was made to port OptiM to Qt, a modern, portable and open framework. As much as possible, the original interface was preserved.While a significant amount of refactoring was required, the underlying physics has been for the most, left unchanged. The custom plots of the original application have been replaced with functional equivalents based on a stable and well-established library (qwt). With very few minor exceptions the new refactored OptiMX should be a drop-in replacement for the original OWL version.

Lebedev, ValeriA. [Joint Inst. for Nuclear Researc↗

The Iowa Tribe of Kansas and Nebraska: Advancing Clean, Resilient, and Sovereign Energy (Summary Report of Communities LEAP Activities)

The Iowa Tribe of Kansas and Nebraska (ITKN) is a federally recognized Native American Tribe located along the Missouri River on the border of northeast Kansas and southeastern Nebraska. There are over 800 residents (Tribal citizens and non-Tribal) who live on the reservation, as well as more than 500 people who visit or work on the reservation on a daily basis. The ITKN faces many energy challenges, including rising service costs and dozens of power outages annually that impact resident well-being and business activities on Tribal lands. Power service issues are made more challenging by the remoteness of the reservation, which is 20 miles from the nearest town. Despite this, the ITKN has a long history of cultural and economic resilience: Local self-reliance, environmental stewardship, respecting the carrying capacity of the land, and strengthening the community are Tribal communities' traditional strengths. Long-term energy goals for the ITKN are centered around achieving energy sovereignty. Priority actions include: (1) Establishing a Tribal Utility Authority (TUA) to promote social welfare and community development.; (2) Deploying renewable community microgrids with ground-mount solar arrays and sustainable energy storage systems to advance energy sovereignty, resilience, and reliability. To advance these goals, the ITKN partnered with the U.S. Department of Energy's (DOE's) Communities LEAP (Local Energy Action Program) pilot. From August 2022 to March 2024, the ITKN community coalition collaborated with technical assistance providers at DOE's National Renewable Energy Laboratory (NREL) and Sandia National Laboratories to evaluate TUA planning needs and microgrid deployment scenarios. This final report details the Communities LEAP technical assistance process, models and analysis performed, and results.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Iowa Tribe of Kansas and Nebraska: Advancing Clean, Resilient, and Sovereign Energy

The Iowa Tribe of Kansas and Nebraska (ITKN) is a federally recognized Native American Tribe located along the Missouri River on the border of northeast Kansas and southeastern Nebraska. There are over 800 residents (Tribal citizens and non-Tribal) who live on the reservation, as well as more than 500 people who visit or work on the reservation on a daily basis. The ITKN faces many energy challenges, including rising service costs and dozens of power outages annually that impact resident well-being and business activities on Tribal lands. Power service issues are made more challenging by the remoteness of the reservation, which is 20 miles from the nearest town. Despite this, the ITKN has a long history of cultural and economic resilience: Local self-reliance, environmental stewardship, respecting the carrying capacity of the land, and strengthening the community are Tribal communities' traditional strengths. Long-term energy goals for the ITKN are centered around achieving energy sovereignty. Priority actions include: (1) Establishing a Tribal Utility Authority (TUA) to promote social welfare and community development.; (2) Deploying renewable community microgrids with ground-mount solar arrays and sustainable energy storage systems to advance energy sovereignty, resilience, and reliability. To advance these goals, the ITKN partnered with the U.S. Department of Energy's (DOE's) Communities LEAP (Local Energy Action Program) pilot. From August 2022 to March 2024, the ITKN community coalition collaborated with technical assistance providers at DOE's National Renewable Energy Laboratory (NREL) and Sandia National Laboratories to evaluate TUA planning needs and microgrid deployment scenarios. This fact sheet provides an overview of the results and outcomes from the Communities LEAP technical assistance process.

Communities Leap↗