Search NASA⌕ Search

SEARCH · Search NASA

Results for “Job scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

A study of the impact of scheduling parameters in heterogeneous computing environments

This paper describes a tool for exploring system scheduler parameter settings in a heterogeneous computing environment. Through the coupling of simulation and optimization techniques, this work investigates optimal scheduling intervals, the impact of job arrival prediction on scheduling, as well as how to best apply fair use policies. The developed simulation framework is quick and modular, enabling decision makers to further explore decisions in real-time regarding scheduling policies or parameter changes.

Powers, Sarah↗

A study of the impact of scheduling parameters in heterogeneous computing environments

This paper describes a tool for exploring system scheduler parameter settings in a heterogeneous computing environment. Through the coupling of simulation and optimization techniques, this work investigates optimal scheduling intervals, the impact of job arrival prediction on scheduling, as well as how to best apply fair use policies. The developed simulation framework is quick and modular, enabling decision makers to further explore decisions in real-time regarding scheduling policies or parameter changes.

Powers, Sarah S↗

Scheduling with genetic algorithms

In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

Fennel, Theron R.↗

Locality-aware and load-balanced static task scheduling for MapReduce

Task scheduling for MapReduce jobs has been an active area of research with the objective of decreasing the amount of data transferred during the shuffle phase via exploiting data locality. In the literature, generally only the scheduling of reduce tasks is considered with the assumption that scheduling of map tasks is already determined by the input data placement. However, in cloud or HPC deployments of MapReduce, the input data is located in a remote storage and scheduling map tasks gains importance. Here, we propose models for simultaneous scheduling of map and reduce tasks in order to improve data locality and balance the processors’ loads in both map and reduce phases. Our approach is based on graph and hypergraph models which correctly encode the interactions between map and reduce tasks. Partitions produced by these models are decoded to schedule map and reduce tasks. A two-constraint formulation utilized in these models enables balancing processors’ loads in both map and reduce phases. The partitioning objective in the hypergraph models correctly encapsulates the minimization of data transfer when a local combine step is performed prior to shuffle, whereas the partitioning objective in the graph models achieve the same feat when a local combine is not performed. Here, we show the validity of our scheduling on the MapReduce parallelizations of two important kernel operations – sparse matrix–vector multiplication (SpMV) and generalized sparse matrix–matrix multiplication (SpGEMM) – that are widely encountered in big data analytics and scientific computations. Compared to random scheduling, our models lead to tremendous savings in data transfer by reducing data traffic from several hundreds of megabytes to just a few megabytes in the shuffle phase and consequently leading up to 2.6x and 4.2x speedup for SpMV and SpGEMM, respectively.

97 MATHEMATICS AND COMPUTING↗

The MICRO-BOSS scheduling system: Current status and future efforts

In this paper, a micro-opportunistic approach to factory scheduling was described that closely monitors the evolution of bottlenecks during the construction of the schedule and continuously redirects search towards the bottleneck that appears to be most critical. This approach differs from earlier opportunistic approaches, as it does not require scheduling large resource subproblems or large job subproblems before revising the current scheduling strategy. This micro-opportunistic approach was implemented in the context of the MICRO-BOSS factory scheduling system. A study comparing MICRO-BOSS against a macro-opportunistic scheduler suggests that the additional flexibility of the micro-opportunistic approach to scheduling generally yields important reductions in both tardiness and inventory. Current research efforts include: adaptation of MICRO-BOSS to deal with sequence-dependent setups and development of micro-opportunistic reactive scheduling techniques that will enable the system to patch the schedule in the presence of contingencies such as machine breakdowns, raw materials arriving late, job cancellations, etc.

Sadeh, Norman M.↗

Prediction and characterization of application power use in a high-performance computing environment

Power use in data centers and high-performance computing (HPC) facilities has grown in tandem with increases in the size and number of these facilities. Substantial innovation is needed to enable meaningful reduction in energy footprints in leadership-class HPC systems. In this paper, we focus on characterizing and investigating application-level power usage. We demonstrate potential methods for predicting power usage based on a priori and in situ characteristics. Lastly, we highlight a potential use case of this method through a simulated power-aware scheduler using historical jobs from a real scientific HPC system.

97 MATHEMATICS AND COMPUTING↗

Characterizing and Modeling Cloud Applications/Jobs on a Google Data Center

In this paper, we characterize and model Google applications and jobs, based on a 1-month Google trace from a large-scale Google data center. We address four contributions: (1) we compute the valuable statistics about task events and resource utilization for Google applications, based on various types of resources and execution types; (2) we analyze the classification of applications via a K-means clustering algorithm with optimized number of sets, based on task events and resource usage; (3) we study the correlation of Google application properties and running features (e.g., job priority and scheduling class); (4) we finally build a model that can simulate Google jobs/tasks and dynamic events, in accordance with Google trace. Experiments show that the tasks simulated based on our model exhibit fairly analogous features with those in Google trace. 95+ % of tasks' simulation errors are 20 %, confirming a high accuracy of our simulation model.

Di, Sheng↗

Human factors in aircraft maintenance and inspection

The events which have led to the intensive study of aircraft structural problems have contributed in no less measure to study of the human factors which influence aircraft maintenance and inspection. Initial research emphasis on aging aircraft maintenance and inspection has since broadened to include all aircraft types, both new and old. The role of today's aircraft maintenance workforce is indeed a complex one as it is strongly influenced by the need to maintain the broad technology mix embodied in the current fleet. Technicians must be equally adept at diagnosing and repairing "old-tech" 727, DC-9 type aircraft and "new-tech" 767, and MD-ll's. Their skills must include ability to repair sheet metal and composite materials; control cables and flyby-wire systems; round dials and glass cockpits. Their work performance is heavily influenced by others such as designers, technical writers, job card authors, schedulers and trainers. This paper describes activities concerning aircraft maintenance and inspection human factors.

Aging Aircraft↗

The MICRO-BOSS scheduling system: Current status and future efforts

In this paper, a micro-opportunistic approach to factory scheduling was described that closely monitors the evolution of bottlenecks during the construction of the schedule, and continuously redirects search towards the bottleneck that appears to be most critical. This approach differs from earlier opportunistic approaches, as it does not require scheduling large resource subproblems or large job subproblems before revising the current scheduling strategy. This micro-opportunistic approach was implemented in the context of the MICRO-BOSS factory scheduling system. A study comparing MICRO-BOSS against a macro-opportunistic scheduler suggests that the additional flexibility of the micro-opportunistic approach to scheduling generally yields important reductions in both tardiness and inventory.

Sadeh, Norman M.↗

NAS Requirements Checklist for Job Queuing/Scheduling Software

The increasing reliability of parallel systems and clusters of computers has resulted in these systems becoming more attractive for true production workloads. Today, the primary obstacle to production use of clusters of computers is the lack of a functional and robust Job Management System for parallel applications. This document provides a checklist of NAS requirements for job queuing and scheduling in order to make most efficient use of parallel systems and clusters for parallel applications. Future requirements are also identified to assist software vendors with design planning.

Jones, James Patton↗

Tuning Parameters in Heuristics by Using Design of Experiments Methods

With the growing complexity of today's large scale problems, it has become more difficult to find optimal solutions by using exact mathematical methods. The need to find near-optimal solutions in an acceptable time frame requires heuristic approaches. In many cases, however, most heuristics have several parameters that need to be "tuned" before they can reach good results. The problem then turns into "finding best parameter setting" for the heuristics to solve the problems efficiently and timely. One-Factor-At-a-Time (OFAT) approach for parameter tuning neglects the interactions between parameters. Design of Experiments (DOE) tools can be instead employed to tune the parameters more effectively. In this paper, we seek the best parameter setting for a Genetic Algorithm (GA) to solve the single machine total weighted tardiness problem in which n jobs must be scheduled on a single machine without preemption, and the objective is to minimize the total weighted tardiness. Benchmark instances for the problem are available in the literature. To fine tune the GA parameters in the most efficient way, we compare multiple DOE models including 2-level (2k ) full factorial design, orthogonal array design, central composite design, D-optimal design and signal-to-noise (SIN) ratios. In each DOE method, a mathematical model is created using regression analysis, and solved to obtain the best parameter setting. After verification runs using the tuned parameter setting, the preliminary results for optimal solutions of multiple instances were found efficiently.

Arin, Arif↗

Aerial Refueling Process Rescheduling Under Job Related Disruptions

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.

Kaplan, Sezgin↗

An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

Moore, J. E.↗

An Optimization Model for Scheduling Problems with Two-Dimensional Spatial Resource Constraint

Traditional scheduling problems involve determining temporal assignments for a set of jobs in order to optimize some objective. Some scheduling problems also require the use of limited resources, which adds another dimension of complexity. In this paper we introduce a spatial resource-constrained scheduling problem that can arise in assembly, warehousing, cross-docking, inventory management, and other areas of logistics and supply chain management. This scheduling problem involves a twodimensional rectangular area as a limited resource. Each job, in addition to having temporal requirements, has a width and a height and utilizes a certain amount of space inside the area. We propose an optimization model for scheduling the jobs while respecting all temporal and spatial constraints.

Garcia, Christopher↗

Certification of Completion of ASC FY08 Level-2 Milestone ID #2933

This report documents the satisfaction of the completion criteria associated with ASC FY08 Milestone ID No.2933: 'Deploy Moab resource management services on BlueGene/L'. Specifically, this milestone represents LLNL efforts to enhance both SLURM and Moab to extend Moab's capabilities to schedule and manage BlueGene/L, and increases portability of user scripts between ASC systems. The completion criteria for the milestone are the following: (1) Batch jobs can be specified, submitted to Moab, scheduled and run on the BlueGene/L system; (2) Moab will be able to support the markedly increased scale in node count as well as the wiring geometry that is unique to BlueGene/L; and (3) Moab will also prepare and report statistics of job CPU usage just as it does for the current systems it supports. This document presents the completion evidence for both of the stated milestone certification methods: Completion evidence for this milestone will be in the form of (1) documentation--a report that certifies that the completion criteria have been met; and (2) user hand-off. As the selected Tri-Lab workload manager, Moab was chosen to replace LCRM as the enterprise-wide scheduler across Livermore Computing (LC) systems. While LCRM/SLURM successfully scheduled jobs on BG/L, the effort to replace LCRM with Moab on BG/L represented a significant challenge. Moab is a commercial product developed and sold by Cluster Resources, Inc. (CRI). Moab receives the users batch job requests and dispatches these jobs to run on a specific cluster. SLURM is an open-source resource manager whose development is managed by members of the Integrated Computational Resource Management Group (ICRMG) within the Services and Development Division at LLNL. SLURM is responsible for launching and running jobs on an individual cluster. Replacing LCRM with Moab on BG/L required substantial changes to both Moab and SLURM. While the ICRMG could directly manage the SLURM development effort, the work to enhance Moab had to be done by Moab's vendor. Members of the ICRMG held many meetings with CRI developers to develop the design and specify the requirements for what Moab needed to do. Extensions to SLURM are used to run jobs on the BlueGene/L architecture. These extensions support the three dimensional network topology unique to BG/L. While BG/L geometry support was already in SLURM, enhancements were needed to provide backfill capability and answer 'will-run' queries from Moab. For its part, the Moab architecture needed to be modified to interact with SLURM in a more coordinated way. It needed enhancements to support SLURM's shorthand notation for representing thousands of compute nodes and report this information using Moab's existing status commands. The LCRM wrapper scripts that emulated LCRM commands also needed to be enhanced to support BG/L usage. The effort was successful as Moab 5.2.2 and SLURM 1.3 was installed on the 106496 node BG/L machine on May 21, 2008, and turned over to the users to run production.

99 GENERAL AND MISCELLANEOUS↗

Backfilling with guarantees granted upon job submission.

In this paper, we present scheduling algorithms that simultaneously support guaranteed starting times and favor jobs with system desired traits. To achieve the first of these goals, our algorithms keep a profile with potential starting times for every unfinished job and never move these starting times later, just as in Conservative Backfilling. To achieve the second, they exploit previously unrecognized flexibility in the handling of holes opened in this profile when jobs finish early. We find that, with one choice of job selection function, our algorithms can consistently yield a lower average waiting time than Conservative Backfilling while still providing a guaranteed start time to each job as it arrives. In fact, in most cases, the algorithms give a lower average waiting time than the more aggressive EASY backfilling algorithm, which does not provide guaranteed start times. Alternately, with a different choice of job selection function, our algorithms can focus the benefit on the widest submitted jobs, the reason for the existence of parallel systems. In this case, these jobs experience significantly lower waiting time than Conservative Backfilling with minimal impact on other jobs.

99 GENERAL AND MISCELLANEOUS↗

Experience and Practice of Batch Scheduling on Leadership Supercomputers at Argonne

The mission of the DOE Argonne Leadership Computing Facility (ALCF) is to accelerate major scientific discoveries and engineering breakthroughs for humanity by designing and providing world-leading computing facilities in partnership with the computational science community. The ALCF operates supercomputers that are generally amongst the Top 5 fastest machines in the world. Specifically, ALCF is looking for the science that is either too big to run anywhere else, or it would take so long as to be impractical (i.e., “capability jobs”). At ALCF, batch scheduling plays a critical role for achieving a set of site goals within a set of constraints. While system utilization is an important goal at ALCF, its largest mission constraint is to enable extreme scale parallel jobs to take precedence. In this paper, we will describe the specific scheduling goals and constraints, analyze the workload traces collected in 2013–2017 from the 48-rack petascale supercomputer Mira, and discuss the upcoming scheduling challenges at ALCF.

Allcock, William↗