Search NASA⌕ Search

SEARCH · Search NASA

Results for “concept trade study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Update on Subsonic Single Aft Engine (SUSAN) Electrofan Trade Space Exploration

NASA is conducting an ongoing trade study analysis of the SUSAN Electrofan aircraft concept, which utilizes 20-MW-class electrified aircraft propulsion to enable propulsive, aerodynamic, and control benefits while retaining the range, speed, and size of typical narrow-body regional aircraft. The study is constrained by the ground rules of operating within the current airport and airspace infrastructure. This ongoing study seeks to find a configuration and combination of technologies that yield significant fuel burn and emissions benefits. Another key goal is to reduce cost per passenger mile. Currently, the study is focused on a configuration that utilizes jet A or sustainable aviation fuels, however, we plan to consider other fuel alternatives in the future. This paper describes the progress in defining the architecture of the aircraft, engine, power system, control system, and initial understandings of the sensitivity of the potential configurations to technology assumptions based on key performance parameters. Additionally, progress towards definition and refinement of driving operational, economic, infrastructure, certification, and technical requirements is discussed.

aircraft concept↗

Update on Subsonic Single Aft Engine (SUSAN) Electrofan Trade Space Exploration

NASA is conducting an ongoing trade study analysis of the SUSAN Electrofan aircraft concept, which utilizes 20-MW-class electrified aircraft propulsion to enable propulsive, aerodynamic, and control benefits while retaining the range, speed, and size of typical narrow-body regional aircraft. The study is constrained by the ground rules of operating within the current airport and airspace infrastructure. This ongoing study seeks to find a configuration and combination of technologies that yield significant fuel burn and emissions benefits. Another key goal is to reduce cost per passenger mile. Currently, the study is focused on a configuration that utilizes jet A or sustainable aviation fuels, however, we plan to consider other fuel alternatives in the future. This presentation describes the progress in defining the architecture of the aircraft, engine, power system, control system, and initial understandings of the sensitivity of the potential configurations to technology assumptions based on key performance parameters. Additionally, progress towards definition and refinement of driving operational, economic, infrastructure, certification, and technical requirements is discussed.

Ralph H. Jansen↗

Rapid Response Risk Assessment in New Project Development

A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

Graber, Robert R.↗

IDEAS: A multidisciplinary computer-aided conceptual design system for spacecraft

During the conceptual development of advanced aerospace vehicles, many compromises must be considered to balance economy and performance of the total system. Subsystem tradeoffs may need to be made in order to satisfy system-sensitive attributes. Due to the increasingly complex nature of aerospace systems, these trade studies have become more difficult and time-consuming to complete and involve interactions of ever-larger numbers of subsystems, components, and performance parameters. The current advances of computer-aided synthesis, modeling and analysis techniques have greatly helped in the evaluation of competing design concepts. Langley Research Center's Space Systems Division is currently engaged in trade studies for a variety of systems which include advanced ground-launched space transportation systems, space-based orbital transfer vehicles, large space antenna concepts and space stations. The need for engineering analysis tools to aid in the rapid synthesis and evaluation of spacecraft has led to the development of the Interactive Design and Evaluation of Advanced Spacecraft (IDEAS) computer-aided design system. The ADEAS system has been used to perform trade studies of competing technologies and requirements in order to pinpoint possible beneficial areas for research and development. IDEAS is presented as a multidisciplinary tool for the analysis of advanced space systems. Capabilities range from model generation and structural and thermal analysis to subsystem synthesis and performance analysis.

Ferebee, M. J., Jr.↗

Aerobrake concepts for NTP systems study

Design concepts are described for landing large spacecraft masses on the Mars surface in support of manned missions with interplanetary transportation using Nuclear Thermal Propulsion (NTP). Included are the mission and systems analyses, trade studies and sensitivity analyses, design analyses, technology assessment, and derived requirements to support this concept. The mission phases include the Mars de-orbit, entry, terminal descent, and terminal touchdown. The study focuses primarily on Mars surface delivery from orbit after Mars orbit insertion using an NTP. The requirements associated with delivery of logistical supplies, habitats, and other equipment on minimum energy Earth to Mars transfers are also addressed in a preliminary fashion.

Cruz, Manuel I.↗

Boulder Capture System Design Options for the Asteroid Robotic Redirect Mission Alternate Approach Trade Study

This paper presents a boulder acquisition and asteroid surface interaction electromechanical concept developed for the Asteroid Robotic Redirect Mission (ARRM) option to capture a free standing boulder on the surface of a 100 m or larger Near Earth Asteroid (NEA). It details the down select process and ranking of potential boulder capture methods, the evolution of a simple yet elegant articulating spaceframe, and ongoing risk reduction and concept refinement efforts. The capture system configuration leverages the spaceframe, heritage manipulators, and a new microspine technology to enable the ARRM boulder capture. While at the NEA it enables attenuation of terminal descent velocity, ascent to escape velocity, boulder collection and restraint. After departure from the NEA it enables, robotic inspection, sample caching, and crew Extra Vehicular Activities (EVA).

Belbin, Scott P.↗

Lunar Auger Dryer ISRU (LADI) Mechanical Testing and Supporting Models

In 2009, the Lunar Reconnaissance Orbiter (LRO) and Lunar Crater Observation and Sensing Satellite (LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR). Both the 2020 NASA Technology Taxonomy and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shad-owed Region (PSR) environmental conditions. A water processing plant operating from inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) began development of the primary sub-system for a Mars plant in 2017 and fabricated a unique breadboard test stand for validating the feasibility of this concept. This testing was postponed with the redirection of NASA’s mission from Mars to Moon. A JSC led trade study in FY20 formulated a plan to leverage existing hardware to test concept feasibility, developed a lunar auger dryer sizing tool, and identified that both physical flow and thermal models are required to develop an Engineering Development Unit (EDU) for environmental testing. Beginning in FY21, the Game Changing Development Program (GCDP) funded a three-year technology development project to increase the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) subsystem to TRL 5.

Lunar↗

Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 4: Operations analyses

Using a coplanar, end-mounted antenna as a baseline, various configuration trades were performed to select a preferred solid state concept. The increase in efficiency that could be realized by use of multi bandgap solar cells, either with klystron or solid state antenna was evaluated. Satellite configurations were developed to exploit the sandwich antenna concept wherein solar cells are located on one side of the antenna panel and solid state dc/RF converters on the other side. These concepts entailed various primary and secondary reflector arrangements for directing solar energy to the solar cell side of the antenna with higher concentration ratios than used on the coplanar configurations. Operations analysis included development of a satellite construction scenario, a concept for the SCB, a top-level satellite construction operation, construction operation, construction timelines and crew sizes, mass flows to orbit, and a satellite maintenance scenario. The list of materials required for satellite construction was updated to identify significant differences relevant to the solid state satellite concept. Means of decommissioning satellites at the end of their design life were studied.

Hanley, G. M.↗

Wheel configurations for combined energy storage and attitude control systems

Integrated power and attitude control system (IPACS) studies performed over a decade ago established the feasibility of simultaneously storing electrical energy in wheels and utilizing the resulting momentum for spacecraft attitude control. It was shown that such a system possessed many advantages over other contemporary energy storage and attitude control systems in many applications. More recent technology advances in composite rotors, magnetic bearings, and power control electronics have triggered new optimism regarding the feasibility and merits of such a system. This paper presents the results of a recent study whose focus was to define an advanced IPACS and to evaluate its merits for the Space Station application. Emphasis is given to the selection of the wheel configuration to perform the combined functions. A component design concept is developed to establish the system performance capability. A system-level trade study, including life-cycle costing, is performed to define the merits of the system relative to two other candidate systems. It is concluded that an advanced IPACS concept is not only feasible but offers substantial savings in mass and life-cycle cost.

Oglevie, R. E.↗

Spacelab user implementation assessment study. Volume 1: Concept development and evaluation

The total matrix of alternate Spacelab processing concepts and the rejection rationale utilized to reduce the matrix of 243 alternates to the final candidate processing concepts are developed. The work breakdown structure used for the systematic estimation and compilation of integration and checkout resources is presented along with descriptors of each element. Program models are provided of the space transportation system, the Spacelab, the orbiter, and the ATL that were used as the basis for the study trades, analyses, and optimizations. Resource requirements for all processing concepts are summarized along with the optimizations of the processing concepts. Concept evaluations including flight-rate sensitivities of the GSE, facilities, Spacelab hardware elements, and personnel are delineated. An analysis is presented of the applicability of the candidate concepts to potential spacelab users. The impact of the use of the western test range as an orbiter/spacelab launch site on the candidate processing concepts is evaluated. An assessment of the geographical co-location of experiment, Spacelab, and orbiter-cargo integration is included. Ownership options of the support module/system igloo are discussed.

Source record↗

Management by Trajectory Trade Study of Roles and Responsibilities Between Participants and Automation Report

This report describes a trade study of roles and responsibilities associated with the Management by Trajectory (MBT) concept. The MBT concept describes roles, responsibilities, and information and automation requirements for providing air traffic controllers and managers the ability to quickly generate, evaluate and implement changes to an aircraft's trajectory. In addition, the MBT concept describes mechanisms for imposing constraints on flight operator preferred trajectories only to the extent necessary to maintain safe and efficient traffic flows, and the concept provides a method for the exchange of trajectory information between ground automation systems and the aircraft that allows for trajectory synchronization and trajectory negotiation. The participant roles considered in this trade study include: airline dispatcher, flight crew, radar controller, traffic manager, and Air Traffic Control System Command Center (ATCSCC) traffic management specialists. The proposed allocation of roles and responsibilities was based on analysis of several use cases that were developed for this purpose as well as for walking through concept elements. The resulting allocation of roles and responsibilities reflects both increased automation capability to support many aviation functions, as well as increased flexibility to assign responsibilities to different participants - in many cases afforded by the increased automation capabilities. Note that the selection of participants to consider for allocation of each function is necessarily rooted in the current environment, in that MBT is envisioned as an evolution of the National Airspace System (NAS), and not a revolution. A key feature of the MBT allocations is a vision for the traffic management specialist to take on a greater role. This is facilitated by the vision that separation management functions, in addition to traffic management functions, will be carried out as trajectory management functions. This creates an opportunity for flexibility, allowing the traffic management specialist to carry out tasks that today can only be carried out by the controller currently in contact with the aircraft. This additional tasking for the traffic management specialist comes with requirements for workload management. An increased role for the Data-side (D-side) controller relative to the Radar-side (R-side) controller is a potential approach to mitigating workload for the traffic management specialist, as the D-side controller would have similar ability to perform separation management functions in what today might be considered the "trajectory management" timeframe. This analysis did not distinguish between the D-side and R-side controllers since in many cases the R-side controller works unassisted.

Fernandes, Alicia D.↗

Optimization of a Multifunctional Hot Structure Aeroshell for Mars Entry

Vehicle size and weight are driving cost factors in sending vehicles into space because the cost of launch is directly related to the payload mass being delivered. Vehicle size and weight have a larger impact on deep- space missions compared to sending a payload to low Earth orbit due to the extra fuel and supplies required to complete the longer duration mission. One area of study for possible vehicle volume or weight reduction is the thermal protection system (TPS) of a vehicle. Hot structures have been proposed as a TPS concept which can carry both primary structural loads and thermal loads. The use of hot structures on a Mars entry vehicle may be feasible and have potential volume and weight savings over the current state of the art ablative TPS technology. A preliminary trade study was performed on a mid lift-to-drag aeroshell Mars entry concept vehicle; comparing the weight and skin thickness of a vehicle using ablative TPS with a vehicle using hot structures. Independent thermal and structural analyses were performed to determine the minimum mass designs. The goal of this study was to determine if the use of hot structures was feasible and had potential for significant vehicle volume and weight savings over the current state of the art. This trade study found that use of a hot structures leads to a feasible alternative to ablative TPS technology, with potential 53% weight and 22% thickness (volume) saving benefits that could enable future missions.

Langston, Sarah L.↗

Design point characteristics of a 500 - 2500 watt isotope-Brayton power system

An analytical study was conducted to investigate the potential performance characteristics of an isotope-Brayton space power system at electric power levels from 500 - 2500 watts. Utilization of the Pu(238) heat source, or capsule, was assumed. A single-loop system design concept was selected. The design concept and results of first-order trade-off studies of the effects of major system parameters on system performance are presented. Results of the study indicate the potential for high system efficiency and high specific power over the entire power range.

Barna, G. J.↗

Lunar Auger Dryer ISRU (LADI) Breadboard Testing and Model Validation

In 2009, the Lunar Reconnaissance Orbiter (LRO)and Lunar Crater Observation and Sensing Satellite(LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)[1]. Both the 2020 NASA Technology Taxonomy[2] and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region(PSR) environmental conditions. A screw conveyor dryer system operating from inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) began development of a similar sub-system for Mars operation in 2017 and fabricated a unique breadboard test stand for validating the feasibility of this concept. This testing was postponed with the redirection of NASA’s mission from Mars to Moon. A JSC led trade study[3] in FY20 formulated a plan to leverage existing hardware to test concept feasibility, developed a lunar auger dryer sizing tool, and identified that both a physical flow and thermal model is required to develop an Engineering Development Unit (EDU) for environmental testing. Beginning in FY21, the Game Changing Development Program (GCDP) funded a three-year technology development project to increase the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) subsystem to TRL 5.

Lunar↗

Lunar Auger Dryer ISRU (LADI) Breadboard Testing and Model Validation

In 2009, the Lunar Reconnaissance Orbiter (LRO)and Lunar Crater Observation and Sensing Satellite(LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)[1]. Both the 2020 NASA Technology Taxonomy[2] and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region(PSR) environmental conditions. A screw conveyor dryer system operating from inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) began development of a similar sub-system for Mars operation in 2017 and fabricated a unique breadboard test stand for validating the feasibility of this concept. This testing was postponed with the redirection of NASA’s mission from Mars to Moon. A JSC led trade study[3] in FY20 formulated a plan to leverage existing hardware to test concept feasibility, developed a lunar auger dryer sizing tool, and identified that both a physical flow and thermal model is required to develop an Engineering Development Unit (EDU) for environmental testing. Beginning in FY21, the Game Changing Development Program (GCDP) funded a three-year technology development project to increase the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) subsystem to TRL 5.

Lunar↗

Tall Lunar Towers: Systems Analysis of a Lunar-Surface-Assembled Power, Communication, and Navigation Infrastructure

The National Aeronautics and Space Administration (NASA) intends to develop and maintain a human-lunar presence, requiring infrastructure on the Lunar South Pole. To keep pace with the continued growth in cislunar activity, there is national interest in developing a global lunar infrastructure network for power and Communication, Position, Navigation, and Timing (CPNT). Demonstrating autonomous construction capabilities is an infrastructure-enabling objective. This study explores several architecture trade studies to assess the feasibility of alternative lunar infrastructure concepts. 50 m towers, for instance, enable solar power generation up to 99% of a lunar year in addition to acting as wide-range communication and navigation surface relays. The infrastructure network considered in this study consisted of tower platforms, utilities hosted on the towers, and both crewed and robotic end users. High-level trades were analyzed, such as tower height, location, and distributed vs centralized power grids. Results indicated that even with minimal permanent surface assets (darkness survival power loads on the order of 5 kW or greater), at any of the five locations considered, taller towers resulted in lower infrastructure mass than shorter towers; up to 24% system mass savings were realized by reducing battery mass. Simultaneously, taller towers increased the range of communication coverage; a 50 m tower on the Connecting Ridge had 5 kg more structure and 76% more line-of-sight coverage to a two-meter-tall end user than a 10 m tower with the same location and user height. Leveraging a grid of tall towers for nominal power and communication would not only save up to 2,800 kg in battery mass but would be more maintainable and allow users to take advantage of generational upgrades.

lunar infrastructure↗

Materials experiment carrier concepts definition study. Volume 2: Technical report, part 2

A materials experiment carrier (MEC) that provides effective accommodation of the given baseline materials processing in space (MPS) payloads and demonstration of the MPS platform concept for high priority materials processing science, multidiscipline MPS investigations, host carrier for commercial MPS payloads, and system economy of orbital operations is defined. The study flow of task work is shown. Study tasks featured analysis and trades to identify the MEC system concept options.

Source record↗

Transit Habitat Government-Reference Conceptual Design Reaction Control System Propulsion Concept Design Data Book

The function of Transit Habitat (TH) Reaction Control System (RCS) propulsion is to provide free-flying spacecraft capabilities and to augment Gateway stack control when docked on Gateway. The requirements of multiple propellant replenishments and extensive life operation have significant impacts on selection of the propulsion system concept and components for the RCS. The intent of this document is to provide insight into the government-reference conceptual design of a propulsion system for TH element. A pressure-fed hypergolic bi-propellant system is the assumed propulsion approach for the RCS. Its architectural concept is being traded within the NASA Moon to Mars architecture. A pressure-regulated system is examined. The propellants under consideration are Monomethyl Hydrazine (MMH) and Mixed Oxides of Nitrogen with 3% Nitric Oxide (MON3). A peer review was conducted to assess the flow schematic design and propulsion component selection, compliant with a set of assumed requirements. Redundant components to satisfy one-fault tolerance for function and two-fault tolerance against catastrophic events are incorporated in the propulsion concept design. Instrumentation laid out on the schematic would be used to gather data to monitor the health of the propulsion system and to support quantity gauging of the propulsion system fluids. Venting propellant ullage gas overboard during the refilling operations poses a significant concern to the external surfaces of the TH. A liquid/gas separator would be required to eliminate, or at least reduce, the amount of liquid propellant expelled in the vent gas mixture. The technology readiness level of the phase separator for the TH must be advanced. Metal diaphragm and non-positive-expulsion PMD propellant tank systems were traded against each other, with the PMD architecture being selected. A blowdown concept is also considered for the TH RCS propulsion. Its fluid schematic is derived from the pressure-regulated schematic with removal of assemblies involving the helium pressurization and ullage venting. Its system wet mass is 10% heavier than the pressure-regulated due to thruster performance loss and larger propellant tanks. There is no firm constraint on the propulsion system mass at this phase of the design. The blowdown concept can offer reduction in component count and operation, that would lead to a more reliable propulsion system. The blowdown concept would also benefit avionics, thermal, power, and structures on the TH. Assessing these benefits will be carried as a future work. Drawbacks of thrust and minimum impulse bit (MIB) variations due to the blowdown operation would be acceptable to Guidance, Navigation, and Control (GNC). Although the blowdown concept has been selected as a current baseline, further evaluation of the concept will be the subject of future work to ensure that the blowdown propulsion operation is appropriate for the HT RCS propulsion. This document also highlights key trade studies and design decisions, including pros and cons of the selected concept. Other appropriate options for components are pointed out for future assessments. Additional background information and documents for further review are referenced in this report.

spacecraft propulsion↗