Search NASA⌕ Search

SEARCH · Search NASA

Results for “Libration point”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

James Webb Space Telescope (JWST) Stationkeeping Monte Carlo Simulations

The James Webb Space Telescope (JWST) will launch in 2018 into a Libration Point Orbit (LPO) around the Sun-EarthMoon (SEM) L2 point, with a planned mission lifetime of 11 years. This paper discusses our approach to Stationkeeping (SK) maneuver planning to determine an adequate SK delta-V budget. The SK maneuver planning for JWST is made challenging by two factors: JWST has a large Sunshield, and JWST will be repointed regularly producing significant changes in Solar Radiation Pressure (SRP). To accurately model SRP we employ the Solar Pressure and Drag (SPAD) tool, which uses ray tracing to accurately compute SRP force as a function of attitude. As an additional challenge, the future JWST observation schedule will not be known at the time of SK maneuver planning. Thus there will be significant variation in SRP between SK maneuvers, and the future variation in SRP is unknown. We have enhanced an earlier SK simulation to create a Monte Carlo simulation that incorporates random draws for uncertainties that affect the budget, including random draws of the observation schedule. Each SK maneuver is planned to optimize delta-V magnitude, subject to constraints on spacecraft pointing. We report the results of the Monte Carlo simulations and discuss possible improvements during flight operations to reduce the SK delta-V budget.

Monte Carlo↗

Stationkeeping Monte Carlo Simulation for the James Webb Space Telescope

The James Webb Space Telescope (JWST) is scheduled to launch in 2018 into a Libration Point Orbit (LPO) around the Sun-Earth/Moon (SEM) L2 point, with a planned mission lifetime of 10.5 years after a six-month transfer to the mission orbit. This paper discusses our approach to Stationkeeping (SK) maneuver planning to determine an adequate SK delta-V budget. The SK maneuver planning for JWST is made challenging by two factors: JWST has a large Sunshield, and JWST will be repointed regularly producing significant changes in Solar Radiation Pressure (SRP). To accurately model SRP we employ the Solar Pressure and Drag (SPAD) tool, which uses ray tracing to accurately compute SRP force as a function of attitude. As an additional challenge, the future JWST observation schedule will not be known at the time of SK maneuver planning. Thus there will be significant variation in SRP between SK maneuvers, and the future variation in SRP is unknown. We have enhanced an earlier SK simulation to create a Monte Carlo simulation that incorporates random draws for uncertainties that affect the budget, including random draws of the observation schedule. Each SK maneuver is planned to optimize delta-V magnitude, subject to constraints on spacecraft pointing. We report the results of the Monte Carlo simulations and discuss possible improvements during flight operations to reduce the SK delta-V budget.

Stationkeepting↗

Summer launch options for the Genesis mission

In November 2000, the decision was finalized to delay launch to the Genesis mission from February 2001 until sometime in the following summer. Given the nature of libration point trajectories and the unique characteristics of the Genesis mission, a complete redesign of the trajectory is required. The design procedure along with the application to the Genesis redesign is discussed and the new baseline solution is presented.

Genesis↗

Orbits of the Tethys Lagrangian bodies

Preliminary libration parameters are derived for the objects found in 1980 at the triangular libration points of Tethys. The parameters are obtained from an orbit analysis of ground-based and Voyager I data obtained in 1980 for the separation from Saturn along the ring major axis, the projected separations from the Tethys L4 and L5 points and the separations from Tethys in orbital longitude. The best fitting libration parameters indicate a small (approximately 2 deg) libration amplitude for the L4 body. Data for the object at the L5 point may be fit either by orbits with libration amplitudes greater than 50 deg, or with small libration amplitudes, which are in agreement with recent Voyager II observations.

Reitsema, H. J.↗

L2 Station Keeping Maneuver Strategy for the James Webb Space Telescope

The station-keeping plan for the James Webb Space Telescope is zero velocity in the x-component at the fourth successive crossing of the XZ plane of the rotation libration point frame. A differential corrector is employed to determine the necessary delta-v. Maneuvering along the position component of the stable eigenvector of the monodromy matrix produces a minimum delta-v solution. The techniques developed to determine the minimum maneuver direction in a full ephemeris model, along with strategies to cope with the attitude constraints imposed by the sunshield that prevents the ability to maneuver along the stable eigenvector, are examined in this study.

Libration Point Orbit↗

High Fidelity Modeling of SRP and Its Effect on the Relative Motion of Starshade and WFIRST

In this paper we perform a detailed analysis of how Solar Radiation Pressure (SRP) affects the relative motion of two spacecrafts, the Wide-Field Infrared Survey Telescope (WFIRST) and Starshade, orbiting in the vicinity of the Sun-Earth L2. While WFIRST orbits about its own Libration Point Orbit (LPO), Starshade will fly a specific trajectory to align with WFIRST and observe a Design Reference Mission of pre-determined target stars. In this analysis, we focus on the transfer orbit for Starshade from one observation to the other. We will describe how SRP affects the dynamics of the Starshade relative to WFIRSTand how relevant this effect is in order to get an accurate estimate of the total difference in velocity (delta v).

WFIRST↗

James Webb Space Telescope Initial Mid-Course Correction Monte Carlo Implementation using Task Parallelism

The James Webb Space Telescope will be launched into a highly elliptical orbit that does not possess sufficient energy to achieve a proper Sun-Earth L2 libration point orbit. Three mid-course correction (MCC) maneuvers are planned to rectify the energy deficit: MCC-1a, MCC-1b, and MCC-2. To validate the propellant budget and trajectory design methods, a set of Monte Carlo analyses that incorporate MCC maneuver modeling and execution are employed. The first analysis focuses on the effects of launch vehicle injection errors on the magnitude of MCC-1a. The second on the spread of potential V based on the performance of the propulsion system as applied to all three MCC maneuvers. The final highlights the slight, but notable, contribution of the attitude thrusters during each MCC maneuver. Given the possible variations in these three scenarios, the trajectory design methods are determined to be robust to errors in the modeling of the flight system.

Libration Point Orbit↗

James Webb Space Telescope Initial Mid-Course Correction Monte Carlo Implementation using Task Parallelism

The James Webb Space Telescope will be launched into a highly elliptical orbit that does not possess sufficient energy to achieve a proper Sun-Earth/Moon L2 libration point orbit. Three mid-course correction (MCC) maneuvers are planned to rectify the energy deficit: MCC-1a, MCC-1b, and MCC-2. To validate the propellant budget and trajectory design methods, a set of Monte Carlo analyses that incorporate MCC maneuver modeling and execution are employed. The first analysis focuses on the effects of launch vehicle injection errors on the magnitude of MCC-1a. The second on the spread of potential V based on the performance of the propulsion system as applied to all three MCC maneuvers. The final highlights the slight, but notable, contribution of the attitude thrusters during each MCC maneuver. Given the possible variations in these three scenarios, the trajectory design methods are determined to be robust to errors in the modeling of the flight system.

James Webb Space Telescope↗

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-EarthMoon L2 libration point, 1.5 million km away from Earth. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate orbit determination (OD) solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cmsec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

James Webb Space Telescope↗

James Webb Space Telescope Orbit Determination Analysis

The James Webb Space Telescope (JWST) is designed to study and answer fundamental astrophysical questions from an orbit about the Sun-Earth/Moon L2 libration point, 1.5 million km away from Earth. This paper describes the results of an orbit determination (OD) analysis of the JWST mission emphasizing the challenges specific to this mission in various mission phases. Three mid-course correction (MCC) maneuvers during launch and early orbit phase and transfer orbit phase are required for the spacecraft to reach L2. These three MCC maneuvers are MCC-1a at Launch+12 hours, MCC-1b at L+2.5 days and MCC-2 at L+30 days. Accurate OD solutions are needed to support MCC maneuver planning. A preliminary analysis shows that OD performance with the given assumptions is adequate to support MCC maneuver planning. During the nominal science operations phase, the mission requires better than 2 cm/sec velocity estimation performance to support stationkeeping maneuver planning. The major challenge to accurate JWST OD during the nominal science phase results from the unusually large solar radiation pressure force acting on the huge sunshield. Other challenges are stationkeeping maneuvers at 21-day intervals to keep JWST in orbit around L2, frequent attitude reorientations to align the JWST telescope with its targets and frequent maneuvers to unload momentum accumulated in the reaction wheels. Monte Carlo analysis shows that the proposed OD approach can produce solutions that meet the mission requirements.

Libration Point Orbit↗

Satellite orbit studies

Earth-satellite orbits in resonance with tesseral perturbation, and motion near earth-moon libration point

TESSERAL HARMONICS↗

Guidance and trajectory considerations in lunar mass transportation

Flight-mechanics problems associated with large-scale transport of lunar mass to a space colony or manufacturing facility are discussed. The proposed transport method involves launch of payloads from a mass-driver on the lunar surface, onto ballistic trajectories to a passive mass-catcher located near the L2 libration point, with the caught mass subsequently being transported to the colony. Arrival velocities at L2, sensitivities in arrival dispersion due to launch errors, and effects of launch site location are treated, via numerically integrated orbits in the restricted three-body problem. From any launch site it is possible to define a target point reached with zero dispersion due to errors in a selected component of launch velocity. Effects of lunar geometrical librations and of obliquity, as well as the conditions for biasing a trajectory away from L2 so as to reduce stationkeeping costs, are dealt with along with transfer orbits from L2 to the colony. The theory of capture and the theory of resonance lead to a colony orbit, with period approximately two weeks, reached from L2 with velocity increment as low as 9.02 m/sec.

Heppenheimer, T. A.↗