Search NASASearch

SEARCH · Search NASA

Results for “NASA History Series”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

544 records · Page 9

Pulsed Electroacoustic Analysis Capabilities at NASA Glenn Research Center

The High Voltage Testing Laboratory at NASA Glenn Research Center is equipped with a pulsed electroacoustic (PEA) analyzer to study space charge phenomena in dielectric materials. Dielectric materials such as those used in high voltage insulation systems are of great interest due to their crucial role in withstanding high voltages and avoiding electrical breakdown in electrified aircraft power systems. Current research is underway for the development of novel lightweight electrical insulation and the thorough evaluation of these materials is required. The PEA instrumentation at NASA GRC is a nondestructive method to evaluate the space charge phenomena which can give a unique insight on the feasibility and lifetime of material systems. The instrumentation capability and initial results are reported here.

pulsed electroacoustic

NASA aerospace flight battery systems program

The major objective of the NASA Aerospace Flight Battery Systems Program is to provide NASA with the policy and posture to increase and ensure the safety, performance and reliability of batteries for space power systems. The program plan has been modified in the past year to reflect changes in the agency's approach to battery related problems that are affecting flight programs. Primary attention in the Battery Program is being devoted to the development of an advanced nickel-cadmium cell design and the qualification of vendors to produce cells for flight programs. As part of a unified Battery Program, the development of a nickel-hydrogen standard and primary cell issues are also being pursued to provide high performance NASA Standards and space qualified state-of-the-art primary cells. The resolution of issues is being addressed with the full participation of the aerospace battery community.

Manzo, Michelle A.

NASA Aerospace Flight Battery Systems Program

The major objective of the NASA Aerospace Flight Battery Systems Program is to provide NASA with the policy and posture to increase and ensure the safety, performance and reliability of batteries for space power systems. The program plan has been modified in the past year to reflect changes in the agency's approach to battery related problems that are affecting flight programs. Primary attention in the Battery Program is being devoted to the development of an advanced nickel-cadmium cell design and the qualification of vendors to produce cells for flight programs. As part of a unified Battery Program, the development of a nickel-hydrogen standard and primary cell issues are also being pursued to provide high-performance NASA Standards and space qualified state-of-the-art primary cells. The resolution of issues is being addressed with the full participation of the aerospace battery community.

Manzo, Michelle A.

Development of Li-Metal Battery Cell Chemistries at NASA Glenn Research Center

State-of-the-Art lithium-ion battery technology is limited by specific energy and thus not sufficiently advanced to support the energy storage necessary for aerospace needs, such as all-electric aircraft and many deep space NASA exploration missions. In response to this technological gap, our research team at NASA Glenn Research Center has been active in formulating concepts and developing testing hardware and components for Li-metal battery cell chemistries. Lithium metal anodes combined with advanced cathode materials could provide up to five times the specific energy versus state-of-the-art lithium-ion cells (1000 Whkg versus 200 Whkg). Although Lithium metal anodes offer very high theoretical capacity, they have not been shown to successfully operate reversibly.

battery

Research Reports: 2001 NASA/ASEE Summer Faculty Fellowship Program

For the thirty-seventh consecutive year, a NASA/ASEE (American Society for Engineering Education) Summer Faculty Fellowship Program was conducted at Marshall Space Flight Center (MSFC). The program was conducted by The University of Alabama in Huntsville and MSFC during the period May 29 - August 3, 2001. Operated under the auspices of the American Society for Engineering Education, the MSFC program, as well as those at other NASA Centers, was sponsored by the University Affairs Office, NASA Headquarters, Washington, DC. The basic objectives of the programs, which are in the thirty-seventh year of operation nationally, are (1) to further the professional knowledge of qualified engineering and science faculty members; (2) to stimulate an exchange of ideas between participants and NASA; (3) to enrich and refresh the research and teaching activities of the participants' institutions; and (4) to contribute to the research objectives of the NASA Centers. The Faculty Fellows spent ten weeks at MSFC engaged in a research project compatible with their interests and background and worked in collaboration with a NASA MSFC colleague. This document is a compilation of Fellows' reports on their research during the summer of 2001.

Avionics

P-band Antenna Array for NASA's Space Exploration Synthetic Aperture Radar (SESAR) Instrument

A dual-polarized, wideband, lightweight P-band (435 MHz) antenna element and array for spaceborne radar applications has been developed for NASA’s SESAR (Space Exploration Synthetic Aperture Radar) instrument for planetary synthetic aperture radar (SAR) applications. The antenna array is based on lightweight, low-profile antenna elements that form the building blocks of configurable “array panels” that can in turn be used to build larger arrays consisting of multiple panels. The element design combines a novel, mostly planar conductor antenna element geometry with a robust lightweight composite material construction.

Synthetic Aperture Radar

NASA 50 amp hour nickel cadmium battery waste heat determination

A process for determining the waste heat generated in a 50-ampere-hour, nickel cadmium battery as a function of the discharge rate is described and results are discussed. The technique involved is essentially calibration of the battery as a heat transfer rate calorimeter. The tests are run at three different levels of battery activity, one at 40-watts of waste heat generated, one at 60, and one at 100. Battery inefficiency ranges from 14 to 18 percent at discharge rates of 284 to 588 watts, respectively and top-of-cell temperatures of 20 C.

Mueller, V. C.

NASA's Advanced Control Law Program for the F-8 Digital Fly-By-Wire Aircraft

This paper briefly describes the NASA F-8 Digital Fly-By-Wire (DFBW) program and Langley Research Center's role in investigating and promoting advanced control laws for possible flight experimentation. The primary purpose of the paper is to provide background material for papers describing some of the F-8 DFBW adaptive control law studies. The paper provides a brief description of the Phase II DFBW F-8 aircraft and its control system, discusses some of the advanced control law study objectives and guidelines, and provides some mathematical models which are useful in the control analysis problem.

Optimal Control

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

NASA Weather Balloon Demonstration of an Additively Manufactured Antenna

Additive manufacturing (AM) enables low-cost, lightweight, and geometrically flexible antennas for rapid deployment missions. This work reports a left-hand circularly polarized magneto-electric dipole printed on a Radix dielectric with inkjet silver metallization and demonstrated as a process replacement for NASA weather-balloon RF hardware. By combining substrate fabrication and metallization, AM provides value for unrecoverable or field-replaceable systems. A physics based verification workflow links AM-specific material behavior to electromagnetic performance and yields bounded total, radiation, and mismatch efficiencies. Standard surface-impedance and roughness models failed to reproduce the frequency-dependent radiation loss observed in printed inks, underscoring the need for AM-specific conductor parameterization. Mission testing confirmed TDRSS link closure from NASA’s Columbia Scientific Balloon Facility and validated a repeatable print–measure–fly workflow for bounding RF performance and qualifying AM antennas for field use.

Peter Moschetti

NASA Weather Balloon Demonstration of an Additively Manufactured Antenna

Additive manufacturing (AM) enables low-cost, lightweight, and geometrically flexible antennas for rapid deployment missions. This work reports a left-hand circularly polarized magneto-electric dipole printed on a Radix dielectric with inkjet silver metallization and demonstrated as a process replacement for NASA weather-balloon RF hardware. By combining substrate fabrication and metallization, AM provides value for unrecoverable or field-replaceable systems. A physics based verification workflow links AM-specific material behavior to electromagnetic performance and yields bounded total, radiation, and mismatch efficiencies. Standard surface-impedance and roughness models failed to reproduce the frequency-dependent radiation loss observed in printed inks, underscoring the need for AM-specific conductor parameterization. Mission testing confirmed TDRSS link closure from NASA’s Columbia Scientific Balloon Facility and validated a repeatable print–measure–fly workflow for bounding RF performance and qualifying AM antennas for field use.

Peter Moschetti

NASA. Johnson Space Center primary battery applications

The role of the Power Branch/EP5 of JSC in primary battery applications is to support those JSC organizations having direct application responsibility with trade studies, battery selection recommendations, and with development, qualification, and provisioning of primary batteries. Battery subsystem management is provided. Payload hazard report preparation is supported, as is the review and comment of such reports for the JSC Payload Safety Panel, who approves the flight safety for all Orbiter payloads. JSC battery users are provided with safety analysis and test support to achieve safety approval. Finally, it is the responsibility of the Power Branch to define and maintain battery safety requirement documentation for JSC.

Bragg, Bob J.

NASA Scatterometer Oceanic Wind Measurement System

Satellite scatterometers are active microwave radars designed to yield measurements of near surface horizontal wind velocity over the ocean. Scatterometers are unique in that they are the only existing microwave remote sensing instruments that allow measurements of both wind speed and wind direction. NASA will fly a scatterometer, NSCAT, aboard the Navy Ocean Remote Sensing System (N-ROSS) mission starting in late 1990. N-ROSS is a spaceborne ocean remote sensing system with a planned mission life of three years. In addition to the NSCAT, N-ROSS will have three other microwave instruments mounted on a single satellite flying in a near polar orbit: an altimeter; a special sensor microwave/imager (SSM/I); and a low frequency microwave radiometer. The NSCAT to be flown on N-ROSS is described.

M Freilich

NASA Aerospace Flight Battery Systems Program: An Update

The major objective of the NASA Aerospace Flight Battery Systems Program is to provide NASA with the policy and posture to increase and ensure the safety, performance, and reliability of batteries for space power systems. The program was initiated in 1985 to address battery problems experienced by NASA and other space battery users over the previous ten years. The original program plan was approved in May 1986 and modified in 1990 to reflect changes in the agency's approach to battery related problems that are affecting flight programs. The NASA Battery Workshop is supported by the NASA Aerospace Flight Battery Systems Program. The main objective of the discussions is to aid in defining the direction which the agency should head with respect to aerospace battery issues. Presently, primary attention in the Battery Program is being devoted to issues revolving around the future availability of nickel-cadmium batteries as a result of the proposed OSHA standards with respect to allowable cadmium levels in the workplace. The decision of whether or not to pursue the development of an advanced nickel-cadmium cell design and the qualification of vendors to produce cells for flight programs hinges on the impact of the OSHA ruling. As part of a unified Battery Program, the evaluation of a nickel-hydrogen cell design options and primary cell issues are also being pursued to provide high performance NASA Standards and space qualified state-of-the-art cells. The resolution of issues is being addressed with the full participation of the aerospace battery community.

Manzo, Michelle A.

NASA's Innovative Entry Systems and TPS Technologies Enabling Commercial Space Missions

For over six decades, the NASA Ames Entry Systems and Technology Division has been a cornerstone of U.S. space exploration, delivering critical atmospheric entry solutions since Project Mercury and now increasingly supporting the commercial space sector. The Division provides reliable entry system solutions through a unique blend of expertise, national facilities, and systems integration knowledge, a combination that is difficult to replicate outside a dedicated government entity. Consistently successful, the TS Division remains central to NASA’s exploration objectives and significantly contributes to the transfer of technology to the commercial space sector, supporting more than ten commercial space companies and supplying flight heatshields to three of them in the past five years. Its strengths in Thermal Protection System (TPS) materials, aerothermodynamics, ground test facilities, and Entry, Descent, and Landing (EDL) systems engineering drive rapid development and sustained U.S. competitiveness in space. The Division's expertise in reusable and ablative thermal protection systems, as well as mechanically deployable entry systems primarily developed for NASA missions, now benefits commercial space missions. This presentation will highlight the vision and needs of these commercial space companies, how NASA-invented technologies meet mission requirements, and how these technologies enable and distinguish their efforts.

Ethiraj Venkatapathy

The NASA OSIRIS-REx Sample Catalog: Samples Returned from Investigators

OSIRIS-REx is a sample return mission that collected carbon-rich material from B-type asteroid Bennu. After landing on September 24th, 2023, the science canister was transported to NASA Johnson Space Center (JSC) in Houston, Texas where it was opened and samples were processed by the curation team in pristine sample nitrogen gloveboxes. As the sample analysis phase of the OSIRIS-REx mission concludes, the Sample Analysis Team (SAT) has returned the majority of mission samples to NASA JSC curation and will return the remaining samples on a defined timetable. The curation team processed and documented as many of these samples as possible to include in the spring 2026 catalog update and are steadily working to process hundreds of more samples to include in the fall 2026 catalog update.

OSIRIS-REx