Search NASA⌕ Search

SEARCH · Search NASA

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Security Risk Assessment Process for UAS in the NAS CNPC Architecture

This informational paper discusses the risk assessment process conducted to analyze Control and Non-Payload Communications (CNPC) architectures for integrating civil Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS). The assessment employs the National Institute of Standards and Technology (NIST) Risk Management framework to identify threats, vulnerabilities, and risks to these architectures and recommends corresponding mitigating security controls. This process builds upon earlier work performed by RTCA Special Committee (SC) 203 and the Federal Aviation Administration (FAA) to roadmap the risk assessment methodology and to identify categories of information security risks that pose a significant impact to aeronautical communications systems. A description of the deviations from the typical process is described in regards to this aeronautical communications system. Due to the sensitive nature of the information, data resulting from the risk assessment pertaining to threats, vulnerabilities, and risks is beyond the scope of this paper.

Iannicca, Dennis C.↗

Reliability and risk assessment of structures

Development of reliability and risk assessment of structural components and structures is a major activity at Lewis Research Center. It consists of five program elements: (1) probabilistic loads; (2) probabilistic finite element analysis; (3) probabilistic material behavior; (4) assessment of reliability and risk; and (5) probabilistic structural performance evaluation. Recent progress includes: (1) the evaluation of the various uncertainties in terms of cumulative distribution functions for various structural response variables based on known or assumed uncertainties in primitive structural variables; (2) evaluation of the failure probability; (3) reliability and risk-cost assessment; and (4) an outline of an emerging approach for eventual certification of man-rated structures by computational methods. Collectively, the results demonstrate that the structural durability/reliability of man-rated structural components and structures can be effectively evaluated by using formal probabilistic methods.

Chamis, C. C.↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Assessment of Model Outcomes Between the Integrated Medical Model (IMM) and the Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT)

The Medical Extensible Dynamic Probabilistic Risk Assessment Tool (MEDPRAT) is a computational model that provides human health and medical risk predictions for crewed spaceflight missions. MEDPRAT utilizes discrete event modeling and dynamic probabilistic simulation to predict critical mission outcomes (total medical events, crew health index, quality time lost, loss of crew life, removal to definitive care), condition occurrences, and resource consumption. Input parameters for MEDPRAT include crew attributes (e.g., sex), types of mission activities (e.g., whether and where crew members perform an extravehicular activity (EVA)), available resources, treatment information, and probability distributions for medical conditions. As an evolution of the Integrated Medical Model (IMM), MEDPRAT provides enhanced capabilities and higher fidelity, and incorporates more appropriate assumptions for long-duration spaceflight. IMM is the currently accepted standard for quantifying spaceflight mission medical risk in NASA operations that uses a probabilistic risk assessment (PRA) approach. MEDPRAT builds on the same logical foundation as IMM but implements the model architecture through highly optimized Monte Carlo sampling methods. An analysis is performed comparing the outputs from IMM with those from MEDPRAT V1.0 and V2.0 for the same reference missions in order to quantify similarities and differences in the model outcomes. The juxtaposition between IMM and MEDPRAT V1.0 and 2.0 shown in this report demonstrates that these two models generate very similar results; where differences in outcomes are shown, these are in accordance with the underlying assumptions and differences in the model architectures. This validation effort further establishes the credibility and reliability of the MEDPRAT software.

Matthew T Prelich↗

Artemis Missions Probabilistic Risk Assessment (PRA) & Reliability Assessment Overview

To show how NASA’s Moon-to-Mars (M2M) program can use hardware reliability assessments and comprehensive Probabilistic Risk Assessments (PRAs) to estimate risk of future missions and manage risk via safety and mission success requirements from the top down, so that this risk can be balanced with other program metrics like cost and schedule. These PRAs and reliability assessments can be used during the concept, design, and operational phases of development. This presentation also provides some thoughts on how the NASA process can be utilized for a lunar surface power grid development.

PRA↗

Geologic Risk Assessment Activities at SECARB Cranfield, MS Site

Risk Assessment (RA) of RCSP Phase 3 sites is a DOE requirement and valuable to DOE’s program because this process encourage careful consideration of elements that could damage an individual project, or if severe ,damage credibility and public commercial acceptance of the sequestration process. Poor outcomes even from small projects can have negative consequences larger than the cost to the individual project. In addition, practice in risk assessment compared to project evolution is needed as part of the confidence-building toward future large scale, long term industrial activities.

01 COAL, LIGNITE, AND PEAT↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Advancement and Application

This report documents activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2024 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, Digital Instrumentation and Control (DI&C) Risk Assessment project. The goal of the RISA Pathway is to optimize safety margins and minimize uncertainties to achieve economic efficiencies while maintaining high levels of safety. This is accomplished by providing scientific basis to better represent safety margins and factors that contribute to cost and safety, and by developing new technologies that reduce operating costs. The research efforts for FY 2024 encompass methodology refinement and exploration. The efforts include: (1) The implementation of a natural language processing tool to expedite key aspects of the reliability analysis methods developed by INL; (2) advances to support intersystem CCF analysis by providing guidance for and identification of coupling mechanisms that may contribute to CCF; (3) the investigation of how generative artificial intelligence tools can aid in hazard analysis and diversity and defense in depth (i.e., D3) assessments; (4) Industry collaboration, allowing the demonstration of and INL's risk assessment tools to support risk assessment of DI&C systems at early and late stages of development; (4) a roadmap for the development of a software for each of INL's risk assessment tools; (5) The development of a theory and methodology manual for a risk quantification methodology; (6) the development of a reliability analysis for machine learning (ML)-integrated control systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Waste management health risk assessment: A case study of a solid waste landfill in South Italy

An integrated risk assessment study has been performed in an area within 5 km from a landfill that accepts non hazardous waste. The risk assessment was based on measured emissions and maximum chronic population exposure, for both children and adults, to contaminated air, some foods and soil. The toxic effects assessed were limited to the main known carcinogenic compounds emitted from landfills coming both from landfill gas torch combustion (e.g., dioxins, furans and polycyclic aromatic hydrocarbons, PAHs) and from diffusive emissions (vinyl chloride monomer, VCM). Risk assessment has been performed both for carcinogenic and non-carcinogenic effects. Results indicate that cancer and non-cancer effects risk (hazard index, HI) are largely below the values accepted from the main international agencies (e.g., WHO, US EPA) and national legislation ( and ).

54 ENVIRONMENTAL SCIENCES↗

Project Risk Assessment and Monitoring for CarbonSAFE Illinois - Macon County (Task 2)

A risk evaluation performed for CarbonSAFE Macon County included performing a risk assessment for the overall project and the identification of technical project risks. These tasks were accomplished through a combination of risk assessment meetings, workshops, expert solicitation, and identifying and implementing risk mitigation or prevention activities. Information from previous carbon storage projects and from the execution of the project (including drilling a test well and conducting 2D seismic survey) were assessed to identify future risks towards the development of a storage complex.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic Risk Assessment Research Needs and Activities

Probabilistic risk assessments (PRAs) have benefitted the safe operation of the U.S. reactor fleet over many decades. Risk insights from these PRAs have provided information from many different perspectives, from what is most important to maintain at a facility to a better understanding of how to address new information regarding safety issues. The methods and tools that have supported the creation and enhancement of PRA models were established through multiple decades of research, from the 1970s starting with the WASH-1400 Reactor Safety Study through comprehensive plant-specific models in use today. Because PRA models are being used to support such a diverse array of plant decisions, they are now being applied to analyze an increasing number and diverse set of aspects of the plant, which are well beyond the initial efforts envisioned in the 1970s. These demands on PRA methods and tools have led to challenges in terms of further expansion of the use of PRA and raised the potential for future research into how to address these challenges to ensure continued nuclear safety. In addition to the PRA needs, the domain of computer science has led to advances in computational approaches that may serve to help nuclear power plant PRA applications. These newer technologies have great potential to improve the effectiveness and economics of PRA and are being considered for exploration of potential benefits to the PRA and nuclear-power communities.

97 MATHEMATICS AND COMPUTING↗

Leakage Risk Assessment for a Potential CO 2 Storage Project in Saskatchewan, Canada

A CO 2 sequestration project is being considered to (1) capture CO 2 emissions from the Consumers Cooperative Refineries Limited at Regina, Saskatchewan and (2) geologically sequester the captured CO 2 locally in a deep saline aquifer. This project is a collaboration of several industrial and governmental organizations, including the Petroleum Technology Research Centre (PTRC), Sustainable Development Technology Canada (SDTC), SaskEnvironment Go Green Fund, SaskPower, CCRL, Schlumberger Carbon Services, and Enbridge. The project objective is to sequester 600 tonnes CO 2 /day. Injection is planned to start in 2012 or 2013 for a period of 25 years for a total storage of approximately 5.5 million tonnes CO 2 . This report presents an assessment of the leakage risk of the proposed project using a methodology known as the Certification Framework (CF). The CF is used for evaluating CO 2 leakage risk associated with geologic carbon sequestration (GCS), as well as brine leakage risk owing to displacement and pressurization of brine by the injected CO 2 . We follow the CF methodology by defining the entities (so-called Compartments) that could be impacted by CO 2 leakage, the CO 2 storage region, the potential for leakage along well and fault pathways, and the consequences of such leakage. An understanding of the likelihood and consequences of leakage forms the basis for understanding CO 2 leakage risk, and forms the basis for recommendations of additional data collection and analysis to increase confidence in the risk assessment.

02 PETROLEUM↗

Preliminary Nuclear Containment Vessel Modeling for Multi-Hazard Probabilistic Risk Assessment under Seismic Hazards and Concrete Degradation

The current practice for natural phenomena hazards (NPH) risk assessment of nuclear facilities is to compute the risk for each hazard independently and then compound the total risk as a combination of single hazard risks. This state of practice does not consider correlations between hazards and the cascading impacts to structures, systems, and components (SSCs), and could thus underestimate the NPH risk or overestimate the nuclear facility safety. Events such as the Fukushima Daiichi accident have highlighted the importance of multi-hazard risk considerations to nuclear power plants (NPPs) that quantify the cascading damage effects to SSCs in the risk models. Moreover, the current fleet of NPPs in the United States is aging; these NPPs are now expected to operate well beyond their initially planned design life. Aging-related deterioration can potentially decrease the capacity of critical structures such as containment vessels to withstand NPH. Such aging considerations may not be adequately accounted for by the current NPH risk assessment guidelines. This paper presents a preliminary modeling and simulation of a representative reinforced concrete containment vessel subjected to seismic mainshock and aftershock considering concrete degradation due to alkali silica reaction. The broader aim is to develop multi-hazard time-dependent fragility functions that could be subsequently used in the probabilistic risk assessment (PRA) model. The multi-hazard component comes into play due to the consideration of damage to the containment vessel under seismic loads and concrete degradation. Consideration of concrete degradation also brings into play the time-dependent nature of the containment vessel response. The response of the containment vessel under varying degrees of concrete degradation to seismic loads is investigated. The results presented are simulated using the Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) software for seismic analysis and the Blackbear software for concrete degradation and damage modeling. Both software are open source and developed within the Multiphysics Object-Oriented Simulation Environment (MOOSE).

42 ENGINEERING↗

Evaluating Micrometeoroid and Orbital Debris Risk Assessments Using Anomaly Data

The accuracy of micrometeoroid and orbital debris (MMOD) risk assessments can be difficult to evaluate. A team from the National Aeronautics and Space Administration (NASA) Engineering and Safety Center (NESC) has completed a study that compared MMOD-related failures on operational satellites to predictions of how many of those failures should occur using NASA's TM"s MMOD risk assessment methodology and tools. The study team used the Poisson probability to quantify the degree of inconsistency between the predicted and reported numbers of failures. Many elements go into a risk assessment, and each of those elements represent a possible source of uncertainty or bias that will influence the end result. There are also challenges in obtaining accurate and useful data on MMOD-related failures.

Squire, Michael↗

Airport Risk Assessment Model (ARAM)

The Airport Risk Assessment Model (ARAM) model automatically determines the optimal allocation of limited security resources to minimize total risk to the airport. At the same time, the model adds an element of randomness to the, reducing the predictability of asset schedules and further increasing countermeasure effectiveness.

Brigantic, Robert↗

Ground Risk Assessment Service Provider (GRASP) Development Effort as a Supplemental Data Service Provider (SDSP) for Urban Unmanned Aircraft System (UAS) Operations

NASA’s Unmanned Aircraft System (UAS) Traffic Management (UTM) project aims to enable the integration of new aviation paradigms such as Unmanned Aircraft Systems (UAS) while providing the necessary infrastructure for future concepts such as On-Demand Mobility (ODM) and Urban Air Mobility (UAM) operations in the National Airspace System (NAS). In order to do so, the UTM project has developed an architecture to allow communication among UAS operators, UAS Service Suppliers (USS), Air Navigation Service Providers (ANSP), and the public. As part of this framework, the Supplemental Data Service Providers (SDSP) are envisioned as model and/or data based services that disseminate essential or enhanced information to ensure safe operations within low-altitude airspace. These services include terrain and obstacle data, specialized weather data, surveillance, constraint information, risk monitoring, etc. This paper highlights the development efforts of a non-participant casualty risk assessment SDSP called Ground Risk Assessment Service Provider (GRASP) which assists operators with preflight planning. GRASP is based on the previously introduced UTM Risk Assessment Framework (URAF) and allows UAS operators to simulate and visualize potential non-participant casualty risks associated with their proposed flight. The risk assessment capability also allows operators to revise their flight plans if the casualty risks are determined to be above acceptable thresholds. GRASP is configured to account for future improvements including servicing airborne aircraft as part of NASA’s System-Wide Safety (SWS) project.

Ancel, Ersin↗

Probabilistic Asteroid Impact Risk Assessment for the Hypothetical PDC17 Impact Exercise

Performing impact risk assessment for the 2017 Planetary Defense Conference (PDC17) hypothetical impact exercise, to take place at the PDC17 conference, May 15-20, 2017. Impact scenarios and trajectories are developed and provided by NASA's Near Earth Objects Office at JPL (Paul Chodas). These results represent purely hypothetical impact scenarios, and do not reflect any known asteroid threat. Risk assessment was performed using the Probabilistic Asteroid Impact Risk (PAIR) model developed by the Asteroid Threat Assessment Project (ATAP) at NASA Ames Research Center. This presentation includes sample results that may be presented or used in discussions during the various stages of the impact exercisecenter dot Some cases represent alternate scenario options that may not be used during the actual impact exercise at the PDC17 conference. Updates to these initial assessments and/or additional scenario assessments may be performed throughout the impact exercise as different scenario options unfold.

Asteroid Impact Risk↗

Operational performance risk assessment in support of a supervisory control system - 251

A supervisory control system is being developed for multiunit advanced small modular reactors to minimize human interventions during normal and abnormal operations. In the supervisory control system, control action decisions are made based on a probabilistic risk assessment that employs event trees and fault trees. Although traditional probabilistic risk assessment tools are implemented, their scope is extended to normal operations, and the application is reversed to assess the success of non-safety related systems and to enable continued operation of the plant. This extended probabilistic risk assessment approach is called operational performance risk assessment (OPRA). OPRA helps to identify available paths, combine control actions for maintaining plant conditions within operational limits, and to quantify the likelihood of success of these operational trajectories to optimize the selection of alternative actions without activating reactor protection system. In this paper, a case study of OPRA in a supervisory control system is demonstrated for the Advanced Liquid Metal Reactor (ALMR) Power Reactor Inherently Safe Module (PRISM) design, specifically the power conversion system. The scenario investigated involved a condition in which the feedwater control valve that was observed to be drifting to the closed position. Alternative plant configurations that would allow the plant to continue to operate at full or reduced power were identified using OPRA. Dynamic analyses were performed with a thermal-hydraulic model of the ALMR PRISM system using Modelica to evaluate the magnitude of safety margins. Successful recovery paths for the selected scenario were identified and quantified using the supervisory control system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Developing a Comprehensive Risk Assessment Framework for Geological Storage CO 2

The operational risks for CCS projects include: risks of capturing, compressing, transporting and injecting CO₂; risks of well blowouts; risk that CO 2 will leak into shallow aquifers and contaminate potable water; and risk that sequestered CO 2 will leak into the atmosphere. This report examines these risks by using information on the risks associated with analogue activities such as CO 2 based enhanced oil recovery (CO 2 -EOR), natural gas storage and acid gas disposal. We have developed a new analysis of pipeline risk based on Bayesian statistical analysis. Bayesian theory probabilities may describe states of partial knowledge, even perhaps those related to non-repeatable events. The Bayesian approach enables both utilizing existing data and at the same time having the capability to adsorb new information thus to lower uncertainty in our understanding of complex systems. Incident rates for both natural gas and CO 2 pipelines have been widely used in papers and reports on risk of CO 2 pipelines as proxies for the individual risk created by such pipelines. Published risk studies of CO 2 pipelines suggest that the individual risk associated with CO2 pipelines is between 10 -3 and 10 -4 , which reflects risk levels approaching those of mountain climbing, which many would find unacceptably high. This report concludes, based on a careful analysis of natural gas pipeline failures, suggests that the individual risk of CO 2 pipelines is likely in the range of 10-6 to 10-7, a risk range considered in the acceptable to negligible range in most countries. If, as is commonly thought, pipelines represent the highest risk component of CCS outside of the capture plant, then this conclusion suggests that most (if not all) previous quantitative- risk assessments of components of CCS may be orders of magnitude to high. The potential lethality of unexpected CO 2 releases from pipelines or wells are arguably the highest risk aspects of CO 2 enhanced oil recovery (CO2-EOR), carbon capture, and storage (CCS). Assertions in the CCS literature, that CO 2 levels of 10% for ten minutes, or 20 to 30% for a few minutes are lethal to humans, are not supported by the available evidence. The results of published experiments with animals exposed to CO 2 , from mice to monkeys, at both normal and depleted oxygen levels, suggest that lethal levels of CO 2 toxicity are in the range 50 to 60%. These experiments demonstrate that CO 2 does not kill by asphyxia, but rather is toxic at high concentrations. It is concluded that quantitative risk assessments of CCS have overestimated the risk of fatalities by using values of lethality a factor two to six lower than the values estimated in this paper. In many dispersion models of CO 2 releases from pipelines, no fatalities would be predicted if appropriate levels of lethality for CO 2 had been used in the analysis.

54 ENVIRONMENTAL SCIENCES↗